This is an Addendum No. 3 to an Invitation to Bid issued by the City of Newport, Oregon for the South Beach Tank and Wastewater Treatment Plant Painting Project (City Project No. 28-25012), dated February 10, 2026. The addendum addresses clarifications regarding project scope, timeline, and operational requirements for surface preparation and recoating services at four municipal facilities: the WWTP Headworks Building, Lime Silo, Storage Facility, and South Beach Water Tank. Mobilization is anticipated to begin in March 2026, weather permitting, with all selected structures required to be fully completed no later than September 30, 2026. Each structure must be completed within 30 days from its individual start date, plus allowable rain or weather days; however, multiple structures may be worked on simultaneously provided each meets its respective 30-day completion requirement. Contractors are limited to five-day work weeks, with Saturday work available only if requested and approved in advance. The bid due date was February 11, 2026 at 2:00 PM, and a mandatory individual site visit was required prior to bid submission.
The addendum confirms that all coating work is strictly weather-dependent, with contractors responsible for verifying that all coating manufacturer requirements for temperature, humidity, dew point, and surface moisture are met; the City reserves the right to suspend or prohibit work if environmental conditions do not meet specifications. Water is available at both sites through City of Newport fire hydrants, with contractors required to rent a bulk-water meter at a $495 setup fee, $382 monthly rental fee, and $11 per 1,000 gallons usage charge. A bid bond is required, along with performance and payment bonds as specified in the contract. No liquidated damages apply to this project, and the warranty period is one year after the Notice of Completion, running from the final date of painting for each individual item. Lead testing will be conducted on the South Beach Tank, though results were not expected prior to the bid due date; the WWTP structures constructed in 2002 are not anticipated to contain lead-based coatings. No third-party inspector will be used; all inspection and quality verification will be performed by City of Newport personnel, including verification of surface preparation, containment, environmental conditions, coating application procedures, and dry film thickness measurements. The project specifications require specific coating systems including Sherwin-Williams Macropoxy 646 Fast Cure Epoxy Mastic primer and Acrolon 218 HS Acrylic Polyurethane finish coat, with no substitutions permitted.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB – SOUTH BEACH TANK AND WWTP PAINTING PROJECT – ADDENDUM No. 3 Page 1
ADDENDUM NO. 3
City of Newport South Beach Tank and WWTP Painting Project City Project No. 28-25012
Date: ____2/10/2026______________
This Addendum forms a part of the Invitation to Bid (ITB) and modifies the original solicitation documents as described below. All other terms, conditions, and requirements of the Invitation to Bid remain unchanged.
1 RESPONSE TO QUESTIONS RECEIVED
The City received the following questions during the bidding period and is issuing the responses below to ensure all bidders have equal access to the same clarifying information.
Question Response
When do you anticipate that this project will begin/mobilization start?
Mobilization is anticipated to begin in March 2026 if weather permits. All coating work is strictly weather-dependent. The Contractor is responsible for verifying that all coating manufacturer requirements for temperature, humidity, dew point, and surface
ITB – SOUTH BEACH TANK AND WWTP PAINTING PROJECT – ADDENDUM No. 3 Page 2
Question Response moisture are met before and during all surface preparation and coating operations. The City reserves the right to suspend or prohibit coating work at any time if environmental conditions do not meet the manufacturer’s specifications or if conditions are expected to fall outside acceptable ranges during application or curing. The Contractor must plan work accordingly and shall not proceed with coating activities unless all specification requirements are satisfied.
Each structure is a standalone project. How many days will we be given for each, and can multiple structures be worked on at the same time?
The ITB did not specify a final completion date. All selected structures must be fully completed no later than September 30.
There is no preferred order for the structures; however, once the Contractor begins work on a specific structure, that structure must be completed within 30 days from its individual start date, plus allowable rain or weather days. Multiple structures may be worked on at the same time, provided each structure meets its respective 30-day completion requirement. The Contractor shall provide the City with a proposed schedule and anticipated start dates upon receipt of the Notice of Intent to Award.
Was the South Beach Reservoir built in 1999? Yes.
Information on existing exterior coatings on the reservoir? No. (Unknown / not provided.)
Will the reservoir be drained before work begins? No.
Where on site will we access water for use? Any charge?
Yes, water is available. Fire hydrants are located at both sites, with the farthest distance being approximately 320 feet from the WWTP hydrant to the Lime Silo. The Contractor must rent a City of Newport bulk-water meter for use at each site. The bulk-water
ITB – SOUTH BEACH TANK AND WWTP PAINTING PROJECT – ADDENDUM No. 3 Page 3 meter has a $495 setup fee, a $382 per-month rental fee, and water usage is billed at $11 per 1,000 gallons.
Can we work 7 days a week?
No, 5 days a week only and Saturday if requested and approved ahead of time.
Confirm no antennas on the reservoir.
The Southbeach tank has one antenna circled in the picture below in pink.
Will a third-party inspector be used?
A third-party inspector will not be used for this project. All inspection and quality verification will be performed by City of Newport personnel in accordance with the specifications.
Inspections will include verification of surface preparation, containment, environmental conditions, coating application procedures, and dry film thickness (DFT) measurements using calibrated gauges.
Amount for liquidated damages? No liquidated damages.
Warranty period?
The warranty period is 1 year after the Notice of Completion. For purposes of warranty administration, the one-year period for each individual item will run from the final date of painting for that specific item, as documented and accepted by the City in writing.
City will not inspect for final completion until all work on an individual item including demobilization and required paint cure time is complete.
Is a bid bond required?
Yes. Bid bond, performance bond, and payment bond, please see contract attached to invitation to bid.
Can wet blast/robotic blasting be used on the tank? If contractor decides to blast, only bottom 6 ft of water tank.
ITB – SOUTH BEACH TANK AND WWTP PAINTING PROJECT – ADDENDUM No. 3 Page 4
Schedule for which structure is painted first?
See above, no required schedule, 9/30/2026 completion date for all, 30-day construction window once a structure is started.
Any lead on the tank? Lead analysis report?
The 4 - WWTP structures were constructed in 2002 and the City does not anticipate the presence of lead-based coatings on those facilities. The South Beach Water Tank was constructed in 1999. The City will conduct lead testing on the South Beach Tank; however, test results will not be available prior to the bid due date. Based on the tank’s construction date and the City’s maintenance history, no lead-based coatings are expected.
Full recoat or spot repairs?
Please see invitation to bid for painting details and addendums, especially addendum 2 for coating details.
Do all structures receive same schedule (spot prime + full coat)?
No, please read the Invitation to bid and addendums 1 and 2 for painting specified.
Restrictions on subcontractors? No.
Specific date/time for site visit? No.
Consider Quadex Structure Guard – Water as an approved NSF 61 coating?
No substitutions for this bid.
Lead paint present on the water tank? See above.
Can we sandblast the Southbeach tank? Only bottom 6 ft.
What is the top rim of the water tank, and is it rust? Angle iron; yes, appears to be rust.
What treatment does the top of the tank get? Same coating treatment as the rest of the tank.
ITB – SOUTH BEACH TANK AND WWTP PAINTING PROJECT – ADDENDUM No. 3 Page 5
Is the headworks building prime and paint?
Yes, headworks is sand blast full prime coat full finish coat for ceiling panels, trusts, and crane and crane support.
Does the entire Water Treatment Plant CMU take the same sealer (split face and smooth)?
Yes.
Will 110 power and water be available at each location?
Yes, and Yes, bulk water meter hydrant from city required and water will be charge at bulk water rate.
Chemical shed dimensions? 8 ft x 20 ft x 8 ft tall. Roof paints also.
Can a small lift be used in the headworks?
With approval and floor coverings only, the gantry crane can lift a lift into the headworks building however the floor grating is fiberglass and aluminum and is not built to support a lift so they would need to be protected with mats or plates capable of holding the full load. Use of a lift and gantry crane and steel plating or other support members must be reviewed and approved by city prior to use and mobilization.
ITB – SOUTH BEACH TANK AND WWTP PAINTING PROJECT – ADDENDUM No. 3 Page 6
END OF ADDENDUM NO. 3