B09_Amendment_0002_QA_0002.docx
DOCX document 20 KB Posted
- Attached to
- WA-SPRING CRK NFH-SCADA ALARM UPGRADE
- Solicitation number
- 140F0322Q0022
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A21_Willard_NFH_SCADA_System_PICS_0002.pdf | ||
| Sol_140F0322Q0022_Amd_0002.pdf | ||
| Sol_140F0322Q0022_Amd_0001.pdf | ||
| B09_Amendment_0001_0001.docx | DOCX document | |
| A04_WILLARD_SCADA__UPGRADE_SOW(20220303)_1_0001.doc | DOC document | |
| A04_1_19_22_WILLARD_SCADA__UPGRADE_SOW.doc | DOC document | |
| Davis_Bacon_Act.pdf | ||
| Sol_140F0322Q0022.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0002 Sol. No. 140F0322Q0022
Title: WA- Spring Crk NFH- SCADA Alarm Upgrade (Cook, WA).
1. Question: Do you have the PLC and HMI model information?
Answer to Question #1: Contractor shall provide/install (3) new PLC Analog Input I/O modules (8 channel) into existing control panel. To include terminals, relays, and power supply.
2. Question: Do they have any additional analog inputs on the PLC for the new sensors?
Answer to Question #2: No, contractor shall provide PLC upgrades to support new sensors.
3. Question: If analog inputs are not available is their extra room in the PLC rack for an analog input card?
Answer to Question #3: The rack has excess capacity, but the contractor shall be responsible for providing necessary hardware and installation.
4. Question: What software is currently installed?
Answer to Question #4: The hatchery utilized TopView Software. This contract will be required the upgrade and associated programming and software to support the system upgrade.
5. Question: Have any additional sensors been identified that are required for this system?
Answer to Question #5: Yes, at a minimum a new flow switch and temperature sensor will be required.
6. Question: Will the contractor be allowed to use the current computer system, if so, can you provide system information, if contract requires a new computer system can you provide system specifications:
Answer to Question #6: Contractor shall provide a new computer system, 27” HD monitor, keyboard and mouse.
System shall be equal to:
Dell OptiPlex 5000 Tower 12th Generation Intel® Core™ i7-12700 (12 Cores/25MB/20T/2.1GHz to 4.9GHz/65W) Windows 11 Pro, English, French, Spanish video card Intel® Integrated Graphics memory 16 GB, 2 x 8 GB, DDR4 Hard drive - 256 GB, M.2 2230, PCIe NVMe, SSD, Class 35 240 W internal power supply unit (PSU), 85% Efficient 27” HD monitor Mouse Keyboard
7. Question: Could I schedule a site visit before bidding?
Answer to Question #7: Site visit shall occur on Wed, Mar 16, 2022, 10:00 am – 11:00 am
Location: Willard NFH 5501B Cook Underwood RD Cook, WA 98605
Hatchery POC: Travis Collier Hatchery Manager Willard National Fish Hatchery work. 509 538-2305 mobile. 509 293-0833
8. Question: What codes apply to the project?
Answer to Question #8: The current NEC applies to this project and applicable current International Building Codes.
9. Question: Would you provide details on the existing PLC hardware/system being used at the hatchery?
Brand?
Model #’s? (PLC-IO-HMI) I-O modules?
Age?
PLC/HMI Software platform & version?
SCADA provider, part #, version?
Are any photos available (or will be available) of the control cabinets? The site(s)?
Is there a site layout drawing available?
Answer to Question #9: The current system utilized TOPVIEW that is 8-10 years old. Limited photos are attached. Contractors were invited to inspect the project site and existing conditions through the optional site visit.
10. Question: What additional upgrades are needed for the system?
Answer to Question #10: Response: The contractor shall be responsible for updated and adjusting the current SCADA programming to include the creation of a screen that will show all the relevant monitoring data such as:
· Create a spreadsheet that can save and print out monthly temperature and flow data.
· Home screen will be upgraded to provide an aerial picture of the facility with locations of all devices with live reading of sensors and real time values including status (off/on)
· Main alarm screen will be relocated from the existing location in the hatchery building shop/garage into the hatchery building break room/common area.
· Upon completion of the project, provide training to hatchery staff and personnel on the use, modify, program, and respond. Training shall be in person and provide an operational manual. All training shall be videotaped.
· Label all cabling and provide updated wiring diagram
· Programming shall include historical trending data; this is a specialized trending display that shows when any process value is selected, and shortcut buttons are created for various time ranges.
· New HMI software package needs to be provided and configured to work with the existing PLC and alarms so a graphical interface with live valves can be created.
· The USFWS has used Rockwell’s FactoryTalk View for similar facilities, but contractor may propose alternative or equal products.
Please note the hatchery does not currently have an HMI software package so the contractor will need to supply, install, and configure a new HMI software.