This document package includes construction drawings and specifications for a 100kW solar photovoltaic system project at the Camas National Wildlife Refuge in Idaho.

The drawings show plans for installing solar panels, mounting racks, inverters, fencing and underground electrical lines at the Refuge. Notes provide requirements for contractor coordination, permitting, site work including restoration, and utility connections. The project will be constructed by a contractor procured under Solicitation 140F0821R0004 issued by the U.S. Fish and Wildlife Service for water control projects at the Camas National Wildlife Refuge. The solar PV system aims to produce 450,000 kilowatt-hours annually to power Refuge facilities.

View the file

Other files for this federal contract opportunity

Other files attached to ID-CAMAS NWR GAOA WATER CONTROL PROJECT, newest first.
File Type Posted
Sol_140F0821R0004_Amd_0006.pdf PDF
140F0821R0004_Amendment_0005_Q_A_ResponsesV3_0005.pdf PDF
Sol_140F0821R0004_Amd_0005.pdf PDF
Updated_Amendment_0005_Camas_NWR_PV_Array_Upgrade_SOW_0005.pdf PDF
Updated_Amendment_0005_Bid_Schedule_Solar_0005.pdf PDF
Sol_140F0821R0004_Amd_0004.pdf PDF
Sol_140F0821R0004_Amd_0003.pdf PDF
Sol_140F0821R0004_Amd_0002.pdf PDF
Sol_140F0821R0004_Amd_0001.pdf PDF
Camas NWR PV Array Drawings.pdf PDF
Site Visit Instructions.pdf PDF
Past Performance Work Sheet.pdf PDF
Scope Narrative.pdf PDF
Sol_140F0821R0004.pdf PDF
DOL Wage Determinations.pdf PDF
Price Schedule.pdf PDF
Camas NWR PV Array SOW.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15p

H W

Y

H

W

Y

AutoCAD SHX Text

FISH AND WILDLIFE SERVICE

AutoCAD SHX Text

SUBMITTED BY REGIONAL ENGINEER

AutoCAD SHX Text

PROGRAMMATIC REVIEW

AutoCAD SHX Text

REVIEWED FOR ADA COMPLIANCE

AutoCAD SHX Text

REVIEWED FOR ENVIRONMENTAL COMPLIANCE

AutoCAD SHX Text

CERTIFIED 10 CFR 435 COMPLIANCE (ENERGY)

AutoCAD SHX Text

SUBMITTED BY PROJECT MANAGER

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REV.

AutoCAD SHX Text

SHEET __ OF __

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SURVEYED

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

PORTLAND, OREGON

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

BY

AutoCAD SHX Text

REVIEWED FOR SAFETY COMPLIANCE

AutoCAD SHX Text

FISH AND WILDLIFE SERVICE

AutoCAD SHX Text

SUBMITTED BY REGIONAL ENGINEER

AutoCAD SHX Text

PROGRAMMATIC REVIEW

AutoCAD SHX Text

REVIEWED FOR ADA COMPLIANCE

AutoCAD SHX Text

REVIEWED FOR ENVIRONMENTAL COMPLIANCE

AutoCAD SHX Text

CERTIFIED 10 CFR 435 COMPLIANCE (ENERGY)

AutoCAD SHX Text

SUBMITTED BY PROJECT MANAGER

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REV.

AutoCAD SHX Text

SHEET __ OF __

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SURVEYED

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

PORTLAND, OREGON

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

REGIONS 1 OFFICE OF ENGINEERING

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

BY

AutoCAD SHX Text

REVIEWED FOR SAFETY COMPLIANCE

AutoCAD SHX Text

CAMAS NATIONAL WILDLIFE REFUGE

AutoCAD SHX Text

HAMER, IDAHO

AutoCAD SHX Text

DEPARTMENT OF THE INTERIOR U.S. FISH AND WILDLIFE SERVICE

AutoCAD SHX Text I D A H O

AutoCAD SHX Text

VICINITY MAP

AutoCAD SHX Text

SCALE: NTS

AutoCAD SHX Text

SITE LOCATION

AutoCAD SHX Text

SITE ADDRESS:

AutoCAD SHX Text

2150 E 2350 N HAMER, ID 83425

AutoCAD SHX Text

JEFFERSON COUNTY

AutoCAD SHX Text

IDAHO

AutoCAD SHX Text

NATIONAL WILDLIFE REFUGE

AutoCAD SHX Text

SOLAR PV SYSTEM

AutoCAD SHX Text

AutoCAD SHX Text

TRL

AutoCAD SHX Text

CAMAS

AutoCAD SHX Text

AutoCAD SHX Text

1R-ID-211-089-01.0

AutoCAD SHX Text 06/14/2021

AutoCAD SHX Text

SWK

AutoCAD SHX Text

ECN

AutoCAD SHX Text G1.01

AutoCAD SHX Text

LOCATION MAP

AutoCAD SHX Text

SCALE: NTS

AutoCAD SHX Text

DRAWING INDEX

AutoCAD SHX Text

GENERAL SHEETS

AutoCAD SHX Text

SHEET NO.

AutoCAD SHX Text

SUBSHEET NO.

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text

AutoCAD SHX Text G1.01

AutoCAD SHX Text

COVERSHEET

AutoCAD SHX Text

AutoCAD SHX Text G2.01

AutoCAD SHX Text

OVERALL SITE PLAN AND GENERAL NOTES

AutoCAD SHX Text

CIVIL SHEETS

AutoCAD SHX Text

AutoCAD SHX Text C1.01

AutoCAD SHX Text

SITE PLAN

AutoCAD SHX Text

AutoCAD SHX Text C1.02

AutoCAD SHX Text

SITE PLAN AND DETAILS

AutoCAD SHX Text

AutoCAD SHX Text C1.03

AutoCAD SHX Text

DETAILS

AutoCAD SHX Text

ELECTRICAL SHEETS

AutoCAD SHX Text

AutoCAD SHX Text E1.01

AutoCAD SHX Text

ELECTRICAL PV SYSTEM PLAN

AutoCAD SHX Text S

AutoCAD SHX Text V

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text W.

AutoCAD SHX Text K

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text H

AutoCAD SHX Text L

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text 16549

AutoCAD SHX Text

CAMAS NATIONAL WILDLIFE REFUGE

AutoCAD SHX Text

CONTACT INFORMATION:

AutoCAD SHX Text USFW PROJECT MANAGER: ROB MORIARTY ROB MORIARTY PHONE: 503-736-4440 E-MAIL: LYNN_MORIARTY@FWS.GOV CAMAS REFUGE MANAGER: BRIAN WEHAUSEN BRIAN WEHAUSEN PHONE: 208-662-5423 E-MAIL: BRIAN_WEHAUSEN@FWS.GOV PROJECT ENGINEER: STEVE KINGSLEY STEVE KINGSLEY PHONE: 253-396-0150 E-MAIL: STEVE.KINGSLEY@KPFF.COM

H

2407 North 31st Street, Suite 100 Tacoma, Washington 98407

(253) 396-0150 Fax (253) 396-0162

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

REV.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

BY

AutoCAD SHX Text

SHEET __ OF __

AutoCAD SHX Text

ORIGINAL DRAWING

AutoCAD SHX Text

NOT ONE INCH

AutoCAD SHX Text

ON THIS SHEET

AutoCAD SHX Text

ACCORDINGLY, IF

AutoCAD SHX Text

ADJUST SCALES

AutoCAD SHX Text 0" 1"

AutoCAD SHX Text

ONE INCH ON

AutoCAD SHX Text

THIS BAR IS

AutoCAD SHX Text

VERIFY SCALE

AutoCAD SHX Text S

AutoCAD SHX Text V

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text W.

AutoCAD SHX Text K

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text H

AutoCAD SHX Text L

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text 16549

AutoCAD SHX Text

CAMAS NWR

AutoCAD SHX Text

OVERALL SITE PLAN AND GENERAL NOTES

AutoCAD SHX Text 06/14/2021

AutoCAD SHX Text

AutoCAD SHX Text

SWK

AutoCAD SHX Text

EN

AutoCAD SHX Text

EN

AutoCAD SHX Text

1R-ID-211-089-2.0

AutoCAD SHX Text

AutoCAD SHX Text G2.01

AutoCAD SHX Text N

AutoCAD SHX Text

CAMAS NWR FACILITY

AutoCAD SHX Text

PINTAIL POND

AutoCAD SHX Text

CATTAIL FLAT

AutoCAD SHX Text

TOOMEY POND

AutoCAD SHX Text

TOOMEY 2

AutoCAD SHX Text

CENTER POND

AutoCAD SHX Text

RAYS LAKE

AutoCAD SHX Text

MALLARD SLOUGH

AutoCAD SHX Text

SANDHOLE LAKE

AutoCAD SHX Text

RAT FARM POND

AutoCAD SHX Text

FLAT POND

AutoCAD SHX Text

SPRING POND

AutoCAD SHX Text

BIG POND

AutoCAD SHX Text

MOOSE POND

AutoCAD SHX Text

SPRING POND 2

AutoCAD SHX Text

EXIST MAIN DITCH

AutoCAD SHX Text

CAMAS CREEK

AutoCAD SHX Text

AVOCET POND

AutoCAD SHX Text

WET MARSH

AutoCAD SHX Text

GOOSE POND

AutoCAD SHX Text

RUDDY POND

AutoCAD SHX Text

TWO-WAY POND

AutoCAD SHX Text

REDHEAD POND

AutoCAD SHX Text

PROPERTY LIMITS

AutoCAD SHX Text

BRINDLEY POND

AutoCAD SHX Text

OVERALL SITE PLAN AND GENERAL NOTES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: NTS

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY, A PRE-CONSTRUCTION MEETING MUST BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY, A PRE-CONSTRUCTION MEETING MUST BE HELD BETWEEN THE ENGINEER, USFW, AND THE CONTRACTOR. 2. A COPY OF THE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN A COPY OF THE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 3. ON-SITE CONSTRUCTION WORK HOURS SHALL BE WITHIN THE NORMAL BUSINESS ON-SITE CONSTRUCTION WORK HOURS SHALL BE WITHIN THE NORMAL BUSINESS HOURS-OF-OPERATION FOR THE FACILITY; TYPICALLY LIMITED TO THE HOURS OF 7 A.M. AND 5 P.M. MONDAY THROUGH FRIDAY, EXCEPT FEDERAL HOLIDAYS UNLESS OTHERWISE APPROVED WITH A WRITTEN DECISION BY USFW. 4. THE CONTRACTOR SHALL COORDINATE LAYDOWN AREA FOR EQUIPMENT AND MATERIALS WITH THE CONTRACTOR SHALL COORDINATE LAYDOWN AREA FOR EQUIPMENT AND MATERIALS WITH THE REFUGE MANAGER PRIOR TO MOBILIZING TO THE SITE. 5. ALL UTILITY TRENCHES AND ROADWAY SUBGRADE SHALL BE BACKFILLED AND COMPACTED TO 95 ALL UTILITY TRENCHES AND ROADWAY SUBGRADE SHALL BE BACKFILLED AND COMPACTED TO 95 PERCENT DENSITY, STANDARD PROCTOR. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS, SAFETY THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE CONTRACTOR. 7. UPON COMPLETION OF CONSTRUCTION CONTRACTOR SHALL LEAVE THE WORK AREA FREE OF UPON COMPLETION OF CONSTRUCTION CONTRACTOR SHALL LEAVE THE WORK AREA FREE OF DEBRIS AND UNUSED MATERIALS. ALL DAMAGE OR SITE DISTURBANCE CAUSED BY THE CONTRACTOR SHALL BE RESTORED TO AN AS GOOD OR BETTER CONDITION. 8. CONTRACTOR SHALL RESTORE ALL VEGETATED AREAS WITH TOPSOIL, MULCH, AND SEEDING AS CONTRACTOR SHALL RESTORE ALL VEGETATED AREAS WITH TOPSOIL, MULCH, AND SEEDING AS DESCRIBED IN PROJECT SPECIFICATIONS, UNLESS OTHERWISE NOTED. 9. CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY OF ALL CONSTRUCTION. ADEQUATE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY OF ALL CONSTRUCTION. ADEQUATE SHORING BRACING, TIES AND SUPPORTS SHALL BE USED TO PROVIDE PROPER TEMPORARY INTEGRITY DURING ALL PHASES OF CONSTRUCTION.

AutoCAD SHX Text

SURVEY NOTES:

AutoCAD SHX Text

1. BASE MAP HAS BEEN DEVELOPED FROM LIDAR SURVEY PERFORMED ON OCTOBER 19-20, 2011, BASE MAP HAS BEEN DEVELOPED FROM LIDAR SURVEY PERFORMED ON OCTOBER 19-20, 2011, PROCESSED AND DELIVERED IN 2012. 2. UNDERGROUND UTILITIES ARE NOT A PART OF THIS SURVEY, ONLY SURFACE FEATURES ARE UNDERGROUND UTILITIES ARE NOT A PART OF THIS SURVEY, ONLY SURFACE FEATURES ARE APPROXIMATED FROM LIDAR AND AERIAL IMAGES. 3. HORIZONTAL DATUM: NAD83 (CORS 96) HORIZONTAL DATUM: NAD83 (CORS 96) 4. VERTICAL DATUM: NAVD88 (GEOID 03) VERTICAL DATUM: NAVD88 (GEOID 03) 5. PROJECTION: IDAHO STATE PLANE - EASTPROJECTION: IDAHO STATE PLANE - EAST

AutoCAD SHX Text

UTILITY AND PIPELINE NOTES:

AutoCAD SHX Text

1. LOCATIONS OF PIPELINES AND UTILITIES ARE PLOTTED FROM AVAILABLE RECORD DOCUMENTS LOCATIONS OF PIPELINES AND UTILITIES ARE PLOTTED FROM AVAILABLE RECORD DOCUMENTS AND INTERPOLATION OF PHYSICAL EVIDENCE ON THE SITE AND ARE SUBJECT TO FIELD VERIFICATION BY THE CONTRACTOR. 2. ALL LOCATIONS FOR WORK SHALL BE CHECKED AND COORDINATED WITH EXISTING CONDITIONS ALL LOCATIONS FOR WORK SHALL BE CHECKED AND COORDINATED WITH EXISTING CONDITIONS IN THE FIELD BEFORE BEGINNING CONSTRUCTION UNDER THIS OR ANY OTHER SECTION. 3. CONTRACTOR SHALL COORDINATE A UTILITY LOCATE 48 HOURS PRIOR TO BEGINNING ANY UTILITY CONTRACTOR SHALL COORDINATE A UTILITY LOCATE 48 HOURS PRIOR TO BEGINNING ANY UTILITY CONSTRUCTION FOR LOCATION MARK-UP OF ALL EXISTING UTILITIES. INFORM ENGINEER IMMEDIATELY IF LOCATE INDICATES THAT EXISTING UTILITIES ARE DIFFERENT THAN SHOWN ON DRAWINGS. 4. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO UTILITIES, FEATURES, AND STRUCTURES CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO UTILITIES, FEATURES, AND STRUCTURES LOCATED ON THE SITE. LOCATE, PROTECT, AND AVOID DISRUPTION OF ALL ABOVE AND BELOW GRADE UTILITIES DURING CONSTRUCTION. 5. ALL BURIED LINES TO HAVE A MINIMUM 2 FEET COVER, UNLESS OTHERWISE NOTED.ALL BURIED LINES TO HAVE A MINIMUM 2 FEET COVER, UNLESS OTHERWISE NOTED.

AutoCAD SHX Text

CAMAS NWR BOUNDARY

CAMAS NWR BOUNDARY

H W

Y

H

15p

15p

H W

Y

H

2407 North 31st Street, Suite 100 Tacoma, Washington 98407

(253) 396-0150 Fax (253) 396-0162

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

REV.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

BY

AutoCAD SHX Text

SHEET __ OF __

AutoCAD SHX Text

ORIGINAL DRAWING

AutoCAD SHX Text

NOT ONE INCH

AutoCAD SHX Text

ON THIS SHEET

AutoCAD SHX Text

ACCORDINGLY, IF

AutoCAD SHX Text

ADJUST SCALES

AutoCAD SHX Text 0" 1"

AutoCAD SHX Text

ONE INCH ON

AutoCAD SHX Text

THIS BAR IS

AutoCAD SHX Text

VERIFY SCALE

AutoCAD SHX Text

CAMAS NWR

AutoCAD SHX Text

SITE PLAN AND DETAILS

AutoCAD SHX Text 06/14/2021

AutoCAD SHX Text

AutoCAD SHX Text

SWK

AutoCAD SHX Text

CM

AutoCAD SHX Text

CM

AutoCAD SHX Text

1R-ID-211-89-03.0

AutoCAD SHX Text

AutoCAD SHX Text C1.01

AutoCAD SHX Text

KEY MAP

AutoCAD SHX Text

CAMAS WILDLIFE REFUGE

AutoCAD SHX Text

SOLAR ARRAY

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: 1"=200'

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text 1 inch = ft.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

1. LOCATION OF SOLAR ARRAY PV SYSTEM IS APPROXIMATE AND SHALL LOCATION OF SOLAR ARRAY PV SYSTEM IS APPROXIMATE AND SHALL BE COORDINATED WITH REFUGE MANAGER AND ENGINEER FOR FINAL LOCATION. CONTRACTOR SHALL STAKE CORNER LOCATIONS OF SOLAR PANELS AND EQUIPMENT NOT LESS THAN 14 DAYS PRIOR TO COMMENCING WORK IN THIS AREA AND SHALL NOTIFY THE ENGINEER WHEN STAKING HAS BEEN COMPLETED. ENGINEER SHALL VISIT THE SITE TO REVIEW STAKED LOCATIONS AND APPROVE LOCATION OR REQUEST A SHIFT OF THE PROJECT LOCATION IN THE GENERAL AREA. CONTRACTOR SHALL ASSUME THAT IF A SHIFT IN LOCATION IS REQUESTED, ALL PROJECT IMPROVEMENTS WILL SHIFT AN EQUAL MAGNITUDE AND DIRECTION AND THAT THE RELATIVE LAYOUT AND ORIENTATION OF PROJECT ELEMENTS WILL REMAIN UNCHANGED. REQUEST FOR A SHIFT IN THE LOCATION OF SOLAR EQUIPMENT SHALL NOT BE CONSIDERED GROUNDS FOR ADDITIONAL COMPENSATION UNLESS MATERIAL QUANTITY INCREASES BY MORE THAN 5.0% AS A RESULT OF THE SHIFT LOCATION. 2. ALL EQUIPMENT, INCLUDING BUT NOT LIMITED TO THE SOLAR PV ALL EQUIPMENT, INCLUDING BUT NOT LIMITED TO THE SOLAR PV PANEL, 62.5KVA INVERTERS, AND SOLAR PANELS SHALL BE MOUNTED TO A STAINLESS STEEL UNISTRUT OR APPROVED EQUAL RACKING SYSTEM. RACKING SYSTEM FOOTINGS SHALL BE DESIGNED TO SUPPORT EQUIPMENT AND SHALL BE AT LEAST 36 INCHES DEEP DUE TO FROST DEPTH. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COORDINATION, CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COORDINATION, CONNECTION, PERMITTING, AND COMMISSIONING OF THE SOLAR SYSTEM WITH THE LOCAL UTILITY COMPANY (ROCKY MOUNTAIN POWER), SEE SPECIFICATIONS.

AutoCAD SHX Text S

AutoCAD SHX Text V

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text W.

AutoCAD SHX Text K

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text H

AutoCAD SHX Text L

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text 16549

AutoCAD SHX Text

CAMAS REFUGE COMPLEX

AutoCAD SHX Text 100kW SOLAR ARRAY, W/ OPTIONAL PHASE 2 & 3 100kW INCREMENTAL ADDITIONS EL=±4799.00'

AutoCAD SHX Text

EXIST ACCESS ROAD E 2350 N

AutoCAD SHX Text

WELL 4 LOOP

AutoCAD SHX Text

EXIST ACCESS ROAD, TYP

AutoCAD SHX Text

EXIST ACCESS ROAD 2200E

AutoCAD SHX Text

CONNECT TO METER ON POLE

AutoCAD SHX Text

PROPOSED UNDERGROUND POWER

AutoCAD SHX Text

CAMAS CREEK

AutoCAD SHX Text 6/14/21

AutoCAD SHX Text

ADDENDUM 1 PV MODIFICATIONS

AutoCAD SHX Text

H W

Y

H

15p

15p

H W

Y

H

2407 North 31st Street, Suite 100 Tacoma, Washington 98407

(253) 396-0150 Fax (253) 396-0162

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

REV.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

BY

AutoCAD SHX Text

SHEET __ OF __

AutoCAD SHX Text

ORIGINAL DRAWING

AutoCAD SHX Text

NOT ONE INCH

AutoCAD SHX Text

ON THIS SHEET

AutoCAD SHX Text

ACCORDINGLY, IF

AutoCAD SHX Text

ADJUST SCALES

AutoCAD SHX Text 0" 1"

AutoCAD SHX Text

ONE INCH ON

AutoCAD SHX Text

THIS BAR IS

AutoCAD SHX Text

VERIFY SCALE

AutoCAD SHX Text

CAMAS NWR

AutoCAD SHX Text

SITE PLAN AND DETAILS

AutoCAD SHX Text 06/14/2021

AutoCAD SHX Text

AutoCAD SHX Text

SWK

AutoCAD SHX Text

CM

AutoCAD SHX Text

CM

AutoCAD SHX Text

1R-ID-211-89-03.0

AutoCAD SHX Text

AutoCAD SHX Text C1.02

AutoCAD SHX Text

KEY MAP

AutoCAD SHX Text

CAMAS WILDLIFE REFUGE

AutoCAD SHX Text

SOLAR ARRAY

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: 1"=25'

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text 1 inch = ft.

AutoCAD SHX Text 12.5

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text V

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text W.

AutoCAD SHX Text K

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text H

AutoCAD SHX Text L

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text 16549

AutoCAD SHX Text

10' GATE

AutoCAD SHX Text

WIRE FENCE

AutoCAD SHX Text

AutoCAD SHX Text

UNDERGROUND POWER TO ROCKY MOUNTAIN POWER GRID TIE

AutoCAD SHX Text

1. LOCATION OF SOLAR ARRAY PV SYSTEM IS APPROXIMATE AND SHALL LOCATION OF SOLAR ARRAY PV SYSTEM IS APPROXIMATE AND SHALL BE COORDINATED WITH REFUGE MANAGER AND ENGINEER FOR FINAL LOCATION. CONTRACTOR SHALL STAKE CORNER LOCATIONS OF SOLAR PANELS AND EQUIPMENT NOT LESS THAN 14 DAYS PRIOR TO COMMENCING WORK IN THIS AREA AND SHALL NOTIFY THE ENGINEER WHEN STAKING HAS BEEN COMPLETED. ENGINEER SHALL VISIT THE SITE TO REVIEW STAKED LOCATIONS AND APPROVE LOCATION OR REQUEST A SHIFT OF THE PROJECT LOCATION IN THE GENERAL AREA. CONTRACTOR SHALL ASSUME THAT IF A SHIFT IN LOCATION IS REQUESTED, ALL PROJECT IMPROVEMENTS WILL SHIFT AN EQUAL MAGNITUDE AND DIRECTION AND THAT THE RELATIVE LAYOUT AND ORIENTATION OF PROJECT ELEMENTS WILL REMAIN UNCHANGED. REQUEST FOR A SHIFT IN THE LOCATION OF SOLAR EQUIPMENT SHALL NOT BE CONSIDERED GROUNDS FOR ADDITIONAL COMPENSATION UNLESS MATERIAL QUANTITY INCREASES BY MORE THAN 5.0% AS A RESULT OF THE SHIFT LOCATION. 2. PANEL QUANTITIES AND SIZES ARE SHOWN FOR INFORMATION ONLY. PANEL QUANTITIES AND SIZES ARE SHOWN FOR INFORMATION ONLY. ALTERNATIVE CONFIGURATIONS MAY BE ACCEPTABLE, PROVIDED THE SYSTEM PRODUCES 450,000 KILOWATT-HOURS PER YEAR AS CALCULATED UTILIZING THE NREC.GOV CALCULATOR. 3. ALL EQUIPMENT, INCLUDING BUT NOT LIMITED TO THE SOLAR PV ALL EQUIPMENT, INCLUDING BUT NOT LIMITED TO THE SOLAR PV PANEL, 62.5KVA INVERTERS, AND SOLAR PANELS SHALL BE MOUNTED TO A STAINLESS STEEL UNISTRUT OR APPROVED EQUAL RACKING SYSTEM. RACKING SYSTEM FOOTINGS SHALL BE DESIGNED TO SUPPORT EQUIPMENT AND SHALL BE AT LEAST 36 INCHES DEEP DUE TO FROST DEPTH. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COORDINATION, CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COORDINATION, CONNECTION, PERMITTING, AND COMMISSIONING OF THE SOLAR SYSTEM WITH THE LOCAL UTILITY COMPANY (ROCKY MOUNTAIN POWER), SEE SPECIFICATIONS. 5. FENCE TO BE PLACED AT LEAST 6' BUT NOT MORE THAN 8' FROM FENCE TO BE PLACED AT LEAST 6' BUT NOT MORE THAN 8' FROM PANELS AND EQUIPMENT AROUND PERIMETER OF INSTALLATION. 6. ALL VEGETATED AREAS DISTURBED DURING CONSTRUCTION SHALL BE ALL VEGETATED AREAS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED AND SEEDED WITH NATIVE GRASSES IN ACCORDANCE WITH PROJECT SPECIFICATIONS.

AutoCAD SHX Text PHASE 1 ENCLOSED 100kW SOLAR ARRAY

AutoCAD SHX Text

FENCE & WORK AREA LIMIT, SEE NOTE 5

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6/14/21

AutoCAD SHX Text

ADDENDUM 1 PV MODIFICATIONS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

2407 North 31st Street, Suite 100 Tacoma, Washington 98407

(253) 396-0150 Fax (253) 396-0162

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

REV.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

BY

AutoCAD SHX Text

SHEET __ OF __

AutoCAD SHX Text

ORIGINAL DRAWING

AutoCAD SHX Text

NOT ONE INCH

AutoCAD SHX Text

ON THIS SHEET

AutoCAD SHX Text

ACCORDINGLY, IF

AutoCAD SHX Text

ADJUST SCALES

AutoCAD SHX Text 0" 1"

AutoCAD SHX Text

ONE INCH ON

AutoCAD SHX Text

THIS BAR IS

AutoCAD SHX Text

VERIFY SCALE

AutoCAD SHX Text S

AutoCAD SHX Text V

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text W.

AutoCAD SHX Text K

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text H

AutoCAD SHX Text L

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text 16549

AutoCAD SHX Text

CAMAS NWR

AutoCAD SHX Text

AutoCAD SHX Text

CM

AutoCAD SHX Text

CM

AutoCAD SHX Text

1R-ID-211-089--2.0

AutoCAD SHX Text

AutoCAD SHX Text

DETAILS

AutoCAD SHX Text 06/14/2021

AutoCAD SHX Text

SWK

AutoCAD SHX Text C1.03

AutoCAD SHX Text

METAL POST

AutoCAD SHX Text 13"

AutoCAD SHX Text 12"

AutoCAD SHX Text 12"

AutoCAD SHX Text 14"

AutoCAD SHX Text

9 GAUGE WIRE STAYS BETWEEN POSTS

AutoCAD SHX Text

HINGE SIDE

AutoCAD SHX Text

LATCH SIDE

AutoCAD SHX Text

METAL TERMINAL BRACE SHOWN

AutoCAD SHX Text

VERTICAL STAYS (SEE TABLE)

AutoCAD SHX Text

16 GAUGE, 1.66" O.D. STEEL TUBING FRAME & HORIZONTAL BARS

AutoCAD SHX Text

GATE GROUNDING (SEE NOTE 2)

AutoCAD SHX Text

2" TO 4"

AutoCAD SHX Text 52"

AutoCAD SHX Text

MIN. FOUR HORIZ. BRACES

AutoCAD SHX Text

OVERSIZED HINGE POST SEE NOTES 3 & 4

AutoCAD SHX Text

GATE

AutoCAD SHX Text

GATE

AutoCAD SHX Text

EXAMPLE OF ROD GROUNDING

AutoCAD SHX Text

EXAMPLE OF FENCE GROUNDING

AutoCAD SHX Text

FLEXIBLE CONNECTING CABLE

AutoCAD SHX Text

FLEXIBLE CONNECTING CABLE

AutoCAD SHX Text

HINGE SIDE

AutoCAD SHX Text

HINGE SIDE

AutoCAD SHX Text

MINIMUM 8' X " 58" GROUNDING ROD

AutoCAD SHX Text

GATE HORIZONTAL BRACE TABLE

AutoCAD SHX Text

GATE TYPE

AutoCAD SHX Text

GATE HEIGHT

AutoCAD SHX Text

NO. OF HORIZ. BRACES

AutoCAD SHX Text

TYPE 1A

AutoCAD SHX Text 4.33'

AutoCAD SHX Text

AutoCAD SHX Text

GATE VERTICAL STAY TABLE

AutoCAD SHX Text

GATE TYPE

AutoCAD SHX Text

GATE WIDTH

AutoCAD SHX Text

NO. OF VERT. STAYS

AutoCAD SHX Text

TYPE 1A

AutoCAD SHX Text

4' TO 6'

AutoCAD SHX Text

AutoCAD SHX Text

8' TO 12'

AutoCAD SHX Text

AutoCAD SHX Text

14' TO 16'

AutoCAD SHX Text

AutoCAD SHX Text

GATE GROUNDING TABLE

AutoCAD SHX Text

FENCE DIST. FROM TRANSMISSION LINE

AutoCAD SHX Text kV

AutoCAD SHX Text

GROUNDING TYPE

AutoCAD SHX Text 0' - 100'

AutoCAD SHX Text

AutoCAD SHX Text

ROD

AutoCAD SHX Text 100' - 200'

AutoCAD SHX Text

AutoCAD SHX Text

FENCE

AutoCAD SHX Text 0' - 100'

AutoCAD SHX Text

AutoCAD SHX Text

ROD

AutoCAD SHX Text 100' - 150'

AutoCAD SHX Text

AutoCAD SHX Text

FENCE

AutoCAD SHX Text 50' - 100'

AutoCAD SHX Text

AutoCAD SHX Text

FENCE

AutoCAD SHX Text

SEE NOTE 1

AutoCAD SHX Text

MINIMUM 8' X " 58" GROUNDING ROD

AutoCAD SHX Text

WIRE AND WIRE MESH FENCE GROUNDING TABLE

AutoCAD SHX Text

FENCE DIST. FROM TRANSMISSION LINE

AutoCAD SHX Text kV

AutoCAD SHX Text

GROUNDING INTERVAL

AutoCAD SHX Text 0' - 100'

AutoCAD SHX Text

AutoCAD SHX Text 200'

AutoCAD SHX Text 100' - 200'

AutoCAD SHX Text

AutoCAD SHX Text 500'

AutoCAD SHX Text 0' - 100'

AutoCAD SHX Text

AutoCAD SHX Text 400'

AutoCAD SHX Text 100' - 150'

AutoCAD SHX Text

AutoCAD SHX Text 1,000'

AutoCAD SHX Text 50' - 100'

AutoCAD SHX Text

AutoCAD SHX Text 500'

AutoCAD SHX Text

FENCE DETAIL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

AutoCAD SHX Text

WIRE FENCE

AutoCAD SHX Text

GROUNDING DETAIL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

AutoCAD SHX Text

GATE DETAIL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

AutoCAD SHX Text

GATE GROUNDING DETAILS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

AutoCAD SHX Text

NOTES

1. GROUND WIRE AND WIRE MESH FENCES THAT ARE NEAR POWER GROUND WIRE AND WIRE MESH FENCES THAT ARE NEAR POWER TRANSMISSION LINES OR THAT PASS UNDER TRANSMISSION LINES. SEE THE WIRE FENCE GROUNDING TABLE AND THE WIRE FENCE DETAIL. TO GROUND, CONNECT EACH FENCE WIRE TO 6 GAUGE BRAIDED GROUND CABLE WITH SPLIT BOLT CABLE CONNECTORS. 2. GROUND GATES THAT ARE NEAR POWER TRANSMISSION LINES OR GROUND GATES THAT ARE NEAR POWER TRANSMISSION LINES OR THAT PASS UNDER TRANSMISSION LINES. GROUND BY CONNECTING THE HINGE SIDE OF THE GATE TO THE FENCE OR TO THE FENCE AND A GROUNDING ROD. SEE THE GATE GROUNDING TABLE AND GATE GROUNDING DETAILS. ENSURE THAT THE GATE IS GROUNDED WITH A FLEXIBLE COPPER CABLE. 3. CONSTRUCT MATCHING METAL BRACES ON BOTH SIDES OF THE GATE CONSTRUCT MATCHING METAL BRACES ON BOTH SIDES OF THE GATE OPENING. MODIFY THE TERMINAL BRACE ON THE HINGE SIDE. 4. GATE: GATE: A. USE A MODIFIED METAL POST ON THE HINGE SIDE. USE A 4" USE A MODIFIED METAL POST ON THE HINGE SIDE. USE A 4" DIAMETER, 7'6" METAL TUBE. SET THE POST IN AN 18" SQUARE OR ROUND FOUNDATION. B. ENSURE THAT THE HINGES ON GATES WIDER THAN 10' HAVE ENSURE THAT THE HINGES ON GATES WIDER THAN 10' HAVE LEVELING THREADS ON A " DIAMETER OR LARGER ROD. 34" DIAMETER OR LARGER ROD. C. ENSURE THAT THE LATCHES ARE LOCKABLE. ENSURE THAT THE LATCHES ARE LOCKABLE. D. CLEAR THE GROUND NEAR THE GATE SO THAT THE GATE CAN CLEAR THE GROUND NEAR THE GATE SO THAT THE GATE CAN SWING 90° IN EACH DIRECTION

File details come from the government source that posted it. Updated .