This document is a consolidated questions and answers (Q&A) file for federal contract 140FF027Q0041, an office relocation project for South Dakota Ecological Services. The file addresses 23 inquiries from potential vendors regarding scope, logistics, scheduling, and contractual requirements for relocating the Pierre office building.

The relocation project spans February 15–26, 2027, with work hours Monday through Friday, 8 a.m. to 5 p.m., and after-hours options available if needed. The building is single-level with access through a standard door for office contents and two large garage doors for garage items. Items will be stored approximately 5 miles away in 8-by-20-foot shipping containers with ground-level, drive-up access and 8-by-8-foot doors; the Government will lease and pay for storage. The contractor must handle landfill, recycling, and e-waste disposal fees but is not responsible for hazardous materials (handled separately by Government) or Government property disposal paperwork. A 500-pound empty gun safe (24w x 60h x 18d) requires proper disposal. Building inventory details are provided in an attached document; additional garage items will be labeled for inspection at the November 17–18 walkthrough. Site-visit attendance is not mandatory, photos and floor plans will be posted with Amendment 0001, and subcontractors or project managers may attend on the prime contractor's behalf. The contractor must provide a detailed price breakdown (planning, packing, furniture disassembly, loading, transportation, etc.) rather than a single lump sum, and must be properly licensed and insured for the project scope. Modular furniture reassembly at storage is excluded, and the move ideally should occur on consecutive days. The questions deadline was November 20, 2026, following the walkthrough.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140FF027Q0041 Office Relocation Page 1 of 3 South Dakota Ecological Services

Consolidated questions and answers

# Topic Consolidated question Answer provided

1 Questions deadline

What is the deadline for submitting solicitation questions?

Friday, November 20, 2026, after vendors had an opportunity to participate in the walkthrough.

2 Storage distance

How far is the storage location from 420 S.

Garfield Avenue?

Approximately 5 miles.

3 Storage configuration

What type of storage will be used, and what are the access conditions?

The Government will use 8-by-20-foot shipping containers with ground-level, drive-up access and an 8-by-8-foot door.

4 Storage lease/payment

Will the Government lease and pay for the storage space?

Yes.

5 Inventory and volume

Can the Government provide an inventory or approximate quantities of items to be moved and disposed of?

The attached Pierre Office Building Inventory.docx identifies the building inventory and items for retention or disposal. Garage items will be labeled and available for inspection during the onsite walkthrough.

6 Disposal proportion

What share of the property will be disposed of rather than stored?

No percentage or total volume was provided. The inventory identifies known disposal items, and additional garage disposal items will be labeled for the walkthrough.

7 Disposal fees Who is responsible for landfill, recycling, and e-waste disposal fees?

The contractor is responsible for landfill, recycling, and e-waste fees.

8 Disposal documentation

Is the contractor responsible for Government property disposal paperwork?

No. The contractor is not responsible for disposal paperwork for Government-owned equipment.

9 Hazardous materials

Are hazardous materials included in the contractor’s scope and price?

No. Hazardous materials will be handled separately by the Government, and the moving contractor will not be responsible for them.

10 Gun safe Is there a gun safe, and must it be moved or disposed of?

Yes, an empty gun safe will need to be properly disposed of.

Approximate measurements: 24w x 60h x 18d, and weighs roughly 500 lbs.

140FF027Q0041 Office Relocation Page 2 of 3

11 Work schedule

What work hours and scheduling restrictions apply during February 15–26, 2027?

Work hours are M-F 8 – 5. There are after-hour options if required.

Building access will be provided, and weather contingency days will be established within the performance window.

12 Building access

Are there stairs, elevators, loading docks, truck-staging limitations, or weekend/after-hours options?

The building is one level. There is no loading dock but the garage has two large garage doors. The vendor will have to move everything inside the office (excluding the garage) through a standard door. Work hours are M-F 8 – 5. There are after-hour options if required.

13 Site-visit attendance

Is attendance at the November 17 or 18 site visit mandatory?

No. Walkthrough attendance is not mandatory for a quote to be considered.

14 Subcontractor at site visit

May a named subcontractor or its project manager attend on the prime contractor’s behalf?

Yes.

Photos and floor plan

Will photos, a floor plan, or other information be available to vendors unable to attend?

Yes. This information will be posted with Amendment 0001

16 Past performance

May offerors use commercial relocation projects and work performed by a disclosed subcontractor?

Yes. Commercial experience and comparable work attributable to the disclosed subcontractor may be considered.

17 Electrical work Who must disconnect hardwired electrical fixtures?

None.

18 Modular furniture

Is modular furniture reassembly required at the storage facility?

No. Modular furniture reassembly is excluded. Furniture will be stored in the shipping containers. [Re:

[EXTER...Relocation | Outlook]

19 Pricing format Is a single lump sum price sufficient, or is a breakdown required?

A breakdown (planning, packing, furniture disassembly, loading, transportation, etc.) of charges is preferred.

20 Solicitation clauses

Are current SAM representations sufficient when FAR

These FAR clauses are no longer applicable.

https://outlook.office365.com/owa/?ItemID=AAMkADA5NTc5YzhiLTZiYzAtNGIxNC1iOWNjLTUxNDM3NTRhZWY0OABGAAAAAADSvL7VyJFnRLuiZ9P%2bHOSgBwCJMnISKN%2b4S4OebaAEYwFlAAAAAAEMAACJMnISKN%2b4S4OebaAEYwFlAAn8GjFwAAA%3d&exvsurl=1&viewmodel=ReadMessageItem https://outlook.office365.com/owa/?ItemID=AAMkADA5NTc5YzhiLTZiYzAtNGIxNC1iOWNjLTUxNDM3NTRhZWY0OABGAAAAAADSvL7VyJFnRLuiZ9P%2bHOSgBwCJMnISKN%2b4S4OebaAEYwFlAAAAAAEMAACJMnISKN%2b4S4OebaAEYwFlAAn8GjFwAAA%3d&exvsurl=1&viewmodel=ReadMessageItem

140FF027Q0041 Office Relocation Page 3 of 3

52.212-3 and 52.212-5 are referenced but not included in the package?

21 Insurance

Are there minimum insurance requirements for this work?

The contractor or subcontractor needs to be properly licensed and insured for the size of this office relocation.

22 Subcontractor Is there a limit on how much work can go to a subcontractor?

No.

23 Move Schedule

Will the move happen on consecutive days within Feb 15 to Feb 26, 2027, or can it be split?

Consecutive days are ideal.