This document is a Questions and Answers Log for a Request for Proposal (RFP) for a roof replacement project at the Beclabito Day School. The log contains two sets of questions from contractors (attendants and AmerInd Contracting) and corresponding government responses, covering technical specifications, warranty requirements, and procurement strategy.
Key details include a 20-year No Dollar Limit (NDL) warranty for a single-ply TPO roofing system with 60 mil membrane, fully adhered installation, and high-density coverboard. The project will require replacing all components including drains and parapet caps, with a structural steel deck and 5.2" of polyiso insulation. Initially planned as a Lowest Price Technically Acceptable (LPTA) procurement, the government ultimately recommends transitioning to a Best Value procurement method. The solicitation involves the Department of the Interior Bureau of Indian Education and seeks a comprehensive roof replacement solution with manufacturer oversight and performance guarantees.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Number Date Received Contractor Question Date Sent to COR Answer Date Answered
1 5/5/2025 attendants
The roof currently has 5.2” of polyiso over a structurally sloped steel deck.
Is the roof replacement going back with 5.2” of polyiso or more to meet higher R-value codes? 5.2" is sufficient. Replcament can have same R-Vale as existing 5/15/2025
2 5/5/2025 attendants
There currently has no coverboard on top of the polyiso. We always recommend having a high-density product (coverboard) as the top layer. Is the new roof getting coverboard or being left off like the current roof?
Yes, new roof will include a high-density coverboard installed over the polysio insulation 5/15/2025
3 5/5/2025 attendants
Is the roof structurally sloped everywhere?
Core samples showed what appears as structural slopes but that would be good information to be published to everyone involved in the bidding. BIE to proivde as-builts 5/15/2025
4 5/5/2025 attendants
Are the crickets to the internal drains structurally sloped or sloped with tapered iso?
I am confident that they are done with tapered iso but that should be published as well to everyone along with what slope rate you want. ¼” in 12” is the standard now.
BIE to provide as-builts. New Internal drains shall be constructed using tapered iso with a standard slope of 1/4" per 12". 5/15/2025
5 5/5/2025 attendants
Are the drains being replaced or being reused?
I would recommend replacing them. They are 6”x6” just so you know in case you publish them to be replaced. Replace all with new. Do not reuse existing 5/15/2025
6 5/5/2025 attendants Are the parapet caps being replaced or reused? I personally think they are fine to be reused but, I commonly see them spec’d to be replaced. Replace all with new. Do not reuse existing 5/15/2025
7 5/5/2025 attendants
Is the new roof getting a 20-year NDL warranty or a 30-year NDL warranty. Some of the contractors were disagreeing on the standard. It makes a big difference because if they need a 30-year NDL, we have to use 80 mil TPO and all premanufactured corners and patches. If they only need a 20-year NDL, we can use 60 mil TPO. 20-year NDL’s are the standard in our area but, it makes no difference to me I just need to know which membrane to quote. 20 year NDL, 60 mil TPO 5/15/2025
8 5/5/2025 attendants
The current system is attached via mechanically attached membrane.
I would HIGHLY recommend not doing that again and going with a fully adhered system.
This area gets way too much wind for a mechanically attached system especially with kids in school under the roof.
But I want to make sure we are all on the same page with that.
Does this need to be quoted as mechanically attached or fully adhered? fully adhered 5/15/2025
9 5/5/2025 attendants Do you have the building’s original plans that could be sent out?
We could gain a lot of information from the original plan set. BIE to provide 5/15/2025
10 5/15/2025
Questions and Answers Log for Request for Proposal
Number Date Received Contractor Question Date Sent to COR Answer Date Answered
1 5/5/2025 AmerInd
Contracting
Specification Clarity: In the interest of promoting bid consistency and minimizing future scope gaps, can you confirm whether a formal written roofing specification will be provided by the government, or are bidders expected to submit proprietary system proposals? 5/5/2025 Formal written specification will be provided, see other RFI responses 5/15/2025
2 5/5/2025 AmerInd
Contracting
Defined Scope of Work: To ensure apples-to-apples bid comparisons and avoid misinterpretation of intent, will an official Scope of Work be issued, clearly outlining the work to be performed. 5/5/2025 Yes official scope of work will be issued 5/15/2025
3 5/5/2025 AmerInd
Contracting
Warranty Requirements: To ensure long-term value and reduce risk to the government, please clarify the required warranty parameters—specifically the duration, type (e.g., No Dollar Limit), and whether the issuing authority must be the manufacturer or a third party. 5/5/2025 20 year NDL, 60 mil TPO 5/15/2025
4 5/5/2025 AmerInd
Contracting
Code Compliance and Uplift Requirements: To align with federal building standards and reduce liability during installation, are there specific IBC, FM Global, or other compliance and wind uplift benchmarks that the proposed roofing assembly must satisfy? 5/5/2025
2021 IBC, Wind uplift calcs based on ASCE 7-16, 20 year NDL, BIE to confirm FM Global. Standard zone based wind uplift cals based on ASCE 7-16 are sufficent for submittal 5/15/2025
5 5/5/2025 AmerInd
Contracting
Acceptable Roof Assemblies: To guide appropriate system selection and meet lifecycle cost expectations, will both single-ply TPO, and multi-ply roofing systems be considered acceptable options? 5/5/2025 single ply TPO system, fully adhered installation, 60 mil membrane, 20 year NDL 5/15/2025
6 5/5/2025 AmerInd
Contracting
Performance Benchmarks: Are there stated performance goals or service life expectations (e.g., 30-year system lifespan) that the proposed roof assembly must be designed to meet or exceed? 5/5/2025 20 year NDL 5/15/2025
7 5/5/2025 AmerInd
Contracting
Moisture Scan and Overlay Option: Would the government consider an infrared moisture scan to evaluate the viability of an overlay option in lieu of a full tear-off—provided less than 25% of the roof area shows moisture intrusion, thereby reducing waste and project cost? 5/5/2025 Yes. 5/15/2025
8 5/5/2025 AmerInd
Contracting
Project Oversight Expectations: Will a certified manufacturer’s representative be required on-site throughout the installation to ensure compliance with specification details, quality control protocols, and warranty activation requirements? 5/5/2025 Yes 5/15/2025
9 5/5/2025 AmerInd
Contracting
Liability and Risk Transfer: Will the roofing system manufacturer be required to assume performance liability through a system-specific specification, warranty issuance, and active oversight, as part of the bid submission? 5/5/2025 Yes 5/15/2025
10 5/5/2025 AmerInd
Contracting
Contractor Selection Support: Would the owner or project team be open to assistance from the manufacturer regarding contractor prequalification or bid review, to ensure that approved applicators meet system requirements and quality expectations? 5/5/2025 Yes 5/15/2025
11 5/5/2025 AmerInd
Contracting
Submission by Manufacturer Representative: If a manufacturer's representative attended the pre-bid meeting, would the government permit them to submit a proposed performance specification and scope of work on behalf of the project to serve as a uniform bidding standard? 5/5/2025 Yes 5/15/2025
12 5/5/2025 AmerInd
Contracting
Applicable Design Standards: Can you confirm whether any of the following design standards are being used to inform this project’s roofing scope or compliance requirements: BIA “School Facilities Design Handbook” (2007); BIA “Educational Space Criteria Handbook” (2007); BIA-DMRS Space Allocation Guidelines? 5/5/2025 Confirmed, shall be considered along with above adddional codes 5/15/2025
Questions and Answers Log for Request for Proposal
13 5/5/2025 AmerInd
Contracting
Clarification of “Technically Acceptable” Criteria under LPTA: In reference to the current solicitation approach: Given that the project has not yet issued a formal specification or detailed Scope of Work, how does the agency intend to define “technically acceptable” in order to meet the requirements of a Lowest Price Technically Acceptable (LPTA) source selection under FAR 15.101-2?
Per FAR 11.002(a)(1), agencies must define their needs in a way that allows offerors to propose meaningful solutions and permits objective evaluation.
Without clearly established specifications or performance benchmarks, there is no baseline to determine technical acceptability—potentially compromising the integrity of the LPTA process.
In the interest of ensuring fairness and compliance with FAR 15.101-2(b)(1) and FAR 11.002(b), we respectfully recommend the agency consider one of the following approaches to help ensure that all proposals are evaluated equitably and in accordance with applicable procurement standards:
1. Issuing a site-specific, performance-based specification to provide a uniform technical baseline, or
2. Allowing a manufacturer’s representative who attended the pre-bid meeting to submit a standardized performance specification and scope of work to serve as a basis for all bids. 5/5/2025
BIE confirms option 2:allowing manufacturer's rep to submit a standard performance specification and scope 5/15/2025
14 5/5/2025 AmerInd
Contracting
Procurement Strategy and LPTA Evaluation Clarity: Given the current absence of a detailed specification or defined Scope of Work, how does the agency plan to ensure an objective evaluation under the Lowest Price Technically Acceptable (LPTA) source selection method as outlined in FAR 15.101-2?
Without clearly defined minimum technical criteria, the determination of "technically acceptable" risks becoming subjective—contrary to FAR 15.101- 2(b)(1), which requires evaluation against clearly stated minimum acceptability standards. Additionally, FAR 11.002(a)(1) emphasizes the need for clearly articulated requirements to support meaningful proposal comparisons. In light of these factors, we respectfully suggest that a Best Value Tradeoff procurement method, in accordance with FAR 15.101-1, may better support this project's goals. A Best Value approach would allow for consideration of both cost and technical merit—particularly appropriate when:
-- Project requirements are still evolving, -- System longevity and performance may vary significantly across proposals, -- Lifecycle cost and risk mitigation are important evaluation factors.
Would the agency consider transitioning to a Best Value procurement model or issuing a performance-based specification to align more closely with FAR procurement best practices and ensure the agency receives the most advantageous outcome? 5/5/2025 Yes 5/15/2025
15 5/5/2025 AmerInd
Contracting
The RFP indicates that the project will be awarded under a Lowest Price Technically Acceptable (LPTA) evaluation. However, during our review and discussions, it has been indicated that the roof requires a full replacement and that a 30-year warranty on the new system is preferred. Given the complexity and long-term nature of the project, we believe that a Best Value evaluation would be more appropriate to ensure that the selected contractor can meet the technical requirements and provide a high-quality, durable solution.
Additionally, the current solicitation lacks detailed design standards and specifications, making it difficult to ensure an apples-to-apples comparison of bidders' proposals. Clear specifications are essential for evaluating the technical acceptability and overall value of each proposal.
According to FAR 15.101-2, the LPTA source selection process should only be used when:
1. The agency can comprehensively and clearly describe the minimum requirements in terms of performance objectives, measures, and standards that will be used to determine the acceptability of offers;
2. The agency would realize no, or minimal, value from a proposal that exceeds the minimum technical or performance requirements;
3. The agency believes the technical proposals will require no, or minimal, subjective judgment by the source selection authority as to the desirability of one offeror's proposal versus a competing proposal;
4. The agency has a high degree of confidence that reviewing the technical proposals of all offerors would not result in the identification of characteristics that could provide value or benefit to the agency;
5. The agency determined that the lowest price reflects the total cost, including 5/5/2025 BIE recommeds change to Best Value 5/15/2025