- CON - EPOXY FLOORING - CAFETERIA
- Solicitation number
- 140A2324Q0342
About this file
This document is a set of questions and responses related to a federal contract opportunity for the replacement of the cafeteria floor at the Sherman Indian High School.
The key details are:
- The contract opportunity is for a firm fixed-price construction project to remove and replace the flooring in the gymnasium, auditorium, and Bennett Hall at the Sherman Indian High School.
- The solicitation number is 140A2324Q0342, and it is a 100% Indian Small Business Economic Enterprise (ISBEE) set-aside.
- The contract includes providing all materials, supplies, labor, equipment, and supervision necessary for the floor replacement/installation.
- The site visit date is July 9, 2024, and the last day for questions is July 16, 2024. Proposals are due on August 5, 2024, at 12:00 PM MDT.
- The contract will be awarded by the Department of the Interior, Bureau of Indian Affairs, and Bureau of Indian Education.
- The contractor will need to address several specific questions and requirements related to the existing equipment, coolers, and cove base during the installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140A2324Q0342_Amd_0002.pdf | ||
| AHERA_Bld__9_0002.pdf | ||
| B_-_Question_Log__B_0002.xlsx | XLSX spreadsheet | |
| Sol_140A2324Q0342_Amd_0001.pdf | ||
| SF-24_Bid_Bond_Form.pdf | ||
| Sherman_Indian_School_Site_Map_2023.pdf | ||
| SF-25A_Payment_Bond_Form.pdf | ||
| SF-25_Performance_Bond_Form.pdf | ||
| B_-_Question_Log.xlsx | XLSX spreadsheet | |
| SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf | ||
| Sol_140A2324Q0342.pdf | ||
| Wage_Rates.pdf | ||
| SOW_Elements_SIHS_Cafeteria_2024.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Questions Log - 140A2324Q0342 | ||
| 22 | Contractor's Question | Government Response |
| 1 | Please Confirm if the equipment is staying in place or being removed . If the equipment is to stay we would need a high lighted plan to follow of what is staying and what is being removed to estimate | Serving lines are not to moved. All other equipment the school wiil move. |
| key ways will be necessary for the installation in the kitchen areas where we are going over tile . For the purpose of apples to apples bids ,Will the key in detail be added to the scope? This will take substantial labor and | ||
| if it is not performed the system will fail at the edges . | ||
| 2 | Coolers will need to be shut down for installation of the flooring system . Please confirm this will be possible . | Epoxy will not be installed in cooler. They are going to be replaced. |
| 3 | Cooler walls are metal . The specified system does not bond to metal . ¼ inch hardy backer will need be installed screwed and glued . Please confirm this will be added to the scope or will we delete cove base at the coolers and use metal radius flashing . | Epoxy will not be installed in cooler. They are going to be replaced. |
| 4 | Now that the restrooms have changed to epoxy will epoxy cove base be installed or will rubber base be replaced ? | No Epoxy on base boards, will stay rubber. |
| 5 | At the dining room area where existing slim foot tile is installed . Will we be installing epoxy cove base over the tile in this area ? | Yes |
| 6 | Please confirm if the installation of the epoxy flooring will be done while school is in session or out of session . Please confirm all areas will be shut down during installation . | CO will answer. |
| 7 | Please confirm a VOLUME 2 Technical Proposal is necessary for this project and not just a price proposal | Yes |
| 8 | what is the Tero tax percentage for this project | None |
| 9 | When is the first proposal or proposals due date | CO will answer. |
| 10 | Does this project have any asbuiltsto be provided to the contractor | Yes |
| 11 | Please confirm we can use a local water hose connection. | Yes |
| 12 | Please confirm Supervison is the be a TRI HAT- meaning Safety/Quality Control/ Supervisor to fullfill all roles on site. | Yes |
| 13 | please confirm areas will be unoccupied during construction | CO will answer. |
| 14 | Please consider extending Proposal date and or lowering Written technical portion of this proposal for this small of a scope. | CO will answer. |
| 15 | Will all RFI questions and responses be shared with the other Contractor for an even bidding field. | CO will answer. |
| 16 |