This document contains questions and answers related to federal contract solicitation 140FC323Q0041 for demolition work at the Turnbull National Wildlife Refuge Lake House and Garage in Washington State. The questions and answers provide clarification that the contractor is not required to abandon an on-site water well, disclose the location and dimensions of the well casing to be capped, confirm there is no gas service to the property and the electric lines will be removed, and specify that an on-site lake side retaining wall is not included in the scope of work. Fire restriction information for demolition work beginning before the end of September is also attached.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140FC323Q0041
Turnbull NWR
Jolly Jack Farmstead Questions & Answers
07/21/2023
1. Are we supposed to include the cost of having the water well abandoned by a licensed well driller?
Answer: No, a locking rubber gasket sealed metal cap should be installed over the well casing cut off 12-24" above the surface of the ground
2. We need to know where the well is located and the diameter and depth of the well.
Answer: For capping, the well head is located inside the well house and is a 7" diameter casing.
3. A concern with gas used to run a heater in the pumphouse, clarifying.
Answer: Refuge investigated and has confirmed no gas and heater identified is electric. All electricity has been shutoff to the property and power company (Inland Power) will remove the lines before demo. Power poles will be empty and should be included in the removal.
4. Fire Restriction information:
There may be fire restrictions associated with this work if the contractors begin before the end of September. Attached is the criteria we use for operations during fire season per the State of WA DNR. The work we are doing would fall under "other operations". We will be moving into ifpl 3 sometime next week. We will likely be in this category through September. Read the attached brochure.
5. Is this included in the work to be completed - Lake side retaining wall south of the deck?
Answer: This should not be included in the deliverables. Refuge staff will handle that part of the site restoration.