This is a Questions and Answers document for RFQ 140A1225Q0002 regarding furniture, design, and installation services for Building 993 at Fort Vancouver, issued by the Bureau of Indian Affairs. The Q&A clarifies several key requirements and specifications for the project.
The project involves providing and installing office furniture for three floors, including 14 existing high wall cubicles, 3 executive office setups, 17 high wall cubicles, and 11 lower wall cubicles, totaling a minimum of 45 desk spaces. The contractor must submit a full furniture design with their quote as part of the Best Value Trade-Off evaluation. HON products are not required; equivalent furniture is acceptable. The contractor is responsible for any required electrical work, though no IT or low voltage work is anticipated. While the original completion date was 2/28/2025, vendors are asked to specify their proposed delivery dates based on actual lead times. The contract is classified as a commercial supply purchase with incidental service installation, subject to Service Contract Act wage determinations for Clark County, Washington, but not Davis Bacon Act requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A’s RFQ 140A1225Q0001 Ft Vancouver Bldg 993 Furniture, Design & Installation Questions 1/10/2025 Q1. The current lead times for products do not allow a completion date of 2/28/2025. Additionally, the official award date and final finish selections would be needed prior to any product order. Can the government please confirm that the period of performance end date will be determined after award by the actual product lead times, shipping and delivery, and installation activities are scheduled and completed?
A1. Since this is a Best Value Trade Off solicitation please make sure to highlight or bold the date in your quote what the delivery date would need to be. This is considered a commercial supply purchase with incidental service installation. The government will update the statement of work to reflect this.
Q2. Will the government please confirm that Davis Bacon does not apply to any portion of the FF&E or furniture services?
A2. This is considered a commercial supply purchase with incidental service installation and is not for any type of construction. The Davis Bacon act does not apply and the Service Contract Act wage determination for Clark County, Washington applies for any services provided. This document was supplied with the solicitation.
Q3. Can the Government confirm all work is to be completed in (1) Phase for all (3) Floors?
A3. The contractor just has to ensure the delivery date that is proposed in their quote. You may install the furniture how and when you prefer in coordination with the COR.
Q4. Can the Government provide the overall pdf drawing as mentioned on site visit? Additionally, please provide the CAD and/or available building drawings/plans.
A4. The government will be adding the PDF’s of building 993 and PDF’s of the CAD drawings to the solicitation that was posted.
Q5. Has the Government selected an electrical contractor for the Junction box connections?
A5. The electrician that is to be utilized will be provided by the awarded Contractor if the furniture requires electrical whips, hard wiring or electrical connections. The government will update the statement of work to add this task for the contractor.
Q6. Does the Government anticipate any IT work ahead of FF&E installation?
A6. There is no IT work anticipated as all IT outlets for the offices’ internet have all been previously wired and are located next to most of the power outlets in the building.
Q7. Has the Government selected the Low voltage contractor for low voltage requirements?
A7. The government anticipates no low voltage requirements if an electrician is required please refer to A5.
Q8. If any existing power/data outlets need to be relocated to meet headcount, is that an option? Or must fit most headcount possible with existing power/data?
A8. The government would not like to move any existing power/data outlets. The government would like the minimum 45 total desk headcount (14) existing high wall cubicles currently installed onsite, (3) executive offices setups, (17) high wall cubicles, (11) lower wall cubicles with the existing power/data outlets.
Q9. If New workstations cannot match exact overall height of Existing workstations, will that be acceptable to the government? Or should the response reflect Existing in that case to keep consistent height throughout?
A9. The office furniture offered by the Contractor does not need to exactly match the overall height but needs to be something similar in height.
Q10. The SF 1449 and Section 2.2 note to use the provided furniture list for pricing. However, additional items outside the list may be required for the project. Can the government please advise if only this list should be used and items on this list should be priced; or if a contractor-created BOM with individually priced line items, can be supplemental to the government list and thus is acceptable for submission?
A10. If the government price list provided is not used then a contractor-created BOM with individually priced line items, can be supplemental to the government list and would be acceptable for submission on their quote.
Q11. This Section refers to the required removal of specified excess furniture. Can the government please confirm that the contractor can remove the specified excess furniture offsite?
A11. The excess furniture may be moved offsite and disposed of how the contractor sees fit, i.e., donated, taken to dump, etc.
Q12. Does the Government require HON product for this opportunity or can offerors substitute with equivalent product?
A12. The Contractor does not need to supply HON product and may offer similar office furniture in their quote.
1/3/2025
Q1. Wanted to clarify whether the full furniture design is expected to be completed as part of the submittal, or if our team is just supposed to submit our pricing for the design services and complete the design upon award?
A1. You must submit a full furniture design with your quote since this is a Best Value Trade Off solicitation and it is highly encouraged for your company to attend a site visit.
Q2. Wanted to confirm that we could still schedule an alternative time to visit the site and confirm any measurements/information needed?
A2. You may schedule a different date and time with Kurt Fredenberg, kurt.fredenberg@bia.gov the Government POC and CC the Contracting Officer in the email also.
Questions are listed on the date received by the Bureau of Indian Affairs from Vendors with the most current listed ones on top