This document is a set of questions and responses related to a federal contract opportunity for the replacement of the cafeteria floor at the Sherman Indian High School.

The key details are:

  • The contract opportunity is for a firm fixed-price construction project to remove and replace the flooring in the gymnasium, auditorium, and Bennett Hall at the Sherman Indian High School.
  • The solicitation number is 140A2324Q0342, and it is a 100% Indian Small Business Economic Enterprise (ISBEE) set-aside.
  • The contract includes providing all materials, supplies, labor, equipment, and supervision necessary for the floor replacement/installation.
  • The site visit date is July 9, 2024, and the last day for questions is July 16, 2024. Proposals are due on August 5, 2024, at 12:00 PM MDT.
  • The contract will be awarded by the Department of the Interior, Bureau of Indian Affairs, and Bureau of Indian Education.
  • The contractor will need to address several specific questions and requirements related to the existing equipment, coolers, and cove base during the installation.

View the file

Other files for this federal contract opportunity

Other files attached to CON - EPOXY FLOORING - CAFETERIA, newest first.
File Type Posted
Sol_140A2324Q0342_Amd_0002.pdf PDF
AHERA_Bld__9_0002.pdf PDF
B_-_Question_Log__B_0002.xlsx XLSX spreadsheet
Sol_140A2324Q0342_Amd_0001.pdf PDF
SF-25_Performance_Bond_Form.pdf PDF
Wage_Rates.pdf PDF
SOW_Elements_SIHS_Cafeteria_2024.docx DOCX document
Sol_140A2324Q0342.pdf PDF
SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf PDF
Sherman_Indian_School_Site_Map_2023.pdf PDF
B_-_Question_Log.xlsx XLSX spreadsheet
SF-25A_Payment_Bond_Form.pdf PDF
SF-24_Bid_Bond_Form.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Questions Log - 140A2324Q0342
22Contractor's QuestionGovernment Response
1Please Confirm if the equipment is staying in place or being removed . If the equipment is to stay we would need a high lighted plan to follow of what is staying and what is being removed to estimateServing lines are not to moved. All other equipment the school wiil move.
key ways will be necessary for the installation in the kitchen areas where we are going over tile . For the purpose of apples to apples bids ,Will the key in detail be added to the scope? This will take substantial labor and
if it is not performed the system will fail at the edges .
2Coolers will need to be shut down for installation of the flooring system . Please confirm this will be possible .Epoxy will not be installed in cooler. They are going to be replaced.
3Cooler walls are metal . The specified system does not bond to metal . ¼ inch hardy backer will need be installed screwed and glued . Please confirm this will be added to the scope or will we delete cove base at the coolers and use metal radius flashing .Epoxy will not be installed in cooler. They are going to be replaced.
4Now that the restrooms have changed to epoxy will epoxy cove base be installed or will rubber base be replaced ?No Epoxy on base boards, will stay rubber.
5At the dining room area where existing slim foot tile is installed . Will we be installing epoxy cove base over the tile in this area ?Yes
6Please confirm if the installation of the epoxy flooring will be done while school is in session or out of session . Please confirm all areas will be shut down during installation .CO will answer.
7Please confirm a VOLUME 2 Technical Proposal is necessary for this project and not just a price proposalYes
8what is the Tero tax percentage for this projectNone
9When is the first proposal or proposals due dateCO will answer.
10Does this project have any asbuiltsto be provided to the contractorYes
11Please confirm we can use a local water hose connection.Yes
12Please confirm Supervison is the be a TRI HAT- meaning Safety/Quality Control/ Supervisor to fullfill all roles on site.Yes
13please confirm areas will be unoccupied during constructionCO will answer.
14Please consider extending Proposal date and or lowering Written technical portion of this proposal for this small of a scope.CO will answer.
15Will all RFI questions and responses be shared with the other Contractor for an even bidding field.CO will answer.