B09_Amendment_0001_0001.docx
DOCX document 17 KB Posted
- Attached to
- WA-SPRING CRK NFH-SCADA ALARM UPGRADE
- Solicitation number
- 140F0322Q0022
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B09_Amendment_0002_QA_0002.docx | DOCX document | |
| A21_Willard_NFH_SCADA_System_PICS_0002.pdf | ||
| Sol_140F0322Q0022_Amd_0002.pdf | ||
| Sol_140F0322Q0022_Amd_0001.pdf | ||
| A04_WILLARD_SCADA__UPGRADE_SOW(20220303)_1_0001.doc | DOC document | |
| A04_1_19_22_WILLARD_SCADA__UPGRADE_SOW.doc | DOC document | |
| Davis_Bacon_Act.pdf | ||
| Sol_140F0322Q0022.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0001 Sol. No. 140F0322Q0022
Title: WA- Spring Crk NFH- SCADA Alarm Upgrade (Cook, WA).
1. Question: Do you have the PLC and HMI model information?
Answer to Question #1: Contractor shall provide/install (3) new PLC Analog Input I/O modules (8 channel) into existing control panel. To include terminals, relays, and power supply.
2. Question: Do they have any additional analog inputs on the PLC for the new sensors?
Answer to Question #2: No, contractor shall provide PLC upgrades to support new sensors.
3. Question: If analog inputs are not available is their extra room in the PLC rack for an analog input card?
Answer to Question #3: The rack has excess capacity, but the contractor shall be responsible for providing necessary hardware and installation.
4. Question: What software is currently installed?
Answer to Question #4: The hatchery utilized TopView Software. This contract will be required the upgrade and associated programming and software to support the system upgrade.
5. Question: Have any additional sensors been identified that are required for this system?
Answer to Question #5: Yes, at a minimum a new flow switch and temperature sensor will be required.
6. Question: Will the contractor be allowed to use the current computer system, if so, can you provide system information, if contract requires a new computer system can you provide system specifications:
Answer to Question #6: Contractor shall provide a new computer system, 27” HD monitor, keyboard and mouse.
System shall be equal to:
Dell OptiPlex 5000 Tower 12th Generation Intel® Core™ i7-12700 (12 Cores/25MB/20T/2.1GHz to 4.9GHz/65W) Windows 11 Pro, English, French, Spanish video card Intel® Integrated Graphics memory 16 GB, 2 x 8 GB, DDR4 Hard drive - 256 GB, M.2 2230, PCIe NVMe, SSD, Class 35 240 W internal power supply unit (PSU), 85% Efficient 27” HD monitor Mouse Keyboard
7. Question: Could I schedule a site visit before bidding?
Answer to Question #7: Site visit shall occur on Wed, Mar 16, 2022, 10:00 am – 11:00 am
Location: Willard NFH 5501B Cook Underwood RD Cook, WA 98605
Hatchery POC: Travis Collier Hatchery Manager Willard National Fish Hatchery work. 509 538-2305 mobile. 509 293-0833
8. Question: What codes apply to the project?
Answer to Question #8: The current NEC applies to this project and applicable current International Building Codes.