This is a Questions and Answers document for a roofing and siding project at a Fish and Wildlife Service facility in Massachusetts. The Q&A clarifies that the scope includes removing and replacing siding on the entire structure, with PVC materials for fascia and vinyl for soffit if the Alternate Item is awarded. While fascia, gutters, and trim are to remain per the original scope, contractors noted their deteriorated condition. The garage is only included in the Alternate Item for siding and trim, not the main roofing work.
The document addresses operational details including: work hours restricted to 7am-5pm Monday-Friday unless approved by the project manager; contractors must provide their own bathroom facilities; no permits or security clearances are required; the Government will handle electrical work related to vinyl siding installation; and window flashing must follow manufacturer installation instructions. The contractor will use driveway access for egress, and cornerboards replacement is required under the Alternate Item - Siding scope.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140FC225R0004_Amd_0002.pdf | ||
| B09_Quote_Schedule_Revised_amd2_0002.pdf | ||
| B09_SOW_Revised_amd2_0002.pdf | ||
| Sol_140FC225R0004_Amd_0001.pdf | ||
| B08_SOW.pdf | ||
| B03_Wages.pdf | ||
| Sol_140FC225R0004.pdf | ||
| B08_Quote_Schedule.pdf | ||
| Past_Performance_Survey.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A
1. Are you R&R the siding on the entire structure?
2. If so, I do not see what the material is required for the fascia and eaves? i.e, Aluminum, primed/painted wood, etc.
Q1 - Yes to R&R siding on entire structure.
Q2 - Materials for Facia would be PVC and similar or vinyl for soffit if Alternate Item is awarded.
1. Question : The SOW indicates that the fascia, gutters, and trim, and rakes are to remain. Based on our evaluation at the site, the fascia, gutters, and trim are quite deteriorated which will lead to increased damage (specifically water damage) soon. Is the Government interested in adding these as a requirement? We do not recommend removing and resetting the existing gutters based on condition.
Answer : At this time, please reflect the scope of work as written.
2. Question : Should we assume that the cornerboards will need to be replaced?
Answer : Yes, as required in Alternate Item - Siding
3. Question : Please describe how the Government would like the Contractor to flash out the windows.
Answer : Flashing is indicated per window installation and by manufacturer installation instructions
4. Question : Is the Contractor or the Government responsible for all electrical for the vinyl siding option? (i.e., pulling the meters off, light fixtures, doorbells, a licensed electrician will be required for this, which would include pulling a permit).
Answer : The Government will be responsible
5. Question : What points of egress does the Government require the Contractor to use?
Answer : Indicated at site visit and at time work is scheduled. Egress per driveway
6. Question : Are there any work site restrictions to be considered? (i.e., working weekends, start early as 7am, end later than 5pm?)
Answer : Work during weekends are not permitted outside of project manager's agreement. Daily work hours are 7:00am - 5:00pm outside of project manager's agreement.
7. Question : Will the contractor have access to bathroom facilities on site or will contractor need to provide their own?
Answer : No. Contractor must provide
8. Question : Are any specific permits required to be pulled for this job?
Answer : No
9. Question : Will any security clearances need to be made for personnel prior to start of construction?
Answer : No
Is the garage is included in the roofing?
The Garage is only included in the Alternate Item - Siding and Trim portion of the project.