This bid schedule outlines the costs for a solar energy system project at the Camas National Wildlife Refuge in Idaho. The project involves designing and constructing a 100kW ground-mounted solar photovoltaic system in three incremental phases, with itemized costs provided for system design, construction of Phase 1, and optional additions for Phases 2 and 3. Bids are due by an unspecified date, and the total proposed cost should be written at the bottom.
The related federal contract opportunity is solicitation number 140F0821R0004 for the Camas NWR GAOA Water Control Project from the Department of the Interior Fish and Wildlife Service. The opportunity type is a solicitation and additional details are not provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140F0821R0004_Amd_0006.pdf | ||
| Updated_Amendment_0005_Camas_NWR_PV_Array_Upgrade_SOW_0005.pdf | ||
| Updated_Amendment_0005_SOLAR_PV_SYSTEM_COMBINED_DRAWINGS_20210614_0005.pdf | ||
| 140F0821R0004_Amendment_0005_Q_A_ResponsesV3_0005.pdf | ||
| Sol_140F0821R0004_Amd_0005.pdf | ||
| Sol_140F0821R0004_Amd_0004.pdf | ||
| Sol_140F0821R0004_Amd_0003.pdf | ||
| Sol_140F0821R0004_Amd_0002.pdf | ||
| Sol_140F0821R0004_Amd_0001.pdf | ||
| Scope Narrative.pdf | ||
| Sol_140F0821R0004.pdf | ||
| DOL Wage Determinations.pdf | ||
| Price Schedule.pdf | ||
| Camas NWR PV Array Drawings.pdf | ||
| Site Visit Instructions.pdf | ||
| Past Performance Work Sheet.pdf | ||
| Camas NWR PV Array SOW.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
for
Camas NWR Water Delivery System Upgrades Solar System at the
Camas NWR, ID
Item
Description Estimated Quantity
Unit Unit Price Total Cost
Base Bid: System Design, Utility Coordination, Generation Application, Review and Approval
1 LS
Base Bid: Construct Phase 1 - 100kW Ground Mounted Solar System and Electric Grid Interconnection
1 LS
Bid Option 1: Construct Phase 2 – 100kW Ground Mounted Solar System Incremental Addition
1 LS
Bid Option 2: Construct Phase 3 – 100kW Ground Mounted Solar System Incremental Addition
1 LS
TOTAL PROPOSAL COST: $__________