B12_HMNAR__Bid_Schedule-Proposal_Schedule__02-25-2022_0001.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- OR-HMNAR -REFUGE GRADE ROAD RESTORATION
- Solicitation number
- 140F0322R0012
About this file
This document contains a bid schedule and proposal schedule for a federal construction contract opportunity with the U.S. Fish and Wildlife Service. The contract is for grade road restoration work at the Hart Mountain National Antelope Refuge in Oregon. The bid schedule lays out 11 line items with descriptions and spaces for bidders to provide unit prices and total amounts. The line items cover tasks such as mobilization, rock scaling, ditch clearing, erosion mitigation which includes generating 30 cubic yards of on-site riprap, road resurfacing which includes generating 600 cubic yards of on-site surfacing material, regrading curves, and signage installation. The schedule also contains two option items for additional material generation and stockpiling if needed. Accompanying instructions provide details for bidders to include labor categories, rates, hours, material and equipment quantities and rates, and tools required. Bidders are also invited to submit assumptions about material quantities. The related federal contract opportunity posting provides the solicitation number, name of the opportunity, and identifies it is from the U.S. Fish and Wildlife Service.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
BID SCHEDULE /
PROPOSAL SCHEDULE
Schedule of prices for construction of Hart Mountain NAR Grade Road Restoration in accordance with the Contract Documents.
| Item No. | Description | Quantity | Unit* | Unit Price | Amount | ||||
| 1. | Mobilization Allowance | 1 | LS | $ | $ | ||||
| 2. | Rock Scaling | 1 | LS | $ | $ | ||||
| 3. | Ditch Clearing | 1 | LS | $ | $ | ||||
| 4. | Erosion Mitigation** | 1 | LS | $ | $ | ||||
| 5. | Road Resurfacing** | 1 | LS | $ | $ | ||||
| 6. | Low-Visibility Curve Regrading | ||||||||
| and Sitework | 1 | LS | $ | $ | |||||
| 7. | Signage, Road Delineators, | ||||||||
| and Landscaping Boulders | 1 | LS | $ | $ | |||||
| 8. | Road Surfacing Material | ||||||||
| Generation and Stockpiling | 8,000 | CY | $ | $ | |||||
| 9. | Riprap Material | ||||||||
| Generation and Stockpiling | 50 | CY | $ | $ | |||||
| 10. | [Option] Road Surfacing | ||||||||
| Material Generation and Stockpiling*** | TBD | CY | $ | $ | TBD | ||||
| 11. | [Option] Riprap Material | ||||||||
| Generation and Stockpiling*** | TBD | $ | $ | TBD | |||||
| For a TOTAL lump sum of | $ | $ | (Lines 1 - 9 ONLY) | ||||||
| * LS – Lump Sum; CY – Cubic Yard |
** Erosion mitigation includes approximately 30 CY (~40 tons) of riprap material generated on-site. Road Resurfacing includes approximately 600 CY (~910 tons) of road surfacing material generated on-site. Volumes in loose condition.
*** Option Items 10 and 11 involve additional material generation and stockpiling according to the Drawings and Specifications. Options will be exercised at the OWNER’s discretion and in the volumes that they indicate on a unit price basis. Volumes will be in addition to those required for Line Items 4 and 5 and those indicated in Line Items 8 and 9. OWNER will notify the CONTRACTOR of the final volumes prior to CONTRACTOR receiving the Notice to Proceed (NTP). Volume of Line Item 10 is not expected to exceed 16,000 CY, and Line Item 11 is not expected to exceed 100 CY. Stockpile volumes are expressed in loose condition.
USFWS - 02242022 BID FORMS
USFWS – HART MOUNTAIN NAR GRADE ROAD RESTORATION PAGE 00 30 00-1
| INSTRUCTIONS: |
| The Offeror shall edit this Bid Schedule / Proposal Schedule and may provide a detailed breakdown of their |
| Proposal (including support documentation) and all associated line item pricing. It is the |
| responsibility of the Offeror to ensure all requirements are met and all support documentation |
| is provided. The purpose of the Bid Schedule / Proposal Schedule Document is to organize Base Bid Tasks |
| and Option Bid Tasks for U.S. Fish and Wildlife Service Price Evaluation. Contractor |
| shall show pricing for items. Failure to provide pricing for all items may result in bid not being |
| considered for award. |
| ADDITIONAL NOTES: |
| The Offeror may provide a detailed breakdown of their bid and all associated line item pricing. |
| The above Bid Schedule / Proposal Schedule Description column is not intended to be comprehensive. |
| It is the responsiblilty of the Offeror to ensure all requirements are met. |
| As part of the Bid Schedule / Proposal Schedule, and at the Offeror's discretion, Prepare and |
| Submit Back-Up Documents for the Bid Schedule / Proposal Schedule including Number of Labor Categories, |
| Labor Rates, Number of Labor Hours, Material Quantities, Equipment Quantities, |
| Equipment Rates, and Required Tools. Include All Items Required and Anticipated |
| to successfully deliver the Project. |
| As the Contractor is preparing their Proposal, Material Quantities require Contractor assumptions. |
| The Contractor may submit their assumptions about Material Quantities as part of their Offer. |
| Whether the Contractor chooses to submit their assumptions about Material Quantities to USFWS |
| for review and as part of their Offer is at the discretion of the Contractor. |
Incomplete Bids Will Not Be Considered.