ELECTRICAL DISTRIBUTION SYSTEM INVESTIGATION
Solicitation number
140A2326R0010
Issued by

About this file

This is a medium voltage (MV) electrical distribution system design document for a facility campus. The schematic and site plan depict an underground MV distribution network originating from a substation located in Building 61's basement, with a 45kVA transformer serving a water tower pump house and a field distribution panel. The system includes seventeen marked manholes (MH-1 through MH-17) distributed across the facility campus, with specific underground cable run distances documented between connection points.

The total MV underground distribution span is 5,845 feet, with individual runs ranging from 100 feet (MH-3 to MH-4) to 630 feet (MH-9 to MH-17). The document notes that two existing transformers are to remain in place, while a property service disconnect requires replacement. An alternate pricing provision is included for approximately 450 feet of MV distribution extension to baseball and softball fields. The design indicates 2-3 inch conduits with 4-#4/0 conductors and 1-#1G ground conductor for the main feeder (from MH-16 to MH-1). The aerial site map illustrates the routing of distribution lines across multiple campus buildings and recreational facilities, providing comprehensive visualization of the infrastructure layout and connection points.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MH MH MH

MHMH

MH MH

MH

MH

MH

MHMH

MH

MH

MH14 MH-13 MH-12 MH-15

Property service disconnect to be replaced.

Water Tower XFMR 45kVA

Pump House

Field Dist Panel 2-3" w/ 4-#4/0 & 1-#1G

MH-1

MH-2

Old XFMR to remain

Old XFMR to remain

MH-4

MH-3

MH-5

MH-6

MH-7

MH-8

MH-9

MH

MH17

MH10?

MH

MH

MH11?

MH

Alternate pricing for extension of MV distribution to baseball and softball fields. approx = 450'

MV Underground distances:

MH16-MH1 = 350'

MH1-MH2 = 325'

MH2-MH3 = 500'

MH3-MH4 = 100'

MH3-MH5 = 400'

MH5-MH6 = 230'

MH6-MH7 = 260'

MH7-MH8 = 200'

MH8-MH9 = 425'

MH6-MH12 = 350'

MH12-MH13 = 300'

MH13-MH14 = 175'

MH14-MH15 = 440'

MH15-MH16 = 440'

MH4-MH10 = 440'

MH10-MH11 = 275'

MH9-MH17 = 630'

Total = 5,845'

T-6

Substation located in Bldg. 61 basement

Blank Page

File details come from the government source that posted it. Updated .