The document is a comprehensive set of construction plans and technical specifications for the City of Lubbock's Northeast Sanitary Sewer Interceptor Line Intermediate Lift Station project, prepared by Enprotec | Hibbs & Todd engineering firm. The project involves constructing a new sanitary sewer interceptor line and lift station, with detailed plans spanning 18 sheets covering site layout, plan and profile views, construction details, electrical systems, and structural components. The project includes installing approximately 3,314 linear feet of 8" HDPE DR-13.5 force main, a 10-foot diameter fiberglass wet well, concrete valve vault, 24" gravity sewer line, electrical infrastructure, and associated site improvements along Oak Avenue and East 8th Street in Lubbock, Texas.
The construction documents provide extensive technical specifications for site preparation, utility coordination, electrical systems, and infrastructure installation. The project includes specific requirements for excavation, utility protection, trench safety, materials testing, and environmental compliance, with careful attention to stormwater management and erosion control. The lift station will be equipped with three submersible pumps, a comprehensive electrical control system with SCADA capabilities, and supporting infrastructure like a shade structure, fencing, and site lighting. The plans indicate a projected construction timeline with a date of 06/24/2025, suggesting the project is planned for near-term implementation, with detailed engineering and technical specifications to guide the construction process.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAGE DILLER, P.E.
SHEET NO.
CONTRACT NO.
CONSTRUCTION PLANS
FOR
CITY OF LUBBOCK
NORTHEAST SANITARY SEWER INTERCEPTOR LINE
INTERMEDIATE LIFT STATION
LUBBOCK, LUBBOCK COUNTY, TEXAS
MAYOR
MARK MCBRAYER
CITY COUNCIL
CHRISTY MARTINEZ-GARCIA
GORDON HARRIS
DAVID GLASHEEN
BRAYDEN ROSE
DR. JENNIFER WILSON
TIM COLLINS
DIVISION DIRECTOR OF ENGINEERING
JOHN TURPIN, P.E.
CONSTRUCTION CITY INSPECTOR
ADAM SALINAS:
806-548-4153
VICINITY MAP
NO SCALE
LOCATION MAP
SCALE: 1" = 2000'
Enprotec | Hibbs & Todd 402 Cedar Street • Abilene, Texas 79601 • T: (325) 698-5560 • F: (325) 690-3240 • www.e-ht.com
PE Firm Registration No. 1151 • PG Firm Registration No. 50103 • RPLS Firm Registration No. 10011900
E n p ro te c
| H ib b s
T od d
E n p ro te c
| H ib b s
T od d
E n p ro te c
| H ib b s
T od d
LUBBOCK
AUSTIN
CORPUS
CHRISTI
ODESSA
MIDLAND
SAN
ANGELO
ANTONIO
SAN
SPRING
BIG
LUBBOCK
WORTH
FORT
WICHITA
FALLS
AMARILLO
BEAUMONT
HOUSTON
STATION
COLLEGE
DALLAS
DENTON
TYLER
ABILENE
APPROVED FOR CONSTRUCTION
(CITY ENGINEER)
JOHN TURPIN, P.E.
LUBBOCK, TEXAS
DATE
PROJECT
LOCATION
TABLE OF CONTENTS
Sheet Number Sheet Title
01 OF 18 COVER SHEET
02 OF 18 OVERALL PROJECT LAYOUT
03 OF 18 PLAN AND PROFILE
04 OF 18 PLAN AND PROFILE
05 OF 18 PLAN AND PROFILE
06 OF 18 PLAN AND PROFILE
07 OF 18 PLAN AND PROFILE
08 OF 18 LIFT STATION SITE PLAN
09 OF 18 LIFT STATION PAVING AND GRADING PLAN
10 OF 18 LIFT STATION PLAN AND SECTION
11 OF 18 CONSTRUCTION DETAIL 1
12 OF 18 CONSTRUCTION DETAIL 2
13 OF 18 CONSTRUCTION DETAIL 3
14 OF 18 FENCE DETAILS
15 OF 18 LIFT STATION ELECTRICAL SITE PLAN
16 OF 18 LIFT STATION ELECTRICAL RACK DETAILS
17 OF 18 ONE-LINE DIAGRAM AND SCHEDULE
18 OF 18 ELECTRICAL SHADE STRUCTURE
06/24/2025 http://www.e-ht.com AutoCAD SHX Text 96645
AutoCAD SHX Text
SAGE DILLER
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text D
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text S
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 TMAP MOBILITY Earthstar Geographics SIO
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
BENCHMARK
POINT NUMBER 1
DESC: BM CP IRS
NORTHING: 7,277,061.15
EASTING: 957,521.43
ELEVATION: 3158.68
BENCHMARK
POINT NUMBER 2
DESC: BM CP IRS
NORTHING: 7,276,912.82
EASTING: 958,995.80
ELEVATION: 3188.89
M .L
.K J
R B
L V
D M
.L .K
J R
B L
V D
E 9TH ST
E 8TH ST
E 8TH ST E 8TH ST
U T
E A
V E
U T
E A
V E
V A
N D
A A
V E
W A
L N
U T
A V
E W
A L
N U
T A
V E
Z E
N
IT
H A
V E
Z E
N
IT
H A
V E
O A
K A
V E
PROPOSED LIFT STATION
E 7TH ST
R E
D B
U D
S T
E 6TH ST
PROPOSED 8" HDPE
DR-13.5 FORCE MAIN
PROPOSED
MANHOLE
PROPOSED 8" HDPE
DR-13.5 FORCE MAIN
PROPOSED 8" HDPE
DR-13.5 FORCE MAIN
N: 7276858.0174 E: 957516.4631
N: 7276841.0346 E: 958080.8224
N: 7276884.7074 E: 958192.6493
N: 7276812.0306 E: 960755.3664
S 88° 16' 35" E - 564.61'
S
° 3 7'
4"
W
0.
N 68° 40' 03" E - 120.05'
S 88° 22' 32" E - 2563.75'
PROPOSED
MANHOLE
LEGEND
MANHOLE - SANITARY SEWER
FIRE HYDRANT
WATER METER
WATER VALVE
GAS METER
LIGHT POLE
UTILITY POLE
UTILITY POLE WITH LIGHT
UTILITY POLE WITH TRANSFORMER
PULL-BOX - ELECTRIC
SIGN
SIGN - BURIED GAS LINE
MAIL BOX
TREE
GUY ANCHOR
CHAINLINK FENCE
GAS LINE
SANITARY SEWER LINE
WATER LINE
OVERHEAD UTILITY LINE
G
S
W
OU
SS
W
G
G
A
REVISIONNO.
DATE
B C D
A B C D
E F
B. MCGIFF
DRAWN BY
CHECKED BY
DESIGNED BY
G
06/24/2025
DATE
SCALE
H I
SHEET No.
PROJECT NO.:
E F G
H I
BAR IS ONE INCH ON
ORIGINAL DRAWING
IF NOT ONE INCH ON
THIS SHEET. ADJUST
SCALES ACCORDINGLY.
0 1
CITY OF LUBBOCK
NORTHEAST SANITARY SEWER INTERCEPTOR LINE
INTERMEDIATE LIFT STATION
S. DILLER
P:
\P ro je ct s\
Lu bb oc k, C ity o f\8
- N E
In te rm ed ia te
L S\
. C
A D
\7 . C
O N
ST
\4
. S H
EE
TS
\8
- 0
O
V
ER
A
LL
P
LA
N A
N D
P R
O
FI
LE
.d w g
Enprotec | Hibbs & Todd 402 Cedar Street • Abilene, Texas 79601 • T: (325) 698-5560 • F: (325) 690-3240 • www.e-ht.com
PE Firm Registration No. 1151 • PG Firm Registration No. 50103 • RPLS Firm Registration No. 10011900
DISCLAIMER:
THIS DRAWING
IS INTENDED TO
BE PRINTED IN
COLOR !
J. PARKER
Z. MORPHEW
06/24/2025
N
SCALE IN FEET
75 0 150
OVERALL PROJECT LAYOUT 02 OF 18
1" = 150'
NOTES
1. THIS SURVEY IS BASED UPON
TOPOGRAPHIC SURVEY PERFORMED IN
JULY AND AUGUST 2024.
2. EXISTING UTILITIES ARE LOCATED
BASED UPON LIMITED FIELD
LOCATIONS AND AVAILABLE RECORD
DRAWINGS.
3. EXISTING UTILITY ASSUMED DEPTH OF
COVER:
· WATER: 48" TYPICAL
· GAS: 48" TYPICAL
· SANITARY SEWER: PER SURVEY
4. CONTRACTOR TO VERIFY UTILITY
CROSSINGS BY HYDRO EXCAVATIONS.
GENERAL CONSTRUCTION NOTES
1. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR SHALL EXAMINE THE
CONTRACT DOCUMENTS AND SPECIFICATIONS, THE PLAN, INCLUDING ALL NOTES AND ANY OTHER
APPLICABLE STANDARDS AND SPECIFICATIONS RELEVANT TO THE PROPER COMPLETION OF THE
WORK SPECIFIED. FAILURE ON THE PART OF THE CONTRACTOR TO EXAMINE ALL STANDARDS OR SPECIFICATIONS PERTAINING TO THIS WORK SHALL IN NO WAY RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY OF PERFORMING THE WORK IN ACCORDANCE WITH ALL SUCH APPLICABLE
STANDARDS AND SPECIFICATIONS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES OF CONSTRUCTION AND ANY SAFETY
PRECAUTION PROGRAMS RELATING IN ANY WAY TO THE CONDITIONS OF THE PREMISES. THIS
WORK IS SUBSIDIARY TO THE VARIOUS BID ITEMS.
2. THE INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE, INFORMATION, AND THE
LOCATION OF UNDERGROUND AND OTHER UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR
COMPREHENSIVE. THE DETERMINATIONS AS TO THE TYPE AND LOCATIONS OF ALL
UNDERGROUND UTILITIES AND OTHER UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGES,
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL REPAIR ANY
DAMAGES TO EXISTING UTILITIES IMMEDIATELY AND AT NO ADDITIONAL COST TO THE CITY OF
LUBBOCK. ANY ADDITIONAL INFORMATION NEEDED TO LOCATE EXISTING UTILITIES SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR WITH NO ADDITIONAL COMPENSATION FROM THE CITY
OF LUBBOCK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING UTILITY COMPANIES
HAVING PROPERTY IN THE AREA OF CONSTRUCTION A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION. CONTRACTOR SHALL EMPLOY SERVICES OF TEXAS811 AS NOTED ON DRAWINGS.
3. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE AND PROTECT ALL PUBLIC
UTILITIES DURING CONSTRUCTION OF THIS PROJECT. ALL STORM SEWER INLETS, MANHOLES,
CLEANOUTS, VALVE BOXES, METER BOXES, FIRE HYDRANTS, GAS MAINS, ELECTRIC AND
TELEPHONE CONDUIT BANKS, ETC. MUST BE ADJUSTED TO THE PROPER LINE AND GRADE BY THE
CONTRACTOR PRIOR TO AND AFTER THE REPLACING OF PERMANENT PAVING WHERE NECESSARY.
4. EXISTING IMPROVEMENTS, INCLUDING, BUT NOT LIMITED TO: FENCES, GATES, GROUND SURFACES, LANDSCAPING, UTILITY PIPELINES, AND DRAINAGE STRUCTURES WHICH ARE REMOVED OR
ALTERED TO PERMIT INSTALLATION OF THE WORK, SHALL BE REPAIRED OR REPLACED BY THE
CONTRACTOR AT THE CONTRACTOR'S EXPENSE, IN THE SAME LOCATION AND IN CONDITION
EQUAL TO OR BETTER THAN FOUND.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING TRENCH SAFETY REQUIREMENTS IN
ACCORDANCE WITH THE CITY OF LUBBOCK STANDARDS, TEXAS STATE LAW, AND O.S.H.A.
STANDARDS FOR ALL EXCAVATIONS.
6. AT ALL TIMES WHEN WORK IS PROGRESSING, THE CONTRACTOR SHALL HAVE A DESIGNATED
COMPETENT PERSON ON-SITE WHO SHALL BE RESPONSIBLE FOR SUPERVISING THE WORK AND
WHOSE DUTIES WILL INCLUDE TO PERFORM REQUIRED SAFETY INSPECTIONS AND TO DIRECT ALL
REQUIRED CONSTRUCTION SAFETY ACTIVITIES.
7. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST CITY OF LUBBOCK STANDARD DESIGN REQUIREMENTS AND SPECIFICATIONS. IN THE CASE OF CONFLICT BETWEEN DRAWINGS, SPECIFICATIONS OR CITY OF LUBBOCK STANDARD REQUIREMENTS AND SPECIFICATIONS, THE
MOST STRINGENT SHALL BE FOLLOWED UNLESS REQUESTED BY CONTRACTOR AND APPROVED IN
WRITING BY CITY OF LUBBOCK ENGINEER.
8. ALL SPOIL MATERIALS THAT WAS REMOVED DURING CONSTRUCTION AND ARE NOT SALVAGED, REUSED OR RELOCATED SHALL BE HAULED OFF AND LEGALLY DISPOSED OF OFF-SITE BY THE
CONTRACTOR.
9. CONTRACTOR SHALL “POTHOLE” ALL UNDERGROUND UTILITY CROSSINGS AHEAD OF THE
CONSTRUCTION CREWS TO LOCATE AND VERIFY EXACT EXISTING VERTICAL ELEVATIONS.
CONTRACTOR SHALL NOTIFY THE OWNER IMMEDIATELY UPON IDENTIFICATION OF A POTENTIAL
CONFLICT.
10. CONSTRUCTION SHALL BE IN COMPLIANCE WITH §217.53 OF THE CURRENT TCEQ REGULATIONS IN
REGARD TO INSTALLATION METHOD, MATERIAL TYPE AND SEPARATION DISTANCE BETWEEN
WATER MAINS AND WASTEWATER COLLECTION FACILITIES.
11. IF CULTURAL MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION, WORK SHALL
IMMEDIATELY CEASE IN THE AREA OF DISCOVERY. WORK MAY CONTINUE IN THE PROJECT AREA
WHERE NO CULTURAL MATERIALS ARE PRESENT. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY
THE OWNER AND THE TEXAS HISTORICAL COMMISSION AT (512) 463-6100.
12. CONTRACTOR SHALL PROTECT EXISTING TREES ALONG THE PROJECT ROUTE TO THE EXTENT
PRACTICAL. CLEARING OF TREES ALONG THE PROJECT ROUTE SHALL ONLY BE CONDUCTED
BETWEEN SEPTEMBER 1 AND FEBRUARY 28 AND MUST BE APPROVED BY THE OWNER PRIOR TO
REMOVAL. COORDINATE REMOVAL AND TRIMMING WITH OWNER PRIOR TO WORK.
13. ALL DIMENSIONS ARE TO BE VERIFIED BY THE CONTRACTOR. HORIZONTAL OR VERTICAL
ALIGNMENT CHANGES ARE TO BE APPROVED BY THE OWNER.
14. ANY RELOCATION OF AN EXISTING UTILITY NOT SHOWN ON THE DRAWINGS, WHETHER
TEMPORARY OR PERMANENT, SHALL BE APPROVED BY THE OWNER PRIOR TO RELOCATION AND
SHALL CONFORM TO ALL APPLICABLE GOVERNING STANDARDS AND SPECIFICATIONS.
15. CONTRACTOR SHALL BE RESPONSIBLE FOR SAFEGUARDING AND PROTECTING ALL MATERIALS
AND EQUIPMENT STORED ON OR OFF THE JOB-SITE IN A SAFE AND WORKMAN-LIKE MANNER,
DURING AND AFTER WORKING HOURS, UNTIL JOB COMPLETION.
16. CONTRACTOR SHALL PREPARE AND SUBMIT A SCHEDULE FOR ALL PHASES OF CONSTRUCTION AND
PROVIDE AN UPDATED SCHEDULE FOLLOWING ANY SIGNIFICANT DEVIATION FROM THE
SCHEDULE.
17. CONTRACTOR SHALL SCHEDULE AND COORDINATE WORK WITH OWNER AS FAR IN ADVANCE AS
PRACTICAL TO MINIMIZE DISTURBANCES TO RESIDENTS AND BUSINESSES ALONG THE PROJECT
ROUTE.
18. THE OWNER WILL DESIGNATE LOCATIONS ALONG THE PROJECT ROUTE FOR CONTRACTOR'S USE IN
STORAGE AND STAGING EQUIPMENT AND MATERIALS.
19. CONTRACTOR SHALL NOT STORE MATERIALS OR EQUIPMENT OR PLACE EXCESS EXCAVATED
MATERIAL ON PRIVATE PROPERTY WITHOUT PRIOR WRITTEN AGREEMENT WITH THE PROPERTY
OWNER.
20. CONTRACTOR SHALL REPLACE TOPSOIL AND RESEED ALL AREAS DISTURBED BY CONSTRUCTION
ACTIVITIES AND NOT SPECIFIED FOR OTHER SURFACE REPLACEMENT.
21. CONTRACTOR SHALL RESTORE PAVEMENT TO AS GOOD OR BETTER THAN THE CONDITION PRIOR
TO CONSTRUCTION, TO THE SATISFACTION OF THE OWNER.
22. CONTRACTOR SHALL REVIEW GEOTECHNICAL BORE LOGS AND BECOME FAMILIAR WITH LOCAL UNDERGROUND CONDITIONS EXPECTED TO BE ENCOUNTERED ON THIS PROJECT. ALL EXCAVATION IS CONSIDERED “UNCLASSIFIED” AND IS SUBSIDIARY TO THE VARIOUS BID ITEMS OF THE PROJECT.
23. CONTRACTOR SHALL PROVIDE SHEETING, SHORING AND BRACING AS NECESSARY TO
ADEQUATELY PROTECT WORKMEN AND EXISTING STRUCTURES AND UTILITIES DURING ALL
PHASES OF CONSTRUCTION IN ACCORDANCE WITH OSHA REQUIREMENTS.
24. CONTRACTOR SHALL COVER OPEN EXCAVATIONS IN TRAFFICKED AREAS WITH ANCHORED ½”
STEEL PLATES DURING NON-WORKING HOURS. OPEN EXCAVATIONS IN NON-TRAFFICKED AREAS
SHALL BE OTHERWISE PROTECTED.
25. USE APPROPRIATE COMPACTION EQUIPMENT FOR THE TYPE OF SOIL ENCOUNTERED. CLAY
BACKFILLS NORMALLY REQUIRE CONSOLIDATED BY SHEEP'S-FOOT ROLLER WHEREAS SAND AND
GRAVEL CAN BE COMPACTED WITH VIBRATORY EQUIPMENT. THE OWNER MAY REJECT SPECIFIC
TYPES OF EQUIPMENT ON SITE AS SOIL CONDITIONS MAY VARY AND AS LOCATION WARRANTS (IE.
PROXIMITY TO EXISTING STRUCTURES).
26. IF GROUND WATER IS ENCOUNTERED THE CONTRACTOR SHALL USE PUMPS AND/OR WELL POINTS
TO DEWATER THE AREA TO ALLOW UNDERGROUND CONSTRUCTION. COST OF DEWATERING SHALL
BE INCLUDED IN THE UNIT BID FOR INSTALLATION OF PROPOSED LINE OR STRUCTURE.
27. CONTRACTOR SHALL TEST MATERIALS TO BE USED FOR BACKFILLING AND ADJUST MOISTURE
CONTENT TO SPECIFIED LEVELS BY ADDING WATER OR DRYING SOILS AS NECESSARY AND AS
SPECIFIED.
28. THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULING CONSTRUCTION MATERIALS TESTING
THROUGH THE DESIGNATED FIELD REPRESENTATIVE 24 HOURS PRIOR TO TESTING. CONTRACTOR IS
RESPONSIBLE FOR ADHERING CLOSELY TO TESTING SCHEDULE TO AVOID ANY DELAYS IN THE
FIELD.
29. CONTRACTOR SHALL VERIFY THAT BENCH MARKS HAVE NOT BEEN DISTURBED AND NOTIFY THE
OWNER IMMEDIATELY UPON IDENTIFICATION OF A POTENTIAL ISSUE.
30. CONTRACTOR SHALL MINIMIZE THE GENERATION OF NUISANCE DUST BY WATERING AND/OR
SWEEPING AS NEEDED.
31. CONTRACTOR SHALL FOLLOW ALL CITY ORDINANCES REGARDING NOISE AND ENVIRONMENTAL
IMPACTS.
32. CONTRACTOR SHALL KEEP ACCURATE RECORDS OF AS-BUILT CONDITIONS AND PROVIDE TO THE
ENGINEER TO AID IN THE PREPARATION OF AS-BUILT RECORD DRAWINGS. AS-BUILT RECORD
DRAWINGS WILL BE PROVIDED TO THE OWNER FOLLOWING COMPLETION OF ALL CONSTRUCTION.
33. CONTRACTOR SHALL PROVIDE TO THE OWNER ALL MATERIAL AND EQUIPMENT OPERATION AND MAINTENANCE (O&M) MANUALS, SPARE PARTS LISTS, ETC., AS RECOMMENDED BY THE EQUIPMENT MANUFACTURERS AND REQUIRED BY THE PROJECT DOCUMENTS, PRIOR TO FINAL ACCEPTANCE OF
THE WORK.
34. SEWER MAINS SHALL BE MARKED UNDER THE GROUND SURFACE TWO FEET ABOVE THE PIPE BY
PLACING A 2'' METALIZED TAPE WITH THE WORD “SEWER” PRINTED ON THE TAPE.
LIMITS OF CONSTRUCTION
1. CONTRACTOR SHALL TAKE PHOTO/VIDEO EVIDENCE OF EXISTING CONDITIONS OF THE PROJECT
SITE AREA PRIOR TO CONSTRUCTION AND SUBMIT TO THE OWNER PRIOR TO MOBILIZATION OF
EQUIPMENT OR MATERIALS.
2. LIMIT OPERATIONS TO WITHIN THE CONFINES OF THE CONSTRUCTION WORK LIMITS SHOWN ON
THE DRAWINGS AND DESIGNATED BY THE OWNER.
3. LIMIT THE STORAGE OF EQUIPMENT, MATERIALS, STOCK PILES, ETC. TO ONE (1) CONSTRUCTION WEEK ALONG CONSTRUCTION ROUTE WITHIN THE PUBLIC RIGHT OF WAY. STORAGE LONGER THAN
ONE (1) WEEK SHALL BE LOCATED IN OWNER DESIGNATED AREAS.
4. WHEN TUNNELING OR BORING IS SHOWN IN PLANS, ACCESS (OPEN CUT) FROM SURFACE IS
PROHIBITED. THE EXCEPTION TO THIS RESTRICTION IS FOR EMERGENCY SITUATIONS WHERE
ACTION IS REQUIRED TO SAFE GUARD THE WORK IN PROGRESS OR OTHER EXISTING UTILITIES. IN
THIS CASE, THE OWNER IS TO BE IMMEDIATELY NOTIFIED OF ADDITIONAL TRAFFIC CONTROL
PROCEDURES AND ANY OTHER NECESSARY ACTIONS THAT WILL BE TAKEN UNTIL THE SITUATION
HAS BEEN RECTIFIED.
TRAFFIC NOTES
1. CONTRACTOR SHALL PREPARE AND SUBMIT A TRAFFIC CONTROL PLAN (TCP) FOR CONSTRUCTION.
IMPLEMENTATION AND MAINTENANCE OF TRAFFIC CONTROLS SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR THROUGHOUT CONSTRUCTION.
2. CONTRACTOR SHALL PROVIDE AND INSTALL TRAFFIC CONTROL DEVICES IN CONFORMANCE WITH
THE TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (TMUTCD), LATEST EDITION,
DURING CONSTRUCTION.
3. WHEN APPLICABLE, CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING CONTINUOUS SIGNAL
OPERATION AT SIGNALIZED INTERSECTIONS, FOR ADJUSTING AND/OR RELOCATING EXISTING
TRAFFIC SIGNAL EQUIPMENT OR PROVIDING, INSTALLING, AND MAINTAINING TEMPORARY SIGNAL
EQUIPMENT AS NEEDED FOR CONSTRUCTION AND TO PROVIDE LINE-OF-SIGHT SIGNAL
INDICATIONS, AND FOR IMMEDIATELY REPLACING AND/OR REPAIRING ANY TRAFFIC SIGNAL
EQUIPMENT, CABLES, OR CONDUIT THAT IS CUT OR DAMAGED.
4. THE CONSTRUCTION WARNING SIGNS AND END OF CONSTRUCTION SIGNS SHALL BE PLACED AT
PROJECT LIMITS AND SHALL REMAIN IN PLACE THROUGHOUT THE DURATION OF THE
CONSTRUCTION.
5. CONTRACTOR SHALL MAINTAIN TRAFFIC IN EACH DIRECTION BY MEANS OF FLAGMEN OR DETOUR.
6. CONTRACTOR SHALL PROVIDE AND MAINTAIN PEDESTRIAN SAFETY FENCES AND BARRICADES AT
ALL TIMES AT EACH SITE WHERE PEDESTRIAN TRAFFIC IS EVIDENT.
7. CONTRACTOR SHALL PROMPTLY PLACE AND MAINTAIN TEMPORARY COLD-MIX PAVING ON
PAVEMENT CUTS RELEASED TO GENERAL TRAFFIC UNTIL FINAL PAVEMENT IS PLACED.
8. CONTRACTOR MUST NOTIFY BUSINESSES AND RESIDENTS IMPACTED BY CONSTRUCTION AT LEAST
ONE WEEK PRIOR TO CONSTRUCTION START IN THEIR AREA.
9. A NOTICE, PREPARED BY THE CONTRACTOR AND APPROVED BY THE OWNER, SHALL BE HAND
DELIVERED BY THE CONTRACTOR TO ALL RESIDENTS AND BUSINESSES WITHIN THE VICINITY OF CONSTRUCTION NOTIFYING THEM OF THE PROPOSED CONSTRUCTION AND POSSIBLE DISRUPTIONS IN SERVICE TO WATER, SEWER, ROADS, ACCESS, ETC. NOTICE SHALL INCLUDE DATES OF WORK
AND NUMBERS TO CONTACT IN CASE OF ANY QUESTIONS.
10. CONTRACTOR SHALL COORDINATE WITH PROPERTY OWNERS TO DETERMINE AN APPROPRIATE
TIME TO CROSS DRIVEWAYS AND PROVIDE ALTERNATE MEANS OF ACCESS DURING
CONSTRUCTION ACTIVITIES IN ONE OR MORE OF THE FOLLOWING METHODS: (1) ANCHORED ½”
STEEL PLATES (2) BACKFILLING IMMEDIATELY AFTER CONSTRUCTION AND PLACING CALICHE
SURFACE FOR TEMPORARY DRIVEWAY PURPOSES. COST FOR NOTIFICATIONS AND MAINTAINING
ACCESS SHALL BE CONSIDERED INCIDENTAL TO THE VARIOUS BID ITEMS.
DRAINAGE NOTES
1. CONTRACTOR SHALL PREPARE AND SUBMIT A STORM WATER POLLUTION PREVENTION PLAN
(SWPPP) FOR ALL PHASES OF CONSTRUCTION. IMPLEMENTATION AND MAINTENANCE OF
STORMWATER CONTROLS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR THROUGHOUT
CONSTRUCTION.
2. ADEQUATE DRAINAGE SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION AND ANY
DRAINAGE DITCH OR STRUCTURE DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO
THE SATISFACTION OF THE OWNER.
3. NO EXCESS EXCAVATED MATERIAL SHALL BE DEPOSITED IN LOW AREAS OR ALONG NATURAL
DRAINAGE WAYS, UNLESS SPECIFICALLY AUTHORIZED BY OWNER IN WRITING.
WATER LINE (WHERE APPLICABLE)
1. ALL WATER LINES SHOWN IN APPROXIMATE LOCATION. CONTRACTOR TO FIELD VERIFY EXACT
LOCATION.
2. WATER LINES DESIGNATED TO REMAIN IN-SERVICE SHALL BE PROTECTED BY THE CONTRACTOR
FROM CONSTRUCTION ACTIVITIES.
3. REPAIR EXISTING LINES DAMAGED DURING CONSTRUCTION WITH LIKE MATERIALS. NO
ADDITIONAL PAY.
4. UNLESS NOTED ON STANDARD DETAILS, DUCTILE IRON FITTINGS SHALL BE MEASURED AND
PAID SUBSIDIARY TO THE PRICE BID FOR THE APPLICABLE MAIN WATER LINE.
ELECTRICAL NOTES (WHERE APPLICABLE)
1. WARNING: OVERHEAD LINES MAY EXIST ON THE PROPERTY. SINCE THEY ARE CLEARLY VISIBLE
THEY MAY NOT HAVE BEEN MARKED ON THE PLANS. THE CONTRACTOR SHOULD LOCATE ALL
OVERHEAD UTILITIES PRIOR TO BEGINNING ANY CONSTRUCTION. TEXAS LAW, FORBIDS ALL
ACTIVITIES IN WHICH PERSONS OR THINGS MAY COME WITHIN SIX (6) FEET OF LIVE OVERHEAD
HIGH VOLTAGE LINES. CONTRACTORS ARE LEGALLY RESPONSIBLE FOR SAFETY AND
CONSTRUCTION WORKERS UNDER THIS LAW. THIS LAW CARRIES BOTH CRIMINAL AND CIVIL
LIABILITY. LOCATION OF AEP FACILITIES ARE APPROXIMATE AND HAVE NOT BEEN VERIFIED BY
AN ACTUAL FIELD CHECK.
2. HAND DIG WITHIN ONE (1) FOOT OF UNDERGROUND CONDUIT OR CABLE.
GAS NOTES (WHERE APPLICABLE)
1. CAUTION: UNDERGROUND GAS FACILITIES: LOCATION OF GAS LINES (TO INCLUDE UNIT GAS TRANSMISSION, AND/OR INDUSTRIAL GAS SUPPLY CORPORATION WHERE APPLICABLE) ARE SHOWN
IN AN APPROXIMATE LOCATION ONLY. SERVICE LINES ARE USUALLY NOT SHOWN. THE
CONTRACTOR SHALL CONTACT TEXAS ONE-CALL AT 1-800-245-4545 A MINIMUM OF 48 HOURS PRIOR TO CONSTRUCTION TO HAVE MAIN AND SERVICE LINES FIELD LOCATED. THE CONTRACTOR SHALL
DETERMINE THE EXACT LOCATION BEFORE COMMENCING WORK AND AGREE TO BE FULLY
RESPONSIBLE FOR ANY DAMAGES CAUSED BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE
THESE UNDERGROUND FACILITIES.
2. HAND DIG WITHIN ONE (1) FOOT OF UNDERGROUND GAS LINES.
TELEPHONE (WHERE APPLICABLE)
1. THE LOCATIONS OF TELEPHONE CO. UTILITIES ARE SHOWN IN AN APPROXIMATE LOCATION ONLY.
THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION BEFORE COMMENCING WORK.
CONTRACTOR AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE
OCCASIONED BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE THESE UNDERGROUND
UTILITIES.
2. HAND DIG WITHIN ONE (1) FOOT OF UNDERGROUND CONDUIT CABLE SYSTEMS OR MANHOLES.
3. COORDINATE ANY CONFLICT WITH TELEPHONE COMPANY REPRESENTATIVES AND PROVIDE
NECESSARY SUPPORT FOR TELEPHONE CABLE AS INSTRUCTED BY TELEPHONE COMPANY NO
SEPARATE PAYMENT WILL BE MADE FOR SUCH WORK.
UTILITY NOTE
1. THE EXISTING UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY
INFORMATION AND EXISTING RECORD DRAWINGS. THE ENGINEER/SURVEYOR MAKES NO
GUARANTEE THAT UNDERGROUND UTILITIES SHOWN OR NOTED COMPRISE ALL SUCH UTILITIES IN THE AREA EITHER IN SERVICE, OR ABANDONED. THE ENGINEER/SURVEYOR HAS NOT PHYSICALLY LOCATED ANY UNDERGROUND UTILITIES SHOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
PROVIDE PROPER NOTIFICATION TO THE INSPECTOR OF CONSTRUCTION/GRADING/PAVING
ACTIVITIES PRIOR TO BEGINNING THE PROJECT AND TO FOLLOW ALL APPLICABLE TEXAS
EXCAVATION SAFETY SYSTEM RULES TO AVOID UTILITY DISRUPTION. REFER TO TEXAS811 NOTE.
2. LOCATIONS OF UNDERGROUND UTILITIES ARE NOT SHOWN ON THE PLANS. CONTRACTOR SHALL
PRE-LOCATE ALL UNDERGROUND UTILITIES PRIOR TO COMMENCING WORK BY WHATEVER MEANS
NECESSARY (METAL DETECTION, EXCAVATION, SURVEY).
3. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO COMMENCING
WORK.
4. CONTRACTOR SHALL APPLY FOR AND RECEIVE A BARRICADE PERMIT FROM TRAFFIC
ENGINEERING FEES WILL BE WAIVED. UPON APPROVAL, IT IS STILL THE CONTRACTOR'S
RESPONSIBILITY TO MAINTAIN COMPLIANCE WITH THE TEXAS MUTCD STANDARDS DURING
CONSTRUCTION.
5. CONTRACTOR SHALL NOTIFY PROPERTY OWNERS 72 HOURS BEFORE PERFORMING ANY WORK
THAT WILL AFFECT THE OWNERS ACCESS TO PROPERTY.
UTILITY PROTECTION
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH AND PROTECTING ANY
PUBLIC AND PRIVATE UTILITIES IN THE AREA.
TEXAS811 NOTE
1. CONTRACTOR SHALL CONTACT TEXAS811 BY DIALING 811 FOR UTILITY LOCATES NO LATER THAN
TWO FULL WORKING DAYS PRIOR TO COMMENCING GRADING/PAVING/CONSTRUCTION.
2. CONTRACTOR WILL BE RESPONSIBLE FOR ANY AND ALL COORDINATION WITH ALL PUBLIC AND PRIVATE UTILITY COMPANIES INCLUDING THE CITY OF LUBBOCK, AS THIS MAY BE NECESSARY
FOR THE TIMELY AND ORDERLY PROGRESSION OF THE CONTRACTOR'S WORK.
3. EXISTING UTILITIES ARE TO REMAIN IN SERVICE AT ALL TIMES. CONTRACTOR SHALL OBTAIN
WRITTEN APPROVAL FROM THE UTILITY OWNER AND SHALL SUBMIT WRITTEN APPROVAL TO THE
CITY ENGINEER PRIOR TO TAKING UTILITY OUT OF SERVICE.
4. CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION STAKING NEEDS AND AS-BUILT SURVEYS, INCLUDING STATIONS AND ELEVATIONS.
5. PRIOR TO ANY CONSTRUCTION DIFFERENT FROM THIS PLAN, CALL CONSTRUCTION INSPECTION SUPERVISOR AT 806-548-4152 FOR AUTHORIZATION. ALL VARIANCES SHALL BE REQUESTED AND
APPROVED IN WRITTEN FORM.
6. THE CONTRACTOR SHALL INSTALL TRACER WIRE TO INDICATE THE LOCATION OF THE PIPE.
7. THE CONTRACTOR IS RESPONSIBLE FOR TEMPORARY RELOCATION OF TRASH DUMPSTERS AND
RETURNING TO ORIGINAL LOCATION AT CONTRACTOR'S OWN EXPENSE, WITHOUT ADDITIONAL
COMPENSATION.
8. BEFORE RETAINAGE WILL BE PAID CONTRACTOR SHALL PROVIDE THE CITY A SET OF AS BUILT
PLANS WITH AS BUILT ELEVATIONS FOR EVERY ELEVATION SHOWN ON THE PLANS. THIS WORK
SHALL BE SUBSIDIARY TO THE VARIOUS BID ITEMS.
9. PROPOSED UTILITY LOCATIONS ARE IN COMPLIANCE WITH TCEQ RULE 290.44 (E) (1). IF FIELD LOCATIONS OF EXISTING UTILITIES DIFFER FROM THE PLAN LOCATION AND VIOLATE RULE 290.44, THEN THE CONTRACTOR SHALL MODIFY THE LOCATION OF THE PROPOSED UTILITY LINE.
MODIFICATIONS SHALL NOT BE CAUSE FOR A CHANGE ORDER, AND WILL BE PAID IN ACCORDANCE
WITH UNIT PRICES IN CONTRACT.
10. THE PLANS DO NOT TAKE INTO ACCOUNT ELEVATION DIFFERENCES OF EXISTING LINES TO WHICH
THE NEW LINES WILL BE CONNECTED. THE CONTRACTOR SHALL PROVIDE ALL FITTINGS,
APPURTENANCES AND PIPE SHALL BE TO COMPENSATE FOR SUCH UNKNOWNS WITHIN THE UNIT
PRICE OF PIPING AND FITTINGS. FOR PAYMENT PURPOSES ALL DISTANCES AND LENGTHS OF
PIPING, TUBING, TRENCHING & DIRECTIONAL DRILLING SHALL BE MEASURED AS HORIZONTAL
REGARDLESS OF VARIATIONS IN PIPE ELEVATIONS NECESSARY TO INSTALL.
11. IN PAVED AREAS, FOR ALL VALVES TO BE CLOSED AND ABANDONED, THE CONTRACTOR SHALL REMOVE VALVE BOXES, FILL THEM WITH CEMENT STABILIZED MATERIAL TO WITHIN 2 INCHES OF SURFACE. TOP 2 INCHES SHALL BE HMAC IF SURROUNDING PAVEMENT IS ASPHALT OR CONCRETE
IF SURROUNDING PAVEMENT IS CONCRETE.
12. ALL DOMESTIC WATER SERVICE CONNECTIONS AND WATER METERS SHALL BE A MINIMUM OF 1"
IN SIZE UNLESS OTHERWISE NOTED, LINE SIZE SHALL MATCH THE WATER METER SIZE.
13. SEWER SERVICE SHALL BE A MINIMUM OF 4" IN SIZE. SIZE ON SIZE SEWER SERVICE CONNECTIONS
SHALL NOT BE ALLOWED.
SWPPP:
1. LESS THAN 1 ACRE - MS4 ONLY
SINCE TOTAL LAND DISTURBANCE IS LESS THAN ONE ACRE AT A GIVEN TIME, TPDES CGP AND SWP3
REQUIREMENTS DO NOT APPLY. HOWEVER, BMP'S ARE RECOMMENDED ONSITE, ESPECIALLY
SURROUNDING SENSITIVE MS4 FEATURES. PER CITY OF LUBBOCK ORDINANCE 22.11, THE CITY OF LUBBOCK RETAINS THE AUTHORITY TO REQUIRE A SWP3 AND INSTALLATION OF BMP'S IF SITE(S) IS
DISCHARGING EXCESS POLLUTANTS INTO MSA.
2. 1 - 4.99 ACRES - SMALL CONSTRUCTION SITE
• PREPARE AND SUBMIT SWP3 TO CITY OF LUBBOCK NO LATER THAN 7 DAYS PRIOR TO
COMMENCEMENT OF LAND DISTURBANCE; MUST BE SUBMITTED THROUGH CSS PORTAL FOUND AT
LUBBOCKSTORMWATER.ORG/
• SWP3 MUST BE PREPARED TO TCEQ AND CGP STANDARDS
• INCLUDE COMPLETED CITY OF LUBBOCK COVER PAGE
• CITY OF LUBBOCK PROJECT - REVIEW FEE WILL BE WAIVED
• SUBMIT AND POST SMALL CONSTRUCTION SITE NOTICE FOR VIEWING AT CONSTRUCTION SITE
• INSTALL AND MAINTAIN BMP'S PER MANUFACTURERS SPECIFICATIONS
3. 5 - 9.99 ACRES - LARGE CONSTRUCTION SITE
• PREPARE AND SUBMIT SWP3 TO CITY OF LUBBOCK NO LATER THAN 7 DAYS PRIOR TO
COMMENCEMENT OF LAND DISTURBANCE; MUST BE SUBMITTED THROUGH CSS PORTAL FOUND AT
LUBBOCKSTORMWATER.ORG
• SWP3 MUST BE PREPARED TO TCEQ AND CGP STANDARDS
• INCLUDE COMPLETED CITY OF LUBBOCK COVER PAGE
• SUBMIT NOTICE OF INTENT (NOI) THROUGH TCEQ STEERS WEBSITE:
HTTP://WWW3.TCEQ.TEXAS.GOV/STEERS/
• CONTACT CITY OF LUBBOCK TO DECLARE OPERATOR ROLES ON TCEQ PERMITS
• CITY OF LUBBOCK PROJECT - REVIEW FEE WILL BE WAIVED
• SUBMIT AND POST LARGE CONSTRUCTION SITE NOTICE FOR VIEWING AT CONSTRUCTION SITE
• INSTALL AND MAINTAIN BMP'S PER MANUFACTURERS SPECIFICATIONS
4. 10 > ACRES - LARGE CONSTRUCTION SITE
• PREPARE AND SUBMIT SWP3 TO CITY OF LUBBOCK NO LATER THAN 7 DAYS PRIOR TO
COMMENCEMENT OF LAND DISTURBANCE; MUST BE SUBMITTED THROUGH CSS PORTAL FOUND AT
LUBBOCKSTORMWATER.ORG
• SWP3 MUST BE PREPARED TO TCEQ AND CGP STANDARDS
• INCLUDE COMPLETED CITY OF LUBBOCK COVER PAGE
• SUBMIT NOTICE OF INTENT (NOI) THROUGH TCEQ STEERS WEBSITE:
HTTP://WWW3.TCEQ.TEXAS.GOV/STEERS/
• CONTACT CITY OF LUBBOCK TO DECLARE OPERATOR ROLES ON TCEQ PERMITS
• CITY OF LUBBOCK PROJECT - REVIEW FEE WILL BE WAIVED
• SUBMIT AND POST LARGE CONSTRUCTION SITE NOTICE FOR VIEWING AT CONSTRUCTION SITE
• INSTALL AND MAINTAIN BMP'S PER MANUFACTURERS SPECIFICATIONS
• SEDIMENTATION BASIN REQUIREMENT(S) MUST BE MET FOR THE DURATION OF PROJECT
COORDINATION AND EMERGENCY NUMBERS
THE FOLLOWING NUMBERS ARE INCLUDED FOR THE
CONTRACTOR'S CONVENIENCE
C.O.L. WATER UTILITIES 806-775-3161
CONSTRUCTION INSPECTION 806-548-4152
SUPERVISOR
SUDDENLINK COMMUNICATIONS 806-771-6229
806-771-6211
ATMOS ENERGY 1-800-692-4694
806-548-1895 806-893-3561
LUBBOCK POWER AND LIGHTS 806-775-2579
806-790-7243
AT&T 1-800-286-8313
806-790-7243
C.O.L. TRAFFIC ENGINEERING 806-775-2132
EMERGENCY CONTACT 806-775-2816
VEXUS 806-577-6059
http://www.e-ht.com AutoCAD SHX Text 96645
AutoCAD SHX Text
SAGE DILLER
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text D
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
O U
OUOUOUOUOUOUOUOUOUOUOU
OU
G
MANHOLE
RIM: 3180.04
INV: 3171.17 (IN-E)
INV: 3170.95 (IN-S)
INV:3170.90 (OUT-N)
MANHOLE
RIM:3160.98
INV:3155.37 (IN-S)
INV: 3155.41(IN-E)
INV:3152.32 (OUT-N)
G
RA
VE
L
AS
PH
AL
T
AS
PH
AL
T
C O
N C
RE
TE
C O
N C
RE
TE
C O
N C
RE
TE
C O
N C
RE
TE
C O
N C
C O
N C
C O
N C
C O
N C
. G
RA
SS
G
RA
SS
G
RA
SS
G
RA
SS
G
RA
SS
OAK AVENUE
OAK AVENUE
GGGGGGGGGGGGGGGGG
GS S S S S S S S S S S S S S S S S
WWWWWWWWWWWWWWWW
S S
SSSSSSSSSSS
S
S S
S S
S S
S S
W W
W W
WW
W W
W W
SS
SS
G
MANHOLE
RIM:3162.30
INV:3141.47 BOTTOM
SS
BO
RE
0+
1+00 2+00 3+00 4+00 5+00
6+
7+
SEWER CROSSING
WATER CROSSING
PROPOSED
LIFT STATION
GAS CROSSING
EXPECTED PATH OF
EXISTING GAS LINE
PROPOSED
MANHOLE
OAK AVENUE
OAK AVENUE
E A
S T th
S T
R E
E T
INSTALL 78 SQ YD OF
ASPHALT REPAIR ( PER
DETAIL SHEET 12, TYP)
INSTALL 45 SQ YD OF
ASPHALT REPAIR (PER
DETAIL SHEET 12, TYP)
INSTALL 750 LF OF 8"
HDPE DR-13.5 FORCE MAIN
BY OPEN CUT
23.3'
EXISTING 8"
SEWER LINE
EXISTING 30"
SEWER LINE
MATCH LINE 7+28
-0+50 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 7+50
-0+50 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 7+50
8" SEWER CROSSING
6" WATER CROSSING
PROPOSED LIFT STATION
GAS CROSSING
I N
V
EL
EV
.3
IN
V
EL
EV
.4
IN
V
EL
EV
.9
IN
V
EL
EV
.6
IN
V
EL
EV
.7
IN
V
EL
EV
.9
IN
V
EL
EV
.1
IN
V
EL
EV
.2
IN
V
EL
EV
.4
IN
V
EL
EV
.6
IN
V
EL
EV
.7
IN
V
EL
EV
.7
IN
V
EL
EV
.6
IN
V
EL
EV
.5
IN
V
EL
EV
.3
IN
V
EL
EV
.2
IN
V
EL
EV
EXISTING GROUND
PROPOSED 8" FORCE MAIN
30" SEWER CROSSING
A
REVISIONNO.
DATE
B C D
A B C D
E F
B. MCGIFF
DRAWN BY
CHECKED BY
DESIGNED BY
G
06/24/2025
DATE
SCALE
H I
SHEET No.
PROJECT NO.:
E F G
H I
BAR IS ONE INCH ON
ORIGINAL DRAWING
IF NOT ONE INCH ON
THIS SHEET. ADJUST
SCALES ACCORDINGLY.
0 1
CITY OF LUBBOCK
NORTHEAST SANITARY SEWER INTERCEPTOR LINE
INTERMEDIATE LIFT STATION
S. DILLER
P:
\P ro je ct s\
Lu bb oc k, C ity o f\8
- N E
In te rm ed ia te
L S\
. C
A D
\7 . C
O N
ST
\4
. S H
EE
TS
\8
- 0
TH
R U
PL
A
N A
N D
P R
O
FI
LE
.d w g
Enprotec | Hibbs & Todd 402 Cedar Street • Abilene, Texas 79601 • T: (325) 698-5560 • F: (325) 690-3240 • www.e-ht.com
PE Firm Registration No. 1151 • PG Firm Registration No. 50103 • RPLS Firm Registration No. 10011900
J. PARKER
Z. MORPHEW
06/24/2025
PLAN AND PROFILE 03 OF 18
HOR: 1" = 30'
VER: 1" = 5'
N
SCALE IN FEET
10 0 30 http://www.e-ht.com AutoCAD SHX Text 96645
AutoCAD SHX Text
SAGE DILLER
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text D
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
O U
OU
OU
OU OU OU OU OU OU
O U
G
W
ASPHALT
ASPHALT
ASPHALT
CONCRETE
CONCRETE CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE CONCRETE
CONCRETE CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONC.GRASS
GRASS
GRASS
GRASS GRASS
GRASS GRASS GRASS
GRASS GRASS
GRASS
GRASS
GRASS
ASPHALT
ASPHALT
G G G G
BP
BP
BP
BP
W W
W W
W W
G
FIREHYDRANT
(BROKEN OFF)
W W W W W W W
7+00 8+00 9+00 10+00
11+00
12+00 13+00 14+00 15+00
WATER CROSSING
WATER CROSSING
(VERIFY DEPTH
PRIOR TO BORING)
GAS CROSSING
INSTALL 120 LF OF 8" HDPE DR
13.5 PIPE BY SLICK BORE
CONTRACTOR TO VERIFY
LOCATION OF GAS LINE
BY HYDRO EXCAVATION
BEGIN INSTALL 2,564
LF OF 8" HDPE FORCE
MAIN BY OPEN CUT
FIBER CROSSING INSTALL 8" AIR
RELEASE VALVE
(REFER TO DETAIL
FOR PLACEMENT)
EAST 8th STREET
IN
S
T A
L L
78 S Q
Y D
O F
A S
P H
A L
T R
E P
A
IR
( P E
R D
E T
A
IL
S H
E E
T 12, T
Y P
INSTALL 334 SQ YD
OF ASPHALT REPAIR
INSTALL 334 SQ YD OF
ASPHALT REPAIR (PER
DETAIL SHEET 12, TYP)
INSTALL 750 LF OF 8"
HDPE DR-13.5 FORCE MAIN
BY OPEN CUT
.4
M A
R T
IN
L
K
IN
G B
O U
L E
V A
R D
EAST 8th STREET
EAST 8th STREET
30' x 10' BORE PIT
TO BE ASPHALT
REPAIRED
30' x 10'
LANDING PIT
TO BE ASPHALT
REPAIRED
M A
T C
H L
IN
E
M A
T C
H L
IN
E
4+
FORCE MAIN ALIGNMENT PROFILE
7+50 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00
7+50 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00
8" WATER CROSSING
30" WATER CROSSING
GAS CROSSING
FIBER CROSSING
INSTALL 120 LF OF 8"
HDPE DR 13.5 PIPE
BY SLICK BORE
EXISTING GROUND
PROPOSED 8" FORCE MAIN
.2
IN
V
EL
EV
.1
IN
V
EL
EV
.0
IN
V
EL
EV
.9
IN
V
EL
EV
.8
IN
V
EL
EV
.7
IN
V
EL
EV
.3
IN
V
EL
EV
.7
IN
V
EL
EV
.8
IN
V
EL
EV
.8
IN
V
EL
EV
.8
IN
V
EL
EV
.1
IN
V
EL
EV
.2
IN
V
EL
EV
.1
IN
V
EL
EV
.7
IN
V
EL
EV
.6
IN
V
EL
EV
A
REVISIONNO.
DATE
B C D
A B C D
E F
B. MCGIFF
DRAWN BY
CHECKED BY
DESIGNED BY
G
06/24/2025
DATE
SCALE
H I
SHEET No.
PROJECT NO.:
E F G
H I
BAR IS ONE INCH ON
ORIGINAL DRAWING
IF NOT ONE INCH ON
THIS SHEET. ADJUST
SCALES ACCORDINGLY.
0 1
CITY OF LUBBOCK
NORTHEAST SANITARY SEWER INTERCEPTOR LINE
INTERMEDIATE LIFT STATION
S. DILLER
P:
\P ro je ct s\
Lu bb oc k, C ity o f\8
- N E
In te rm ed ia te
L S\
. C
A D
\7 . C
O N
ST
\4
. S H
EE
TS
\8
- 0
TH
R U
PL
A
N A
N D
P R
O
FI
LE
.d w g
Enprotec | Hibbs & Todd 402 Cedar Street • Abilene, Texas 79601 • T: (325) 698-5560 • F: (325) 690-3240 • www.e-ht.com
PE Firm Registration No. 1151 • PG Firm Registration No. 50103 • RPLS Firm Registration No. 10011900
J. PARKER
Z. MORPHEW
06/24/2025
PLAN AND PROFILE 04 OF 18
N
SCALE IN FEET
10 0 30
HOR: 1" = 30'
VER: 1" = 5'
http://www.e-ht.com AutoCAD SHX Text 96645
AutoCAD SHX Text
SAGE DILLER
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text D
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
OU OU OU OU OU OU OU OU OU OU OU OU OU OU OU OU OU OU OU
MANHOLE
RIM:3187.28
INV:3178.90 (N)
INV:3178.65 (SE)
ASPHALT
ASPHALT
CONCRETE
CONCRETE CONCRETE
CONCRETE CONC.
ASPHALT
GRASS
ASPHALT EAST 8th STREET
R E
D B
U D
A V
E N
U E
S W
W W W W W W W W W W W W W W W W W W
SS
BORE 2 - 10'
W
S P
R U
C E
A V
E N
U E
14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00
WATER CROSSING
SEWER CROSSING
INSTALL 8" AIR
RELEASE VALVE
(REFER TO DETAIL
FOR PLACEMENT)INSTALL 334 SQ YD OF
ASPHALT REPAIR (PER
DETAIL SHEET 12, TYP)
INSTALL 334 SQ YD
OF ASPHALT REPAIRINSTALL 334 SQ YD OF
ASPHALT REPAIR (PER
DETAIL SHEET 12, TYP)
INSTALL 334 SQ YD OF
ASPHALT REPAIR (PER
DETAIL SHEET 12, TYP)INSTALL 750 LF OF 8"
HDPE DR-13.5 FORCE MAIN
BY OPEN CUT
.4
INSTALL 750 LF OF 8"
HDPE DR-13.5 FORCE MAIN
BY OPEN CUTM
A T
C H
L
IN
E
4+
M A
T C
H L
IN
E
2+
FORCE MAIN ALIGNMENT PROFILE
15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 22+50
15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 22+50
6" WATER CROSSING
6" WATER CROSSING
8" SEWER CROSSING
EXISTING GROUND
INSTALL 8" AIR
RELEASE VALVE
PROPOSED 8" FORCE MAIN
.6
IN
V
EL
EV
.1
IN
V
EL
EV
.3
IN
V
EL
EV
.6
IN
V
EL
EV
.9
IN
V
EL
EV
.2
IN
V
EL
EV
.7
IN
V
EL
EV
.4
IN
V
EL
EV
.4
IN
V
EL
EV
.5
IN
V
EL
EV
.7
IN
V
EL
EV
.9
IN
V
EL
EV
.1
IN
V
EL
EV
.3
IN
V
EL
EV
.5
IN
V
EL
EV
.7
IN
V
EL
EV
A
REVISIONNO.
DATE
B C D
A B C D
E F
B. MCGIFF
DRAWN BY
CHECKED BY
DESIGNED BY
G
06/24/2025
DATE
SCALE
H I
SHEET No.
PROJECT NO.:
E F G
H I
BAR IS ONE INCH ON
ORIGINAL DRAWING
IF NOT ONE INCH ON
THIS SHEET. ADJUST
SCALES ACCORDINGLY.
0 1
CITY OF LUBBOCK
NORTHEAST SANITARY SEWER INTERCEPTOR LINE
INTERMEDIATE LIFT STATION
S. DILLER
P:
\P ro je ct s\
Lu bb oc k, C ity o f\8
- N E
In te rm ed ia te
L S\
. C
A D
\7 . C
O N
ST
\4
. S H
EE
TS
\8
- 0
TH
R U
PL
A
N A
N D
P R
O
FI
LE
.d w g
Enprotec | Hibbs & Todd 402 Cedar Street • Abilene, Texas 79601 • T: (325) 698-5560 • F: (325) 690-3240 • www.e-ht.com
PE Firm Registration No. 1151 • PG Firm Registration No. 50103 • RPLS Firm Registration No. 10011900
J. PARKER
Z. MORPHEW
06/24/2025
PLAN AND PROFILE 05 OF 18
N
SCALE IN FEET
10 0 30
HOR: 1" = 30'
VER: 1" = 5'
http://www.e-ht.com AutoCAD SHX Text 96645
AutoCAD SHX Text
SAGE DILLER
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text D
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
OU OU OU OU OU OU OU OU OU OU OU OU OU OU OU OU
U
OU
OU OU OU OU OU OU OU OU OU
OU O
U
G
ASPHALT
ASPHALT
CONCRETE
CONCRETE
CONCRETE
CONC.
CONCRETE CONCRETE
CONCRETE
CONC.
ASPHALT
ASPHALT
EAST 8th STREET
U T
E A
V E
N U
E
V A
N D
A A
V E
N U
E
G
S
S S
S S
W W
W W
W W W W W W
WS
SS
MANHOLE
RIM:3189.78
INV:3184.25 CLAY (IN-E)
INV:3181.70 CLAY (IN-N)
INV:3181.62 CLAY (OUT-S)
SS
W W
SS
MANHOLE
RIM:3191.09
INV:3186.75 CLAY (IN-S)
INV:3185.33 CLAY (OUT-W)
W W W W W W W W W
22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00
SEWER CROSSING
WATER CROSSING SEWER CROSSING
WATER CROSSING
SEWER CROSSING
WATER CROSSING
INSTALL 334 SQ YD OF
ASPHALT REPAIR (PER
DETAIL SHEET 12, TYP)
INSTALL 334 SQ YD OF
ASPHALT REPAIR (PER
DETAIL SHEET 12, TYP) INSTALL 750 LF OF 8"
HDPE DR-13.5 FORCE MAIN
BY OPEN CUT
M A
T C
H L
IN
E
2+
M A
T C
H L
IN
E
9+
FORCE MAIN ALIGNMENT PROFILE
22+50 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00
22+50 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00
8" SEWER CROSSING
8" WATER CROSSING 6" WATER CROSSING
3" WATER CROSSING
6" SEWER CROSSING 6" SEWER CROSSING
3" WATER CROSSING
EXISTING GROUND
PROPOSED 8" FORCE MAIN
.7
IN
V
EL
EV
.9
IN
V
EL
EV
.1
IN
V
EL
EV
.4
IN
V
EL
EV
.0
IN
V
EL
EV
.9
IN
V
EL
EV
.1
IN
V
EL
EV
.3
IN
V
EL
EV
.9
IN
V
EL
EV
.0
IN
V
EL
EV
.0
IN
V
EL
EV
.1
IN
V
EL
EV
.2
IN
V
EL
EV
.3
IN
V
EL
EV
.3
IN
V
EL
EV
.4
IN
V
EL
EV
A
REVISIONNO.
DATE
B C D
A B C D
E F
B. MCGIFF
DRAWN BY
CHECKED BY
DESIGNED BY
G
06/24/2025
DATE
SCALE
H I
SHEET No.
PROJECT NO.:
E F G
H I
BAR IS ONE INCH ON
ORIGINAL DRAWING
IF NOT ONE INCH ON
THIS SHEET. ADJUST
SCALES ACCORDINGLY.
0 1
CITY OF LUBBOCK
NORTHEAST SANITARY SEWER INTERCEPTOR LINE
INTERMEDIATE LIFT STATION
S. DILLER
P:
\P ro je ct s\
Lu bb oc k, C ity o f\8
- N E
In te rm ed ia te
L S\
. C
A D
\7 . C
O N
ST
\4
. S H
EE
TS
\8
- 0
TH
R U
PL
A
N A
N D
P R
O
FI
LE
.d w g
Enprotec | Hibbs & Todd 402 Cedar Street • Abilene, Texas 79601 • T: (325) 698-5560 • F: (325) 690-3240 • www.e-ht.com
PE Firm Registration No. 1151 • PG Firm Registration No. 50103 • RPLS Firm Registration No. 10011900
J. PARKER
Z. MORPHEW
06/24/2025
PLAN AND PROFILE 06 OF 18
N
SCALE IN FEET
10 0 30
HOR: 1" = 30'
VER: 1" = 5'
http://www.e-ht.com AutoCAD SHX Text 96645
AutoCAD SHX Text
SAGE DILLER
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text D
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
OU OU OU OU OU OU OU OU OU OU
U
OU OU OU
ASPHALT ASPHALT
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETECONCRETE
CONCRETE CONCRETE
CONCRETE
CONCRETE
CONCRETE CONCRETE CONCRETE CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONC. CONC.
CONC.
CONC.
ASPHALT
ASPHALT
EAST 8th STREET
Z E
N
IT
H A
V E
N U
E
W A
L N
U T
A V
E N
U E
G G G
G
S S
S S
S S
W W
W
W W
W
W W W W W W W W W W W W W
BORE 3 - 20'
37+70
30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00
WATER CROSSING
WATER CROSSING
EXISTING 24"
ALTERNATIVE NE
INTERCEPTOR LINE
PROPOSED 5' FIBERGLASS MANHOLE
PROPOSED NORTH INVERT ELEVATION: 3177.91
PROPOSED WEST INVERT ELEVATION: 3184.50
EXITING ELEVATION: 3177.81
INSTALL 350 SQ YD OF
ASPHALT REPAIR (PER
DETAIL SHEET 12, TYP)
INSTALL 791 LF OF 8"
HDPE DR-13.5 FORCE
MAIN BY OPEN CUT
INSTALL 45 SQ YD
OF ASPHALT REPAIR
(PER DETAIL SHEET
12, TYP)
FORCE MAIN ALIGNMENT PROFILE
30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 38+50
30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 38+50
8" WATER CROSSING
10" WATER CROSSING
PROPOSED 5'
FIBERGLASS MANHOLE
RIM: 3193.55
CONNECT TO
PROPOSED MANHOLE
PER DETAIL SHEET 11
INV: 3184.50
EXISTING GROUND
PROPOSED 8" FORCE MAIN
.4
IN
V
EL
EV
.4
IN
V
EL
EV
.4
IN
V
EL
EV
.4
IN
V
EL
EV
.4
IN
V
EL
EV
.4
IN
V
EL
EV
.4
IN
V
EL
EV
.4
IN
V
EL
EV
.4
IN
V
EL
EV
.4
IN
V
EL
EV
.4
IN
V
EL
EV
.4
IN
V
EL
EV
.4
IN
V
EL
EV
.4
IN
V
EL
EV
.4
IN
V
EL
EV
.4
IN
V
EL
EV
EXISTING 24"
ALTERNATIVE NE
INTERCEPTOR LINE
INV: 3177.81
A
REVISIONNO.
DATE
B C D
A B C D
E F
B. MCGIFF
DRAWN BY
CHECKED BY
DESIGNED BY
G
06/24/2025
DATE
SCALE
H I
SHEET No.
PROJECT NO.:
E F G
H I
BAR IS ONE INCH ON
ORIGINAL DRAWING
IF NOT ONE INCH ON
THIS SHEET. ADJUST
SCALES ACCORDINGLY.
0 1
CITY OF LUBBOCK
NORTHEAST SANITARY SEWER INTERCEPTOR LINE
INTERMEDIATE LIFT STATION
S. DILLER
P:
\P ro je ct s\
Lu bb oc k, C ity o f\8
- N E
In te rm ed ia te
L S\
. C
A D
\7 . C
O N
ST
\4
. S H
EE
TS
\8
- 0
TH
R U
PL
A
N A
N D
P R
O
FI
LE
.d w g
Enprotec | Hibbs & Todd 402 Cedar Street • Abilene, Texas 79601 • T: (325) 698-5560 • F: (325) 690-3240 • www.e-ht.com
PE Firm Registration No. 1151 • PG Firm Registration No. 50103 • RPLS Firm Registration No. 10011900
J. PARKER
Z. MORPHEW
06/24/2025
PLAN AND PROFILE 07 OF 18
N
SCALE IN FEET
10 0 30 M
A T
C H
L
IN
E
9+
HOR: 1" = 30'
VER: 1" = 5'
http://www.e-ht.com AutoCAD SHX Text 96645
AutoCAD SHX Text
SAGE DILLER
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text D
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
G G
G G
G G
G G
G G
G
S S
S S
S S
S S
S S
S
W W
W W
W W
W W
W W
W
S S
S S
S S
S S
S S
S
INSTALL 10' DIAMETER
FIBERGLASS WETWELL
INSTALL CONCRETE
VALVE VAULT
INSTALL 4" SUMP
OVERFLOW DRAIN
INSTALL 4" SCH 40 PVC AIR
RELEASE VALVE DRAIN LINE
INSTALL 24" PVC
GRAVITY LINE INSTALL 24" PVC
GRAVITY LINE
INSTALL 5' DIAMETER FIBERGLASS MANHOLE
ASSUMED RIM ELEVATION: 3155.00
ASSUMED INVERT ELEVATION: 3142.06
INSTALL 5' DIAMETER FIBERGLASS MANHOLE
ASSUMED RIM ELEVATION: 3155.00
ASSUMED INVERT ELEVATION: 3142.47
INSTALL 8"
FORCEMAIN
INSTALL
CONCRETE
DRIVEWAY
16' SLIDING GATE
3' MAN GATE
EXISTING 30"
GRAVITY SEWER LINE
REMOVE EXISTING
CURB AND SIDEWALK
FOR PROPOSED ENTRY
N: 7277402.7893 E: 957509.9539
N: 7277415.0816 E: 957522.9251
N: 7277413.8441 E: 957568.9770
ASPHALT REPAIR
INSTALL 7" THK CONCRETE PAD
INSTALL TXDOT
247 FLEX BASE OR
CRUSHED ASPHALT
O A
K A
V E
N U
E
39.5'
2'
STAINLESS STEEL AIR
VENT. REFER TO SHEET
10 FOR DETAIL
STAINLESS STEEL AIR
VENT. REFER TO SHEET
10 FOR DETAIL
CHAINLINK FENCE
5' 5'
A
REVISIONNO.
DATE
B C D
A B C D
E F
B. MCGIFF
DRAWN BY
CHECKED BY
DESIGNED BY
G
06/24/2025
DATE
SCALE
H I
SHEET No.
PROJECT NO.:
E F G
H I
BAR IS ONE INCH ON
ORIGINAL DRAWING
IF NOT ONE INCH ON
THIS SHEET. ADJUST
SCALES ACCORDINGLY.
0 1
CITY OF LUBBOCK
NORTHEAST SANITARY SEWER INTERCEPTOR LINE
INTERMEDIATE LIFT STATION
S. DILLER
P:
\P ro je ct s\
Lu bb oc k, C ity o f\8
- N E
In te rm ed ia te
L S\
. C
A D
\7 . C
O N
ST
\4
. S H
EE
TS
\8
- 0
LS
S
IT
E
PL
A N
.d w g
Enprotec | Hibbs & Todd 402 Cedar Street • Abilene, Texas 79601 • T: (325) 698-5560 • F: (325) 690-3240 • www.e-ht.com
PE Firm Registration No. 1151 • PG Firm Registration No. 50103 • RPLS Firm Registration No. 10011900
J. PARKER
Z. MORPHEW
06/24/2025
LIFT STATION SITE PLAN 08 OF 18
1" = 5'
N
SCALE IN FEET
2.5 0 5
GENERAL SITE PLAN NOTES:
1. SEWER LINE ELEVATIONS ARE ASSUMED.
CONTRACTOR MUST VERIFY ELEVATION OF
SEWER LINE BEFORE ORDERING LIFT STATION
EQUIPMENT.
http://www.e-ht.com AutoCAD SHX Text 96645
AutoCAD SHX Text
SAGE DILLER
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text D
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
3154.50
3153.99
3154.25 3154.47 3154.12
3154.573154.62
3153.66
3153.54
3154.50
3153.51
3154.00 3153.97
3154.50
3154.42
3154.48
3154.39SLAB ELEV. =
3154.50
-11.0%
-11.3%
-1 1.
1%
-1.8%
-6 .6
-4 .1
-1.4%
-4.6% -1.
4%
-0.9%
-1 6.
7%
3154.50
3154.50
-1 1.
1%
LIMITS OF GRADING
LIMITS OF GRADING
LIMITS OF GRADING
3154.031
.5
.0
.5
.5
3154.5
.0
PROPOSED SWALE LINE
O A
K A
V E
N U
E
BENCHMARK
POINT NUMBER 1
DESC: BM CP IRS
NORTHING: 7,277,061.15
EASTING: 957,521.43
ELEVATION: 3158.68
(REFER TO OVERALL
PROJECT LAYOUT SHEET 02)
3154.44
3154.50
3153.91
3154.34
ADA COMPLIANT CROSSING
CURB TRANSITION
CURB TRANSITION
5'
A
REVISIONNO.
DATE
B C D
A B C D
E F
B. MCGIFF
DRAWN BY
CHECKED BY
DESIGNED BY
G
06/24/2025
DATE
SCALE
H I
SHEET No.
PROJECT NO.:
E F G
H I
BAR IS ONE INCH ON
ORIGINAL DRAWING
IF NOT ONE INCH ON
THIS SHEET. ADJUST
SCALES ACCORDINGLY.
0 1
CITY OF LUBBOCK
NORTHEAST SANITARY SEWER INTERCEPTOR LINE
INTERMEDIATE LIFT STATION
S. DILLER
P:
\P ro je ct s\
Lu bb oc k, C ity o f\8
- N E
In te rm ed ia te
L S\
. C
A D
\7 . C
O N
ST
\4
. S H
EE
TS
\8
- 0
LS
P A
V
IN
G G
R A
D
IN
G P
LA
N
.d w g
Enprotec | Hibbs & Todd 402 Cedar Street • Abilene, Texas 79601 • T: (325) 698-5560 • F: (325) 690-3240 • www.e-ht.com
PE Firm Registration No. 1151 • PG Firm Registration No. 50103 • RPLS Firm Registration No. 10011900
J. PARKER
Z. MORPHEW
06/24/2025
LIFT STATION PAVING
AND GRADING PLAN 09 OF 18
1" = 10'
N
GENERAL SITE GRADING NOTES
1. THE CONTRACTOR SHALL WATER THE SITE OR PROVIDE
OTHER SUITABLE METHODS FOR DIRT AND DUST CONTROL
DURING CONSTRUCTION.
2. CUT AND FILL SLOPES SHALL NOT EXCEED 3:1 UNLESS
OTHERWISE SPECIFIED.
3. STRIP, REMOVE, AND STOCKPILE ON SITE 4 TO 6 INCHES OF
TOPSOIL PER RECOMMENDATIONS OF THE SITE
GEOTECHNICAL REPORT.
4. GRADE SITE TO THE LINES AND GRADES SPECIFIED ON THE
SITE GRADING PLAN. ANY DISCREPANCIES NOTED ON THE
PLANS SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION
OF THE ENGINEER. SITE GRADING WORK SHALL CEASE
UNTIL DISCREPANCY IS RESOLVED.
5. DISTURBED AREAS NOT DESIGNATED FOR LANDSCAPING OR
OTHER SURFACE TREATMENT SHALL BE GRADED TO DRAIN
AS SHOWN ON THE PLANS. REPLACE 4 TO 6 INCHES OF CLEAN
TOPSOIL IN THESE AREAS TO BRING SITE TO FINAL GRADE
AND RESEED.
6. EXISTING AND PROPOSED CONTOUR LINES ARE SHOWN AT
6-INCH INTERVALS.
7. EROSION CONTROL PLAN: THIS PROJECT/DEVELOPMENT IS
SUBJECT TO THE REQUIREMENTS OF THE TEXAS COMMISSION
ON ENVIRONMENTAL QUALITY (TCEQ) AND THE U.S.
ENVIRONMENTAL PROTECTION AGENCY (EPA) FOR A
STORMWATER POLLUTION PREVENTION PLAN (SWP3). THE
APPLICABLE SWP3 SHALL BE KEPT CURRENT ON SITE AT ALL
TIMES AND WILL BE SUBJECT TO REVIEW AT ANY TIME BY
THE CITY OF LUBBOCK UPON REQUEST. CONTRACTOR SHALL
SUBMIT COPIES OF THE CONSTRUCTION SITE NOTICE AND
THE NOTICE OF INTENT (NOI) FORMS TO THE CITY OF
LUBBOCK STORMWATER DIVISION. CONTACT 806-775-3118
FOR ADDITIONAL INFORMATION.
8. TESTING: ALL REQUIRED EARTHWORK TESTING SHALL BE
COMPLETED IN ACCORDANCE WITH THE PROJECT
SPECIFICATIONS. GENERAL CONTRACTOR SHALL RETAIN
THE SERVICES OF AN INDEPENDENT MATERIALS TESTING
LAB TO PERFORM ALL REQUIRED SOILS TESTING. COPIES OF
ALL TESTING REPORTS SHALL BE PROVIDED TO THE CIVIL
ENGINEER, GENERAL CONTRACTOR, AND ALL OTHER
PARTIES DEEMED NECESSARY.
a. PERFORM AT LEAST ONE PROCTOR TEST, ATTERBERG
LIMITS TEST, AND MINUS 200 SIEVE TEST FOR EACH SOIL
TYPE FOR SUBGRADE, BACKFILL, AND FILL MATERIALS.
b.IN PLACE DENSITY TESTS SHALL BE PERFORMED AS
FOLLOWS:
i. 1 PER 1,000 SF OF SUBGRADE ii.1 PER 1,000 SF OF COMPACTED 6” THICKNESS OF FILL
iii. 1 PER 2,500 SF OF BASE MATERIAL
iv. 1 PER 100 LF OF TRENCH PER 6” COMPACTED LIFT
THICKNESS
c. CONCRETE TESTING SHALL BE PERFORMED AS FOLLOWS:
i. 1 SLUMP, AIR CONTENT, TEMPERATURE TEST, AND 1 SET
OF 3 CONCRETE CYLINDERS FOR EACH TYPE OF
CONCRETE PER PLACE PER DAY. CYLINDERS SHOULD BE
TESTED FOR COMPRESSIVE STRENGTH WITH 1 OF THE
CYLINDERS TESTED AT 7 DAYS AND 2 OF THE CYLINDERS
TESTED AT 28 DAYS.
9. SITE ELEVATIONS ARE ASSUMED. CONTRACTOR TO VERIFY
SITE ELEVATIONS PRIOR TO LAYING DOWN CONCRETE.
SCALE IN FEET
5 0 10 http://www.e-ht.com AutoCAD SHX Text 96645
AutoCAD SHX Text
SAGE DILLER
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text D
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
D I
SS
PIPE SUPPORT,
PER DETAIL
INSTALL
4" CHECK
VALVE (TYP. 3)
INSTALL
8" GATE VALVE
INSTALL
8" FORCE MAIN
INSTALL 10' DIA
WET WELL
INSTALL
4" PLUG VALVE
(TYP. 3)
INSTALL
24" GRAVITY LINE
LIFT STATION PLAN
SCALE: 3/8" = 1'-0"
INSTALL
8" PLUG VALVE
INSTALL
4" x 8"
REDUCER
8' -0
8'-0"
INSTALL
8" QUICK
CONNECT
INSTALL
2" ARV
5' DIAMETER
MANHOLE
2' -6
45°
INSTALL
4" x 8"
REDUCER
INSTALL
PLUG VALVE
FLYGT NP 3153 SH 3~276
PUMP, 17 HP OR
APPROVED EQUAL
5' DIAMETER
MANHOLE
SECTION
NO SCALE
1' -0
4" FLANGE WITH
2" OUTLET
2" SCH 80 DI
FLANGE BALL
VALVE
INSTALL 2" AIR
RELEASE VALVE
(A.R.I. OR
APPROVED EQUAL)
2" SCH. 80 DI
DRAIN TO
CLEANOUT
4" SCH. 40 PVC
CLEANOUT
4" SCH. 40 PVC
DRAIN @ 1%
TO WET WELL
SURFACE
1' -0
4" MJ 90°
BEND
4" MJ 45°
BEND
4"x 8" MJ
REDUCER
4"x 8"
MJ WYE
4"x 8"
MJ WYE
8" MJ 90°
BEND
8" MJ 45°
BEND
8" MJ WYE
8" MJ WYE INSTALL
8" FORCE MAIN
2'-6" 2'-6"10'-0"
HIGH LEVEL
ALARM FLOAT
ELEV. 3141.95
LOW LEVEL CUTOFF ELEVATION
ELEV. 3136.00
LIFT STATION SECTION
SCALE: 3/8" = 1'-0"
ELEV. 3134.00
ELEV.
3155.00
PROPOSED
24" LINE
INV. 3141.95
4" FLxPE
90° BEND
INSTALL SEAL
RING ADAPTER
ALUMINUM
ACCESS DOOR
WITH…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .