This document is an amendment to a solicitation for a federal contract opportunity to provide exterior painting services for a duplex and a single-family residence at the Nathaniel P. Reed Hobe Sound National Wildlife Refuge in Hobe Sound, Florida.

The amendment extends the bid due date to April 12, 2024, provides answers to questions generated from the initial solicitation, and includes a revised Statement of Work. The key requirements are for the contractor to clean, prepare, prime, and paint the exterior surfaces of the two buildings, including trim, siding, concrete walkways, gutters, and doors. The contractor must supply all materials, labor, and equipment. Paint colors will be selected after contract award. The project manager and Contracting Officer's Technical Representative are identified, along with contact information for technical inquiries. The document also includes photographs of the two residences.

View the file

Other files

File Type Posted
SOW_Revised_04-04-2024_0001.pdf PDF
Q_A_Amd_0001_0001.pdf PDF
General_Wage_Decision_No__FL20240073_01_05_2024.pdf PDF
A04_Statement_of_Work_12-21-2023.doc DOC document
Sol_140FC124Q0012.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140FC124Q0012

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

F04

Atlanta GA 30345-3319

1875 CENTURY BOULEVARD, SUITE 310

DIV OF CONT & GRANT SVCS

FC1

Falls Church VA 22041 5275 Leesburg Pike FWS, Construction A/E Tea FWS, Constr A/E 1

03/26/20240001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/26/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to:

(a) extend the hour and date for receipt of offers to Friday, April 12, 2024 before 3:00PM

EST.

(b) provide answers to questions generated from the solicitation (see attached Q&A Doc.)

(c) provide a revised Statement of Work to include clarifications and additional requirements (See Attach Doc.)

All other terms and conditions remain unchange.

LIST OF CHANGES:

Bids due date : 09-APR-24 changed to 12-APR-24

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Khanhthong Moody

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 12

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140FC124Q0012/0001

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Solicitation No.: 140FC124Q0012 Amendment 0001

Questions & Answers Generated

1. We would like to know if there has been a decision regarding the paint specification.

a. Paint color selection will be determined after the award of the contract.

2. Could you please confirm if a pre-bid site walk date has been set for this project?

a. There is no pre-bid date. The individualize scheduled site visit is considered the pre-bid meeting indicated in the Statement of Work (SOW).

3. Do we need to pressure wash all the concrete walkways?

a. YES, concrete walkways would be considered exterior surfaces. They should be cleaned, prepared, and painted per 2.1.2. This is addressed in the revised SOW.

4. For the wood posts - are we sanding and bringing back to original and stained/protected?

a. Answer addressed in Revised SOW. Contractor shall clean, prepare, and paint as an exterior surface per 2.1.2. Wood post should be painted not stained.

5. When were told to clean the surfaces to be painted I assume by that you mean pressure wash correct?

a. Yes, pressure wash. This is addressed in the revised SOW.

6. Stucco substrates really only need to be primed when its raw, unpainted, but all the stucco, as depicted in the pictures, has previously been painted. The only exception to this is if the stucco is chalky and in that case it would need primed. Please confirm whether it needs primed or not.

a. Yes, primed with tinted primer - This is addressed in the revised SOW.

7. Will the gutters, metal garage doors, doors, and columns be painted as well. If the gutters haven’t been painted before and are just factory finished, I wouldn’t recommend painting them because of the amount of abuse they take being metal and highly exposed to the elements. Same goes for the hurricane stow boxes and metal frames.

a. Yes, all considered exterior surfaces. Not sure if gutters are factory finished. All these surfaces would be painted as part of this project - This is addressed in the revised SOW.

8. Are there outlets available around the exterior of the buildings that can be used to connect paint sprayers. Are there water spigots available for pressure washing?

a. Power and water would be provided by the Government. Outlets around the SFR quarters are not to be used, but power can be used from our nearby garage area and extend to this building. Power outlets can be used in association with the Duplex building.

9. I do not see anywhere in the solicitation the desired colors to be used. If there is no preference applying 1 color throughout would save greatly on labor cost. If not 1 uniform color typically its one color for the walls and another second color for the trim which constitutes (Soffits, trim around windows, trim around doors, doors, and columns). If neither of the aforementioned options work, please provide colors to be used or the number of colors that there are.

a. Colors and number of colors would be selected once award is made.

Solicitation No.: 140FC124Q0012 Amendment 0001

10. What is the Color of hurricane shutter metal housing?

a. Paint color will be determined after award is made.

11. Will the Garage doors need to be painted?

a. Yes, cleaned, prepared and painted per the revised SOW.

12. Gutters and downspouts to be painted?

a. Yes, per the revised SOW.

13. What is the square footage for each building?

a. Duplex = 2,000sf

SFR = 2,083sf

Exterior Painting NPR Hobe Sound NWR Quarters Page 1 of 8 April 4, 2024

STATEMENT OF WORK

Exterior Painting of a Duplex and a Single-Family Residence at N.P.R. Hobe Sound National Wildlife Refuge

Hobe Sound, Florida Asset Number Residence Numbers: 10014643 Quarters #1 & #2;

10052601 Quarters #3

April 4, 2024

PART 1. GENERAL

1.1. The contractor shall supply all materials, labor, supplies and equipment to perform all operations required to complete the work in conformance with this statement of work to paint the exterior of Residence Numbers 1,2 (Duplex) and 3 (Single Family Residence, SFR) buildings at the N.P.R. Hobe Sound National Wildlife Refuge (NWR) in Hobe Sound, Florida (see Appendix A for images of residences).

1.2. The refuge is located about 10 miles south of Stuart, Florida, and is accessible from Interstate 95 by going east on Bridge Road until you reach SE Federal Highway. From SE Federal Highway head south for approximately 2 miles and turn east into the Refuge parking lot.

1.3. A Pre-Bid Proposal Meeting will be held at the project site at N.P.R. Hobe Sound NWR.

The time and date of this meeting will be mutually agreed upon by the Refuge representative, prospective contractors, Contracting Officer and USFWS Project Manager.

1.3.1. The purpose of the meeting will be to visit the site, review existing conditions, and discuss the performance requirements of the project. Contact the Station to obtain best access to the Refuge or refer to Paragraph 1.2 for directions.

1.3.2. As-built drawings of the building(s) are not available. The site will be viewed at the Pre-Bid Proposal Meeting.

PART 2. DESCRIPTION OF WORK

Exterior Painting NPR Hobe Sound NWR Quarters Page 2 of 8 April 4, 2024

2.1. Bid Item No. 1: Paint Exterior of Residence Numbers 1 and 2 (Duplex) and Residence 3 (SFR) (Product Data Submittal and color charts, as applicable, are required for all materials used in this section.

2.1.1. Clean and prepare all exterior trim surfaces of the houses. Patch and repair holes and cracks in sofit and/or facia using like materials of existing surfaces, caulk as needed to seal edges, and apply one coat of exterior grade primer, tinted to color selected for the surface it is being applied to and two coats of exterior grade latex paint on the exterior trim surfaces only. There shall be three total paint coats applied – one tinted exterior grade primer coat and two exterior grade latex coats.

2.1.2. Clean and prepare all exterior surfaces. Patch and repair holes and cracks in exterior walls using like materials of existing surfaces, caulk as needed to seal windows, doors and other edges, and apply one coat of exterior grade primer, tinted to color selected for the surface it is being applied to and two coats of exterior grade latex paint on these surfaces. There shall be three total paint coats applied – one tinted exterior grade primer coat and two exterior grade latex coats.

2.1.3. Hurricane shutter stow boxes and frames are considered exterior surfaces per 2.1.2, are metal and shall require cleaning, preparation and painting using paint appropriate for metal surfaces. Prepare surfaces to bare metal where existing paint is bubbling, flaking and/or pealing and tie in prepared to uncompromised paint surface. Hurricane shutters shall not be painted.

2.1.4. All paints used shall be of a brand that is readily available should an exact match be needed later.

2.1.5. Color shall be selected once award is made. Submit the color selection as part of the product data submittal to the Contracting officers technical:

2.1.5.1. All paint data and colors to be used on the siding, soffits, fascia, and metal surfaces.

2.1.5.2. All product data on the caulks and sealants to be used.

2.1.6. All exterior doors including garage doors and all associated trim shall be cleaned, prepared and painted per 2.1.1 and 2.1.2 above.

2.1.7. Exterior concrete patios, concrete walk surfaces under eaves, and connected concrete walk/path surfaces are considered exterior surfaces and shall be cleaned, prepared and painted per 2.1.2. Cracks shall be patched and prepared prior to painting.

2.1.8. Gutters and downspouts are considered exterior surfaces and shall be cleaned, prepared and painted per 2.1.2.

2.1.9. Exposed wooden columns are considered exterior surfaces and shall be cleaned, prepared and painted per 2.1.2.

2.1.10. All exterior and trim surfaces shall be pressure washed as the cleaning method prior to preparation and painting.

Exterior Painting NPR Hobe Sound NWR Quarters Page 3 of 8 April 4, 2024

2.1.11. Furniture and other non-permanent personal items shall be removed from walkways and patios by Service prior to initiation of project.

PART 3. GENERAL NOTES

3.1.1. The building will be occupied during project. Care shall be taken to coordinate all construction activities with Refuge personnel.

3.1.2. Non-target surfaces such as windows and shutters, and landscape vegetation must be protected from overspray and/or drippage.

3.1.3. All project debris shall become the contractor’s property and shall be removed from the site and disposed of in a legal manner.

PART 4. PROJECT CONTACTS

4.1. The project manager and the Contracting Officers Technical Rep (COTR)

William Miller, Refuge Manager U.S. Fish & Wildlife Service Nathaniel P. Reed Hobe Sound National Wildlife Refuge 13640 SE Federal Hwy Hobe Sound, FL 33455 Telephone:(772) 341-4852 Fax:(772) 545-7572 Email: William_g_miller@fws.gov

4.2. Questions regarding the scope of work and technical matters shall be directed to:

U. S. Fish & Wildlife Service Infrastructure Management Division Southeast Region 1875 Century Parkway Atlanta, GA 30345 Contact: John Stricklan P.E.

Telephone:(404) 694-2431 Email: John_Stricklan@fws.gov

Exterior Painting NPR Hobe Sound NWR Quarters Page 4 of 8 April 4, 2024

Appendix A:

Figure 1. Front View of Residence #1 & #2

Figure 2. North (Side) View of Residence #1 & #2

Exterior Painting NPR Hobe Sound NWR Quarters Page 5 of 8 April 4, 2024

Figure 3. Back View of Residence #1 & #2

Figure 4. South (Side)View of Residence #1 & #2

Exterior Painting NPR Hobe Sound NWR Quarters Page 6 of 8 April 4, 2024

Figure 5. Front View of Residence #3, Image A

Figure 6. Front View of Residence #3, Image B.

Exterior Painting NPR Hobe Sound NWR Quarters Page 7 of 8 April 4, 2024

Figure 7. Back View of Residence #3.

Figure 8. South (Side) View of Residence #3

Exterior Painting NPR Hobe Sound NWR Quarters Page 8 of 8 April 4, 2024

Figure 9. North (Side) View of Residence #3.

File details come from the government source that posted it. Updated .