- The contract opportunity is for a firm fixed-price construction project to remove and replace the flooring in the gymnasium, auditorium, and Bennett Hall at the Sherman Indian High School.
- The solicitation number is 140A2324Q0342, and it is a 100% Indian Small Business Economic Enterprise (ISBEE) set-aside.
- The contract includes providing all materials, supplies, labor, equipment, and supervision necessary for the floor replacement/installation.
- The site visit date is July 9, 2024, and the last day for questions is July 16, 2024. Proposals are due on August 5, 2024, at 12:00 PM MDT.
- The contract will be awarded by the Department of the Interior, Bureau of Indian Affairs, and Bureau of Indian Education.
- The contractor will need to address several specific questions and requirements related to the existing equipment, coolers, and cove base during the installation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140A2324Q0342_Amd_0002.pdf | ||
| AHERA_Bld__9_0002.pdf | ||
| B_-_Question_Log__B_0002.xlsx | XLSX spreadsheet | |
| Sol_140A2324Q0342_Amd_0001.pdf | ||
| SF-25_Performance_Bond_Form.pdf | ||
| Sol_140A2324Q0342.pdf | ||
| SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf | ||
| Sherman_Indian_School_Site_Map_2023.pdf | ||
| B_-_Question_Log.xlsx | XLSX spreadsheet | |
| SF-25A_Payment_Bond_Form.pdf | ||
| SF-24_Bid_Bond_Form.pdf | ||
| Wage_Rates.pdf | ||
| SOW_Elements_SIHS_Cafeteria_2024.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Questions Log - 140A2324Q0342 | ||
| 22 | Contractor's Question | Government Response |
| 1 | Please Confirm if the equipment is staying in place or being removed . If the equipment is to stay we would need a high lighted plan to follow of what is staying and what is being removed to estimate | Serving lines are not to moved. All other equipment the school wiil move. |
| key ways will be necessary for the installation in the kitchen areas where we are going over tile . For the purpose of apples to apples bids ,Will the key in detail be added to the scope? This will take substantial labor and | ||
| if it is not performed the system will fail at the edges . | ||
| 2 | Coolers will need to be shut down for installation of the flooring system . Please confirm this will be possible . | Epoxy will not be installed in cooler. They are going to be replaced. |
| 3 | Cooler walls are metal . The specified system does not bond to metal . ¼ inch hardy backer will need be installed screwed and glued . Please confirm this will be added to the scope or will we delete cove base at the coolers and use metal radius flashing . | Epoxy will not be installed in cooler. They are going to be replaced. |
| 4 | Now that the restrooms have changed to epoxy will epoxy cove base be installed or will rubber base be replaced ? | No Epoxy on base boards, will stay rubber. |
| 5 | At the dining room area where existing slim foot tile is installed . Will we be installing epoxy cove base over the tile in this area ? | Yes |
| 6 | Please confirm if the installation of the epoxy flooring will be done while school is in session or out of session . Please confirm all areas will be shut down during installation . | CO will answer. |
| 7 | Please confirm a VOLUME 2 Technical Proposal is necessary for this project and not just a price proposal | Yes |
| 8 | what is the Tero tax percentage for this project | None |
| 9 | When is the first proposal or proposals due date | CO will answer. |
| 10 | Does this project have any asbuiltsto be provided to the contractor | Yes |
| 11 | Please confirm we can use a local water hose connection. | Yes |
| 12 | Please confirm Supervison is the be a TRI HAT- meaning Safety/Quality Control/ Supervisor to fullfill all roles on site. | Yes |
| 13 | please confirm areas will be unoccupied during construction | CO will answer. |
| 14 | Please consider extending Proposal date and or lowering Written technical portion of this proposal for this small of a scope. | CO will answer. |
| 15 | Will all RFI questions and responses be shared with the other Contractor for an even bidding field. | CO will answer. |
| 16 |