Sol_140F0921R0002_Amd_0001.pdf
PDF 86 KB Posted
- Attached to
- OK-COMANCHE DAM MODIFICATIONS Federal contract opportunity
- Solicitation number
- 140F0921R0002
About this file
This document is an amendment to a solicitation related to the Comanche Dam Modifications project. The Fish and Wildlife Service is seeking offers for roller compacted concrete work at Comanche Dam in Oklahoma. The amendment provides answers to questions from potential offerors regarding control of lake levels using the existing outlet gates and intake tower. Offerors must acknowledge receipt of the amendment by the specified date and time or their offers may be rejected. The period of performance for the work is from March 5, 2021 through September 1, 2021.
The amendment clarifies that the contractor shall use the existing outlet works gate to control water levels in Comanche Lake per the specifications. The gate is located on the right side of the intake tower. Offerors must incorporate this information into their proposals.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment I - 20Aug20_Industry Day Presentation.pdf | ||
| Attachment H - Comanche RCC Mix Study - Rev102120.pdf | ||
| Attachment J - Design Summary Report - Comanche Dam Modifications.pdf | ||
| Attachment D - SF25 Performance Bond.pdf | ||
| Attachment B - Comanche Drawings PDF.pdf | ||
| Attachment K - Addendum to Specifications.pdf | ||
| Attachment G - Past Performance Questionaire.pdf | ||
| Sol_140F0921R0002.pdf | ||
| Attachment E - SF-25A Payment Bond.pdf | ||
| Attachment C - Davis Bacon Wage Determination No. OK20200023 .pdf | ||
| Attachment A - Comanche Specs.pdf | ||
| Attachment F - DI-137 - DOI Release of Claims.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140F0921R0002 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
F09
Falls Church VA 22041-3803
MS: BMO
5275 Leesburg Pike
FWS, DIVISION OF CONTRACTING AND FA
01/19/20210001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/22/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to post contractor questions and the answers to those questions. The Questions and Answers follow:
Question 1: How does the contractor control the level of each lake?
Answer: The Contractor shall control the reservoir in Grama Lake and Comanche Lake with the existing outlet works gate in each dam per the requirements of Paragraph 3.1 of
Specification Section 01 57 00.
Question 2: How does the contractor drop the level of the lake below the intake tower elevation and if there is a bypass, where is that located and where does the water flow?
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Jerry Perry
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140F0921R0002/0001
Answer: The Contractor shall use the existing outlet works gate to control the reservoir water level in Comanche Lake per Paragraph 3.1C of
Specifications Section 01 57 00. The gate is located on the right side of the intake tower.
Legacy Doc #: FWS
Period of Performance: 03/05/2021 to 09/01/2021
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .