14_-_Plan_Pages.pdf

PDF 418 KB Posted

Attached to
I-000891 M-097A
Solicitation number
0000035365
Issued by
Trinity County, California

About this file

These are electrical demolition and finish plan drawings for the California Department of Corrections and Rehabilitation (CDCR) at the California Medical Facility (CMF) located in Vacaville, California. The documents, dated April 12, 2024, are specifically for ADA Modifications Group C - H-1 and cover the H-Wing First Floor electrical renovation, with detailed plans for electrical outlet and lighting modifications. The drawings include demolition plans, finish plans, and electrical fixture schedules, focusing on the electrical infrastructure changes in the facility.

The plans are part of a project to upgrade and modify the electrical systems in the H-Wing, with specific attention to ADA compliance and electrical outlet reconfiguration. The drawings provide detailed technical specifications for electrical work, including keynotes for outlet placement, core drilling, conduit installation, and lighting fixture replacements. The documents are approved by the Office of the State Fire Marshal with a fire and panic approval dated 10/28/24, indicating compliance with state safety regulations. The project involves precise electrical modifications, including the removal of existing electrical infrastructure and the installation of new electrical components to meet current standards and accessibility requirements.

View the file

Other files

File Type Posted
12_-_I-000891_M-097A_RFQ.pdf PDF
14_-_Spec_26_05_00.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CDCR

CALIFORNIA DEPARTMENT OF

CORRECTIONS AND REHABILITATION

ARCHITECTURE & ENGINEERING

SHEET NUMBER

SHEETS OF

C A

L

IF

O R

N

IA

M E

D

IC

A L

F A

C

IL

IT

Y

C

M F

C A

L

IF

O R

N

IA

D R

IV

E

V A

C A

V

IL

L E

C

A L

IF

O

R N

IA

CMF

CALIFORNIA DEPARTMENT OF

CORRECTIONS AND REHABILITATION

ACCESS COMPLIANCE REVIEW

APPROVAL OF THIS PLAN DOES NOT AUTHORIZE

OR APPROVE ANY OMISSION OR DEVIATION

FROM APPLICABLE REGULATIONS

APRIL 12, 2024

A D

A M

O D

IF

IC

A T

IO

N S G

R O

U P C

H

-1

V2

23-028

MANUEL ACOBA

SENIOR ELECTRICAL ENGINEER

ALI KAZEMI

SUPERVISING ELECTRICAL ENGINEER

4 3

KEYNOTES

H-WING_FIRST_FLOOR_DEMOLITION_PLAN

H-WING_FIRST_FLOOR_DEMOLITION_PLAN H-WING_FIRST_FLR_FINISH_PLAN 1

E-3.0

E N L A

R G

E D

E L E C

T R

IC

A L P

L A

N S A

N D

D E T A

IL

S

GENERAL NOTES

H-WING_FIRST_FLOOR_FINISH_PLAN

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/28/24

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

24-1592

CDCR

CALIFORNIA DEPARTMENT OF

CORRECTIONS AND REHABILITATION

ARCHITECTURE & ENGINEERING

SHEET NUMBER

SHEETS OF

C A

L

IF

O R

N

IA

M E

D

IC

A L F

A C

IL

IT

Y

C M

F

C

A L

IF

O R

N

IA

D R

IV

E

V A

C A

V

IL

L E

C

A L

IF

O R

N

IA

CMF

CALIFORNIA DEPARTMENT OF

CORRECTIONS AND REHABILITATION

ACCESS COMPLIANCE REVIEW

APPROVAL OF THIS PLAN DOES NOT AUTHORIZE

OR APPROVE ANY OMISSION OR DEVIATION

FROM APPLICABLE REGULATIONS

APRIL 12, 2024

A D

A M

O D

IF

IC

A

T

IO

N S G

R O

U P C

H

-1

V2

23-028

MANUEL ACOBA

SENIOR ELECTRICAL ENGINEER

ALI KAZEMI

SUPERVISING ELECTRICAL ENGINEER

2 H-WING_FIRST_FLOOR_FINISH_PLAN 1H-WING_FIRST_FLOOR_DEMOLITION_PLAN

KEYNOTES

LIGHTING FIXTURE SCHEDULE

GENERAL NOTES:

DEMOLITION NOTES:

4LIGHTING FIXTURE SCHEDULE

E-4.0

E N L A

R G

E D

E L E C

T R

IC

A

L P

L A

N S S C

H E D

U L E A

N D

D E T A

IL

S

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/28/24

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

24-1592

Pages from 23-028_CMF_ADA_Modifications_(H-1)_Final_Plans-2.pdf
Pages from 23-028_CMF_ADA_Modifications_(H-1)_Final_Plans.pdf

File details come from the government source that posted it. Updated .