Amend 0002 Att 04.pdf

PDF 4 MB Posted

Attached to
NIST Boulder Building 2 1330 Fume Hood Replacement
Solicitation number
1333ND26RNB190028
Issued by

About this file

This is a Basement Plumbing Plan for Wing B, a technical architectural drawing that details the plumbing infrastructure and systems for a basement level. The plan illustrates the layout of water supply lines, drainage systems, and plumbing fixtures across the basement section, with a specific area marked by a red rectangle indicating a partial plan view for detailed specification. The drawing includes dimensional annotations, pipe sizing notations, fixture callouts, and connection details necessary for construction or renovation purposes. The plan references plumbing codes and standards, includes a general notes section addressing installation requirements and specifications, and contains a title block with project information and revision details. Additional detail drawings are provided in the lower portion of the sheet, depicting specific plumbing connections, valve installations, and drainage configurations. This document serves as a technical specification and construction guide for contractors or mechanical engineers responsible for implementing the basement plumbing system for Wing B of the project.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ajc9 Rectangle ajc9 Highlight ajc9 Highlight ajc9 Callout partial plan for this area

File details come from the government source that posted it. Updated .