This document contains questions and answers regarding solicitation number 140A0524Q0001 from the Department of the Interior Bureau of Indian Affairs and Indian Education for environmental remediation services in Kotzebue, Alaska. The services include excavating up to 200 cubic yards of contaminated soil, backfilling any excavated areas, installing liners as needed, and conducting groundwater monitoring in the spring of 2024. Bidders must include costs for backfill material, perimeter liners, and arrangements must be made with the Kikiktagruk Inupiat Corporation for use of their landfarm property. Contaminated soils will be excavated until cleanup levels are met but excavation will cease at 200 cubic yards even if additional contamination remains. The period of performance is one year from date of award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140A0524Q0001 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

A13

Sacramento CA 95825 Contracting Office

2800 COTTAGE WAY ROOM W2820

BIA PACIFIC 00013

12/18/20230001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

11/27/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of Amendment 0001 is to publicly release all questions that have been asked on the solicitation to date and the answers provided by BIA.

All interested parties submitting a quotation must complete blocks 8 and 15A-C of this

Amendment AND INCLUDE the completed page 1 of this Amendment with their quotation.

All questions about this amendment and solicitation shall be emailed to jodi.zachary@bia.gov.

All terms and conditions of the solicitation remain unchanged.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Jodi Zachary

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment # 1 140A0524Q0001, Kotzebue Remediation:

1. Should we include backfill material and backfilling of the excavation in our bid?

Yes, any excavated areas need to be returned to grade.

2. Are there any specifications for compaction of the backfill material?

All applicable tribal, local, state or federal; rules, codes, regulations, statutes and/or laws must be followed. If none apply to soil compaction densities, industry standard operating procedures will be used.

3. Should we place a liner in the excavation prior to backfilling?

Yes

4. Should we assume the excavation will extend to groundwater?

For planning, most likely, at least to the interface. Generally, GWD is roughly 4-6 ft.

5. Should we assume the landfarm will need a new bottom liner, top liner, and berms?

The last documented landfarm maintenance was conducted in 2020. Some or all of these components may require replacement or refurbishment.

6. Will the excavation limits be pre-determined, or will it be guided by field conditions?

Previous work indicates a general area for excavation; however, field conditions will dictate the specific area/volume of soil above applicable DEC cleanup levels on the site and able/possible to remove.

7. Will the excavation cease at 200 cubic yards, even if additional contamination is encountered; or will the excavation continue until all contamination has been removed?

Yes, the excavation will cease at 200 cubic yards, even if additional contamination is encountered; however, if contamination above applicable DEC cleanup levels does exceed 200 cy, this will be delineated.

8. The response to #7 it indicates that if contamination exceeds 200 cubic yards, the excavation will stop at 200 cubic yards but the remaining contamination will be delineated.

Would the standard confirmation sampling from the base and sidewalls of the excavation satisfy this delineation requirement, or would we need to excavate additional test pits beyond the limits of the excavation to determine how far the contamination extends?

Yes, excavation will stop at 200 cubic yards but the remaining contamination will be delineated. Standard confirmation sampling from the base and sidewalls of the excavation may satisfy this delineation requirement if they indicate that these are below cleanup levels. If not soil sampling would need to be extended, until below cleanup levels are encountered in order to determine the full extent of contamination above cleanup levels. This is the primary objective and shall be included in the award amount

9. The previous report suggests the existing landfarm is at capacity following previous excavations. Is there an existing landfarm with capacity to accommodate excavated soils?

The landfarm property is owned and operated by Kikiktagruk Inupiat Corporation (KIC) and is located off of Base Road in Kotzebue, POC: Thomas Baker, KIC Construction Operations Manager. It is the responsibility of the contractor to make contact with KIC as necessary.

10. Is the contractor responsible for backfilling the excavation? If so, can the excavation be backfilled prior to the receipt of analytical results?

Yes, any excavated areas need to be returned to grade. Yes, based on field screening results and consultation with AK DEC.

Amendment # 1 140A0524Q0001, Kotzebue Remediation:

11. Should the bidder include costs for backfill material or will this be provided by the village or other entity?

Yes, the bidder shall include costs for the backfill material.

12. Task 2 states the groundwater monitoring is to be completed in the fall of 2023, please confirm this is a typo and that the sampling is to be performed in 2024. Also, is the monitoring still required to be performed in the fall?

GWM will be conducted in the spring of 2024.

Sampling will be conducted in the spring/summer of 2024 after the melt/thaw when conditions allow. Sampling will not be conducted in the fall.

13. The period of performance is stated as being both six months from the initial contract award and as one year. Please confirm the period of performance.

The period of performance will be (1) year from the date of award.

14. Does the 200 cy include clean soils that may be encountered in surface soils, or is this limited to contaminated soils above maximum allowable concentrations?

Clean overburden, based on field screening and AK DEC consultations, can be segregated and replaced during return to grade.

15. Is there a maximum amount of soil to be excavated including both clean and contaminated?

If the contamination is confined to a thin layer a significant area and large volumes of clean soil would have to be excavated to remove 200 cy of contaminated soils.

Based on previous reports, BIA’s expectation is that any remaining and accessible contaminated soil is in two limited areas extending to permafrost (or the ground water interface) with some clean overburden. The potential maximum of contaminated soil removed is expected to be 200 cy or less.

16. In prior excavations liner was placed around the perimeter to delineate the excavation. Will this be required again and should the bidder include costs for a liner?

Yes, a perimeter liner to delineate the excavation is required and costs shall be included.