Submittal Register
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| preconstruction_safety_checklist.pdf | ||
| CPARS_Notice.pdf | ||
| Bid_Schedule.pdf | ||
| CLAUSES.pdf | ||
| Notice_to_Offerors.pdf | ||
| General_Decision_IL2.pdf | ||
| 16_RF-011_DWGS.pdf | ||
| 16_RF-011_Specs.pdf | ||
| SF_24,_Bid_Bond.pdf | ||
| Sol_140F0318R0003.pdf | ||
| PPQ.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Action Codes:
A. Approved as Submitted D. No Action Taken *See Comments B. Approved, Except as Noted *Resubmission not Required E. Disapprove *See Comments C. Approved, Except as Noted *Resubmission Required F. Resubmission Required 01-30-01 - 1 of 12
SUBMITTAL REGISTER
SHOP DRAWINGS, EQUIPMENT DATA, AND MATERIAL SAMPLES
Contract:
Project: Crab Orchard National Wildlife Refuge Headquarters Building Location: Marion, IL Contractor:
Project Manager: _____
Specification Section No. Description Date
Submitted Transmittal Number Reviewed by Date Action
Taken Action Code
Date Resubmitted
Action Code Comments
01-70-00 Project Record Documents
01-70-00 Contractor’s Punch List
01-70-00 Surveyor Errors and Omissions Insurance
01-74-19 Non-Incineration Certificate
01-74-19 Waste Disposal Reports
01-78-00 Project Record Documents
01-78-00 Operation and Maintenance Data
01-78-00 Maintenance Requirements
01-78-00 Warranties and Bonds
01-78-00 Testing and Balancing Reports
02-41-00 Demolition Plan
03-10-00 Product Data
03-20-00 Shop Drawings
03-30-00 Product Data
03-30-00 Samples
SHOP DRAWINGS, EQUIPMENT DATA, AND MATERIAL SAMPLES (Continued)
A. Approved as Submitted D. No Action Taken See Comments B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 2 of 12
Specification Section No. Description Date
Submitted Transmittal Number Reviewed by Date Action
Taken Action Code
Date Resubmitted
Action Code Comments
03-41-13 Product Data
03-41-13 Shop Drawings
04-05-11 Product Data
04-05-11 Samples
04-20-00 Product Data
04-20-00 Samples
04-42-00 Product Data
04-42-00 Samples
05-40-00 Product Data
05-40-00 Welder’s Certificates
05-50-00 Shop Drawings
05-50-00 Welder’s Certificates
05-52-13 Shop Drawings
06-20-00 Product Data
06-20-00 Samples
06-41-00 Product Data
06-41-00 Shop Drawings
06-41-00 Fabricator Qualifications
B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 3 of 12
Specification Section No. Description Date
Submitted Transmittal Number Reviewed by Date Action
Taken Action Code
Date Resubmitted
Action Code Comments
07-21-00 Product Data
07-25-00 Product Data
07-25-00 Installation Instructions
07-25-00 Shop Drawings
07-25-00 Installer Qualifications
07-41-13 Product Data
07-41-13 Shop Drawings
07-41-13 Samples
07-41-13 Warranty
07-42-13 Product Data
07-42-13 Shop Drawings
07-42-13 Warranty
07-53-00 Product Data
07-53-00 Warranty
07-62-00 Samples
07-84-00 Product Data
07-84-00 UL, FM Listings
07-92-00 Product Data
B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 4 of 12
Specification Section No. Description Date
Submitted Transmittal Number Reviewed by Date Action
Taken Action Code
Date Resubmitted
Action Code Comments
07-92-00 Samples
08-11-13 Product Data
08-11-13 Shop Drawings
08-14-16 Product Data
08-14-16 Shop Drawings
08-14-16 Warranty
08-31-00 Product Data
08-41-13 Product Data
08-41-13 Shop Drawings
08-41-13 Warranty
08-62-23 Product Data
08-62-23 Shop Drawings
08-62-23 Warranty
08-71-00 Product Data
08-71-00 Scheduling
08-71-00 Warranty
08-80-00 Product Data
08-80-00 Samples
B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 5 of 12
Specification Section No. Description Date
Submitted Transmittal Number Reviewed by Date Action
Taken Action Code
Date Resubmitted
Action Code Comments
08-80-00 Warranty
09-30-00 Product Data
09-30-00 Shop Drawings
09-30-00 Samples
09-30-00 Maintenance Materials
09-51-00 Product Data
09-51-00 Samples
09-51-00 Maintenance Materials
09-65-00 Product Data
09-65-00 Shop Drawings
09-65-00 Samples
09-65-00 Warranty
09-65-00 Maintenance Materials
09-67-00 Product Data
09-67-00 Installation Instructions
09-67-00 Installer Qualifications
09-68-13 Product data
09-68-13 Samples
B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 6 of 12
Specification Section No. Description Date
Submitted Transmittal Number Reviewed by Date Action
Taken Action Code
Date Resubmitted
Action Code Comments
09-68-13 Maintenance Data 09-68-13 Maintenance Materials
09-68-13 Warranty
09-72-00 Product Data
09-72-00 Samples
09-72-00 Maintenance Materials
09-72-00 Maintenance Data 09-91-13 Product Data
09-91-13 Samples
09-91-13 Maintenance Materials
09-91-23 Product Data
09-91-23 Samples
09-91-23 Maintenance Materials 10-14-00 Shop Drawings
10-14-00 Product Data 10-14-23 Product Data
10-14-23 Shop Drawings
10-14-23 Samples
B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 7 of 12
Specification Section No. Description Date
Submitted Transmittal Number Reviewed by Date Action
Taken Action Code
Date Resubmitted
Action Code Comments
10-21-13 Product Data 10-21-13 Shop Drawings
10-21-13 Samples 10-22-39 Product Data
10-22-39 Shop Drawings
10-22-39 Samples
10-26-01 Product Data 10-26-01 Samples
10-28-00 Product Data 10-41-16 Product Data
10-41-00 Maintenance Data
10-44-00 Product Data
10-44-00 Shop Drawings
10-51-00 Product Data
10-51-00 Shop Drawings 10-51-00 Samples
10-56-17 Product Data
10-75-00 Product Data
B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 8 of 12
Specification Section No. Description Date
Submitted Transmittal Number Reviewed by Date Action
Taken Action Code
Date Resubmitted
Action Code Comments
10-75-00 Shop Drawings
10-81-13 Product Data
10-81-13 Installation Instructions 11-52-13 Product Data
11-52-13 Operation and Maintenance
12-21-23 Product Data
12-21-23 Shop Drawings
12-21-23 Samples
12-21-23 Maintenance Data 12-21-13 Warranty
12-21-13 Installer Qualifications
12-36-00 Product Data
12-36-00 Shop Drawings
12-36-00 Samples
13-34-19 Product Data
13-34-19 Shop Drawings
13-34-19 Erector Qualifications
B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 9 of 12
Specification Section No. Description Date
Submitted Transmittal Number Reviewed by Date Action
Taken Action Code
Date Resubmitted
Action Code Comments
13-34-19 13-34-19
13-34-19
21 13 13 Product Data
21 13 13 LEED Submittal
21 13 13 Delegated Design Submittal
21 13 13 Approved Sprinkler Piping Drawings
21 13 13 Operation and Maintenance
22 05 19 Product Data
22 05 23 Product Data
22 05 29 Product Data
22 07 19 LEED Submittal
22 11 19 Product Data 22 13 19 Product Data
22 14 23 Product Data
22 42 13.13 Product Data
22 42 13.13 LEED Submittal
B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 10 of 12
Specification Section No. Description Date
Submitted Transmittal Number Reviewed by Date Action
Taken Action Code
Date Resubmitted
Action Code Comments
22 42 13.16 Product Data
22 42 13.16 LEED Submittal
22 42 16 Product Data 22 42 16 Maintenance Data
22 47 13 Product Data
23 05 23 Product Data
23 05 29 Qualification Data 23 05 29 Contract Documents
Examination Report
23 05 29 Strategies and Procedures Plan
23 05 29 Certified TAB Reports
23 05 29 Sample Report Forms
23 07 13 Product Data
23 07 13 Material Test Reports
23 07 19 Product Data
23 07 19 LEED Submittals
23 07 19 Shop Drawings
23 09 00 Product Data
B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 11 of 12
Specification Section No. Description Date
Submitted Transmittal Number Reviewed by Date Action
Taken Action Code
Date Resubmitted
Action Code Comments
23 09 00 Samples
23 09 00 Shop Drawings
23 21 13 Product Data
23 21 13 LEED Submittals
23 21 13.13 Product Data 23 33 00 Product Data
23 33 00 LEED Submittals
23 33 00 Shop Drawings
23 37 13 Product Data
23 72 23 Product Data
23 72 23 LEED Submittals
23 72 23 Shop Drawings
23 81 29 Product Data
23 81 29 LEED Submittals
23 81 29 Shop Drawings
23 82 39.13 Product Data
23 82 39.13 LEED Submittals
B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 12 of 12
Specification Section No. Description Date
Submitted Transmittal Number Reviewed by Date Action
Taken Action Code
Date Resubmitted
Action Code Comments
23 82 39.13 Shop Drawings 23 82 39.13 Samples
26-05-00 System Tests
26-05-19 Test Reports
26-05-23 Product Data
26-05-26 Field Test Reports
26-05-29 Delegated Design
26-05-29 Seismic Qualification Data
26-05-33 Seismic Qualification Data 26-05-48 Product Data
26-05-48 Delegated Design
26-05-48 Coordination Drawings
26-05-48 Qualification Data
26-05-48 Welding Certificates
26-05-48 Field Quality-Control Reports 26-05-73 Product Data
26-05-73 Input Data 26-05-73 Study and Equipment
B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 13 of 12
Specification Section No. Description Date
Submitted Transmittal Number Reviewed by Date Action
Taken Action Code
Date Resubmitted
Action Code Comments
Evaluation Reports
26-05-73 Coordination Study Report 26-08-00 Test Reports
26-09-13 Product Data
26-09-13 Shop Drawings
26-09-13 Qualification Data 26-09-13 Field Quality-Control Reports
26-09-13 Installation and Setup Guides
26-09-13 Operation and Maintenance Manuals
26-09-13 Software Documentation, Licenses and Upgrades
26-09-13 Maintenance Materials
26-09-13 Qualifications
26-09-23 Product Data 26-09-23 Shop Drawings
26-09-23 Field Quality-Control Test Reports
26-09-23 Operation and Maintenance
26-09-43 Product Data
B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 14 of 12
Specification Section No. Description Date
Submitted Transmittal Number Reviewed by Date Action
Taken Action Code
Date Resubmitted
Action Code Comments
26-09-43 Field Quality-Control Reports 26-09-43 Operation and Maintenance
26-09-43 Sequence of Operation
26-09-43 Operation of Adjustable Zone Controls
26-09-43 Warranty 26-24-16 Product Data
26-24-16 Shop Drawings
26-24-16 Field Quality-Control Test
26-24-16 Panelboard Schedules 26-24-16 Operation and Maintenance
26-27-02 Product Data
26-27-13 Product Data
26-27-13 Shop Drawings
26-27-13 Field Quality-Control Test
26-27-13 Operation and Maintenance
26-28-13 Product Data
B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 15 of 12
Specification Section No. Description Date
Submitted Transmittal Number Reviewed by Date Action
Taken Action Code
Date Resubmitted
Action Code Comments
26-28-13 Ambient Temperature Adjustment Information
26-28-13 Operation and Maintenance
26-28-16 Product Data
26-28-16 Shop Drawings
26-28-16 Seismic Qualification Certificates
26-28-16 Field Test Reports
26-28-16 Manufacturer’s Field Service Report
26-28-16 Maintenance Data
26-29-13 Product Data 26-29-13 Shop Drawings
26-29-13 Seismic Qualification Data
26-29-13 Field Test Reports
26-29-13 Operation and Maintenance
26-29-13 Load Current and Overload Relay Heater List
26-31-00 Product Data 26-31-00 Shop Drawings
B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 16 of 12
Specification Section No. Description Date
Submitted Transmittal Number Reviewed by Date Action
Taken Action Code
Date Resubmitted
Action Code Comments
26-31-00 Field Quality-Control Reports 26-31-00 Manufacturer’s Warranty
26-31-00 Manufacturer’s Installation Instructions
26-31-00 Utility Interconnection Agreement
26-31-00 Qualification Data 26-31-00 Operation and Maintenance
26-31-00 As-Built Drawings
26-43-13 Product Data
26-43-13 Field Quality-Control Reports 26-43-13 Warranty
26-43-13 Maintenance Data
26-51-00 Product Data
26-51-00 Shop Drawings 26-51-00 Wiring Diagrams
26-51-00 Field Quality-Control Test
26-51-00 Seismic Qualification
B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 17 of 12
Specification Section No. Description Date
Submitted Transmittal Number Reviewed by Date Action
Taken Action Code
Date Resubmitted
Action Code Comments
26-51-00 Operation and Maintenance
26-51-00 Warranties
26-51-00 Maintenance Materials
26-56-00 Product Data
26-56-00 Shop Drawings 26-56-00 Wiring Diagrams
26-56-00 Field Quality-Control Test
26-56-00 Source Quality Control Test
26-56-00 Operation and Maintenance
26-56-00 Warranties
26-56-00 Maintenance Materials
27-05-00 Product Data
27-05-00 Shop Drawings
27-05-00 Warranty
27-05-26 Manufacturer’s Data
27-05-26 Manufacturer’s Installation Instructions
B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 18 of 12
Specification Section No. Description Date
Submitted Transmittal Number Reviewed by Date Action
Taken Action Code
Date Resubmitted
Action Code Comments
27-05-28.33 Qualification Data 27-05-28.33 Seismic Qualification Data
27-05-28.33 Design Calculations 27-05-28.33 Detail Assemblies
27-11-00 Product Data
27-11-00 Qualification Data
27-15-00 Product Data 27-15-00 Shop Drawings
27-15-00 Qualification Data
27-15-00 Source Quality Control
27-15-00 Field Quality Control Reports
27-15-00 Maintenance Data
27-15-00 Software and Firmware Operational Documentation
27-15-00 Maintenance Material
27-41-00 Shop Drawings
27-41-00 Warranty
28-05-13 Product Data
B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 19 of 12
Specification Section No. Description Date
Submitted Transmittal Number Reviewed by Date Action
Taken Action Code
Date Resubmitted
Action Code Comments
28-05-13 Qualification Data 28-05-13 Source Quality Control
28-05-13 Field Quality Control Reports
28-05-28 Qualification Data
28-05-28 Seismic Qualification Data 28-05-28 Design Calculations
28-05-28 Detail Assemblies 28-16-00 Product Data
28-16-00 Shop Drawings
28-16-00 Equipment and System Operation Description
28-16-00 Qualification Data 28-16-00 Field Quality Control Reports
28-16-00 Warranty
28-16-00 Other Information
28-16-00 Operation and Maintenance
28-16-00 Maintenance Material
28-31-11 Product Data
B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 20 of 12
Specification Section No. Description Date
Submitted Transmittal Number Reviewed by Date Action
Taken Action Code
Date Resubmitted
Action Code Comments
28-31-11 Shop Drawings 28-31-11 Qualification Data
28-31-11 Seismic Qualification
28-31-11 Field Quality Control Reports
28-31-11 Operation and Maintenance
28-31-11 Software and Firmware Operational Documentation
28-31-11 Maintenance Material
31-36-13 Product Data
31-36-13 Shop Drawings
*As-Builts not required until after completion of Project.