Sol_140F0222R0024_Amd_0002.pdf

PDF 2 MB Posted

Attached to
WI FWS TREMPEALEAU NWR GARAGE ADDITION
Solicitation number
140F0222R0024
Issued by

View the file

Other files

File Type Posted
Attachment__1Trempealeau_0005.pdf PDF
Sol_140F0222R0024_Amd_0005.pdf PDF
Attachment__3Trempealeau_0005.pdf PDF
Attachment__2_(1)Trempealeau_0005.pdf PDF
Sol_140F0222R0024_Amd_0004.pdf PDF
Sol_140F0222R0024_Amd_0003.pdf PDF
Sol_140F0222R0024_Amd_0001.pdf PDF
Safety_Checklist.pdf PDF
A04-Specs_FINAL.pdf PDF
B03-WageDetermination.pdf PDF
17-RF-007_Bid_Schedule.pdf PDF
BidBond__Form_SF24.pdf PDF
A06-DrawingsFINAL.pdf PDF
Sol_140F0222R0024.pdf PDF
PPQ.docx DOCX document
CPARS_Notice.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140F0222R0024 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

F02

Bloomington MN 55437-1458 5600 American Blvd. W., Ste 990

FWS, DIVISION OF CONTRACTING AND GE

08/29/20220002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/16/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amend 2 is to add questions we received on this project and our responses.

Period of Performance: 09/20/2022 to 05/18/2023

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Jeanne Mohlis

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

RFI Questions USFW Trempealeau Garage Addition

1. With the design of the gutters shown in the plans, we believe that the slope of the roof and being standing seam, that the rain will overshoot the gutters at this angle. Can you please address?

a. Response: Bid as shown on documents.

2. With the gutter design, there is not much stability when ice and snow come down as seen on the other building next to this one, they are getting beat down and bending over to the point where they are almost falling off. Can you please address?

a. Response: Bid as shown on documents.

3. For the gutters, would the end user want heat tape in them, so they are not freezing up?

a. Response: No.

4. Please see attached Picture 4750 of the snow rail system, we want to confirm if this will work?

a. Response: Bid as shown on documents. Substitutions are not discussed during bidding.

5. Plans indicate to go over existing siding with the new siding, in some areas there is severe rot, please confirm how you would like to proceed with this? Should these areas be replaced first?

a. Response: At the areas in the front of the building and any areas around the building between the overhead doors remove the rotten siding a minimum of two foot past any sign of rot and install exterior grade plywood the same thickness in these areas before the metal siding is installed.

6. Bollards are indicated to remain, the condition they are in they are deteriorated, and additionally are located too close to the building where you can’t shovel behind and builds up snow, this is causing rot of the siding and will continue causing water damage and rot in the future if left this close to the building. Please advise. Suggest providing new and moving away from the building a couple feet to allow for a shovel to be able to be used behind them.

a. Response: See answer to previous question. Otherwise, bid as shown in documents.

7. Page 3 of the solicitation Indicates 2 different periods of performance; can you indicate which it is? Also, with bids being help up to 60 days, will time be extended for period of performance?

a. Response: The period of performance is 240 days from the notice to proceed.

8. There is no indication of what metal wall panel profile to use, please advise.

a. Response: Vertical. Style can be covered in submittals.

9. Detail 1 on A7 indicates a 2x8 wall 12” O.C., is there a reason for the stud spacing being so close?

a. Response: Just what we decided to go with.

10. Detail 1 on A7 indicates a 2x8 wall 12” O.C., but the wall plate indicates to be 2x6, which is the correct stud size? 2x8 or 2x6?

a. Response: The 2x8. A corrected drawing will be provided to the contractor who gets the project.

File details come from the government source that posted it. Updated .