This document is a Statement of Work (SOW) for a concrete pad installation project at the Guadalupe-Nipomo Dunes National Wildlife Refuge in California. The U.S. Fish & Wildlife Service requires a 7' x 14' x 6" reinforced concrete slab with a minimum compressive strength of 4,000 psi, to be used as a UTV and skid-steer washing station for decontamination purposes. The project involves grading and compacting the existing ground, installing the concrete pad with #4 rebar spaced 16 inches on center, and following American Concrete Institute (ACI) requirements for placement, finishing, and curing.
The work will be performed between 8 a.m. and 4 p.m., Monday through Thursday, excluding federal holidays, with a 120-day completion timeline after the Notice to Proceed. Contractors must submit material specifications for approval, provide concrete mix tickets, and perform moisture and density testing. The project site is located on Beigle Road, approximately 4 miles northeast of Guadalupe, CA. Prospective contractors are encouraged to inspect the site and submit questions in writing to the Contracting Officer, Tiffannie Pannell, with quotes to be transmitted via email.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B09_AMEND_Q-A_0001_0001.pdf | ||
| Sol_140FC125Q0015_Amd_0001.pdf | ||
| B03_WAGE_DET-2-28-25.pdf | ||
| A04_SOW.pdf | ||
| Sol_140FC125Q0015.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
Guadalupe-Nipomo Dunes National Wildlife Refuge (GND) – Guadalupe, CA
Refuge Concrete Pad Installation
Task No. Description Amount
1 7 x 14 Concrete Slab
Pre-Compacted moisture content and density of native earth (Bid Option A)
Post Compacted moisture content and density of native earth prior to placement of subgrade material (Bid Option B)
A minimum of 2 concrete cylinders, compression strength testing (Bid Option C)
TOTAL PROPOSAL COST: $__________________
Incomplete Bids will not be considered.
Provide a detailed breakdown of the Fee Estimate to include Tasks, Number of Hours, Personnel Type, Labor Rates, and Travel Costs.
Name of Bidder and Company:
Address (Include Zip Code):
STATEMENT OF WORK
Refuge Concrete Pad Installation Guadalupe-Nipomo Dunes National Wildlife Refuge
U.S. Fish & Wildlife Service
1.0 BACKGROUND
Guadalupe-Nipomo Dunes NWR is working on improving its decontamination protocols to reduce new invasive species invasions on the refuge. In order to accomplish this, one of the tasks was to create a decontamination station that includes a 1000-gallon water tank, a pressure washer, and a concrete pad to clean debris and other materials off refuge vehicles (Mainly UTVs).
2.0 SCOPE OF WORK
The intent of this contract is to install a 7’ wide by 14’ long by 6” thick concrete slab on grade for future use by the Refuge. The concrete slab will be used as a UTV washing station but on occasion it would be used to wash an 8,000-12,000 lb skid-steer.
Material Specifications
Material submittals shall be provided to the Government for approval, prior to installation.
The 7’ by 14’ by 6-inch-thick reinforced concrete slab on grade shall have a compressive strength of at least 4,000 pounds per square inch (psi) at 28 days, and shall be reinforced with #4 rebar, space at a minimum of 16 inches O.C (On Center).
Task 1 – Concrete Pad - Installation Requirements
Prior to the concrete slab installation, the existing ground shall be graded and compacted. Photos and/or inspection of compaction will be required. Contractor is responsible for ensuring acceptable subgrade compaction. Contracting Officer Representative (COR) retains the right to reject the subgrade based on perceived moisture and compaction deficiencies. The awarded contractor shall notify the COR 5 days in advance of when compaction is expected to begin. The contractor is required to submit intended source of water to be used for compaction.
All concrete work shall be performed per American Concrete Institute (ACI) requirements.
The concrete slab surface shall be trowel finished and flushed to the surrounding compacted, surface.
Design shall be weather tight against floor and wall.
Cure the concrete per American Concrete Institute (ACI) 308 requirements. Concrete shall be kept moist during the curing period by the use of one or more the following curing methods:
1. Ponding or immersion, spraying or fogging, and saturated wet coverings may be used.
2. Covering the concrete with impervious paper or plastic sheets, or by applying membrane-forming curing compounds.
Install crack control joints per ACI code requirements.
Contractor shall provide concrete mix ticket provided by concrete supplier.
Concrete shall be placed and set with a vibrating rod.
Admixtures, materials, and other chemicals not mentioned in this document, will require Contracting Officer’s approval prior to any use. Contracting Officer may request submittal of manufacturer's product data with installation instructions for proprietary materials including reinforcement and forming accessories, admixtures, joint materials, hardeners, and curing materials. Admixtures shall be in accordance with ASTM C494, Standard Specification for Chemical Admixtures for Concrete and ASTM C260, Standard Specification of Air‐Entraining Admixtures for Concrete. Dosages shall be in accordance with manufacturer’s recommendation, unless stated otherwise in this document.
Additional Bid Option Item A:
Pre-compacted Moisture content and density of native earth.
Additional Bid Option Item B:
Post-compacted moisture content and density of native earth, prior to placement of subgrade material.
Additional Bid Option Item C:
a Minimum of 2 concrete cylinders, compression strength testing.
Work Site
The work site is at Guadalupe-Nipomo Dunes National Wildlife Refuge on Beigle Rd which is about 4 miles northeast of the city of Guadalupe, Ca. The refuge entrance ((35.022180, -120.608442) will be within ¼ mile of the pad location but the pad location will need to be determined through an onsite visit.
Work shall be performed between the hours of 8 a.m. and 4 p.m. during the workweek, Monday thru Thursday excluding Federal Holidays. Work shall be coordinated and scheduled at least 48 hours in advance with the Refuge Manager.
The Contractor shall be responsible for strict compliance with all provisions of the Occupational Safety and Health Administration (OSHA) requirements 29 CFR 1910 and 29 CFR 1926 during the performance of the work.
Upon completion of the project, all work areas shall be free from rubbish and debris.
Period of Performance
Work shall be completed within 120 days after receipt of Notice to Proceed.
Cultural Resources Inadvertent Discovery:
In the unlikely event an inadvertent discovery of cultural material is discovered during the project all work in the vicinity will cease and Louie Ocaranza will be contacted immediately. Refuge staff will take appropriate action to identify and determine significance of find before work in the area can continue.
Cultural material includes but not limited to; glass, ceramic, bone, brick etc.
On Site Government Representative/Contacts:
Louie Ocaranza, Refuge Manager Cell Phone: (661)-343-3332 Email: Joseluis_Ocaranza@fws.gov
Kirk Gilligan, Deputy Project Leader, Cell Phone: (805) 732-3566 Email: Kirk_Gilligan@fws.gov
Contracting Officer:
Tiffannie Pannell Phone: 703-468-8281 Email: Tiffannie_Pannell@fws.gov
Site Inspection:
Prospective Contractors are highly encouraged to inspect the site prior to submitting a quote.
To arrange a site visit, contact Louie Ocaranza with the contact information above. The office address is Hopper Mountain NWRC, 2493 Portola Rd, Suite A, Ventura, CA 93036
Question Submission:
All questions regarding this Solicitation must be submitted in writing to the Contracting Officer.
Quote Submission:
Quotes must be transmitted via e-mail to the Contracting Officer. The point of contact regarding this solicitation is the Contracting Officer.