Attachment II-Bid Schedule_0001.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- CARPET REPLACEMENT 3 WV-NCTC CAMPUS Federal contract opportunity
- Solicitation number
- 140F0421R0019
About this file
This document contains an attachment with a bid schedule for a federal contract opportunity for carpet replacement at three NCTC campuses. The bid schedule provides unit pricing for various carpet installation and demolition line items including general requirements, selective demolition, flooring demolition, wood floor refinishing, carpet tile installation, and office partition removal and reinstallation. It also includes pricing for general contractor markups, general conditions, overhead and profit. The related federal contract opportunity is solicitation number 140F0421R0019 from the Department of the Interior Fish and Wildlife Service for carpet replacement services at three West Virginia NCTC campuses. Pricing is required for various carpet installation and demolition line items to complete the work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment V-REQEUST FOR INFORMATION_0002.pdf | ||
| Sol_140F0421R0019_Amd_0002.pdf | ||
| Attachment I-B08-Solicitation 140F0421R0019_0001.pdf | ||
| Attachment IV-B03-DOL Wage Determination_0001.pdf | ||
| Sol_140F0421R0019_Amd_0001.pdf | ||
| Attachment III-A06-Drawings Specifications_0001.pdf | ||
| Sol_140F0421R0019.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1 Carpet
| (Sub-Contracted) | |||
| 01 General Requirements | |||
| 013113200180 | Field personnel, project manager, minimum | Week | |
| 013113200240 | Field personnel, superintendent, minimum | Week | |
| 01 General Requirements Subtotal | |||
| 02 Existing Conditions | |||
| 024119190840 | Selective demolition, rubbish handling, dumpster, 40 C.Y., 10 ton capacity, weekly rental, includes one dump per week, cost to be | Week | |
| added to demolition cost | |||
| 024119192085 | Selective demolition, rubbish handling, haul and return, add per each extra 100' haul, wheeled, cost to be added to demolition cost | C.Y. | |
| 02 Existing Conditions Subtotal | |||
| 09 Finishes | |||
| 090505200400 | Flooring demolition, carpet, bonded, includes surface scraping | S.F. | |
| 090505200400 | Labor availability, shortage, add, modifications to total project cost summaries | Project | |
| 096429107600 | Wood strip flooring, refinish, sand, 2 coats poly, wax, hardwood | S.F. | |
| 096805110107 | Carpet transition strip, clamp down brass divider 12'/each (@vinyl to carpet) | Ea. | |
| 096813101180 | Carpet tile, tufted nylon, 35 oz., 18" x 18" or 24" x 24" | S.Y. | |
| 096813101180 | Labor availability, shortage, add, modifications to total project cost summaries | Project | |
| 09 Finishes Subtotal | |||
| 15 |
15 Office Partition remove and reinstall, using furniture installation numbers minus materials costs x2
| Subtotal | |
| General Contractor's Markup on Subs | |
| Subtotal | |
| General Conditions | |
| Subtotal | |
| General Contractor's Overhead and Profit | |
| Subtotal | |
| Grand Total |