This document contains a bidding schedule for the construction of Tomahawk Dam located at Tomahawk National Wildlife Refuge in Barnes County, North Dakota. The schedule lists multiple items required for the project including mobilization and demobilization, care and diversion of water, foundation dewatering, erosion and sediment control, clearing and grubbing, demolition and removal of existing structures, excavation, top soil stripping and stockpiling, unclassified excavation, fill including approved fill, topsoil and fine drainfill, riprap, bedding material, conventional concrete, steel reinforcement, stoplog bay, gravel access road, permanent seeding and mulching, and guardrail. The schedule also includes options for additional work and requires bidders to provide overhead and profit percentages. The related federal contract opportunity is solicitation number 140F0222R0015 for rehabilitation of Tomahawk Dam being conducted by the Department of the Interior Fish and Wildlife Service Region 2 located in Valley City, North Dakota.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIDDING SCHEDULE

Tomahawk Dam - Construction (22-031)

Tomahawk NWR

Barnes County, North Dakota

PROJECT DESCRIPTION:

A. GENERAL CONDITIONS:

Division 1: General Requirements

Bond and Insurances $ General Requirements (testing) $ General Requirements (other) $

Division 1 Total $ 0

B. SUMMARY OF COST BREAKDOWN FOR MATERIALS, LABOR AND EQUIPMENT

Item # Item 1 Mobilization and Demobilization $

2 Care and Diversion of Water $

3 Foundation Dewatering $

4 Erosion and Sediment Control $

5 Clearing and Grubbing $

6 Demolition and the Removal of Existing Structures $

7 Excavation $

8a Top Soil Stripping and Stockpiling $

8b Unclassified Excavation $

9 Fill $

9a Approved Fill $

9b Topsoil $

9c Fine Drainfill $

10 Riprap $

11 Bedding Material $

Construct new Concrete Culvert / Bridge in location of existing spillway

Tomahawk NWR

Barnes County, North Dakota

12 Conventional Concrete $

13 Steel Reinforcement $

14 Stoplog Bay $

15 Gravel Access Road $

16 Permanent Seeding and Mulching $

17 Guardrail $

BASE TOTAL $ 0

OVERHEAD AND PROFIT (percentage) % 0% $ 0

BASE TOTAL PLUS OVERHEAD AND PROFIT $ 0

OPTIONS

Option1: (Option item) $

(Base item cost $ )

Option 2: (Option item) $

(Base item cost $ )

(Option item description)

(Option item description)

Tomahawk NWR

Barnes County, North Dakota

Sheet1