14-Addendum 2.pdf
PDF 4 MB Posted
- Attached to
- Northeast Intermediate Lift Station
- Solicitation number
- RFP 25-19043-TF
- Issued by
- Henderson County, Texas
About this file
This document is an Addendum 2 for Request for Proposals (RFP 25-19043-TF) issued by the City of Lubbock, Texas for the Northeast Intermediate Lift Station project. The addendum, dated August 14, 2025, extends the closing date to August 21, 2025 at 2:00 p.m. and includes Engineer's Addendum No. 1, which provides clarifications and additional information for potential bidders. The addendum covers technical specifications for the lift station project, including details on pipe bedding, compaction requirements, backfill methods, and geotechnical information. A public Q&A section addresses specific contractor questions about project details such as pipe materials, bedding classes, compaction specifications, and payment timelines.
The document includes boring logs from three test sites (B-1, B-2, and B-3) located on E 8th Street in Lubbock, revealing soil composition details including layers of sandy clay, calcareous nodules, and limestone base. Key technical specifications include using Class I or II bedding for 24-inch pipes, class #57 gravel with 95% standard proctor density compaction, and acceptance of flow fill for force main backfill. The contractor will be responsible for all construction materials testing, and no separate payment will be made for rock or groundwater encountered during excavation. The base bid calls for 8-inch HDPE force main, with an alternate bid option for 8-inch PVC force main. Payments to the contractor are expected within 20 calendar days of monthly pay request submissions.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM 2
Engineer’s Addendum No. 1
RFP 25-19043-TF
Northeast Intermediate Lift Station
DATE ISSUED: August 14, 2025
CLOSING DATE: August 21, 2025, at 2:00 p.m.
The following items take precedence over specifications for the above named Request for Proposals
(RFP). Where any item called for in the RFP documents is supplemented here, the original requirements, not affected by this addendum, shall remain in effect.
Engineer’s Addendum No. 1
1. Please see Engineer’s Addendum No. 1, attached.
Please note: The closing date has been extended, per addendum 1, as indicated above.
All requests for additional information or clarification must be submitted in writing and directed to:
Teofilo Flores
City of Lubbock
Purchasing and Contracts Management Office
1314 Ave K, Floor 9
Lubbock, Texas 79401
Questions may be emailed to TKFlores@mylubbock.us
Questions are preferred to be posted on https://ci-lubbock-tx.bonfirehub.com/
THANK YOU,
Teofilo Flores
CITY OF LUBBOCK
Teofilo Flores
Assistant Director
City of Lubbock
Purchasing and Contracts Management Office
It is the intent and purpose of the City of Lubbock that this request permits competitive proposals. It shall be the offeror’s responsibility to advise the Director of Purchasing and Contract Management if any language, requirements, etc., or any combinations thereof, inadvertently restricts or limits the requirements stated in this RFP to a single source. Such notification must be submitted in writing and must be received by the Director of Purchasing and Contract Management no later than five (5) business days prior to the close date. A review of such notifications will be made.
https://ci-lubbock-tx.bonfirehub.com/
Public Q&A
#1 - Bedding
L. Howard Construction, Inc., Aug 05, 2025 10:54 AM CDT, Public - Pending
What Class of bedding will be needed for the 24" pipe?
The bedding of the 24” pipe will be Class I or Class II.
#2 - Compaction
L. Howard Construction, Inc., Aug 05, 2025 10:54 AM CDT, Public - Pending
What is the compaction on gravel under the vault and what class of gravel?
The gravel will be class #57 with compaction of 12” gravel (min) compacted to 95% standard proctor density @ +/- 2% optimum moisture (plan set sheet 10).
#3 - Bore Logs
L. Howard Construction, Inc., Aug 05, 2025 10:55 AM CDT, Public - Pending
Are there any bore logs?
The Geotech report will be published in conjunction with this Addendum.
#4 - Backfill
L. Howard Construction, Inc., Aug 05, 2025 10:56 AM CDT, Public - Pending
Is flow fill acceptable for backfill over the force main?
Yes, flow fill is acceptable for backfill over the force main.
#5 - Pay Request
L. Howard Construction, Inc., Aug 05, 2025 10:56 AM CDT, Public - Pending
What is the expected time frame on each Pay Request?
The expected time frame for payments made will be within 20 calendar days from receipt of the monthly pay request.
#6 - Submersible Pumps
Pump Solutions, Aug 05, 2025 4:07 PM CDT, Public - Pending
Would KSB be considered as an approved equal for the submersible wastewater pumps?
No, KSB pumps will not be considered as approved equivalent submersible wastewater pumps for the project.
#7 - HDEP vs PVC
Deerwood Construction, Aug 07, 2025 10:44 AM CDT, Public - Pending
Plans call for 8" HDEP
Bid Tab calls for 8" PVC
Can you verify force main materials
The base bid calls for 8”HDPE force main and the alternate will be for 8” PVC force main.
#8 - Deductive Alternates on Bid Table
Rink's Lease Service, Aug 08, 2025 10:10 AM CDT, Public - Pending
IF the alternate unit prices for PVC are a greater value than those for HDPE, should those be entered as an additional amount, or entered as the total amount. For example, if HDPE is
$100/FT and PVC is $125/FT, would that be shown in the deductive alternate table as $25 or
$125? My concern is that if it is to be shown as $25, the bid table will read as the contractor is going to install that line item for that amount, rather than the necessary increase in the amount from a bid item that is not being used. Also, it is a concern that bidding contractors might interpret this differently and cause great confusion at the time of bid opening. Thanks.
The deductive alternate line will be entered as the total amount for the item.
#9 - Bid Item 2-2
Rink's Lease Service, Aug 08, 2025 10:19 AM CDT, Public - Pending
I assume item 2-2, Install Certaloc, is meant to read "in slick bore." Is this assumption correct?
Yes, bid item 2-2 specifies that the PVC pipe in slick bore shall be the Certa-Lok restrained type.
#10 - Geotechnical report
Rink's Lease Service, Aug 08, 2025 10:22 AM CDT, Public - Pending
It was said in the pre-bid meeting that there is a geotechnical report for the lift station site, but I cannot find it in the specs. Can you please upload this report to bonfire, or point out where it can be found in the spec book?
The Geotech report will be published in conjunction with this Addendum. Please note that there shall not be a separate payment made for rock or incidental groundwater encountered during excavation.
#11 - Construction Staking
Rink's Lease Service, Aug 08, 2025 10:23 AM CDT, Public - Pending
Will construction staking for the lift station site be provided by EHT, or will that cost need to be included in our bid?
Construction staking shall be performed by the Contractor and accordingly the cost shall be included in the bid.
PE Firm Registration No. 1151 PG Firm Registration No. 50103 RPLS Firm Registration No. 10011900 Page 1
August 12, 2025
City of Lubbock, TX Northeast Intermediate Lift Station
Addendum No. 1
Attention is called to the following modifications to the referenced Bid Form and Drawings for the above referenced project. The City of Lubbock (City) will receive bids for the Northeast Intermediate Lift Station, until 2:00 pm local time on Thursday, August 14, 2025, at which time the bids received will be publicly opened and read. We hereby modify the documents as follows:
Contract Documents:
1. All construction materials testing will be the responsibility of the Contractor as referenced in plan sheet 9.
2. There will not be a separate payment made for rock and groundwater encountered during excavation.
Boring Logs:
1. The attached Boring Logs and Boring Location Map are provided for Contractor reference.
This addendum consists of five (5) sheet and becomes a part of the referenced contract documents and shall be acknowledged by the proposer and attached to the sealed proposal submitted.
By: Sage Diller, P.E. #96645 Project Engineer 8/12/2025
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 TMAP MOBILITY Earthstar Geographics SIO
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
BENCHMARK
POINT NUMBER 1
DESC: BM CP IRS
NORTHING: 7,277,061.15
EASTING: 957,521.43
ELEVATION: 3158.68
BENCHMARK
POINT NUMBER 2
DESC: BM CP IRS
NORTHING: 7,276,912.82
EASTING: 958,995.80
ELEVATION: 3188.89
M .L
.K J
R B
L V
D M
.L .K
J R
B L
V D
E 9TH ST
E 8TH ST
E 8TH ST E 8TH ST
U T
E A
V E
U T
E A
V E
V A
N D
A A
V E
W A
L N
U T
A V
E W
A L
N U
T A
V E
Z E
N
IT
H A
V E
Z E
N
IT
H A
V E
O A
K A
V E
PROPOSED
LIFT
STATION
E 7TH ST
R E
D B
U D
S T
E 6TH ST
B-1
B-2 B-3
N: 7276818.6100 E: 960645.4000
N: 7276867.2490 E: 958848.9900N: 7276865.4250
E: 957484.8120
A
REVISIONNO.
DATE
B C D
A B C D
E F
B. MCGIFF
DRAWN BY
CHECKED BY
DESIGNED BY
G
06/24/2025
DATE
SCALE
H I
SHEET No.
PROJECT NO.:
E F G
H I
BAR IS ONE INCH ON
ORIGINAL DRAWING
IF NOT ONE INCH ON
THIS SHEET. ADJUST
SCALES ACCORDINGLY.
0 1
CITY OF LUBBOCK
NORTHEAST SANITARY SEWER INTERCEPTOR LINE
INTERMEDIATE LIFT STATION
P:
\P ro je ct s\
Lu bb oc k, C ity o f\8
- N E
In te rm ed ia te
L S\
. C
A D
\7 . C
O N
ST
\4
. S H
EE
TS
\8
- B
O R
IN
G
L O
C A
TI
O
N M
A P.
dw g
Enprotec | Hibbs & Todd 402 Cedar Street • Abilene, Texas 79601 • T: (325) 698-5560 • F: (325) 690-3240 • www.e-ht.com
PE Firm Registration No. 1151 • PG Firm Registration No. 50103 • RPLS Firm Registration No. 10011900
DISCLAIMER:
THIS DRAWING
IS INTENDED TO
BE PRINTED IN
COLOR !
J. PARKER
Z. MORPHEW
N
SCALE IN FEET
75 0 150
BORING LOCATION MAP 01 OF 01
1" = 150'
LEGEND
BORING LOCATIONB-#
08/07/2025
S. DILLERDATE: ___________________
SAGE DILLER, P.E. 96645
DOCUMENT FOR INTERIM
REVIEW, NOT INTENDED FOR
CONSTRUCTION, BIDDING,
OR PERMIT PURPOSES.
08/07/2025
File details come from the government source that posted it. Updated .