Submittal_Registry_(1).pdf

PDF 372 KB Posted

Attached to
Crab Orchard HeadQuarters Bldg. Federal contract opportunity
Solicitation number
140F0318R0003
Issued by
Department of the Interior Fish and Wildlife Service Region 9 Headquarters

About this file

Submittal Register

View the file

Other files for this federal contract opportunity

Other files attached to Crab Orchard HeadQuarters Bldg., newest first.
File Type Posted
preconstruction_safety_checklist.pdf PDF
CPARS_Notice.pdf PDF
Bid_Schedule.pdf PDF
CLAUSES.pdf PDF
Notice_to_Offerors.pdf PDF
General_Decision_IL2.pdf PDF
16_RF-011_DWGS.pdf PDF
16_RF-011_Specs.pdf PDF
SF_24,_Bid_Bond.pdf PDF
Sol_140F0318R0003.pdf PDF
PPQ.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Action Codes:

A. Approved as Submitted D. No Action Taken *See Comments B. Approved, Except as Noted *Resubmission not Required E. Disapprove *See Comments C. Approved, Except as Noted *Resubmission Required F. Resubmission Required 01-30-01 - 1 of 12

SUBMITTAL REGISTER

SHOP DRAWINGS, EQUIPMENT DATA, AND MATERIAL SAMPLES

Contract:

Project: Crab Orchard National Wildlife Refuge Headquarters Building Location: Marion, IL Contractor:

Project Manager: _____

Specification Section No. Description Date

Submitted Transmittal Number Reviewed by Date Action

Taken Action Code

Date Resubmitted

Action Code Comments

01-70-00 Project Record Documents

01-70-00 Contractor’s Punch List

01-70-00 Surveyor Errors and Omissions Insurance

01-74-19 Non-Incineration Certificate

01-74-19 Waste Disposal Reports

01-78-00 Project Record Documents

01-78-00 Operation and Maintenance Data

01-78-00 Maintenance Requirements

01-78-00 Warranties and Bonds

01-78-00 Testing and Balancing Reports

02-41-00 Demolition Plan

03-10-00 Product Data

03-20-00 Shop Drawings

03-30-00 Product Data

03-30-00 Samples

SHOP DRAWINGS, EQUIPMENT DATA, AND MATERIAL SAMPLES (Continued)

A. Approved as Submitted D. No Action Taken See Comments B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 2 of 12

Specification Section No. Description Date

Submitted Transmittal Number Reviewed by Date Action

Taken Action Code

Date Resubmitted

Action Code Comments

03-41-13 Product Data

03-41-13 Shop Drawings

04-05-11 Product Data

04-05-11 Samples

04-20-00 Product Data

04-20-00 Samples

04-42-00 Product Data

04-42-00 Samples

05-40-00 Product Data

05-40-00 Welder’s Certificates

05-50-00 Shop Drawings

05-50-00 Welder’s Certificates

05-52-13 Shop Drawings

06-20-00 Product Data

06-20-00 Samples

06-41-00 Product Data

06-41-00 Shop Drawings

06-41-00 Fabricator Qualifications

B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 3 of 12

Specification Section No. Description Date

Submitted Transmittal Number Reviewed by Date Action

Taken Action Code

Date Resubmitted

Action Code Comments

07-21-00 Product Data

07-25-00 Product Data

07-25-00 Installation Instructions

07-25-00 Shop Drawings

07-25-00 Installer Qualifications

07-41-13 Product Data

07-41-13 Shop Drawings

07-41-13 Samples

07-41-13 Warranty

07-42-13 Product Data

07-42-13 Shop Drawings

07-42-13 Warranty

07-53-00 Product Data

07-53-00 Warranty

07-62-00 Samples

07-84-00 Product Data

07-84-00 UL, FM Listings

07-92-00 Product Data

B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 4 of 12

Specification Section No. Description Date

Submitted Transmittal Number Reviewed by Date Action

Taken Action Code

Date Resubmitted

Action Code Comments

07-92-00 Samples

08-11-13 Product Data

08-11-13 Shop Drawings

08-14-16 Product Data

08-14-16 Shop Drawings

08-14-16 Warranty

08-31-00 Product Data

08-41-13 Product Data

08-41-13 Shop Drawings

08-41-13 Warranty

08-62-23 Product Data

08-62-23 Shop Drawings

08-62-23 Warranty

08-71-00 Product Data

08-71-00 Scheduling

08-71-00 Warranty

08-80-00 Product Data

08-80-00 Samples

B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 5 of 12

Specification Section No. Description Date

Submitted Transmittal Number Reviewed by Date Action

Taken Action Code

Date Resubmitted

Action Code Comments

08-80-00 Warranty

09-30-00 Product Data

09-30-00 Shop Drawings

09-30-00 Samples

09-30-00 Maintenance Materials

09-51-00 Product Data

09-51-00 Samples

09-51-00 Maintenance Materials

09-65-00 Product Data

09-65-00 Shop Drawings

09-65-00 Samples

09-65-00 Warranty

09-65-00 Maintenance Materials

09-67-00 Product Data

09-67-00 Installation Instructions

09-67-00 Installer Qualifications

09-68-13 Product data

09-68-13 Samples

B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 6 of 12

Specification Section No. Description Date

Submitted Transmittal Number Reviewed by Date Action

Taken Action Code

Date Resubmitted

Action Code Comments

09-68-13 Maintenance Data 09-68-13 Maintenance Materials

09-68-13 Warranty

09-72-00 Product Data

09-72-00 Samples

09-72-00 Maintenance Materials

09-72-00 Maintenance Data 09-91-13 Product Data

09-91-13 Samples

09-91-13 Maintenance Materials

09-91-23 Product Data

09-91-23 Samples

09-91-23 Maintenance Materials 10-14-00 Shop Drawings

10-14-00 Product Data 10-14-23 Product Data

10-14-23 Shop Drawings

10-14-23 Samples

B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 7 of 12

Specification Section No. Description Date

Submitted Transmittal Number Reviewed by Date Action

Taken Action Code

Date Resubmitted

Action Code Comments

10-21-13 Product Data 10-21-13 Shop Drawings

10-21-13 Samples 10-22-39 Product Data

10-22-39 Shop Drawings

10-22-39 Samples

10-26-01 Product Data 10-26-01 Samples

10-28-00 Product Data 10-41-16 Product Data

10-41-00 Maintenance Data

10-44-00 Product Data

10-44-00 Shop Drawings

10-51-00 Product Data

10-51-00 Shop Drawings 10-51-00 Samples

10-56-17 Product Data

10-75-00 Product Data

B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 8 of 12

Specification Section No. Description Date

Submitted Transmittal Number Reviewed by Date Action

Taken Action Code

Date Resubmitted

Action Code Comments

10-75-00 Shop Drawings

10-81-13 Product Data

10-81-13 Installation Instructions 11-52-13 Product Data

11-52-13 Operation and Maintenance

12-21-23 Product Data

12-21-23 Shop Drawings

12-21-23 Samples

12-21-23 Maintenance Data 12-21-13 Warranty

12-21-13 Installer Qualifications

12-36-00 Product Data

12-36-00 Shop Drawings

12-36-00 Samples

13-34-19 Product Data

13-34-19 Shop Drawings

13-34-19 Erector Qualifications

B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 9 of 12

Specification Section No. Description Date

Submitted Transmittal Number Reviewed by Date Action

Taken Action Code

Date Resubmitted

Action Code Comments

13-34-19 13-34-19

13-34-19

21 13 13 Product Data

21 13 13 LEED Submittal

21 13 13 Delegated Design Submittal

21 13 13 Approved Sprinkler Piping Drawings

21 13 13 Operation and Maintenance

22 05 19 Product Data

22 05 23 Product Data

22 05 29 Product Data

22 07 19 LEED Submittal

22 11 19 Product Data 22 13 19 Product Data

22 14 23 Product Data

22 42 13.13 Product Data

22 42 13.13 LEED Submittal

B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 10 of 12

Specification Section No. Description Date

Submitted Transmittal Number Reviewed by Date Action

Taken Action Code

Date Resubmitted

Action Code Comments

22 42 13.16 Product Data

22 42 13.16 LEED Submittal

22 42 16 Product Data 22 42 16 Maintenance Data

22 47 13 Product Data

23 05 23 Product Data

23 05 29 Qualification Data 23 05 29 Contract Documents

Examination Report

23 05 29 Strategies and Procedures Plan

23 05 29 Certified TAB Reports

23 05 29 Sample Report Forms

23 07 13 Product Data

23 07 13 Material Test Reports

23 07 19 Product Data

23 07 19 LEED Submittals

23 07 19 Shop Drawings

23 09 00 Product Data

B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 11 of 12

Specification Section No. Description Date

Submitted Transmittal Number Reviewed by Date Action

Taken Action Code

Date Resubmitted

Action Code Comments

23 09 00 Samples

23 09 00 Shop Drawings

23 21 13 Product Data

23 21 13 LEED Submittals

23 21 13.13 Product Data 23 33 00 Product Data

23 33 00 LEED Submittals

23 33 00 Shop Drawings

23 37 13 Product Data

23 72 23 Product Data

23 72 23 LEED Submittals

23 72 23 Shop Drawings

23 81 29 Product Data

23 81 29 LEED Submittals

23 81 29 Shop Drawings

23 82 39.13 Product Data

23 82 39.13 LEED Submittals

B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 12 of 12

Specification Section No. Description Date

Submitted Transmittal Number Reviewed by Date Action

Taken Action Code

Date Resubmitted

Action Code Comments

23 82 39.13 Shop Drawings 23 82 39.13 Samples

26-05-00 System Tests

26-05-19 Test Reports

26-05-23 Product Data

26-05-26 Field Test Reports

26-05-29 Delegated Design

26-05-29 Seismic Qualification Data

26-05-33 Seismic Qualification Data 26-05-48 Product Data

26-05-48 Delegated Design

26-05-48 Coordination Drawings

26-05-48 Qualification Data

26-05-48 Welding Certificates

26-05-48 Field Quality-Control Reports 26-05-73 Product Data

26-05-73 Input Data 26-05-73 Study and Equipment

B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 13 of 12

Specification Section No. Description Date

Submitted Transmittal Number Reviewed by Date Action

Taken Action Code

Date Resubmitted

Action Code Comments

Evaluation Reports

26-05-73 Coordination Study Report 26-08-00 Test Reports

26-09-13 Product Data

26-09-13 Shop Drawings

26-09-13 Qualification Data 26-09-13 Field Quality-Control Reports

26-09-13 Installation and Setup Guides

26-09-13 Operation and Maintenance Manuals

26-09-13 Software Documentation, Licenses and Upgrades

26-09-13 Maintenance Materials

26-09-13 Qualifications

26-09-23 Product Data 26-09-23 Shop Drawings

26-09-23 Field Quality-Control Test Reports

26-09-23 Operation and Maintenance

26-09-43 Product Data

B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 14 of 12

Specification Section No. Description Date

Submitted Transmittal Number Reviewed by Date Action

Taken Action Code

Date Resubmitted

Action Code Comments

26-09-43 Field Quality-Control Reports 26-09-43 Operation and Maintenance

26-09-43 Sequence of Operation

26-09-43 Operation of Adjustable Zone Controls

26-09-43 Warranty 26-24-16 Product Data

26-24-16 Shop Drawings

26-24-16 Field Quality-Control Test

26-24-16 Panelboard Schedules 26-24-16 Operation and Maintenance

26-27-02 Product Data

26-27-13 Product Data

26-27-13 Shop Drawings

26-27-13 Field Quality-Control Test

26-27-13 Operation and Maintenance

26-28-13 Product Data

B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 15 of 12

Specification Section No. Description Date

Submitted Transmittal Number Reviewed by Date Action

Taken Action Code

Date Resubmitted

Action Code Comments

26-28-13 Ambient Temperature Adjustment Information

26-28-13 Operation and Maintenance

26-28-16 Product Data

26-28-16 Shop Drawings

26-28-16 Seismic Qualification Certificates

26-28-16 Field Test Reports

26-28-16 Manufacturer’s Field Service Report

26-28-16 Maintenance Data

26-29-13 Product Data 26-29-13 Shop Drawings

26-29-13 Seismic Qualification Data

26-29-13 Field Test Reports

26-29-13 Operation and Maintenance

26-29-13 Load Current and Overload Relay Heater List

26-31-00 Product Data 26-31-00 Shop Drawings

B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 16 of 12

Specification Section No. Description Date

Submitted Transmittal Number Reviewed by Date Action

Taken Action Code

Date Resubmitted

Action Code Comments

26-31-00 Field Quality-Control Reports 26-31-00 Manufacturer’s Warranty

26-31-00 Manufacturer’s Installation Instructions

26-31-00 Utility Interconnection Agreement

26-31-00 Qualification Data 26-31-00 Operation and Maintenance

26-31-00 As-Built Drawings

26-43-13 Product Data

26-43-13 Field Quality-Control Reports 26-43-13 Warranty

26-43-13 Maintenance Data

26-51-00 Product Data

26-51-00 Shop Drawings 26-51-00 Wiring Diagrams

26-51-00 Field Quality-Control Test

26-51-00 Seismic Qualification

B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 17 of 12

Specification Section No. Description Date

Submitted Transmittal Number Reviewed by Date Action

Taken Action Code

Date Resubmitted

Action Code Comments

26-51-00 Operation and Maintenance

26-51-00 Warranties

26-51-00 Maintenance Materials

26-56-00 Product Data

26-56-00 Shop Drawings 26-56-00 Wiring Diagrams

26-56-00 Field Quality-Control Test

26-56-00 Source Quality Control Test

26-56-00 Operation and Maintenance

26-56-00 Warranties

26-56-00 Maintenance Materials

27-05-00 Product Data

27-05-00 Shop Drawings

27-05-00 Warranty

27-05-26 Manufacturer’s Data

27-05-26 Manufacturer’s Installation Instructions

B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 18 of 12

Specification Section No. Description Date

Submitted Transmittal Number Reviewed by Date Action

Taken Action Code

Date Resubmitted

Action Code Comments

27-05-28.33 Qualification Data 27-05-28.33 Seismic Qualification Data

27-05-28.33 Design Calculations 27-05-28.33 Detail Assemblies

27-11-00 Product Data

27-11-00 Qualification Data

27-15-00 Product Data 27-15-00 Shop Drawings

27-15-00 Qualification Data

27-15-00 Source Quality Control

27-15-00 Field Quality Control Reports

27-15-00 Maintenance Data

27-15-00 Software and Firmware Operational Documentation

27-15-00 Maintenance Material

27-41-00 Shop Drawings

27-41-00 Warranty

28-05-13 Product Data

B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 19 of 12

Specification Section No. Description Date

Submitted Transmittal Number Reviewed by Date Action

Taken Action Code

Date Resubmitted

Action Code Comments

28-05-13 Qualification Data 28-05-13 Source Quality Control

28-05-13 Field Quality Control Reports

28-05-28 Qualification Data

28-05-28 Seismic Qualification Data 28-05-28 Design Calculations

28-05-28 Detail Assemblies 28-16-00 Product Data

28-16-00 Shop Drawings

28-16-00 Equipment and System Operation Description

28-16-00 Qualification Data 28-16-00 Field Quality Control Reports

28-16-00 Warranty

28-16-00 Other Information

28-16-00 Operation and Maintenance

28-16-00 Maintenance Material

28-31-11 Product Data

B. Approved, Except as Noted Resubmission not Required E. Disapprove See Comments Resubmission Required C. Approved, Except as Noted Resubmission Required F. Resubmission Required 01-30-01 - 20 of 12

Specification Section No. Description Date

Submitted Transmittal Number Reviewed by Date Action

Taken Action Code

Date Resubmitted

Action Code Comments

28-31-11 Shop Drawings 28-31-11 Qualification Data

28-31-11 Seismic Qualification

28-31-11 Field Quality Control Reports

28-31-11 Operation and Maintenance

28-31-11 Software and Firmware Operational Documentation

28-31-11 Maintenance Material

31-36-13 Product Data

31-36-13 Shop Drawings

*As-Builts not required until after completion of Project.