1345_-_Keller_Pk_SFM_Apprvd_Dwgs_with_ISSUE_DATE.pdf
PDF 37 MB Posted
- Solicitation number
- 0000033078
- Issued by
- San Bernardino County, California
About this file
This document contains approved drawings and associated information for the Keller Park Stormwater Facility Modifications project, which is a state and local contract opportunity involving the Department of Public Works and the Department of Municipal Services. The project overview indicates that the work involves stormwater facility modifications, with the drawings and associated details specifying the required products, materials, and installation. No specific response due dates, award dates, or contract term are provided in this document.
The document does not contain pricing terms, set asides, incumbent information, funding sources, or other salient commercial details. This appears to be a technical specification document rather than a solicitation, so those commercial elements are likely contained in separate procurement materials.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT TEAM
COVER SHEET
KP-G001
AP XX
TAB TAB
AS SHOWN
PROJECT CODE INFORMATION
STATEMENT DSA REVIEW
PROJECT
AREA
CALIFORNIA HIGHWAY PATROL
TOWER REPLACEMENT PROJECT
KELLER PEAK
DGS PROJECT 000000000001345
GHD PROJECT 11152117
THIS PACKAGE CONTAINS SITE SPECIFIC DRAWINGS.
PROJECT MAP
PROJECT
AREA
PROJECT
AREA
PROJECT
AREA
DEPARTMENT OF GENERAL SERVICES
GHD, INC.
Matt Weber, Project Director
(916) 296-3222
Jessica Napier, Structural Engineer
(805) 858-3474
Matt Weber, Civil Engineer
(916) 296-3222
Steven Reader, Project Director
(916) 375-4379 N
AREA MAP LOCATION MAP
N
NV5
Chuck Kull, Geotechnical Engineer
(530) 478-1305
Chris Richards, Electrical Engineer
(707) 540-9619
Sheet of
This document shall not be used for construction unless signed and sealed for construction.
DesignerDrawn
Scale
Date
Drafting Check
Design Check
Project Manager
Reuse of Documents
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization. © 2023 GHD
0 1"
Bar is one inch on original size sheet
Original Size
Arch D
Project No.
Sheet No.
IssueNo. Drawn Approved Date
Title
Client
Project
Plot Date: Filename:24 August 2023 - 2:26 PM N:\US\Cameron Park\Projects\111\11152117\06-CAD\Sheets\0001 KPG001 Cover Sheet.dwgPlotted By: Luis Manzo
M. WEBER
11152117
GHD Inc.
4080 Plaza Goldorado Circle Suite B Cameron Park California 95682 USA T 1 530 677 5515 W www.ghd.com
STATE OF CALIFORNIA
DEPARTMENT OF GENERAL SERVICES
CALIFORNIA HIGHWAY PATROL
TOWER REPLACEMENT PROJECT
KELLER PEAK
REV V2
REVIEWER:
REVIEWER SIGNATURE:
DATE REVIEWER:
PSC OPERATIONS PLAN REVIEW
NO EXCEPTIONS TAKEN
STATEMENT OF GENERAL CONFORMANCE
FOR ARCHITECTS/ENGINEERS WHO UTILIZE PLANS,
INCLUDING BUT NOT LIMITED TO SHOP DRAWINGS, PREPARED BY OTHER LICENSED
DESIGN PROFESSIONALS AND/OR CONSULTANTS
(Application No. _______________________ File No. _______________ )
The drawings or sheets listed on the cover or index sheet This drawing, page of specifications/calculations
Have been prepared by other design professionals or consultants who are licensed and/or authorized to prepare such drawings in this state. it has been examined by me for:
1) Design intent and appears to meet the appropriate requirements of Title 24, California Code of Regulations And the project specifications prepared by me, and
2) Coordination with my plans and specifications and is acceptable for incorporation into the construction of this project.
The statement of general Conformance "shall not be construed as relieving me of my rights, duties, and responsibilities under sections 17302 and 81138 of the education code and Sections 4-336, 4-341 and 4-344" of Title 24, Part 1. (Title 24, Part 1, Section 4-317 [b])
I find that: All drawings or sheets listed on the cover or index sheet This drawing or page is/are in general conformance with the project design intent, and has/have been coordinated with the project plans and specifications.
Signature Date
Architect or Engineer designated to be in general responsible charge
Print Name
License Number Expiration Date
DEFERRED SUBMITTALS
SCOPE OF PROJECT
THIS PROJECT CONSISTS OF DEMOLITION OF THE EXISTING
TOWER FOUNDATION, EXCAVATION FOR NEW TOWER
FOUNDATION, MINIMAL GRADING AND CONSTRUCTION OF
NEW TOWER AND FOUNDATION.
1. APPLICABLE CODES AND STANDARDS
TITLE 19 CCR, PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS
TITLE 24 CCR, PART 1 - 2019 BUILDING STANDARDS ADMINISTRATIVE CODE
TITLE 24 CCR, PART 2 - CALIFORNIA BUILDING CODE, VOL 1 & 2 (CBC)
TITLE 24 CCR, PART 3 - CALIFORNIA ELECTRICAL CODE (CEC)
TITLE 24 CCR, PART 4 - 2019 CALIFORNIA MECHANICAL CODE (CMC)
TITLE 24 CCR, PART 5 - 2019 CALIFORNIA PLUMBING CODE (CPC)
TITLE 24 CCR, PART 6 - 2019 CALIFORNIA ENERGY CODE
TITLE 24 CCR, PART 9 - 2019 CALIFORNIA FIRE CODE (CFC)
TITLE 24 CCR, PART 11 - 2019 CALIFORNIA GREEN BUILDING STDS CODE
TITLE 24 CCR, PART 12 - 2019 CALIFORNIA REFERENCED STANDARDS
2. BASIC SIGNAGE REQUIREMENTS FOR FIRE AND LIFE SAFETY
BUILDING ADDRESS AND STREET SIGNAGE, PER CFC 505.1 & 2
BATTERY/EQUIPMENT ROOMS: SIGNAGE PER CFC 604.3.1
ELECTRICAL ROOMS: SIGNAGE PER 604.3.1
NO SMOKING SIGNAGE FOR LPG
PORTABLE FIRE EXTINGUISHERS, PER CFC 906 AND TITLE 19
NFPA 704 SIGNAGE
3. UTILITY REQUIREMENTS / COORDINATION
UNDERGROUND AND OVERHEAD UTILITY SERVICES SHALL MEET THE
REQUIREMENTS OF THE UTILITY PROVIDER. COMPLY WITH UTILITY
PROVIDER STANDARD DETAILS AND SPECIFICATIONS FOR JOINT TRENCH,
TRANSITIONS AND TERMINATIONS AND ABOVE GROUND REQUIREMENTS
04-120205 CHP-RESD
7/20/2023
Jessica E. Napier
6/30/24S5476
DSA
DEPARTMENT OF GENERAL SERVICES
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
DSADSA
IDENTIFICATION STAMP
DIV. OF THE STATE ARCHITECT
APP: INC:
REVIEWED FOR
SS FLS ACS
DATE:
4 4
04-120205
08/29/2023
CSFM FILE #21-S-1718-C-ER
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
10/25/23
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
21-1718
ISSUE DATE: SEPTEMBER 24, 2024
http://www.ghd.com/ mkweber Text Box 8-24-2023 athompso Pencil
TRUE NORTH
LEG 4
LEG 1
LEG 2
LEG 3
112°4'40"
292°4'40"
112°4'40"
TRUE NORTH
LEG 4
LEG 1
LEG 2
LEG 3
°4
'4 0"
112°4'40"
2°
4'
292°4'40"
83 8
3 0
7 840
7 8
29'
7842.00 TOW
7838.50 TOF
7842.00 TOW
7838.50 TOF
7842.00 TOW
7838.50 TOF
7839.50 TOW
7836.00 TOF
7839.50 TOW
7836.00 TOF
7839.50 TOP
OF COLUMN
7839.50 TOP
OF COLUMN
7839.50 TOP
OF COLUMN
7839.50 TOP
OF COLUMN
7839.00 FG
7838.95 FL
7839.35 FG
7839.35 FG
7839.25 FL
7839.35 FG
7839.05 FG
7839.35 FG
7839.35 FG
7839.25 FG
7839.25 FG
7839.11 FL
7838.95 FG
7837.42 FG
7839.00 FG
7841.40 FL
7841.50 FL
HIGH POINT
7839.40 FL
7841.25 FL
7836.92 FL
20'
7839.00 FG
7837.42 FG
7842.00/7839.50 TOW - 2.5' STEP
7838.50/7836.00 TOF
7839.50 TOP
OF COLUMN
7839.50 TOW
7836.00 TOF
7839.00 FG
7842.00 TOW
7838.50 TOF
PROPOSED (N)
TOWER LOCATION
EXISTING
BUILDING
EXISTING
GENERATOR
COVER
EXISTING
PROPANE TANK
EXISTING
RETAINING WALL
PROPOSED (N)
RETAINING WALL
EXISTING TOWER
5'
GHD SHEET INDEX
Sheet Number Sheet Title Drawing Number
1 COVER SHEET
2 DRAWING INDEX, DESIGN CRITERIA AND SITE ORIENTATION
3 ABBREVIATIONS AND SYMBOLS
4 PROPOSED STAGING AREA AND ANTICIPATED AREA OF DISTURBANCE
5 SITE, DEMOLITION, AND GRADING PLAN
6 CIVIL SECTIONS AND DETAILS
7 TOWER ELEVATIONS
8 TOWER SECTIONS
9 TOWER ELEV FULL LOADING
10 TOWER SECT FULL LOADING
11 STRUCTURAL NOTES
12 TOWER FOUNDATION PLAN AND ELEVATIONS, STRUCTURAL DETAILS
13 COMMON STRUCTURAL DETAILS
14 FEEDLINE BRIDGE
15 FEEDLINE BRIDGE
16 TOWER ELEVATION VIEW AND NOTES
17 MONOPOLE ELEVATION, SECTION AND DETAILS
18 MONOPOLE PLATFORM DETAILS
19 TOWER SECTIONS T1 - T4
20 TOWER SECTIONS T1 - T4
21 TOWER SECTIONS T5 - T6
22 TOWER SECTIONS T5 - T6
23 TOWER SECTIONS T7 - T8
24 TOWER SECTIONS T7 - T8
25 TOWER SECTIONS T9 - T10
26 TOWER SECTIONS T9 - T10
27 TYPICAL GRATING-BRACING
28 TYP HAND RAIL-DIAG PIPE LIGHTNING ROD EXT AND SAFETY CLIMB KITS
29 CENTER MAST
30 COAX CAGE-CLIMBING LADDER, ANTI-CLIMB AND BUS BAR
31 MW ICE BRIDGE DETAILS
32 MW ICE BRIDGE DETAILS
33 MICROWAVE MOUNT KITS
34 MICROWAVE MOUNT KITS
35 LEG-ELEVATION I.D. PLATES
36 TOWER ANCHOR BOLT TEMPLATES
37 ELECTRICAL SYMBOLS LEGEND ABBREVIATIONS AND GENERAL NOTES
38 ELECTRICAL SITE PLAN
39 ELECTRICAL DETAILS - 1
40 ELECTRICAL DETAILS - 2
41 ELECTRICAL DETAILS - 3
42 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF CABLING - 1
43 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF CABLING - 2
44 SITE ANTENNA LAYOUT AND PRESSURIZATION EQUIPMENT - 1
45 SITE ANTENNA LAYOUT AND PRESSURIZATION EQUIPMENT - 2
DRAWING INDEX,
DESIGN CRITERIA
AND SITE ORIENTATION
KP-G002
AS SHOWN
DESIGN CRITERIA
TOWER ORIENTATION PLAN
NTS
SITE ORIENTATION PLAN
1" = 10'
NOTES:
1. THE DIFFERENCE BETWEEN GRID NORTH AND TRUE NORTH IS EXAGGERATED
ABOVE FOR DEPICTION PURPOSES.
2. GRID NORTH IS BASED ON THE CALIFORNIA STATE PLANE COORDINATE SYSTEM,
ZONE 5 (NAD83) AND THE BEARINGS SHOWN IN THE TOPOGRAPHIC SURVEY AND
GRADING PLANS ARE ON GRID NORTH.
0° 32' 30.4"
T R U E N
O R T H
G R
ID
N O R T H
N O A A M
O D E L W
M M
-2
9) , D
A T A Q
U E R
IE
D O
C T
, 2
N (D
A
TA
IS
0.
C H A N G
IN
G B
Y .0 9°
W P E R Y
E A R
FOUNDATION DESIGN CRITERIA:
FOUNDATION DESIGN IS BASED ON CRITERIA AND RECOMMENDATIONS IN THE REPORT TITLED
GEOTECHNICAL INVESTIGATION REPORT #11152117 BY GHD, INC. DATED SEPTEMBER, 2019 AND
CODE UPDATE MEMORANDUM DATED JUNE, 2021
1. BEARING PRESSURE:
BASED ON FOOTINGS BEARING ON NATIVE BEDROCK.
DEAD = 4000 PSF
DEAD AND LIVE LOAD
COMBINED = 6000 PSF
ALLOWABLE BEARING PRESSURE MAY BE INCREASED BY 1/3 FOR WIND & SEISMIC LOADS
2. LATERAL RESISTANCE:
ALLOWABLE PASSIVE RESISTANCE AT FOOTING SHALL BE 400 PCF EQUIVALENT FLUID
PRESSURE. COEFFICIENT OF FRICTION SHALL BE 0.5. FRICTION AND PASSIVE RESISTANCE
MAY BE COMBINED PROVIDED THE UPPER FOOT OF PASSIVE IS IGNORED AND STRUCTURE
IS POURED AGAINST NEATLY EXCAVATED FILL.
3. ALL FOOTINGS SHALL BEAR THE MINIMUM DEPTH BELOW THE LOWEST ADJACENT GRADE
SPECIFIED IN THE GEOTECHNICAL INVESTIGATION REPORT, BUT NOT LESS THAN 36".
ICE LOADS:
IMPORTANCE FACTORS:
ICE THICKNESS = 1.25
WIND LOAD W/ICE = 1.0
DESIGN ICE THICKNESS, t i = 1.15 INCHES (PER RWDI SNOW AND ICE LOADING REPORT) CROSS-SECTIONAL AREA OF ICE A iz = CALCULATE PER SECTION 2.6.8 OF TIA-222-H
BASIC WIND SPEED WITH ICE V = 30MPH PER TIA-222-H
TOPOGRAPHIC FACTOR Kzt = 2.91 @ 0', 2.84 @ 100'
SNOW LOADS
GROUND SNOW LOAD Pg = 145 PSF (PER RWDI SNOW AND ICE LOADING REPORT)
WIND DESIGN DATA:
SITE WIND VELOCITY = 125 MPH
WIND IMPORTANCE FACTOR I = 1.00
WIND EXPOSURE = C
Kzt = 2.91 @ 0', 2.84 @ 100'
EARTHQUAKE DESIGN DATA:
SEISMIC IMPORTANCE
FACTOR Ie = 1.5
OCCUPANCY CATEGORY = IV
(PER TABLE 1604.5)
SITE CLASS = C
SPECTRAL RESPONSE SDS = 1.20g COEFFICIENTS SD1 = 0.56g
SEISMIC DESIGN CATEGORY = D
RESPONSE MODIFICATION
FACTOR R = 3.0 LATTICE SELF-SUPPORTING STRUCTURES
ANALYSIS PROCEDURE USED = EQUIVALENT LATERAL FORCE
ALL MECHANICAL, PLUMBING, AND ELECTRICAL COMPONENTS SHALL BE ANCHORED AND INSTALLED PER THE DETAILS ON THE DSA-APPROVED CONSTRUCTION DOCUMENTS. THE FOLLOWING COMPONENTS SHALL BE ANCHORED OR BRACED TO MEET THE FORCE AND DISPLACEMENT REQUIREMENTS PRESCRIBED IN THE 2019 CBC SECTIONS 1617A.1.18 THROUGH 1617A.1.26 AND ASCE 7-16 CHAPTERS 13, 26, AND 30:
1. ALL PERMANENT EQUIPMENT AND COMPONENTS.
2. TEMPORARY, MOVABLE OR MOBILE EQUIPMENT THAT IS PERMANENTLY ATTACHED (E.G. HARD WIRED) TO THE BUILDING UTILITY SERVICES SUCH AS ELECTRICITY, GAS OR WATER. “PERMANENTLY ATTACHED” SHALL INCLUDE ALL ELECTRICAL CONNECTIONS EXCEPT PLUGS FOR 110/220 VOLT RECEPTACLES HAVING A FLEXIBLE CABLE.
3. TEMPORARY, MOVABLE OR MOBILE EQUIPMENT WHICH IS HEAVIER THAN 400 POUNDS OR HAS A CENTER OF MASS LOCATED 4 FEET OR MORE ABOVE THE ADJACENT FLOOR OR ROOF LEVEL THAT DIRECTLY SUPPORT THE
COMPONENT IS REQUIRED TO BE RESTRAINED IN A MANNER APPROVED BY DSA.
THE FOLLOWING MECHANICAL AND ELECTRICAL COMPONENTS SHALL BE POSITIVELY ATTACHED TO THE STRUCTURE BUT NEED NOT DEMONSTRATE DESIGN COMPLIANCE WITH THE REFERENCES NOTED ABOVE. THESE COMPONENTS SHALL HAVE FLEXIBLE CONNECTIONS PROVIDED BETWEEN THE COMPONENT AND ASSOCIATED DUCTWORK, PIPING, AND CONDUIT. FLEXIBLE CONNECTIONS MUST ALLOW MOVEMENT IN BOTH TRANSVERSE AND
LONGITUDINAL DIRECTIONS:
A. COMPONENTS WEIGHING LESS THAN 400 POUNDS AND HAVING A CENTER OF MASS LOCATED 4 FEET OR LESS ABOVE THE ADJACENT FLOOR OR ROOF LEVEL THAT DIRECTLY SUPPORT THE COMPONENT.
B. COMPONENTS WEIGHING LESS THAN 20 POUNDS, OR IN THE CASE OF DISTRIBUTED SYSTEMS, LESS THAN 5 POUNDS PER FOOT, WHICH ARE SUSPENDED FROM A ROOF OR FLOOR OR HUNG FROM A WALL.
THE ANCHORAGE OF ALL MECHANICAL, ELECTRICAL AND PLUMBING COMPONENTS SHALL BE SUBJECT TO THE APPROVAL OF THE DESIGN PROFESSIONAL IN GENERAL RESPONSIBLE CHARGE OR STRUCTURAL ENGINEER DELEGATED RESPONSIBILITY AND ACCEPTANCE BY DSA. THE PROJECT INSPECTOR WILL VERIFY THAT ALL COMPONENTS AND EQUIPMENT HAVE BEEN ANCHORED IN ACCORDANCE WITH THE ABOVE REQUIREMENTS.
MEP COMPONENT ANCHORAGE NOTE
PIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEM BRACING NOTE
Sheet of
This document shall not be used for construction unless signed and sealed for construction.
DesignerDrawn
Scale
Date
Drafting Check
Design Check
Project Manager
Reuse of Documents
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization. © 2023 GHD
0 1"
Bar is one inch on original size sheet
Original Size
Arch D
Project No.
Sheet No.
IssueNo. Drawn Approved Date
Title
Client
Project
Plot Date: Filename:24 August 2023 - 2:27 PM N:\US\Cameron Park\Projects\111\11152117\06-CAD\Sheets\0002 KPG002 Dwg Index Dsgn Criteria.dwgPlotted By: Luis Manzo
M. WEBER
11152117
GHD Inc.
4080 Plaza Goldorado Circle Suite B Cameron Park California 95682 USA T 1 530 677 5515 W www.ghd.com
STATE OF CALIFORNIA
DEPARTMENT OF GENERAL SERVICES
CALIFORNIA HIGHWAY PATROL
TOWER REPLACEMENT PROJECT
KELLER PEAK
REV V2
REVIEWER:
REVIEWER SIGNATURE:
DATE REVIEWER:
PSC OPERATIONS PLAN REVIEW
NO EXCEPTIONS TAKEN
PIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEMS SHALL BE BRACED TO COMPLY WITH THE FORCES AND DISPLACEMENTS PRESCRIBED IN ASCE 7-16 SECTION 13.3 AS DEFINED IN ASCE 7-16 SECTIONS 13.6.5, 13.6.6, 13.6.7, 13.6.8; AND 2019 CBC, SECTIONS 1617A.1.24, 1617A.1.25 AND 1617A.1.26.
THE METHOD OF SHOWING BRACING AND ATTACHMENTS TO THE STRUCTURE FOR THE IDENTIFIED DISTRIBUTION SYSTEM ARE AS NOTED BELOW. WHEN BRACING AND ATTACHMENTS ARE BASED ON A PREAPPROVED INSTALLATION GUIDE (E.G., OSHPD OPM FOR 2013 CBC OR LATER), COPIES OF THE BRACING SYSTEM INSTALLATION GUIDE OR MANUAL SHALL BE AVAILABLE ON THE JOBSITE PRIOR TO THE START OF AND DURING THE HANGING AND BRACING OF THE DISTRIBUTION SYSTEMS. THE STRUCTURAL ENGINEER OF RECORD SHALL VERIFY THE ADEQUACY OF THE STRUCTURE TO SUPPORT THE HANGER AND BRACE LOADS.
MECHANICAL PIPING (MP), MECHANICAL DUCTS (MD), PLUMBING PIPING (PP), ELECTRICAL DISTRIBUTION SYSTEMS (E):
MP MD PP E OPTION 1: DETAILED ON THE APPROVED DRAWINGS WITH PROJECT SPECIFIC NOTES AND
DETAILS.
MP MD PP E OPTION 2: SHALL COMPLY WITH THE APPLICABLE OSHPD PRE-APPROVAL (OPM #)
11.69°
CO-TA1
CO-TA1.1
CO-TA2
CO-TA3
CO-TA4
CO-TA5
CO-TA5.1
CO-TA5.2
CO-TA5.3
CO-TA6
CO-TA6.1
CO-TA6.2
CO-TA6.3
CO-TA6.4
CO-TA6.5
CO-TA6.6
CO-TA6.7
CO-TA6.8
CO-TA7
CO-TA7.2
COVER SHEET AND INDEX
DSA 103
TOWER STRUCTURAL NOTES
SITE PRO BRACKET DETAILS
TOWER ANTENNA MOUNTING DETAILS (ANDREW)
TOWER ANTENNA MOUNTING DETAILS (AMPHENOL ANTEL/ANDREW)
TOWER ANTENNA MOUNTING DETAILS (AMPHENOL ANTEL)
TOWER ANTENNA MOUNTING DETAILS (AMPHENOL ANTEL)
TOWER ANTENNA MOUNTING DETAILS (AMPHENOL ANTEL)
TOWER ANTENNA MOUNTING DETAILS (ANDREW/COMMSCOPE)
TOWER ANTENNA MOUNTING DETAILS (ANDREW/COMMSCOPE)
TOWER ANTENNA MOUNTING DETAILS (PRODELIN/GABRIEL)
TOWER ANTENNA MOUNTING DETAILS (ANDREW)
TOWER ANTENNA MOUNTING DETAILS (MIKRO TIK/mWAVE)
TOWER ANTENNA MOUNTING DETAILS (UBIQUITI, GABRIEL)
TOWER ANTENNA MOUNTING DETAILS (COMMSCOPE/RADIOWAVES)
TOWER ANTENNA MOUNTING DETAILS (COMMSCOPE)
TOWER ANTENNA MOUNTING DETAILS (RADWIN, SINCLAIR)
TOWER ANTENNA MOUNTING DETAILS
(HUSTLER/ANTENNA EXPERT/DIAMOND)
TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)
STANTEC
SHEET NO.
SHEET NUMBER
DRAWING NUMBERSHEET TITLE
CO-TA8
CO-TA9
CO-TA10
CO-TA10.1
CO-TA11
CO-TA11.1
CO-TA11.2
CO-TA12
CO-TA13
CO-TA14
CO-TA14.1
CO-TA15
CO-TA16
CO-TA17
CO-TA17.1
CO-TA17.2
CO-TA18
CO-TA18.1
CO-TA19
TOWER ANTENNA MOUNTING DETAILS (COMPROD)
TOWER ANTENNA MOUNTING DETAILS (M2/KRECO)
TOWER ANTENNA MOUNTING DETAILS (COMMSCOPE/RFS/SINCLAIR)
TOWER ANTENNA MOUNTING DETAILS (RFS/SINCLAIR)
TOWER ANTENNA MOUNTING DETAILS (SCALA)
TOWER ANTENNA MOUNTING DETAILS
(DB SPECTRA/RFI MOTOROLA/SINCLAIR)
TOWER ANTENNA MOUNTING DETAILS (DB SPECTRA/SCALA)
TOWER ANTENNA MOUNTING DETAILS (SCALA)
TOWER ANTENNA MOUNTING DETAILS (SCALA)
TOWER ANTENNA MOUNTING DETAILS (SCALA)
TOWER ANTENNA MOUNTING DETAILS (SCALA)
TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)
TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)
TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)
TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)
TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)
TOWER ANTENNA MOUNTING DETAILS (TELEWAVE)
TOWER ANTENNA MOUNTING DETAILS (TELEWAVE)
TOWER ANTENNA MOUNTING DETAILS (HASKALL DENKE)
TOTAL NO. SHEETS: 57
SUBTOTAL NO. SHEETS: 12
STRUCTURAL DETAILS FOR RADIO AND MICROWAVE ANTENNA MOUNTING BRACKETS
DSA APPLICATION NUMBER: 02-119809
STATE OF CALIFORNIA
SUBTOTAL NO. SHEETS: 45
KP-G001
KP-G002
KP-G003
KP-G004
KP-C101
KP-C501
KP-TE101
KP-TE102
KP-TE103
KP-TE104
KP-S001
KP-S101
KP-S501
KP-S701
KP-S702
KP-S801
KP-S802
KP-S803
KP-S804
KP-S805
KP-S806
KP-S807
KP-S808
KP-S809
KP-S810
KP-S811
KP-S812
KP-S813
KP-S814
KP-S815
KP-S816
KP-S817
KP-S818
KP-S819
KP-S820
KP-S821
KP-E001
KP-E101
KP-E501
KP-E502
KP-E503
KP-E601
KP-E602
KP-E603
KP-E604
N
DSA
DEPARTMENT OF GENERAL SERVICES
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
DSADSA
IDENTIFICATION STAMP
DIV. OF THE STATE ARCHITECT
APP: INC:
REVIEWED FOR
SS FLS ACS
DATE:
4 4
04-120205
08/29/2023
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
10/25/23
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
21-1718
ISSUE DATE: SEPTEMBER 24, 2024
file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf file:///..\..\..\02-Communication\Others-From\2023-08-29 DSA Approved Docs\04-120205_DWG_A.pdf http://www.ghd.com/ mkweber Text Box 8-24-2023
ABBREVIATIONS
AND SYMBOLS
KP-G003
NTS
S Y M B O L SA B B R E V I A T I O N S
MASONRY UNITMU
MTD MOUNTED
STAINLESS STEEL
WH WATER HEATER
WI WROUGHT IRON
W/O WITHOUT
WG WIRE GLASS
UNLESS OTHERWISE NOTEDUON
UNLESS NOTED OTHERWISE
TYPICALTYP
THRU THROUGH
TOW TOP OF WALL
THRESHOLDTHR
SYM SYMMETRICAL
SUSPENDEDSUSP
STRUCT STRUCTURAL
SC SOLID CORE
SD STORM DRAIN
SECTIONSECT
SCHED SCHEDULE
REQ'D REQUIRED
ROOF DRAINRD
WATER OR WEATHERWP
VERTICALVERT
WITHW/
WESTW
OR CONCRETE
TOP OF CURBTC
TOP & BOTTOMT&B
STANDARDSTD
STEELSTL
SS
SQUARESQ
SHEET METALSM
SIMILARSIM
SHEETSHT
SOUTHS
ROCK SLOPE PROTECTIONRSP
REINFORCEREINF
REGISTERREG
RETURN AIRRA
GAUGE
GALVANIZED IRON
GLASS OR GLAZING
GYPSUM
HT HEIGHT
KPL KICKPLATE
MB MACHINE BOLT
MECH MECHANICAL
MEMB MEMBRANE
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
(N) NEW
OPP OPPOSITE
PL PLATE
PLAS PLASTER
PLYWD PLYWOOD
PR PAIR
PVC POLYVINYL CHLORIDE
GALVANIZED
GRADE
HOLLOW CORE
HM HOLLOW METAL
HEADERHDR
HOSE BIBB
LAG BOLTLB
LT LIGHT
MAXIMUMMAX
MTL METAL
MINIMUMMIN
MANUFACTURERMFR
MISC MISCELLANEOUS
NOT TO SCALENTS
OPENINGOPNG
OUTSIDE DIAMETEROD
ON CENTEROC
FRP FIBERGLAS REINFORCED
FOOT OR FEET
FTG FOOTING
FUR FURRING
EXH EXHAUST
EXIST EXISTING (SEE (E))
EXP EXPANSION
EQUIP EQUIPMENT
EASTE
(E) EXISTING
DOWNSPOUTDS
DR DOOR
DWG DRAWING(S)
DIMENSIONDIM
DOUBLE
CONTINUOUSCONT
CONST CONSTRUCTION
BLKG BLOCKING
BTM BOTTOM
BUILT UP ROOFINGBUR
BM BEAM
ASPH ASPHALT
ALUMINUM
FACE OF MASONRYFOM
FACE OF FINISHFOF
FACE OF CONC.FOC
FLOORFLR
FINISH
FIRE EXTINGUISHER
FOUNDATION
FLOOR DRAIN
FLAT BAR
EXPANSION JOINT
EQUAL
ELECTRICAL (AL)ELEC
ELEVATION
EACHEA
DIAGONALDIAG
DIAMETERDIA
DETAILDTL
COMPOSITIONCOMP
CONCRETECONC
COLUMNCOL
CONC MASONRY UNITCMU
CAULKINGCLKG
CEILINGCLG
CONTROL JOINTCJ
CEMENTCEM
BLOCKBLK
BUILDINGBLDG
ARCHITECTURALARCH
ARCHITECT/ENGINEERA/E
JOINT JT
JOISTJST
INCH OR INCHES
INSIDE DIAMETER
OVERO/
FOS FACE OF STUD
NEW CONTOURS
EXISTING SPOT ELEVATION
EXISTING STRUCTURE TO BE DEMOLISHED
EXISTING STRUCTURE TO REMAIN
999.8
EXISTING GUY ANCHOR AND WIRE
NEW BUILDING
EXISTING SURVEY MONUMENT
NEW SURVEY MONUMENT
FINISH PAD ELEVATION FP=1000.0
FINISH SLAB ELEVATION FS=1001.0
FF=1002.0FINISH FLOOR ELEVATION
NEW GROUND ELEVATION
NEW SLOPE BANK
DELAYED DEMOLITION
DBL
PLACE 4" GRAVEL
EXISTING POLE
EXISTING POWER POLE
1000EXISTING CONTOURS
PROPOSED DRAINAGE FLOW DIRECTION
STRUCTURE TO BE DEMOLISHED (D) ANTENNA TOWER
CONCRETE PAD WITH
EXISTING SURVEY INFORMATION
40' TALL ANTENNA
NEW PERMANENT BOLLARD
PANEL
PROOF
SEE DETAIL 5 ON SHEET A501
REVISION CLOUD AND NUMBER
CONTROL POINT
CENTERLINE
OBJECT HIDDEN FROM VIEW
STUD WALL
PLYWOOD
METAL
INSULATION
GYPSUM WALLBOARD
GRAVEL
RIGID INSULATION
EARTH
CONTINUOUS
BLOCKING
CONCRETE
MASONRY UNIT
CONCRETE
CEMENT PLASTER
BLOCKING
ASPHALT
BOW BOTTOM OF WALL
DISTANCE BETWEEN OBJECTS
NOTE: DISTANCE FROM EXISTING
TREE IS RELATIVE TO THE
DISTANCE FROM THE CENTER OF
THE EXISTING TREE
19'-6"
NEW STRUCTURE ELEVATION
UG UNDERGROUND
SW SOUTHWEST
SE SOUTHEAST
NE NORTHEAST
NW NORTHWEST
NEW GROUND ELEVATION @ SWALE FLOWLINE
FINISH GRAVEL ELEVATION FG=997.80
DD
EQ
EL
EJ
FIN
FE
FDN
FD
FB
FT
HC
HB
GYP
GR
GL
GI
GALV
HDR
GA
IN
ID
ROUGH OPENINGRO
UNO TO BE (DD)
AL
995.5
TOP OF STOOP
EL=995.52
980.0
SWALE
LIQUIFIED PETROLEUM GASLPG
RAIN WATER LEADERRWL
TOS TOP OF STEEL
TO TOP OF
BO BOTTOM OF
CAL FIRECDF
TOC TOP OF CONCRETE
A501
ON SHEET KP-A501
BUILDING SECTION B
B
KP-A501
B
KP-A501
NEW PROPANE TANK(S) WITH CONCRETE PAD
TOF TOP OF FOOTING
FINISHED GRADEFG
FLOWLINEFL
Sheet of
This document shall not be used for construction unless signed and sealed for construction.
DesignerDrawn
Scale
Date
Drafting Check
Design Check
Project Manager
Reuse of Documents
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization. © 2023 GHD
0 1"
Bar is one inch on original size sheet
Original Size
Arch D
Project No.
Sheet No.
IssueNo. Drawn Approved Date
Title
Client
Project
Plot Date: Filename:24 August 2023 - 2:28 PM N:\US\Cameron Park\Projects\111\11152117\06-CAD\Sheets\0003 KPG003 Abbreviations and Sym.dwgPlotted By: Luis Manzo
M. WEBER
11152117
GHD Inc.
4080 Plaza Goldorado Circle Suite B Cameron Park California 95682 USA T 1 530 677 5515 W www.ghd.com
STATE OF CALIFORNIA
DEPARTMENT OF GENERAL SERVICES
CALIFORNIA HIGHWAY PATROL
TOWER REPLACEMENT PROJECT
KELLER PEAK
REV V2
REVIEWER:
REVIEWER SIGNATURE:
DATE REVIEWER:
PSC OPERATIONS PLAN REVIEW
NO EXCEPTIONS TAKEN
UNO
DSA
DEPARTMENT OF GENERAL SERVICES
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
DSADSA
IDENTIFICATION STAMP
DIV. OF THE STATE ARCHITECT
APP: INC:
REVIEWED FOR
SS FLS ACS
DATE:
4 4
04-120205
08/29/2023
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
10/25/23
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
21-1718
ISSUE DATE: SEPTEMBER 24, 2024
http://www.ghd.com/ mkweber
PROPOSED STAGING AREA AND
ANTICIPATED AREA
OF DISTURBANCE
KP-G004
NTS
Sheet of
This document shall not be used for construction unless signed and sealed for construction.
DesignerDrawn
Scale
Date
Drafting Check
Design Check
Project Manager
Reuse of Documents
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization. © 2023 GHD
0 1"
Bar is one inch on original size sheet
Original Size
Arch D
Project No.
Sheet No.
IssueNo. Drawn Approved Date
Title
Client
Project
Plot Date: Filename:24 August 2023 - 2:28 PM N:\US\Cameron Park\Projects\111\11152117\06-CAD\Sheets\0004 KPG004 Proposed Staging Area.dwgPlotted By: Luis Manzo
M. WEBER
11152117
GHD Inc.
4080 Plaza Goldorado Circle Suite B Cameron Park California 95682 USA T 1 530 677 5515 W www.ghd.com
STATE OF CALIFORNIA
DEPARTMENT OF GENERAL SERVICES
CALIFORNIA HIGHWAY PATROL
TOWER REPLACEMENT PROJECT
KELLER PEAK
REV V2
REVIEWER:
REVIEWER SIGNATURE:
DATE REVIEWER:
PSC OPERATIONS PLAN REVIEW
NO EXCEPTIONS TAKEN 4 of 57
DSA
DEPARTMENT OF GENERAL SERVICES
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
DSADSA
IDENTIFICATION STAMP
DIV. OF THE STATE ARCHITECT
APP: INC:
REVIEWED FOR
SS FLS ACS
DATE:
4 4
04-120205
08/29/2023
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
10/25/23
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
21-1718
ISSUE DATE: SEPTEMBER 24, 2024
http://www.ghd.com/ mkweber
34 78
(E) PROPANE TANK TO REM
AIN
(E) PROPANE TANK TO REM
AIN
(E) WALL
TO REMAIN
(E) CONCRETE TO REM
AIN
(E) GENERATOR COVER
TO REMAIN
(E) TOWER
TO REMAIN
PROPOSED RETAINING WALL
A
KP-S101
N=1895139.66 E=6848945.60
LAT N034° 11' 46.31"
LONG W117° 02' 59.86"
EARTHSCOPE EQUIPMENT
DO NOT DISTURB
29'
A
(E) BUILDING
TO REMAIN
A
KP-C501
B K P -C
2:1
2:
KP-C501
KP-C501
KP-C501
KP-C501
7842.00 TOW
7838.50 TOF
7842.00 TOW
7838.50 TOF
7842.00 TOW
7838.50 TOF
7839.50 TOW
7836.00 TOF
7839.50 TOW
7836.00 TOF
7839.50 TOP
OF COLUMN
7839.50 TOP
OF COLUMN
7839.50 TOP
OF COLUMN
7839.50 TOP
OF COLUMN
7839.00 FG
7838.95 FL
7839.35 FG
7839.35 FG
7839.25 FL
7839.35 FG
7839.05 FG
7839.35 FG
7839.35 FG
7839.25 FG
7839.25 FG
7839.11 FL
7838.95 FG
7837.42 FG
7839.00 FG
7841.40 FL
7841.50 FL
HIGH POINT
7839.40 FL
7841.25 FL
7836.92 FL
KP-S101
20'
KP-C501
7839.00 FG
2:
(TYP)
7837.42 FG
KP-C501
KP-C501
(TYP)
7842.00/7839.50 TOW - 2.5' STEP
7838.50/7836.00 TOF
7839.50 TOP
OF COLUMN
KP-S101
7839.50 TOW
7836.00 TOF
7839.00 FG
A
PROPOSED (N)
TOWER LOCATION
4.
5'
7842.00 TOW
7838.50 TOF
N=1895143.15 E=6849004.38
LAT N034° 11' 46.34"
LONG W117° 02' 59.16"
RETAINED
SIDE
RETAINED
SIDE
RETAINED
SIDE
TRUE NORTH
LEG 4
LEG 1
LEG 2
LEG 3
°4
'4 0"
112°4'40"
2°
4'
292°4'40"
112°4'40"
COORDINATE POINT TABLE
POINT #
EASTINGS
6849004.38
6848996.38
6849023.26
6849012.37
6848985.50
6848999.14
6849016.75
6849009.61
6848992.00
NORTHINGS
1895143.15
1895162.04
1895151.14
1895124.26
1895135.16
1895155.52
1895148.38
1895130.77
1895137.92
DESCRIPTION
MIDDLE OF CENTER COLUMN
NW CORNER OF FOUNDATION
NE CORNER FACE OF RETAINING WALL
SE CORNER FACE OF RETAINING WALL
SW CORNER FACE OF RETAINING WALL
MIDDLE OF NW COLUMN
MIDDLE OF NE COLUMN
MIDDLE OF SE COLUMN
MIDDLE OF SW COLUMN
SITE, DEMOLITION,
AND GRADING PLAN
KP-C101
PEM PEM
TAB TAB
1" = 5'
0 10'5' TOWER ORIENTATION PLAN
NTS
N
SHEET KEYNOTES
1. (E) TOWER FOUNDATION TO BE REMOVED
2. CABLE BRIDGE
3. CONCRETE MAT FOUNDATION FOR TOWER (SEE STRUCTURAL SHEETS)
TOP OF FOUNDATION ELEVATION = 7834.25
BOTTOM OF FOUNDATION ELEVATION = 7830.25
4. PLACE 4" AB OVER COMPACTED SUBGRADE
5. SPOIL AREA - FLATTEN PROPOSED SLOPE AS NECESSARY TO SPOIL EXCESS
MATERIAL
BASIS OF BEARING
THE BASIS OF BEARINGS FOR THIS SURVEY IS CCS ZONE 5, NAD83 (EPOCH 2010.00) AS
DETERMINED BY GPS FAST-STATIC TIES TO CORS STATIONS, DN5674 RDMT,
DN5633 DSSC, DK6393 NOCO, DN7425 P582, DK6384 BMHL, AF9708 PIN1, DH7054 CNPP
DM7506 CHIL, DM7569 P603.
BENCHMARK
THE VERTICAL DATUM FOR THIS SURVEY IS NAVD 88.
EXISTINGPROPOSED
GROUND ELEVATION
TOP OF SLOPE
GROUND CONTOUR
AB
BOW
(E) E
FG
FL
GB
LAT
LONG
(N) N
TOW
AGGREGATE BASE
BOTTOM OF WALL
EXISTING
EASTING
FINISHED GRADE
FLOWLINE
GRADE BREAK
LATITUDE
LONGITUDE
NEW
NORTHING
TOP OF WALL
CONCRETE
STRAW WATTLE
DITCH FLOWLINE
PLAN VIEW
SCALE: 1" = 5'
ABBREVIATIONS
7839.1± EG
LEGEND
HORIZONTAL/ VERTICAL
SITE CONTROL
SHEET GENERAL NOTES
1. EXCESS EXCAVATION SOIL CAN BE SPREAD ONSITE AT SPECIFIC AREAS.
CONTRACTOR TO VERIFY LOCATION WITH DGS PRIOR TO SPREADING.
2. THE CONTRACTOR SHALL REPAIR ALL ACCESS ROAD SURFACES TO THE SAME
CONDITION AS THEY WERE AT THE START OF THE PROJECT TO THE SATISFACTION
OF THE DGS PROJECT DIRECTOR UPON COMPLETION OF THE PROJECT.
3. EXISTING UTILITY LOCATION NOTE: PROJECT CONTRACTOR TO VERIFY DEPTH AND
LOCATION OF EXISTING UTILITIES PRIOR TO CONSTRUCTION. PROJECT
CONTRACTOR TO CONTACT UNDERGROUND SERVICE ALERT (USA) 811 “CALL
BEFORE YOU DIG” PROGRAM AND COORDINATE LOCATING EXISTING UTILITIES VIA A
PRIVATE UNDERGROUND UTILITY LOCATOR CONTRACTOR THAT UTILIZES
ELECTROMAGNETIC LOCATION DETECTION AND/OR GROUND PENETRATING RADAR.
4" AGGREGATE BASE
COORDINATE POINT TABLE BASED ON CALIFORNIA ZONE 5 STATE PLANE
COORDINATE SYSTEM.
DEMO/SEQUENCING OF CONSTRUCTION
SCALE: NTS
Sheet of
This document shall not be used for construction unless signed and sealed for construction.
DesignerDrawn
Scale
Date
Drafting Check
Design Check
Project Manager
Reuse of Documents
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization. © 2023 GHD
0 1"
Bar is one inch on original size sheet
Original Size
Arch D
Project No.
Sheet No.
IssueNo. Drawn Approved Date
Title
Client
Project
Plot Date: Filename:24 August 2023 - 2:29 PM N:\US\Cameron Park\Projects\111\11152117\06-CAD\Sheets\0005 KPC101 Site Demo and Grdg Plan.dwgPlotted By: Luis Manzo
M. WEBER
11152117
GHD Inc.
4080 Plaza Goldorado Circle Suite B Cameron Park California 95682 USA T 1 530 677 5515 W www.ghd.com
STATE OF CALIFORNIA
DEPARTMENT OF GENERAL SERVICES
CALIFORNIA HIGHWAY PATROL
TOWER REPLACEMENT PROJECT
KELLER PEAK
REV V2
REVIEWER:
REVIEWER SIGNATURE:
DATE REVIEWER:
PSC OPERATIONS PLAN REVIEW
NO EXCEPTIONS TAKEN 5 of 57
DSA
DEPARTMENT OF GENERAL SERVICES
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
DSADSA
IDENTIFICATION STAMP
DIV. OF THE STATE ARCHITECT
APP: INC:
REVIEWED FOR
SS FLS ACS
DATE:
4 4
04-120205
08/29/2023
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
10/25/23
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
21-1718
ISSUE DATE: SEPTEMBER 24, 2024
http://www.ghd.com/ mkweber
(E) GROUND
1' OVER EXCAVATE
1' OVER EXCAVATE
2:1
29'
SEE STRUCTURAL
SHEETS FOR TOWER
FOUNDATION DESIGN
KP-C501
SEE DETAIL A, SHEET KP-S101
FOR RETAINING WALL DESIGN
4" AB OVER COMPACTED
SUBGRADE
TOC=7839.50
SEE STRUCTURAL SHEETS
FOR COLUMN DESIGN
TOC=7834.25
ENGINEERED FILL
FOR SLOPES STEEPER THAN 6:1 FILL SHALL
BE BENCHED INTO EXISTING GRADE WITH A
MINIMUM BENCH WIDTH OF 8 FEET AND
BENCH HEIGHT BETWEEN 6 TO 12 INCHES.
PROPOSED GRADE
SEE DETAIL A, SHEET KP-S101
FOR RETAINING WALL DESIGN
1.
5'
NATIVE BEDROCK
(E) GROUND
(E) BUILDING
1' OVER EXCAVATE
1' OVER EXCAVATE
2:1
SEE STRUCTURAL
SHEETS FOR TOWER
FOUNDATION DESIGN
29'
KP-C501
KP-C501
CONTRACTOR TO VERIFY DEPTH OF (E)
BUILDING FOUNDATION. IF UNDERMINED,
CONTRACTOR TO PROVIDE TEMPORARY
SHORING PER THE RECOMMENDATIONS OF
THE GEOTECHNICAL REPORT.
SEE DETAIL A, SHEET KP-S101
FOR RETAINING WALL DESIGN
4" AB OVER COMPACTED SUBGRADE
TOC=7839.50
SEE STRUCTURAL SHEETS
FOR COLUMN DESIGN (TYP)
TOC=7839.50
TOC=7834.25
2:1 ENGINEERED FILL
PROPOSED GRADE
4" AB OVER
COMPACTED
SUBGRADE
1:1 INFLUENCE LINE
FROM ADJACENT
BUILDING STRUCTURE4'
FOR SLOPES STEEPER THAN 6:1 FILL SHALL
BE BENCHED INTO EXISTING GRADE WITH A
MINIMUM BENCH WIDTH OF 8 FEET AND
CIVIL SECTIONS AND DETAILS
KP-C501
PEM PEM
TAB TAB
AS NOTED
3/4"x3/4"x24" WOOD STAKE AT START, FLOW
NOTES:
3"-5"
M
IN
OVERLAP STRAW WATTLES
12" MIN AT ENDS
EVERY 48" OC AND AT END
FLOW
3'-4'
ON BENCH
30' OR MID HEIGHT
SLOPE STEEPNESS
ON SOIL TYPE AND
SPACING DEPENDS
TIGHTLY ABUT
ADJACENT ROLLS SHALL
1. STRAW WATTLES SHALL BE MANUFACTURED
FROM RICE STRAW AND BE WRAPPED IN A
TUBULAR BLACK PLASTIC NETTING. THE NETTING
SHALL HAVE A STRAND THICKNESS OF 0.30 INCH,
AND A KNOT THICKNESS OF 0.055 AND A WEIGHT
OF 0.35 OUNCE PER FOOT (EACH ± 10%) AND
SHALL BE MADE FROM 85% HIGH DENSITY
POLYETHYLENE, 14% ETHYL VINYL ACETATE AND
1% COLOR FOR UV INHIBITION. STRAW WATTLE
SHALL BE TWENTY-FIVE FEET LONG (± 6") AND
WEIGH APPROXIMATELY 30 POUNDS (± 3LBS)
2. FIBER ROLL INSTALLATION REQUIRES THE
PLACEMENT AND SECURE STAKING OF THE ROLL
IN A TRENCH, 3"-5" (75-125mm) DEEP, DUG ON
CONTOUR. RUNOFF MUST NOT BE ALLOWED TO
RUN UNDER OR AROUND ROLL.
STRAW WATTLES MUST BE PLACED ALONG
SLOPE CONTOURS
SEDIMENT, ORGANIC MATTER, AND
NATIVE SEEDS ARE CAPTURED BEHIND
THE ROLLS
8"-10" DIAMETER RICE
STRAW WATTLE
ONE FOOT MIN KEY AT
BOTH ENDS OF DITCH
GEOTEXTILE FILTER FABRIC PER SPEC 31 20 00 EARTH MOVING
2:1 2:1 6" M
IN
12" 12"
PLACE CLASS NO. 3 RSP PER PER SPEC 31 20 00
EARTH MOVING. 12" MIN THICKNESS
EROSION AND SEDIMENT CONTROL NOTES
1. THE PRACTICE OF EROSION AND SEDIMENT CONTROL IS A DYNAMIC ACTIVITY WHICH REQUIRES FLEXIBILITY AND COMMITMENT BY THE CONTRACTOR TO SUCCESSFULLY IMPLEMENT. THE EROSION AND SEDIMENT CONTROL PLAN IS INTENDED TO PROVIDE GUIDANCE TO THE CONTRACTOR. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PREVENT DISCHARGE OF SEDIMENT FROM THE SITE TO ANY WATERCOURSE, DRAINAGE SYSTEM, OR ADJACENT PROPERTY AND TO PROTECT WATERCOURSES AND ADJACENT PROPERTIES FROM DAMAGE BY EROSION OR DEPOSITION WHICH MAY RESULT FROM THE
PERMITTED GRADING.
2. THE CONTRACTOR SHALL COMPLY WITH THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (N.P.D.E.S.) GENERAL PERMIT, WASTE DISCHARGE REQUIREMENTS AND ALL FEDERAL, STATE AND LOCAL LAWS AND REGULATIONS RELATING TO DISCHARGES OF STORM WATER RUNOFF ASSOCIATED WITH
CONSTRUCTION ACTIVITY.
3. THE LOCATION AND TYPE OF THE EROSION AND SEDIMENT CONTROL PRACTICES SHOWN ON THIS PLAN ARE GUIDELINES ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO IMPLEMENT THE PRACTICES IN SUCH A MANNER AS TO COMPLY WITH THE N.P.D.E.S. PERMIT. THE CONTRACTOR SHALL ADJUST MODIFY AND MAINTAIN THE EROSION AND SEDIMENT CONTROL MEASURES TO FIT THE PARTICULAR SITE CONDITIONS AND PHASE OF CONSTRUCTION OR AS
DIRECTED BY THE CONTRACTING OFFICER.
4. THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN EROSION AND SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION UNTIL SUCH TIME
THAT THE ENTIRE PROJECT HAS BEEN STABILIZED AND ACCEPTED BY THE STATE.
5. THE CONTRACTOR SHALL CONDUCT INSPECTIONS OF THE SITE PRIOR TO ANTICIPATED STORM EVENTS, AND AFTER ACTUAL EVENTS TO IDENTIFY AREAS CONTRIBUTING TO DISCHARGE OF STORM WATER ASSOCIATED WITH CONSTRUCTION ACTIVITY AND TO EVALUATE WHETHER CONTROL PRACTICES TO REDUCE POLLUTANT LOADINGS ARE ADEQUATE AND PROPERLY IMPLEMENTED IN ACCORDANCE WITH THE TERMS OF THE N.P.D.E.S. GENERAL PERMIT OR
WHETHER ADDITIONAL CONTROL PRACTICES ARE NEEDED.
6. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES MUST BE IN PLACE OR BE CAPABLE OF BEING IN PLACE WITHIN 24 HOURS.
7. STRAW WATTLES SHALL BE INSTALLED FOLLOWING THE CONTOUR TO PROTECT AREAS FROM SEDIMENTATION CAUSED BY SHEET AND RILL EROSION.
8. ALL EROSION AND SEDIMENT CONTROL FEATURES SHALL BE MONITORED BY THE CONTRACTOR DURING AND AFTER ALL STORMS TO ENSURE CONTROL FEATURES ARE WORKING PROPERLY. ALTERNATIVE MEASURES MUST BE INSTALLED IF ORIGINAL MEASURES FAIL.
9. CONTRACTOR IS RESPONSIBLE FOR THE PREPARATION OF THE SWPPP PER SPECIFICATION SECTION 31 25 13.
2:1 2:1 6" M
IN
12" 12"
A
SECTION A-A
SCALE: 1"=5'
B
SECTION B-B
SCALE: 1"=5'
STRAW WATTLE
SCALE: NTS
ROCK LINED DITCH
SCALE: NTS
EARTH DITCH
SCALE: NTS
Sheet of
This document shall not be used for construction unless signed and sealed for construction.
DesignerDrawn
Scale
Date
Drafting Check
Design Check
Project Manager
Reuse of Documents
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization. © 2023 GHD
0 1"
Bar is one inch on original size sheet
Original Size
Arch D
Project No.
Sheet No.
IssueNo. Drawn Approved Date
Title
Client
Project
Plot Date: Filename:24 August 2023 - 2:29 PM N:\US\Cameron Park\Projects\111\11152117\06-CAD\Sheets\0006 KPC501 Civil Sections and Details.dwgPlotted By: Luis Manzo
M. WEBER
11152117
GHD Inc.
4080 Plaza Goldorado Circle Suite B Cameron Park California 95682 USA T 1 530 677 5515 W www.ghd.com
STATE OF CALIFORNIA
DEPARTMENT OF GENERAL SERVICES
CALIFORNIA HIGHWAY PATROL
TOWER REPLACEMENT PROJECT
KELLER PEAK
REV V2
REVIEWER:
REVIEWER SIGNATURE:
DATE REVIEWER:
PSC OPERATIONS PLAN REVIEW
NO EXCEPTIONS TAKEN 6 of 57
DSA
DEPARTMENT OF GENERAL SERVICES
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
DSADSA
IDENTIFICATION STAMP
DIV. OF THE STATE ARCHITECT
APP: INC:
REVIEWED FOR
SS FLS ACS
DATE:
4 4
04-120205
08/29/2023
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
10/25/23
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
21-1718
ISSUE DATE: SEPTEMBER 24, 2024
http://www.ghd.com/ mkweber
19'-0"
20'
40'
60'
80'
100'
LIGHTNING
1" DIA X 8'-0"
COPPER CLAD STEEL
80' TOWER ELEVATIONS
NORTH VIEW EAST VIEW SOUTH VIEW WEST VIEW
LEG 4 LEG 1 LEG 1 LEG 2 LEG 3 LEG 3
19'-0"
20'
40'
60'
80'
100'
19'-0"
20'
40'
60'
80'
100'
19'-0"
20'
40'
60'
80'
100'
LEG 2 LEG 4
80-4A
60-4A
LEGEND:
ANDREWS
UHX10-59W-P3A
(ICE BRIDGE NOT SHOWN FOR
CLARITY - SEE SHEET KP-S816 AND
KP-S817 FOR ICE BRIDGE DETAILS)
OR OR
80-1B
40-4A
60-4B 60-2B
70-3
50-3
30-3
60-2B
50-2.5
40-3A
20-3
80-4A
80-3B
70-3
50-3
60-4B
40-4B
40-3A
20-3
KELLER PLAN TO LOAD
80-3.6
80-3A
TELEWAVE
ANT734-960F2
KRECO
CO-41HN
RFS
BA6312-1
40-4B
60-1B
80-1B
60-1B
80-3A
80-3B
RFS
220-3BN
ANDREW
UHX8-59W-P3A
OR
SINCLAIR
SD112-SF2PASNM
RFS
1610-1
AMPHENOL
WPA-800120-4CF-EDIN-NE-3 OR
13'-0" 13'-0"
13'-0" 13'-0"
60-4A
70-2.5
30-2.5
30-3
SEE NOTE 3
SEE NOTE 3
SEE NOTE 3
SEE NOTE 3
40-4A
ANTI-NESTING CONE, TYP
SEE
KP-S802
70-3.5
80-4B
80-3.2
80-3.8
80-3.4
NOTES:
1. THIS SHEET IS PROVIDED IN ORDER TO IDENTIFY ANTENNAE REQUIRED TO BE INSTALLED FOR THIS PROJECT. IT IS NOT TO BE CONSIDERED A STRUCTURAL DRAWING. REFER TO THE DSA APPROVED HARDWARE PC DRAWINGS OR THE DETAILED TOWER STRUCTURE DRAWINGS FOR ANTENNA
MOUNTING HARDWARE OR OTHER INFORMATION NOT SHOWN.
2. ICE BRIDGE(S) NOT SHOWN ON DISHES FOR CLARITY.
3. A REFLECTOR PIPE IS REQUIRED BEHIND THESE ANTENNAS, MIN 12" LONGER AT TOP AND BOTTOM OF THE ANTENNAS. FOR EASE OF INSTALLATION THIS PIPE CAN BE ONE CONTINUOUS PIPE BEHIND BOTH ANTENNAS. THESE ANTENNAS ARE TO BE INSTALLED A SPECIFIC DISTANCE (FREQUENCY
DEPENDENT) FROM THE REFLECTOR.
GABRIEL
QFD6-54-N
SCALA
K531741
XX-XXANTENNA TAG. SEE ANTENNA
SCHEDULE IN SPECIFICATION
SECTION 135000
TOWER ELEVATIONS
KP-TE101
AS SHOWN
Sheet of
This document shall not be used for construction unless signed and sealed for construction.
DesignerDrawn
Scale
Date
Drafting Check
Design Check
Project Manager
Reuse of Documents
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization. © 2023 GHD
0 1"
Bar is one inch on original size sheet
Original Size
Arch D
Project No.
Sheet No.
IssueNo. Drawn Approved Date
Title
Client
Project
Plot Date: Filename:24 August 2023 - 2:29 PM N:\US\Cameron Park\Projects\111\11152117\06-CAD\Sheets\0007 KPTE101 Tower Elevations.dwgPlotted By: Luis Manzo
M. WEBER
11152117
GHD Inc.
4080 Plaza Goldorado Circle Suite B Cameron Park California 95682 USA T 1 530 677 5515 W www.ghd.com
STATE OF CALIFORNIA
DEPARTMENT OF GENERAL SERVICES
CALIFORNIA HIGHWAY PATROL
TOWER REPLACEMENT PROJECT
KELLER PEAK
REV V2
REVIEWER:
REVIEWER SIGNATURE:
DATE REVIEWER:
PSC OPERATIONS PLAN REVIEW
NO EXCEPTIONS TAKEN
J E S
S
IC
A E. NA
P
IE
R
No. S5476
Exp. 6/30/24
DSA
DEPARTMENT OF GENERAL SERVICES
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
DSADSA
IDENTIFICATION STAMP
DIV. OF THE STATE ARCHITECT
APP: INC:
REVIEWED FOR
SS FLS ACS
DATE:
4 4
04-120205
08/29/2023
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
10/25/23
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
21-1718
ISSUE DATE: SEPTEMBER 24, 2024
http://www.ghd.com/ mkweber
80' TOWER PLATFORM SECTIONS
SECTION AT ±80'
SECTION A-A
SECTION AT ±50'
SECTION D-D
SECTION AT ±70'
SECTION B-B
SECTION AT ±40'
SECTION E-E
SECTION AT ±60'
SECTION C-C
SECTION AT ±30'
SECTION F-F
1 4
3 2
3 2
3 2
SECTION AT ±20'
SECTION F-F
20-3
40-3A
40-4B
40-4A
30-2.5
30-3
50-2.5
50-3
60-2B
60-4B
60-1B 60-4A
70-2.5
70-3.5
70-3
80-3B
80-3A
80-1B
80-3.6
80-4A
3 2
3 2
3 2
3 2
80-2.8
80-3.8
80-3.2
80-2.2
80-1.2
80-1.8
80-4.2 80-4.8
80-2.6 80-2.4
80-3.4
80-3.6
80-1.4
80-1.6
80-4.4 80-4.6
60-2.5
60-1.5
60-4.5
60-3.5
40-2.5
40-1.5
40-4.5
40-3.5
20-2.5
20-1.5
20-4.5
20-3.5
NOTE:
THIS SHEET IS PROVIDED IN ORDER TO IDENTIFY ANTENNAE REQUIRED TO BE INSTALLED FOR THIS PROJECT. IT IS NOT TO BE CONSIDERED A STRUCTURAL DRAWING. REFER TO THE DSA APPROVED HARDWARE
PC DRAWINGS OR THE DETAILED TOWER STRUCTURE DRAWINGS FOR ANTENNA MOUNTING HARDWARE OR OTHER INFORMATION NOT SHOWN.
TOWER SECTIONS
KP-TE102
AS SHOWN
Sheet of
This document shall not be used for construction unless signed and sealed for construction.
DesignerDrawn
Scale
Date
Drafting Check
Design Check
Project Manager
Reuse of Documents
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization. © 2023 GHD
0 1"
Bar is one inch on original size sheet
Original Size
Arch D
Project No.
Sheet No.
IssueNo. Drawn Approved Date
Title
Client
Project
Plot Date: Filename:24 August 2023 - 2:30 PM N:\US\Cameron Park\Projects\111\11152117\06-CAD\Sheets\0008 KPTE102 Tower Sections.dwgPlotted By: Luis Manzo
M. WEBER
11152117
GHD Inc.
4080 Plaza Goldorado Circle Suite B Cameron Park California 95682 USA T 1 530 677 5515 W www.ghd.com
STATE OF CALIFORNIA
DEPARTMENT OF GENERAL SERVICES
CALIFORNIA HIGHWAY PATROL
TOWER REPLACEMENT PROJECT
KELLER PEAK
REV V2
REVIEWER:
REVIEWER SIGNATURE:
DATE REVIEWER:
PSC OPERATIONS PLAN REVIEW
NO EXCEPTIONS TAKEN
J E S
S
IC
A E. NA
P
IE
R
No. S5476
Exp. 6/30/24
N
DSA
DEPARTMENT OF GENERAL SERVICES
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
DSADSA
IDENTIFICATION STAMP
DIV. OF THE STATE ARCHITECT
APP: INC:
REVIEWED FOR
SS FLS ACS
DATE:
4 4
04-120205
08/29/2023
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
10/25/23
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
21-1718
ISSUE DATE: SEPTEMBER 24, 2024
http://www.ghd.com/ mkweber
18'-0"
20'
40'
60'
80'
100'
LIGHTNING
1" DIAx8'-0"
COPPER CLAD STEEL
NOTE:
1. ANTENNAS SHOWN ARE REPRESENTIVE AND FOR STRUCTURE DESIGN PURPOSES ONLY. REFER TO SPECIFICATION SECTION FOR TOWER STRUCTURAL DESIGN REQUIREMENTS, SPECIFICATION SECTION 13 50 00 FOR ANTENNA
LAYOUT AND CONFIGURATION REQUIREMENTS, AND TO SITE SPECIFIC TOWER ELEVATIONS FOR ANTENNAS BEING INSTALLED. THESE ARE TYPICAL DETAILS.
80' TOWER ELEVATIONS
NORTH VIEW EAST VIEW SOUTH VIEW WEST VIEW
LEG 4 LEG 1 LEG 1 LEG 2 LEG 3 LEG 3
70-1 70-4
50-1 50-4
30-430-1
30-4.5
18'-0"
20'
40'
60'
80'
100'
18'-0"
20'
40'
60'
80'
100'
18'-0"
20'
40'
60'
80'
100'
LEG 2 LEG 4
80-1B
80-1A
80-4.8
80-4A
80-4B
60-1B
60-1A
60-4A
60-4B
80-4.2
60-4.5 70-4.5
50-4.5
40-1B
40-1A
LEGEND:
ANDREW
UHX10-59W-P3A
ANDREW
DB674G65A-C
OR
OR OR
80-2B
80-2A
80-1A
80-1B
80-1.2
OR OR OR
80-1.8
40-4A
40-4B
70-2 70-1
50-1 50-1
30-1 30-2
30-1.5
60-2B
60-2A
60-1A
60-1B
60-1.5 70-1.5
50-1.5
40-2B
40-1A
40-1A
40-1B
80-3B
80-3A
80-2A
80-2B
80-2.280-2.8
70-3 70-2
50-3 50-2
30-2 30-3
30-2.5
60-3B
60-3A
60-2A
60-2B
60-2.5 70-2.5
50-2.5
40-3B
40-3A
40-2A
40-2B
20-1B
20-1A
20-4A
20-4B
40-4.5
20-4.5
20-2B
20-2A
20-1A
20-1B
20-1.5
40-1.5
20-3B
20-3A
20-…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .