This document is an advertisement for bids for the Keller Peak Tower Replacement project, a contract opportunity issued by the State of California Department of General Services Real Estate Services Division for the California Highway Patrol in San Bernardino County, California. The project involves the construction of a new 80-foot self-supporting communication tower, foundation, and feed line bridge, as well as the demolition of the existing tower and site work. The bid submission deadline is November 19, 2024, and a mandatory pre-bid site inspection tour is scheduled for October 24, 2024. The contract term is 300 calendar days.
The estimated cost of the project is $2,841,100.00. Bidders must possess either an A or C-51 license and submit copies of valid Certificates of Reported Compliance for any fleet vehicles used. Successful bidders will be required to furnish payment and performance bonds, each in the amount of 100 percent of the contract price. The State has requirements for Disabled Veteran Business Enterprise (DVBE) participation, and the contract is subject to various health and safety mandates.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
#$%&$'(�)*#�+,--,./�,.($#0#$(1(,*.�2#)+,3�2$4567�89�75:;<�:=58�.9>;4?;<�@A�BCBDA�@ECC�FG4G3��� 0H-+�#)+,�.9GE�IIIIIIIIIIIIIII��� #;JK;L:9<�#)+,�.9GE�IIIIIIIIIII�� � #;JK;L:�-5:;E� �(9E� 1K?<;;�)<;8M=A�0<9N;M:�-6<;M:9<OH585P;<�� )<94�2+6QQ;<3E�� �0<9N;M:�H585P;4;8:�58Q�-;>;79F4;8:�+<58M=�� #;57�$L:5:;�';<>6M;L�-6>6L698�� 0=98;E��RSTURSRURTVT� W98:5M:E�XXXXXXXXXXXXXXXXXXXXXXXXXX�� 0=98;E�XXXXXXXXXXXXXXXXXXXXXXXXXXX� )5YE��XXXXXXXXXXXXXXXXXXXXXXXXXXXXX�� $4567E���� ��� Z����[\�]̂ ]�̀� $4567E��XXXXXXXXXXXXXXXXXXXXXXXXXXX��177�#)+,L�<;M;6>;Q�F<69<�:9�Q;5Q768;�6Q;8:6a6;Q�5?9>;A�58Q�<;LF98L;L�a<94�:=;�':5:;�b677�?;�FK?76L=;Q�98�=::FEOObbbGM57;F<9MK<;GM5GP9>G�W76Mc�98�d':5<:�';5<M=Ge�,8�:=;�;>;8:�854;�a6;7QA�;8:;<�:=;�F<9N;M:�8K4?;<�58Q�M76Mc�L;5<M=G�f=67;�>6;b68P�:=;�$>;8:�-;:567LA�M76Mc�98�dg6;b�$>;8:�05Mc5P;e�:9�>6;b�#)+,�<;LF98L;LG�� �0<9N;M:�.9G��� �������������!"�0<9N;M:�.54;���h�ii�����_j���k������i_�������l9M5:698�� �_��m���_������n����op�n��IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII��-<5b68P�#;a;<;8M;��IIIIIIIIIIIIIIIIIIII�0<9N;M:�H58K57�#;a;<;8M;��IIIIIIIIIIIIIIIIIIIIIIIIIII�%K;L:698E� +6QQ;<qL�1K:=9<6r;Q�'6P85:K<;��IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII� ��s��t��n[��j�[�����u�_�������_i��_]�̂�_��_�[��� � � �_]�����u�IIII��
Zeb Vigil 530-848-3214 bids@apexsitesolutions.com
Hi, Aubree.
Looking for tower specs and weights. This information is important for our crane quote.
Thank you.
Keller Peak Weights for Crane Installation:
0-20’ AGL section will have an assembled weight of 23,500 lbs. which includes everything inside of the 4 pipe legs, items excluded are the externally mounted items, i.e. microwave mounts, ice shields and v-mounts, etc. If they are assembling all sections on the ground, the next area of concern will be at 60-80’ AGL where they will need an absolute minimum of 14,500 lbs. at 85’.
Again, externally mounted items are excluded in this weight.
11/21/2024