16_RF-011_Specs.pdf
PDF 14 MB Posted
- Attached to
- Crab Orchard HeadQuarters Bldg. Federal contract opportunity
- Solicitation number
- 140F0318R0003
About this file
Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 16_RF-011_DWGS.pdf | ||
| Bid_Schedule.pdf | ||
| CLAUSES.pdf | ||
| Submittal_Registry_(1).pdf | ||
| Notice_to_Offerors.pdf | ||
| General_Decision_IL2.pdf | ||
| SF_24,_Bid_Bond.pdf | ||
| Sol_140F0318R0003.pdf | ||
| PPQ.pdf | ||
| preconstruction_safety_checklist.pdf | ||
| CPARS_Notice.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P R O J E C T M A N U A L
Crab Orchard National Wildlife Refuge Headquarters Building
Marion, Illinois
BID PACKAGE
Project # 198212.00| October 23, 2017
O W N E R
U.S. Fish and Wildlife Service 5600 American Blvd West, Suite 990
Bloomington, MN 55437
A R C H I T E C T
The Kubala Washatko Architects, Inc.
N61 W617 Mequon Avenue, Cedarburg, WI 53012 tel: 262.377.6039 fax: 262.377.2954
Crab Orchard National Wildlife Refuge SEALS PAGE Headquarters Building - 198212.01 00-01-07 - 1 of 2
The Kubala Washatko Architects, Inc. (C) 2017
SECTION 00-01-07
SEALS PAGE
ARCHITECT:
THOMAS ALLEN KUBALA, ARCHITECT, AIA
THE KUBALA WASHATKO ARCHITECTS, INC.
ILLINOIS LICENSE NO.: 001-009492 _________________________
CIVIL ENGINEER:
RYAN A. BRANDT, PE
KIRKHAM MICHAEL & ASSOCIATES, INC.
ILLINOIS LICENSE NO.: 062-069233 __________________________
STRUCTURAL ENGINEER:
SARAH L. FRECSKA, PE
PIERCE ENGINEERS, INC.
ILLINOIS LICENSE NO.: 081-006311 __________________________
PLUMBING ENGINEER:
LEV ZVENYACH, PE
IBC ENGINEERING SERVICES, INC.
ILLINOIS LICENSE NO.: 062-047109 __________________________
SEALS PAGE Crab Orchard National Wildlife Refuge 00-01-07 - 2 of 2 Headquarters Building - 198212.01
The Kubala Washatko Architects, Inc. (C) 2017
MECHANICAL ENGINEER:
LEV ZVENYACH, PE
IBC ENGINEERING SERVICES, INC.
ILLINIOS LICENSE NO.: 062-047109 __________________________
ELECTRICAL ENGINEER:
LEV ZVENYACH, PE
IBC ENGINEERING SERVICES, INC.
ILLINOIS LICENSE NO.: 062-047109 __________________________
LANDSCAPE ARCHITECT:
JOHN PARKE ROYSTER, PLA
BIG MUDDY WORKSHOP, INC.
ILLINOIS LICENSE NO.: 157.001591 __________________________
END OF SEALS PAGE
Crab Orchard National Wildlife Refuge TABLE OF CONTENTS Headquarters Building -- 198212.00 00-01-10 - 1 of 5
The Kubala Washatko Architects, Inc. © 2017
DOCUMENT 00 01 10
TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00-01-07 SEALS PAGE
00-01-10 TABLE OF CONTENTS
00-31-00 AVAILABLE PROJECT INFORMATION
00-31-32 GEOTECHNICAL REPORT
00-63-25 SUBSTITUTION REQUEST FORM – DURING CONSTRUCTION
DIVISION 01 – GENERAL REQUIREMENTS
01-00-10 LIST OF DRAWINGS
01-10-00 SUMMARY
01-20-00 PRICE AND PAYMENT PROCEDURES
01-23-00 ALTERNATES
01-30-00 ADMINISTRATIVE REQUIREMENTS
01-30-01 SUBMITTAL REGISTER
01-33-29 SUSTAINABLE DESIGN REPORTING
01-33-29.04 MATERIAL CONTENT FORM
01-33-29.07 PROHIBITED CONTENT INSTALLER CERTIFICATION
01-40-00 QUALITY REQUIREMENTS
01-42-16 DEFINITIONS
01-42-19 REFERENCE STANDARDS
01-50-00 TEMPORARY FACILITIES AND CONTROLS
01-57-21 INDOOR AIR QUALITY CONTROLS
01-60-00 PRODUCT REQUIREMENTS
01-61-16 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01-70-00 EXECUTION AND CLOSEOUT REQUIREMENTS
01-74-19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01-78-00 CLOSEOUT SUBMITTALS
01-79-00 DEMONSTRATION AND TRAINING
01-91-13 GENERAL COMMISSIONING REQUIREMENTS
01-91-14 COMMISSIONING AUTHORITY RESPONSIBILITIES
DIVISION 02 – EXISTING CONDITIONS
02-41-00 DEMOLITION
DIVISION 03 – CONCRETE
03-10-00 CONCRETE FORMING AND ACCESSORIES
03-20-00 CONCRETE REINFORCING
03-30-00 CAST-IN-PLACE CONCRETE
03-41-13 PRECAST CONCRETE HOLLOW CORE PLANKS
DIVISION 04 – MASONRY
04-05-11 MORTAR AND MASONRY GROUTS
04-20-00 UNIT MASONRY
04-42-00 EXTERIOR STONE CLADDING
DIVISION 05 – METALS
05-40-00 COLD-FORMED METAL FRAMING
05 50 00 METAL FABRICATIONS
05-52-13 PIPE AND TUBE RAILINGS
TABLE OF CONTENTS Crab Orchard National Wildlife Refuge 00-01-10 - 2 of 5 Headquarters Building -- 198212.00
The Kubala Washatko Architects, Inc. © 2017
DIVISION 06 – WOOD, PLASTIC AND COMPOSITES
06-10-00 ROUGH CARPENTRY
06-20-00 FINISH CARPENTRY
06-41-00 ARCHITECTURAL WOOD CASEWORK
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07-21-00 THERMAL INSULATION
07-25-00 AIR AND VAPOR RETARDERS
07-41-13 METAL ROOF PANELS
07-42-13 METAL WALL PANELS
07-53-00 ELASTOMERIC MEMBRANE ROOFING
07-62-00 SHEET METAL FLASHING AND TRIM
07-84-00 FIRESTOPPING
07-92-00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08-11-13 HOLLOW METAL DOORS AND FRAMES
08-14-16 FLUSH WOOD DOORS
08-31-00 ACCESS DOORS AND PANELS
08-43-13 ALUMINUM-FRAMED STOREFRONTS
08-52-00 WOOD WINDOWS
08-62-23 TUBULAR SKYLIGHTS
08-71-00 DOOR HARDWARE
08-80-00 GLAZING
DIVISION 09 - FINISHES
09-21-16 GYPSUM BOARD ASSEMBLIES
09-30-00 TILING
09-51-00 ACOUSTICAL CEILINGS
09-65-00 RESILIENT FLOORING
09-67-00 FLUID-APPLIED FLOORING
09-68-13 TILE CARPETING
09-72-00 WALL COVERING
09-91-13 EXTERIOR PAINTING
09-91-23 INTERIOR PAINTING
DIVISION 10 - SPECIALTIES
10-14-00 SIGNAGE
10-14-23 PLASTIC SIGNAGE
10-21-13.19 PLASTIC TOILET COMPARTMENTS
10-22-39 FOLDING PANEL PARTITIONS
10-26-01 WALL AND CORNER GUARDS
10-28-00 TOILET, BATH AND LAUNDRY ACCESSORIES
10-41-16 FIRE DEPARTMENT ACCESS KEY BOX
10-44-00 FIRE PROTECTION SPECIALTIES
10-51-00 LOCKERS
10-56-17 WALL MOUNTED STANDARDS AND SHELVING
10-75-00 FLAGPOLES
10-81-13 PEST CONTROL DEVICES
DIVISION 11 – EQUIPMENT
11-52-13 PROJECTION SCREENS
Headquarters Building -- 198212.00 00-01-10 - 3 of 5
The Kubala Washatko Architects, Inc. © 2017
DIVISION 12 - FURNISHINGS
12-21-13 ROLLERS SHADE SYSTEM
12-36-00 COUNTERTOPS
12-93-00 SITE FURNISHINGS
DIVISION 13 – SPECIAL CONSTRUCTION
13-34-16 METAL BUILDING SYSTEMS
DIVISION 21 – FIRE PROTECTION
21-05-48 VIBRATION AND SEISMIC CONTROLS FOR FIRE-SUPPRESSION PIPING
AND EQUIPMENT
21-13-13 WET-PIPE SPRINKLER SYSTEMS
DIVISION 22 – PLUMBING
22-05-00 COMMON WORK RESULTS FOR PLUMBING
22-05-13 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT
22-05-19 METERS AND GAGES FOR PLUMBING PIPING
22-05-23 GENERAL-DUTY VALVES FOR PLUMBING PIPING
22-05-29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
22-05-48 VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING
AND EQUIPMENT
22-07-19 PLUMBING PIPING INSULATION
22-11-16 DOMESTIC WATER PIPING
22-11-19 DOMESTIC WATER PIPING SPECIALTIES
22-13-16 SANITARY WASTE AND VENT PIPING
22-13-19 SANITARY WASTE PIPING SPECIALTIES
22-14-13 FACILITY STORM DRAINAGE PIPING
22-42-13.13 COMMERCIAL WATER CLOSETS
22-42-13.16 COMMERCIAL URINALS
22-42-16 COMMERCIAL LAVATORIES AND SINKS
22-42-19 COMMERCIAL SHOWERS
22-47-13 DRINKING FOUNTAINS
DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING
23-05-00 COMMON WORK RESULTS FOR HVAC
23-05-13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
23-05-23 GENERAL-DUTY VALVES FOR HVAC PIPING
23-05-29 HANGER AND SUPPORT FOR HVAC PIPING AND EQUIPMENT
23-05-48 VIBRATION AND SEISMIC CONTROLS FOR HVAC
23-05-93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23-07-13 DUCT INSULATION
23-07-19 HVAC PIPING INSULATION
23-09-00 INSTRUMENTATION AND CONTROL FOR HVAC
23-21-13 HYDRONIC PIPING
23-21-13.13 IN-LINE CENTRIFUGAL HYDRONIC PUMPS
23-31-13 METAL DUCTS
23-33-00 AIR DUCT ACCESSORIES
23-37-13 DIFFUSERS, REGISTERS AND GRILLES
23-72-23 PACKAGED AIR-TO-AIR ENERGY RECOVERY UNITS
23-81-29 VARIABLE REFRIGERANT FLOW HVAC SYSTEMS
23-82-39.13 CABINET UNIT HEATERS
TABLE OF CONTENTS Crab Orchard National Wildlife Refuge 00-01-10 - 4 of 5 Headquarters Building -- 198212.00
The Kubala Washatko Architects, Inc. © 2017
DIVISION 26 – ELECTRICAL
26-05-00 COMMON WORK RESULTS FOR ELECTRICAL
26-05-03 ELECTRICAL EQUIPMENT MOUNTING REQUIREMENTS
26-05-04 INSPECTION AND TESTING OF ELECTRICAL EQUIPMENT
26-05-19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26-05-23 CONTROL-VOLTAGE ELECTRICAL POWER CABLES
26-05-26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26-05-29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26-05-33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
26-05-48 SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
26-05-53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26-05-73 OVERCURRENT PROTECTIVE DEVICE COORDINATION
AND ARC FLASH HAZARD ANALYSIS STUDY
26-08-00 COMMISSIONING OF ELECTRICAL SYSTEMS
26-09-13 ELECTRICAL POWER MONITORING AND CONTROL
26-09-23 LIGHTING CONTROL DEVICES
26-09-43 DIGITAL NETWORK LIGHTING CONTROLS
26-24-16 PANELBOARDS
26-27-02 EQUIPMENT WIRING SYSTEMS
26-27-13 ELECTRICITY METERING
26-27-26 WIRING DEVICES
26-28-13 FUSES
26-28-16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26-29-13 ENCLOSED CONTROLLERS
26-31-00 PHOTOVOLTAIC ENERGY EQUIPMENT
26-43-13 SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS
26-51-00 INTERIOR LIGHTING
26-56-00 EXTERIOR LIGHTING
DIVISION 27 – COMMUNICATIONS
27-05-00 COMMON WORK RESULTS FOR COMMUNICATIONS
27-05-26 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS
27-05-28.33 CONDUITS AND BACKBOXES FOR COMMUNICATIONS
27-05-44 SLEEVES AND SLEEVE SEALS FOR COMMUNICATIONS PATHWAYS
AND CABLING
27-11-00 COMMUNICATIONS EQUIPMENT ROOM FITTINGS
27-15-00 COMMUNICATIONS HORIZONTAL CABLING
27-41-00 AUDIO/VISUAL SYSTEM
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28-05-13 CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY
28-05-28 PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY
28-05-44 SLEEVES AND SLEEVE SEALS FOR ELECTRONIC SAFETY AND SECURITY
PATHWAYS AND CABLING
28-16-00 INTRUSION DETECTION
28-31-11 DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM
DIVISION 31 – EARTHWORK
31-10-00 SITE CLEARING
31-22-00 SITE GRADING
31-23-16 EXCAVATION FOR BUILDINGS
31-23-23 FILL AND BACKFILL
31-36-00 GABIONS
Headquarters Building -- 198212.00 00-01-10 - 5 of 5
The Kubala Washatko Architects, Inc. © 2017
DIVISION 32 – SITE IMPROVEMENTS
32-17-23 PAVEMENT MARKINGS
32-32-00 METAL BIN RETAINING WALL SYSTEM
32-91-13 BIORETENTION GARDENS
32-92-19 SEEDING
32-93-00 PLANTS
DIVISION 33 – UTILITIES
33-14-16 WATER MAINS AND APPURTENANCES
33-31-13 WASTEWATER SYSTEMS
33-40-00 STORM DRAINAGE UTILITIES
END OF TABLE OF CONTENTS
Crab Orchard National Wildlife Refuge AVAILABLE PROJECT INFORMATION Headquarters Building - 198212.01 00-31-00 - 1 of 1
The Kubala Washatko Architects, Inc. (C) 2017
SECTION 00-31-00
AVAILABLE PROJECT INFORMATION
PART 1 GENERAL
1.01 EXISTING CONDITIONS
A. Certain information relating to existing surface and subsurface conditions and structures is available to bidders, as follows:
B. Site Survey: Entitled Site Preparation & Removals Plan, dated June 2017.
1. The survey is included in the Bidding Documents as C1.1, Sheet 4 of 132.
2. This survey identifies grade elevations prepared primarily for the use of Government in establishing new grades and identifying natural water shed.
C. Geotechnical Report: Entitled Soil Borings and Foundation Recommendations Proposed Crab
Orchard National Wildlife Refuge Headqarters and Visitor Center, dated January 5, 2017.
1. A geotechnical reports has been prepared for the site and is included as part of this Project
Manual.
2. This report identifies properties of below grade conditions and offers recommendations for the design of foundations, prepared primarily for the use of Government.
3. The recommendations described shall not be construed as a requirement of this Contract, unless specifically referenced in the Contract Documents.
4. This report, by its nature, cannot reveal all conditions that exist on the site. Should subsurface conditions be found to vary substantially from this report, changes in the design and construction of foundations will be made, with resulting credits or expenditures to the Contract Sum accruing to Government.
D. Existing Geothermal Site Plan: Entitled HVAC Renovation of Headquarters Building, Geothermal Site Plan (CRO638M0.DWG), dated August, 2004.
1. The existing geothermal site plan is available from the Government upon request.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
END OF SECTION
Project:
CONWR Headquarters and Visitor Center
Williamson County, Illinois
Client:
The Kubala Washatko Architects, Inc.
Cedarburg, Wisconsin
Project No. H-16265
Not to Scale
December 15, 2016
Boring Location Diagram
B9
B7 B6
B8
B4
B11
B2
B3
B1
B10
B5
B12
SUBSTITUTION FORM – CONSTRUCTION
00 63 25 - 1 of 2
The Kubala Washatko Architects, Inc. © 2017
Substitution Request Form during Construction
Project: Crab Orchard National Wildlife Refuge Headquarters Building
To: Erik Hancock, Project Architect The Kubala Washatko Architects, Inc.
W16 N617 Mequon Ave Cedarburg, WI 53012 Tel: 262-377-6039 Email: ehancock@tkwa.com Fax: 262-377-2954
Project No.: 198212.00 _________________________
Substitution Request No.: ___________________________
From: ________________________________________
Date: ________________________________________
Contract For: ____________________________________
Specification Section: ______________________________
Section No.: _______________ Page: ______________
Description: _____________________________________
Article/Paragraph: _________________________________
Proposed Substitution: ______________________________________________________________________________________
Manufacturer: _______________________________________ Address: ______________________________________
Phone: ___________________ Fax: __________________ ______________________________________
Trade Name: _______________________________________ Model No.: ______________________________________
Installer: ___________________________________________ Address: ______________________________________
Phone: ___________________ Fax: __________________ ______________________________________
Differences between proposed and specified product: ____________________________________________________________
History: New 2 – 5 years old 5 – 10 years old Greater than 10 years old
Point-by-point comparison attached – Required by Government
Reason for not providing specified item: ________________________________________________________________________
Similar Installation:
Project: ______________________________________ Design Professional: _____________________________________
Address: ______________________________________ Owner: _______________________________________________
______________________________________ Date Installed: _________________________________________
Proposed Substitution affects which other portions of the Work: No Yes – Explain: ______________________
Proposed Deduction in Contract Price: _____________________________________________ ($ _____________________ )
Proposed Substitution Changes Contract Time: X No Yes [Add] [Deduct] Days CHANGES TO PROJECT TIME ARE
NOT ALLOWED
Supporting Data: Drawings Product Data Samples Tests Reports Other _________
SUBSTITUTION FORM – CONSTRUCTION
00 63 25 - 2 of 2
The Kubala Washatko Architects, Inc. © 2017
Substitution Request Form during Construction
The Undersigned Certifies:
• Proposed substitution has been fully investigated and determined to be equal or superior in all aspects the specified product.
• Same Warranty will be furnished for proposed substitution as for specified product.
• Same maintenance service and source of replacement parts, as applicable, is available.
• Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule.
• Cost data as stated above is complete. Claims for additional costs related to accepted substitution, which may subsequently become apparent are to be waived.
• Proposed substitution does to affect dimensions and functional clearances.
• Payment will be made for changes to building design, including architectural design, detailing, and construction costs caused by the substitution.
• Coordination, installation, and changes in the Work as necessary for accepted substitution willl be complete in all respects.
Submitted by: _____________________________________________________________________
Signed By: _____________________________________________________________________
Firm: _____________________________________________________________________
Address: _____________________________________________________________________
Telephone: _________________________ Fax/Email: ______________________________
Attachments: _____________________________________________________________________
GOVERNMENT’S REVIEW AND ACTION
Substitution approved. Make submittals in accordance with Specification Section 01 30 00.
Substitution approved as noted. Make submittals in accordance with Specification Section 01 30 00.
Substitution rejected. Use specified materials.
Substitution Request received too late. Use specified materials.
Signed By: _____________________________________________________ Date: _________________
Additional Comments: Contractor Subcontractor Supplier Manufacturer Architect
Crab Orchard National Wildlife Refuge LIST OF DRAWINGS Headquarters Building -- 198212.00 00-01-10 - 1 of 3
The Kubala Washatko Architects, Inc. © 2017
DOCUMENT 01-00-10
LIST OF DRAWINGS
DISCIPLINE SHEET FWS CADD
SHEET No. NO. SHEET NAME NAME
GENERAL
G0.0 1 COVER SHEET, VICINITY/LOCATION MAPS .................................. CRO 121 G4 G0.1 2 GENERAL NOTES AND DRAWING INDEX ...................................... CRO 122 G4
CIVIL
C1.0 3 SITE KEY PLAN.................................................................................. CRO 123 C0 C1.1 4 SITE PREPARATION & REMOVALS PLANS .................................... CRO 124 C0 C1.2 5 SITE LAYOUT PLAN .......................................................................... CRO 125 C0 C1.3 6 SITE GRADING PLAN ........................................................................ CRO 126 C0 C1.4 7 SWPP PLAN ....................................................................................... CRO 127 C0 C1.5 8 SWPP PLAN ....................................................................................... CRO 128 C0 C1.6 9 SWPP PLAN ....................................................................................... CRO 129 C0 C1.7 10 SWPP PLAN ....................................................................................... CRO 130 C0
C1.8 11 NORTH PARKING AREA – SITE REPARATION & LAYOUT PLANS CRO 131 C6
C1.9 12 NORTH PARKING AREA – SITE GRADING PLANS ........................ CRO 132 C0 C1.10 13 PHASE 2 – SITE LAYOUT & GRADING PLANS ............................... CRO 133 C0 C1.11 14 SITE DETAILS .................................................................................... CRO 134 C2 C1.12 15 SITE DETAILS .................................................................................... CRO 135 C2 C1.13 16 SITE DETAILS .................................................................................... CRO 136 C2 C1.14 17 SITE DETAILS .................................................................................... CRO 137 C2 C1.15 18 DIRECTION SIGN DETAILS .............................................................. CRO 138 C2
LANDSCAPE
L0.0 19 PLANTING AND SEEDING PLANS .................................................... CRO 139 L0 L1.1 20 PLANTING DETAILS ........................................................................... CRO 140 L2 L1.2 21 BIORETENTION LAYOUT & GRADING PLANS ................................ CRO 141 L6 L1.3 22 BIORETENTION LAYOUT & GRADING PLANS ................................ CRO 142 L6 L1.4 23 BIORETENTION LAYOUT & GRADING PLANS ................................ CRO 143 L6 L1.5 24 BIORETENTION NOTES AND DETAILS ............................................ CRO 144 L2
UTILITY
U1.0 25 OVERALL SITE UTILITY PLAN .......................................................... CRO 145 U0 U1.1 26 WATER PLAN & PROFILE ................................................................. CRO 146 U0 U1.2 27 WATER PLAN & PROFILE ................................................................. CRO 147 U0 U1.3 28 WATER PLAN & PROFILE ................................................................. CRO 148 U0 U1.4 29 WATER PLAN & PROFILE ................................................................. CRO 149 U0 U1.5 30 WATER PLAN & PROFILE ................................................................. CRO 150 U0 U1.6 31 WATER PLAN & PROFILE ................................................................. CRO 151 U0 U1.7 32 SANITARY SEWER FORCE MAIN PLAN & PROFILE ...................... CRO 152 U2 U1.8 33 WATER MAIN DETAILS ..................................................................... CRO 153 U2 U1.9 34 SANITARY SEWER DETAILS ............................................................ CRO 154 U2 U1.10 35 SANITARY SEWER DETAILS ............................................................ CRO 155 U2 U1.11 36 SANITARY SEWER DETAILS ............................................................ CRO 156 U2 U1.12 37 SANITARY SEWER DETAILS ............................................................ CRO 157 U2
ARCHITECTURAL
A1.0 38 FLOOR PLAN – PHASE 1 ................................................................... CRO 158 A0 A1.1 39 CLERESTORY PLAN – PHASE 1 ....................................................... CRO 159 A0 A1.2 40 ROOF PLAN – PHASE 1 ..................................................................... CRO 160 A0 A1.3 41 FLOOR PLAN – PHASE 2 ................................................................... CRO 161 A0
LIST OF DRAWINGS Crab Orchard National Wildlife Refuge 00-01-10 - 2 of 3 Headquarters Building -- 198212.00
The Kubala Washatko Architects, Inc. © 2017
DISCIPLINE SHEET FWS CADD
SHEET No. NO. SHEET NAME NAME
ARCHITECTURAL Continued
A1.4 42 CLERESTORY PLAN – PHASE 2 ....................................................... CRO 162 A0 A1.5 43 ROOF PLAN – PHASE 2 ..................................................................... CRO 163 A0 A2.0 44 REFLECTED CEILING PLAN – PHASE 1 .......................................... CRO 164 A0 A2.1 45 REFLECTED CEILING PLAN – PHASE 2 .......................................... CRO 165 A0 A3.0 46 EXTERIOR ELEVATIONS – PHASE 1 ................................................ CRO 166 A1 A3.1 47 EXTERIOR ELEVATIONS – PHASE 1 ................................................ CRO 167 A1 A3.2 48 EXTERIOR ELEVATIONS – PHASE 2 ................................................ CRO 168 A1 A4.0 49 BUILDING SECTIONS – PHASE 1 ..................................................... CRO 169 A2 A4.1 50 BUILDING SECTIONS – PHASE 1 ..................................................... CRO 170 A2 A4.2 51 BUILDING SECTIONS – PHASE 1 ..................................................... CRO 171 A2 A4.3 52 BUILDING SECTIONS – PHASE 1 ..................................................... CRO 172 A2 A4.4 53 BUILDING SECTIONS – PHASE 2 ..................................................... CRO 173 A2 A5.0 54 WALL SECTIONS ................................................................................ CRO 174 A2 A5.1 55 WALL SECTIONS ................................................................................ CRO 175 A2 A5.2 56 WALL SECTIONS ................................................................................ CRO 176 A2 A5.3 57 WALL SECTIONS ................................................................................ CRO 177 A2 A5.4 58 SITE ACCESSORIES .......................................................................... CRO 178 A2 A6.0 59 WALL TYPES ....................................................................................... CRO 179 A2 A6.1 60 DETAILS .............................................................................................. CRO 180 A2 A6.2 61 DETAILS .............................................................................................. CRO 181 A2 A6.3 62 DETAILS .............................................................................................. CRO 182 A2 A6.4 63 DETAILS .............................................................................................. CRO 183 A2 A6.5 64 DETAILS .............................................................................................. CRO 184 A2 A6.6 65 PRECAST DETAILS ............................................................................ CRO 185 A2 A7.0 66 INTERIOR ELEVATIONS & DETAILS ................................................. CRO 186 A3 A7.1 67 INTERIOR ELEVATIONS & DETAILS ................................................. CRO 187 A3 A7.2 68 INTERIOR ELEVATIONS & DETAILS ................................................. CRO 188 A3 A7.3 69 INTERIOR ELEVATIONS & DETAILS ................................................. CRO 189 A3 A7.4 70 INTERIOR ELEVATIONS & DETAILS ................................................. CRO 190 A3 A7.5 71 INTERIOR ELEVATIONS & DETAILS ................................................. CRO 191 A3 A8.0 72 DOOR SCHEDULE – PHASE 1 .......................................................... CRO 192 A4 A8.1 73 DOOR SCHEDULE – PHASE 2 .......................................................... CRO 193 A4 A8.2 74 WINDOW SCHEDULE AND ELEVATIONS ........................................ CRO 194 A4 A8.3 75 WINDOWS ELEVATIONS ................................................................... CRO 195 A3 A8.4 76 DOOR & WINDOW DETAILS .............................................................. CRO 196 A3 A8.5 77 DOOR & WINDOW DETAILS .............................................................. CRO 197 A3 A8.6 78 DOOR & WINDOW DETAILS .............................................................. CRO 198 A3 A8.7 79 DOOR & WINDOW DETAILS .............................................................. CRO 199 A3 A9.0 80 FINISH SCHEDULE & KEY ................................................................. CRO 200 A4 A9.1 81 FINISH SPECIFICATIONS .................................................................. CRO 201 A4 A9.2 82 FINISH FLOOR PLAN – PHASE 1 ...................................................... CRO 202 A0 A9.3 83 FINISH FLOOR PLAN – PHASE 2 ...................................................... CRO 203 A0 A9.4 84 FURNITURE PLAN – PHASE1 ............................................................ CRO 204 A0 A9.5 85 FURNITURE PLAN – PHASE 2 ........................................................... CRO 205 A0
STRUCTURAL
S0.1 86 GENERAL NOTES .............................................................................. CRO 206 S4 S0.2 87 NOTES & SCHEDULES ...................................................................... CRO 207 S4 S1.0 88 FOUNDATION PLAN – PHASE 1 ........................................................ CRO 208 S0 S1.1 89 ROOF FRAMING PLAN – PHASE 1 ................................................... CRO 209 S0 S1.2 90 FOUNDATION PLAN – PHASE 2 ........................................................ CRO 210 S0 S1.3 91 ROOF FRAMING PLAN – PHASE 2 ................................................... CRO 211 S0
Crab Orchard National Wildlife Refuge LIST OF DRAWINGS Headquarters Building -- 198212.00 00-01-10 - 3 of 3
The Kubala Washatko Architects, Inc. © 2017
DISCIPLINE SHEET FWS CADD
SHEET No. NO. SHEET NAME NAME
STRUCTURAL Continued
S3.0 92 STORM SHELTER............................................................................... CRO 212 S0 S3.1 93 STRUCTURAL DETAILS ..................................................................... CRO 213 S0 S3.2 94 STRUCTURAL DETAILS ..................................................................... CRO 214 S2 S3.3 95 STRUCTURAL DETAILS ..................................................................... CRO 215 S2
MECHANICAL
M0.0 96 MECHANICAL LEGEND, ABBREVIATIONS, NOTES ....................... CRO 216 M4 M1.1 97 MECHANICAL FLOOR PLAN - PHASE 1 .......................................... CRO 217 M0 M1.2 98 MECHANICAL FLOOR PLAN - PHASE 2 .......................................... CRO 218 M0 M4.0 99 ENLARGED MECHANICAL PLANS ................................................... CRO 219 M0 M4.1 100 MECHANICAL SECTIONS ................................................................. CRO 220 M2 M4.2 101 MECHANICAL SCHEMATICS – VRF PHASE 1 ................................ CRO 221 M2 M4.3 102 MECHANICAL SCHEMATICS – VRF PHASE 2 ................................ CRO 222 M2 M5.0 103 MECHANICAL DETAILS .................................................................... CRO 223 M2 M6.0 104 MECHANICAL SCHEDULES ............................................................. CRO 224 M4 M6.1 105 MECHANICAL SCHEDULES ............................................................ CRO 225 M4
PLUMBING
P0.0 106 PLUMBING LEGEND, ABBREVIATIONS, NOTES DETAILS ............. CRO 226 P4
P0.1 107 PLUMBING UNDERGROUND PLAN – PHASE 1 ............................... CRO 227 P0 P0.2 108 PLUMBING UNDERGROUND PLAN – PHASE 2 ............................... CRO 228 P0 P1.1 109 PLUMBING FLOOR PLAN – PHASE 1 ............................................... CRO 229 P0 P1.2 110 PLUMBING FLOOR PLAN – PHASE 2 ............................................... CRO 230 P0 P4.0 111 PLUMBING ENLARGED PLANS......................................................... CRO 231 P0 P6.0 112 PLUMBING SCHEDULES ................................................................... CRO 232 P4 P9.0 113 PLUMBING ISOMETRICS ................................................................... CRO 233 P2 P9.1 114 PLUMBING ISOMETRICS ................................................................... CRO 234 P2
ELECTRICAL
E0.0 115 ELECTRICAL LEGEND, ABBREVIATIONS, NOTES ......................... CRO 235 E4 E0.1 116 ELECTRICAL SITE PLAN ................................................................... CRO 236 E0 E0.2 117 ELECTRICAL SITE PLAN – ENTRANCE GATE ................................. CRO 237 E0 E0.3 118 ELECTRICAL SITE PLAN – MAINTENANCE BUILDING ................... CRO 238 E0 E1.1 119 ELECTRICAL LIGHTING FLOOR PLAN – PHASE 1.......................... CRO 239 E0 E1.2 120 ELECTRICAL LIGHTING FLOOR PLAN – PHASE 2.......................... CRO 240 E0 E2.1 121 ELECTRICAL POWER FLOOR PLAN – PHASE 1 ............................. CRO 241 E0 E2.2 122 ELECTRICAL POWER FLOOR PLAN – PHASE 2 ............................. CRO 242 E0 E3.1 123 ELECTRICAL SYSTEMS FLOOR PLAN – PHASE 1 ......................... CRO 243 E0 E3.2 124 ELECTRICAL SYSTEMS FLOOR PLAN – PHASE 2 ......................... CRO 244 E0 E4.0 125 LIGHTING FIXTURE SCHEDULE ....................................................... CRO 245 E4 E4.1 126 LIGHTING CONTROL SCHEDULES .................................................. CRO 246 E4 E4.2 127 ELECTRICAL SCHEDULES ................................................................ CRO 247 E4 E4.3 128 ELECTRICAL PANEL SCHEDULES ................................................... CRO 248 E4 E5.0 129 ELECTRICAL ONE-LINE DIAGRAMS................................................. CRO 249 E2 E6.0 130 ELECTRICAL DETAILS ....................................................................... CRO 250 E2 E6.1 131 ELECTRICAL DETAILS ....................................................................... CRO 251 E2 E6.2 132 ELECTRICAL DETAILS ....................................................................... CRO 252 E2
END OF LIST OF DRAWINGS
Crab Orchard National Wildlife Refuge Headquarters LIST OF DRAWINGS & Visitor Center -- 198212.00 00 01 10 - 1 of 3
The Kubala Washatko Architects, Inc. © 2017
DOCUMENT 01 00 10
LIST OF DRAWINGS
GENERAL
G0.0 1 COVER SHEET, VICINITY/LOCATION MAPS
G0.1 2 GENERAL NOTES AND DRAWING INDEX
CIVIL
C1.0 3 SITE KEY PLAN
C1.1 4 SITE PREPARATION & REMOVALS PLANS
C1.2 5 SITE LAYOUT PLAN
C1.3 6 SITE GRADING PLAN
C1.4 7 SWPP PLAN
C1.5 8 SWPP PLAN
C1.6 9 SWPP PLAN
C1.7 10 SWPP PLAN
C1.8 11 NORTH PARKING AREA – SITE REPARATION & LAYOUT PLANS
C1.9 12 NORTH PARKING AREA – SITE GRADING PLANS
C1.10 13 PHASE 2 – SITE LAYOUT & GRADING PLANS
C1.11 14 SITE DETAILS
C1.12 15 SITE DETAILS
C1.13 16 SITE DETAILS
C1.14 17 SITE DETAILS
C1.15 18 DIRECTION SIGN DETAILS
LANDSCAPE
L0.0 19 PLANTING AND SEEDING PLANS
L1.1 20 PLANTING DETAILS
L1.2 21 BIORETENTION LAYOUT & GRADING PLANS
L1.3 22 BIORETENTION LAYOUT & GRADING PLANS
L1.4 23 BIORETENTION LAYOUT & GRADING PLANS
L1.5 24 BIORETENTION NOTES AND DETAILS
UTILITY
U1.0 25 OVERALL SITE UTILITY PLAN
U1.1 26 WATER PLAN & PROFILE
U1.2 27 WATER PLAN & PROFILE
U1.3 28 WATER PLAN & PROFILE
U1.4 29 WATER PLAN & PROFILE
U1.5 30 WATER PLAN & PROFILE
U1.6 31 WATER PLAN & PROFILE
U1.7 32 SANITARY SEWER FORCE MAIN PLAN & PROFILE
U1.8 33 WATER MAIN DETAILS
U1.9 34 SANITARY SEWER DETAILS
U1.10 35 SANITARY SEWER DETAILS
U1.11 36 SANITARY SEWER DETAILS
U1.12 37 SANITARY SEWER DETAILS
ARCHITECTURAL
A1.0 38 FLOOR PLAN – PHASE 1
A1.1 39 CLERESTORY PLAN – PHASE 1
A1.2 40 ROOF PLAN – PHASE 1
A1.3 41 FLOOR PLAN – PHASE 2
A1.4 42 CLERESTORY PLAN – PHASE 2
A1.5 43 ROOF PLAN – PHASE 2
LIST OF DRAWINGS Crab Orchard National Wildlife Refuge Headquarters 00 01 10 - 2 of 3 & Visitor Center -- 198212.00
The Kubala Washatko Architects, Inc. © 2017
ARCHITECTURAL Continued
A2.0 44 REFLECTED CEILING PLAN – PHASE 1
A2.1 45 REFLECTED CEILING PLAN – PHASE 2
A3.0 46 EXTERIOR ELEVATIONS – PHASE 1
A3.1 47 EXTERIOR ELEVATIONS – PHASE 1
A3.2 48 EXTERIOR ELEVATIONS – PHASE 2
A4.0 49 BUILDING SECTIONS – PHASE 1
A4.1 50 BUILDING SECTIONS – PHASE 1
A4.2 51 BUILDING SECTIONS – PHASE 1
A4.3 52 BUILDING SECTIONS – PHASE 1
A4.4 53 BUILDING SECTIONS – PHASE 2
A5.0 54 WALL SECTIONS
A5.1 55 WALL SECTIONS
A5.2 56 WALL SECTIONS
A5.3 57 WALL SECTIONS
A5.4 58 SITE ACCESSORIES
A6.0 59 WALL TYPES
A6.1 60 DETAILS
A6.2 61 DETAILS
A6.3 62 DETAILS
A6.4 63 DETAILS
A6.5 64 DETAILS
A6.6 65 PRECAST DETAILS
A7.0 66 INTERIOR ELEVATIONS & DETAILS
A7.1 67 INTERIOR ELEVATIONS & DETAILS
A7.2 68 INTERIOR ELEVATIONS & DETAILS
A7.3 69 INTERIOR ELEVATIONS & DETAILS
A7.4 70 INTERIOR ELEVATIONS & DETAILS
A8.0 71 DOOR SCHEDULE – PHASE 1
A8.1 72 DOOR SCHEDULE – PHASE 2
A8.2 73 WINDOW SCHEDULE
A8.3 74 WINDOWS SCHEDULE AND ELEVATIONS
A8.4 75 DOOR & WINDOW DETAILS
A8.5 76 DOOR & WINDOW DETAILS
A8.6 77 DOOR & WINDOW DETAILS
A9.0 78 FINISH SCHEDULE
A9.1 79 FINISH SPECIFICATIONS
A9.2 80 FINISH FLOOR PLAN – PHASE 1
A9.3 81 FINISH FLOOR PLAN – PHASE 2
A9.4 82 FURNITURE PLAN – PHASE1
A9.5 83 FURNITURE PLAN – PHASE 2
STRUCTURAL
S0.1 84 GENERAL NOTES
S0.2 85 NOTES & SCHEDULES
S1.0 86 FOUNDATION PLAN – PHASE 1
S1.1 87 ROOF FRAMING PLAN – PHASE 1
S1.2 88 FOUNDATION PLAN – PHASE 2
S1.3 89 ROOF FRAMING PLAN – PHASE 2
S3.0 90 STORM SHELTER
S3.1 91 STRUCTURAL DETAILS
S3.2 92 STRUCTURAL DETAILS
S3.3 93 STRUCTURAL DETAILS
S3.4 94 STRUCTURAL DETAILS
S3.5 95 STRUCTURAL DETAILS
Crab Orchard National Wildlife Refuge Headquarters LIST OF DRAWINGS & Visitor Center -- 198212.00 00 01 10 - 3 of 3
The Kubala Washatko Architects, Inc. © 2017
MECHANICAL
M0.0 96 MECHANICAL LEGEND, ABBREVIATIONS, NOTES
M1.1 97 MECHANICAL FLOOR PLAN - PHASE 1
M1.2 98 MECHANICAL FLOOR PLAN - PHASE 2
M4.0 99 ENLARGED MECHANICAL PLANS
M4.1 100 MECHANICAL SECTIONS
M4.2 101 MECHANICAL SCHEMATICS – VRF PHASE 1
M4.3 102 MECHANICAL SCHEMATICS – VRF PHASE 2
M5.0 103 MECHANICAL DETAILS
M6.0 104 MECHANICAL SCHEDULES
M6.1 105 MECHANICAL SCHEDULES
PLUMBING
P0.0 106 PLUMBING LEGEND, ABBREVIATIONS, NOTES DETAILS
P0.1 107 PLUMBING UNDERGROUND PLAN – PHASE 1
P0.2 108 PLUMBING UNDERGROUND PLAN – PHASE 2
P1.1 109 PLUMBING FLOOR PLAN – PHASE 1
P1.2 110 PLUMBING FLOOR PLAN – PHASE 2
P4.0 111 PLUMBING ENLARGED PLANS
P6.0 112 PLUMBING SCHEDULES
P9.0 113 PLUMBING ISOMETRICS
P9.1 114 PLUMBING ISOMETRICS
ELECTRICAL
E0.0 115 ELECTRICAL LEGEND, ABBREVIATIONS, NOTES
E0.1 116 ELECTRICAL SITE PLAN
E0.2 117 ELECTRICAL SITE PLAN – ENTRANCE GATE
E0.3 118 ELECTRICAL SITE PLAN – MAINTENANCE BUILDING
E1.1 119 ELECTRICAL LIGHTING FLOOR PLAN – PHASE 1
E1.2 120 ELECTRICAL LIGHTING FLOOR PLAN – PHASE 2
E2.1 121 ELECTRICAL POWER FLOOR PLAN – PHASE 1
E2.2 122 ELECTRICAL POWER FLOOR PLAN – PHASE 2
E3.1 123 ELECTRICAL SYSTEMS FLOOR PLAN – PHASE 1
E3.2 124 ELECTRICAL SYSTEMS FLOOR PLAN – PHASE 2
E4.0 125 LIGHTING FIXTURE SCHEDULE
E4.1 126 LIGHTING CONTROL SCHEDULES
E4.2 127 ELECTRICAL SCHEDULES
E4.3 128 ELECTRICAL PANEL SCHEDULES
E5.0 129 ELECTRICAL ONE-LINE DIAGRAMS
E6.0 130 ELECTRICAL DETAILS
E6.1 131 ELECTRICAL DETAILS
E6.2 132 ELECTRICAL DETAILS
END OF LIST OF DRAWINGS
Crab Orchard National Wildlife Refuge Headquarters SUMMARY & Visitor Center - 198212.01 01 10 00 - 1 of 1
The Kubala Washatko Architects, Inc. (C) 2017
SECTION 01 10 00
SUMMARY
PART 1 GENERAL
1.01 PROJECT
A. Project Name: Crab Orchard National Wildlife Refuge Headquarters & Visitor Center
B. Owner's Name: US Fish and Wildlife Service.
C. Architect's Name: The Kubala Washatko Architects, Inc..
D. Phase 1 Bid: The Project consists of the construction of a one-story, approximate 10,625 square foot headquarter structure. The Project includes site clearing and grading, site utilities, paving, and landscaping; The building consist of concrete foundations, rigid steel framing, concrete masonry and exterior stone, metal siding, metal roofing, metal and wood doors, storefront windows and doors, interior finishes, standard building specialties, mechanical, plumbing, fire protection (sprinklers and alarms), and electrical systems.
E. Phase 2- Do Not Bid: The second phase will be incorporating a one-story visitor center of approximate 5,630 square feet, constructed of the same materials, and include an exterior presentation area.
1.02 CONTRACT DESCRIPTION
A. Contract Type: A single prime contract based on a Stipulated Price as described in Document 00 52 00 - Agreement Form.
1.03 OWNER OCCUPANCY
A. Owner intends to occupy the Project upon Substantial Completion.
B. Cooperate with Owner to minimize conflict and to facilitate Owner's operations.
C. Schedule the Work to accommodate Owner occupancy.
1.04 CONTRACTOR USE OF SITE AND PREMISES
A. Construction Operations: Limited to areas noted on Drawings.
B. Provide access to and from site as required by law and by Owner:
1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered.
2. Do not obstruct roadways, sidewalks, or other public ways without permit.
1.05 WORK SEQUENCE
A. Construct Work in this phase during the construction period:
1. Phase 1: Headquarter offices.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
Crab Orchard National Wildlife Refuge Headquarters PRICE AND PAYMENT PROCEDURES & Visitor Center - 198212.01 01 20 00 - 1 of 3
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Procedures for preparation and submittal of applications for progress payments.
B. Documentation of changes in Contract Sum and Contract Time.
C. Procedures for preparation and submittal of application for final payment.
1.02 RELATED REQUIREMENTS
A. Document 00 52 00 - Agreement Form: Contract Sum, retainages, payment period, monetary values of unit prices.
B. Document 00 72 00 - General Conditions and Document 00 73 00 - Supplementary Conditions:
Additional requirements for progress payments, final payment, changes in the Work.
C. Section 01 22 00 - Unit Prices: Monetary values of unit prices, payment and modification procedures relating to unit prices.
1.03 SCHEDULE OF VALUES
A. Electronic media printout including equivalent information will be considered in lieu of standard form specified; submit draft to Architect for approval.
B. Forms filled out by hand will not be accepted.
C. Submit Schedule of Values in duplicate within 15 days after date of Owner-Contractor
Agreement.
D. Format: Utilize the Table of Contents of this Project Manual. Identify each line item with number and title of the specification Section. Identify site mobilization.
E. Include separately from each line item, a direct proportional amount of Contractor's overhead and profit.
1.04 APPLICATIONS FOR PROGRESS PAYMENTS
A. Payment Period: Submit at intervals stipulated in the Agreement.
B. Electronic media printout including equivalent information will be considered in lieu of standard form specified; submit sample to Architect for approval.
C. Forms filled out by hand will not be accepted.
D. Present required information in typewritten form.
E. Form: AIA G702 - Contractor's Application for Payment Form including continuation sheets when required.
F. For each item, provide a column for listing each of the following:
1. Item Number.
2. Description of work.
3. Scheduled Values.
4. Previous Applications.
5. Work in Place and Stored Materials under this Application.
6. Authorized Change Orders.
7. Total Completed and Stored to Date of Application.
8. Percentage of Completion.
9. Balance to Finish.
10. Retainage.
G. Execute certification by signature of authorized officer.
H. List each authorized Change Order as a separate line item, listing Change Order number and dollar amount as for an original item of Work.
PRICE AND PAYMENT PROCEDURES Crab Orchard National Wildlife Refuge Headquarters 01 20 00 - 2 of 3 & Visitor Center - 198212.01
I. Submit One (1) copies of each Application for Payment.
J. Include the following with the application:
1. Transmittal letter as specified for Submittals in Section 01 30 00.
2. Construction progress schedule, revised and current as specified in Section 01 30 00.
3. Partial release of liens from major Subcontractors and vendors.
K. When Architect requires substantiating information, submit data justifying dollar amounts in question.
1.05 MODIFICATION PROCEDURES
A. Architect will issue a Construction Bulletin to initiate a modification to the Contract Documents.
Construction Bulletin may be resultant from a Request for Information / Interpretation issued by the Contractor, Architect's on-site observations, Owner's request for a modification, substitution request, or other similar manner.
1. Contractor shall respond to Construction Bulletin's instructions promptly.
2. Upon acceptance of Construction Bulletin proposal, contract modification will be recorded under a Change Order referencing the Construction Bulletin number, changes to the Work, Contract Sum and Contract Time.
B. Contractor may propose a change by submitting a request for change to Architect, describing the proposed change and its full effect on the Work, with a statement describing the reason for the change, and the effect on the Contract Sum and Contract Time with full documentation and a statement describing the effect on Work by separate or other contractors. Document any requested substitutions in accordance with Section 01 60 00.
C. Computation of Change in Contract Amount: As specified in the Agreement and Conditions of the Contract.
1. For change requested by Architect for work falling under a fixed price contract, the amount will be based on Contractor's price quotation.
2. For change requested by Contractor, the amount will be based on the Contractor's request for a Change Order as approved by Architect.
3. For pre-determined unit prices and quantities, the amount will based on the fixed unit prices.
4. For change ordered by Architect without a quotation from Contractor, the amount will be determined by Architect based on the Contractor's substantiation of costs as specified for Time and Material work.
D. Substantiation of Costs: Provide full information required for evaluation.
1. Provide following data:
a. Quantities of products, labor, and equipment.
b. Taxes, insurance, and bonds.
c. Overhead and profit.
d. Justification for any change in Contract Time.
e. Credit for deletions from Contract, similarly documented.
2. Support each claim for additional costs with additional information:
a. Origin and date of claim.
b. Dates and times work was performed, and by whom.
c. Time records and wage rates paid.
d. Invoices and receipts for products, equipment, and subcontracts, similarly documented.
E. Execution of Change Orders: Architect will issue Change Orders for signatures of parties as provided in the Conditions of the Contract.
F. Promptly enter changes in Project Record Documents.
1.06 APPLICATION FOR FINAL PAYMENT
A. Prepare Application for Final Payment as specified for progress payments, identifying total adjusted Contract Sum, previous payments, and sum remaining due.
Crab Orchard National Wildlife Refuge Headquarters PRICE AND PAYMENT PROCEDURES & Visitor Center - 198212.01 01 20 00 - 3 of 3
B. Application for Final Payment will not be considered until the following have been accomplished:
1. All closeout procedures specified in Section 01 70 00.
2. Submission of Final Waiver of Lien.
PART 2 PRODUCTS - NOT USED
Crab Orchard National Wildlife Refuge Headquarters UNIT PRICES & Visitor Center - 198212.01 01 22 00 - 1 of 1
SECTION 01 22 00
UNIT PRICES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. List of unit prices, for use in preparing Bids.
B. Measurement and payment criteria applicable to Work performed under a unit price payment method.
1.02 RELATED REQUIREMENTS
A. Section 01 20 00 - Price and Payment Procedures: Additional payment and modification procedures.
1.03 COSTS INCLUDED
A. Unit Prices included on the Bid Form shall include full compensation for all required labor, products, tools, equipment, plant, transportation, services and incidentals; erection, application or installation of an item of the Work; overhead and profit.
1.04 UNIT QUANTITIES SPECIFIED
A. Quantities indicated in the Bid Form are for bidding and contract purposes only. Quantities and measurements of actual Work will determine the payment amount.
1.05 MEASUREMENT OF QUANTITIES
A. Measurement methods delineated in the individual specification sections complement the criteria of this section. In the event of conflict, the requirements of the individual specification section govern.
B. Take all measurements and compute quantities. Measurements and quantities will be verified by Architect.
C. Assist by providing necessary equipment, workers, and survey personnel as required.
1.06 PAYMENT
A. Payment for Work governed by unit prices will be made on the basis of the actual measurements and quantities of Work that is incorporated in or made necessary by the Work and accepted by the Architect, multiplied by the unit price.
B. Payment will not be made for any of the following:
1. Products wasted or disposed of in a manner that is not acceptable.
2. Products determined as unacceptable before or after placement.
3. Products not completely unloaded from the transporting vehicle.
4. Products placed beyond the lines and levels of the required Work.
5. Loading, hauling, and disposing of rejected Products.
1.07 SCHEDULE OF UNIT PRICES
A. Item: Unsuitable soils; Section 31 23 16 & 31 23 23.
1. Description: Provide cost per cubic yard to remove unsuitable soils from site and replace with compacted Structural Fill, Type B, inc accordance with Sections 31 23 16 - Excavation and 32 32 23 - Fill.
PART 2 PRODUCTS - NOT USED
Crab Orchard National Wildlife Refuge Headquarters ADMINISTRATIVE REQUIREMENTS & Visitor Center - 198212.01 01 30 00 - 1 of 5
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. General administrative requirements.
B. Electronic document submittal service.
C. Preconstruction meeting.
D. Progress meetings.
E. Construction progress schedule.
F. Progress photographs.
G. Coordination drawings.
H. Submittals for review, information, and project closeout.
I. Number of copies of submittals.
J. Submittal procedures.
1.02 RELATED REQUIREMENTS
A. Section 01 70 00 - Execution and Closeout Requirements: Additional coordination requirements.
B. Section 01 78 00 - Closeout Submittals: Project record documents.
1.03 GENERAL ADMINISTRATIVE REQUIREMENTS
A. Conform to requirements of Section 01 70 00 - Execution and Closeout Requirements for coordination of execution of administrative tasks with timing of construction activities.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 ELECTRONIC SUBMITTAL PROCEDURES
A. Documents transmitted for purposes of administration of the Contract are to be in electronic (PDF) format and transmitted via Contractor's email-based submittal process that receives, logs and stores documents, and notifies addressees via email.
1. Besides submittals for review, information, and closeout, this procedure applies to requests for information (RFIs), progress documentation, contract modification documents (e.g. construction bulletins, supplementary instructions, change proposals, change orders), applications for payment, field reports and meeting minutes, and any other document any participant wishes to make part of the project record.
2. Contractor, Government and Architect are required to use this procedure.
3. It is Contractor's responsibility to submit documents in PDF format.
4. Subcontractors, suppliers, and Architect's consultants will be permitted to use the procedure.
5. Electronic software must be a commercially available program that will be used on standard computers, similar to Submittal Exchange by Oracle, or approved equal.
6. Users of the procedure need an email address, Internet access, and PDF review software that includes ability to mark up and apply electronic stamps (such as Adobe Acrobat, www.adobe.com, or Bluebeam PDF Revu, www.bluebeam.com).
7. Paper document transmittals will not be reviewed.
8. All other specified submittal and document transmission procedures apply, except that electronic document requirements do not apply to samples or color selection charts.
B. Project Closeout: Architect will determine when to terminate the service for the project and is responsible for obtaining archive copies of files for Owner.
ADMINISTRATIVE REQUIREMENTS Crab Orchard National Wildlife Refuge Headquarters 01 30 00 - 2 of 5 & Visitor Center - 198212.01
3.02 PRECONSTRUCTION MEETING
A. Schedule meeting after Notice of Award.
B. Attendance Required:
1. Owner.
2. Architect.
3. Contractor.
4. Major subcontractors.
C. Agenda:
1. Execution of Owner-Contractor Agreement.
2. Submission of executed bonds and insurance certificates.
3. Distribution of Contract Documents.
4. Submission of list of Subcontractors, list of Products, schedule of values, and progress schedule.
5. Designation of personnel representing the parties to Contract, Owner and Architect.
6. Designation of personnel representing the parties to Contract, Owner, Construction
Manager and Architect.
7. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.
8. Scheduling.
D. Record minutes and distribute copies within two days after meeting to participants, with two copies to Architect, Owner, participants, and those affected by decisions made.
3.03 PROGRESS MEETINGS
A. Schedule and administer meetings throughout progress of the Work at maximum monthly intervals.
B. Make arrangements for meetings, prepare agenda with copies for participants, preside at meetings.
C. Attendance Required:
1. Contractor.
2. Owner.
3. Architect.
4. Contractor's Superintendent.
5. Major Subcontractors.
D. Agenda:
1. Review minutes of previous meetings.
2. Review of Work progress.
3. Field observations, problems, and decisions.
4. Identification of problems that impede, or will impede, planned progress.
5. Review of submittals schedule and status of submittals.
6. Review of off-site fabrication and delivery schedules.
7. Maintenance of progress schedule.
8. Corrective measures to regain projected schedules.
9. Planned progress during succeeding work period.
10.…