This is a Sealed Bid Solicitation (IFB) for construction services to demolish Building 2A (B2A) at the National Institute of Standards and Technology (NIST) campus in Boulder, Colorado. The acquisition is a 100% Small Business Set-Aside under NAICS code 238910 (Demolition Services) with a $19.0 million small business size standard. The contract type is Firm-Fixed-Price (FFP) with two line items: Task 1 for demolishing Building 2A including its superstructure, roof, mechanical and electrical equipment, foundations, utility disconnections, and site improvements; and Task 2 for site restoration including backfilling, grading, installing Class 2 aggregate base, placing asphalt and sidewalk, and installing two new parking lot luminaires with associated electrical circuits and security camera. Work will be performed at 325 Broadway, Boulder, CO, and the contractor must submit a Site-Specific Safety Plan within 7 days of award for approval before a Notice to Proceed is issued.
The solicitation requires sealed offers with an offer guarantee and mandates compliance with performance and payment bonds. Contractor personnel must comply with HSPD-12 physical access requirements and obtain appropriate background investigations. Key deliverables include Quality Control Plans, Site-Specific Safety Plans, project schedule, construction daily reports, and detailed as-builts in PDF format, all due within 30 days of award. Invoices shall be submitted to invoice@nist.gov and require Contracting Officer approval for payment. Insurance requirements include workers' compensation with $100,000 employer's liability coverage, general liability of $500,000 per occurrence, and automobile liability of $200,000 per person/$500,000 per occurrence. The solicitation is subject to prevailing wage requirements, Buy American construction materials provisions, and all applicable OSHA, state, and local safety regulations. Award information and specific pricing details are to be determined, with applicable City of Boulder Sales/Use Tax inclusion required for all invoices.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 07 B2A DEMO TOPO.pdf | ||
| 1333ND26RNB190025 AMD 0001 B2a Demo NIST Boulder CO.pdf | ||
| 06 Below Grade Condition Requirements.pdf | ||
| Site Visit Sign-In.pdf | ||
| 260604 B2A Additional Supporting Documents.zip | ZIP file | |
| Attachments.zip | ZIP file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
See Attached
STANDARD FORM 1442 (REV. )
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( )
20b. SIGNATURE 20c. OFFER DATE
STANDARD FORM 1442 (REV. ) BACK
Attachment Page
PAGE 3 OF 196 1333ND26RNB190025
SF 1442 BLOCK 10 (CONTINUED)
Project: B2A Demolition, NIST, Boulder, CO
Enter Price(s) in Section B.
This acquisition is a 100% Small Business Set-Aside.
The NAICS for this acquisition is 238910; the Small Business Size Standard is $19.0 Million.
Verbal explanations given before award WILL NOT BE BINDING. Any changes will be made in writing by issuing amendment(s).
Offeror(s) shall acknowledge receipt of amendment(s) in block 19 of the SF 1442 or by returning a signed copy of the amendment(s) with their offer.
Notice to Proceed will not be issued until the contractor's Site Specific Safety Plan has been accepted.
Any award resulting from this solicitation will be subject to the City of Boulder Sales/Use Tax. No exemption certificate issued by the Colorado Department of Revenue or any other taxing authority shall be recognized as a basis for exemption from the City of Boulder Sales/Use Tax.
Attachment Page
PAGE 4 OF 196 1333ND26RNB190025
GENERAL AWARD INFORMATION
1. Contract Type: Firm-Fixed-Price (FFP)
2. Contractor’s Point of Contact:
Name: ___________________________________ Phone: __________________________________ Email: ___________________________________
3. Designated Government Official:
_XX____ Contracting Officer _______ Contracting Officer’s Representative (COR) Name: To Be Determined at Award Phone: To Be Determined at Award Email: To Be Determined at Award
_______ Other, Alternate Contracting Officer Representative (ACOR):
4. The contractor shall submit invoices to invoice@nist.gov.
5. Additional Information:
Invoices shall require Contracting Officer approval for payment.
SCHEDULE Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Task 1, Demolish building 2a
0001 Task 1, Demolish building 2a. Contractor is responsible for all labor, materials, and equipment to accomplish the work requirement in accordance with attached statement of work and specific to this line item of task 1 demolish building 2a. Refer to the statement of work for associated details.
1.00 JB
Task 2, Restore building 2a site
0002 Task 2, Restore building 2a site. Contractor is responsible for all labor, materials, and equipment to accomplish the work requirement in accordance with attached statement of work and specific to this line item of task 2 restore building 2a site. Refer to the statement of work for associated details.
1.00 JB
PAGE 5 OF 196 1333ND26RNB190025
Table of Contents
SECTION C DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 Statement of Work
C.2 04 Building 2A Map
SECTION E INSPECTION AND ACCEPTANCE
E.1 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
E.2 52.246-13 INSPECTION--DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS (AUG 1996)
E.3 1352.246-70 PLACE OF ACCEPTANCE (APR 2010)
SECTION F DELIVERIES OR PERFORMANCE
F.1 52.242-14 SUSPENSION OF WORK (APR 1984)
F.2 52.236-15Schedules for Construction Contracts
SECTION G CONTRACT ADMINISTRATION DATA
G.1 1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)
G.2 1352.201-72 CONTRACTING OFFICER`S REPRESENTATIVE (COR) (APR 2010)
SECTION H SPECIAL CONTRACT REQUIREMENTS
H.1 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)
H.2 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)
H.3 1352.228-70 INSURANCE COVERAGE (APR 2010)
SECTION I CONTRACT CLAUSES
I.1 52.203-3 GRATUITIES (APR 1984)
I.2 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
I.3 52.203-6RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)
I.4 52.203-7ANTI-KICKBACK PROCEDURES (JUN 2020)
I.5 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (MAY
2014)
I.6 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
I.7 52.203-12LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (JUN 2020)
I.8 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS
(JAN 2017)
I.9 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
I.10 52.222-3 CONVICT LABOR (JUN 2003)
I.11 52.222-7 WITHHOLDING OF FUNDS (MAY 2014)
I.12 52.222-8PAYROLLS AND BASIC RECORDS (JUL 2021)
I.13 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)
I.14 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014)
I.15 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)
I.16 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2104)
I.17 52.222-30 CONSTRUCTION WAGE RATE REQUIREMENTS--PRICE ADJUSTMENT (NONE OR SEPARATELY SPECIFIED
METHOD) (AUG 2018)
I.18 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010). 27
I.19 52.222-55MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER EXECUTIVE ORDER 14026. (JAN 2022)
I.20 52.222-62PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2022)
I.21 52.223-5POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2024)
I.22 52.226-7DRUG-FREE WORKPLACE (MAY 2024)
I.23 52.226-8ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (MAY 2024)
I.24 52.227-1AUTHORIZATION AND CONSENT (JUN 2020)
I.25 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
PAGE 6 OF 196 1333ND26RNB190025
I.26 52.228-15PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (JUN 2020)
I.27 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
I.28 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)
I.29 52.232-17 INTEREST (MAY 2014)
I.30 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
I.31 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)
I.32 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
I.33 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUNE 2013)
I.34 52.232-40PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (MAR 2023)
I.35 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
I.36 52.242-13 BANKRUPTCY (JUL 1995)
I.37 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)
I.38 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 2012)
I.39 52.249-3 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (DISMANTLING, DEMOLITION, OR REMOVAL OF
IMPROVEMENTS) (APR 2012)
I.40 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)
I.41 52.204-10Reporting Executive Compensation and Firs
I.42 52.204-13System for Award ManagementMaintenance
I.43 52.209-10Prohibition on Contracting With Inverted
I.44 52.209-6Protecting the Governments Interest When S
I.45 52.212-4Terms and ConditionsCommercial Products an
I.46 52.215-8Order of Precedence-Uniform Contract Forma
I.47 52.219-28Postaward Small Business Program Rerepres
I.48 52.219-6Notice of Total Small Business Set-Aside
I.49 52.219-8Utilization of Small Business Concerns
I.50 52.222-11Subcontracts Labor Standards
I.51 52.222-35Equal Opportunity for Veterans
I.52 52.222-36Equal Opportunity for Workers with Disabi
I.53 52.222-37Employment Reports on Veterans
I.54 52.222-4Contract Work Hours and Safety Standards -
I.55 52.222-50Combating Trafficking in Persons
I.56 52.222-54Employment Eligibility Verification
I.57 52.222-6Construction Wage Rate Requirements
I.58 52.222-90 Addressing DEI Discrimination by Federal
I.59 52.223-2Reporting of Biobased Products Under Servi
I.60 52.225-9Buy American-Construction Materials
I.61 52.233-1Disputes
I.62 52.233-3Protest after Award
I.63 52.236-10Operations and Storage Areas
I.64 52.236-11Use and Possession Prior to Completion
I.65 52.236-12Cleaning Up
I.66 52.236-13Accident Prevention
I.67 52.236-14Availability and Use of Utility Services
I.68 52.236-16Quantity Surveys
I.69 52.236-17Layout of Work
I.70 52.236-2Differing Site Conditions
I.71 52.236-21Specifications and Drawings for Construct
I.72 52.236-3Site Investigation and Conditions Affectin
I.73 52.236-5Material and Workmanship
I.74 52.236-6Superintendence by the Contractor
I.75 52.236-7Permits and Responsibilities
PAGE 7 OF 196 1333ND26RNB190025
I.76 52.236-8Other Contracts
I.77 52.236-9Protection of Existing Vegetation Structur
I.78 52.243-4Changes
I.79 52.253-1Computer Generated Forms
I.80 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
I.81 52.252-6AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
I.82 NIST LOCAL-33U.S. DEPARTMENT OF LABOR WAGE DETERMINATION
I.83 NIST LOCAL-53CONTRACT PERFORMANCE DURING CHANGES IN NIST OPERATING STATUS
I.84 NIST LOCAL-54ELECTRONIC BILLING INSTRUCTIONS
I.85 NIST LOCAL-56INVOICING PROCESSING PLATFORM-ALTERNATE I (DEC 2022)
SECTION J LIST OF ATTACHMENTS
J.1 01 General Contractor Requirements Boulder
J.2 Wage Determination
SECTION K REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
K.1 52.203-11CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS (SEP 2024)
K.2 52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS--REPRESENTATION (JAN 2017)
K.3 52.223-4RECOVERED MATERIAL CERTIFICATION (MAY 2008)
K.4 52.209-11Representation by Corporations Regarding
K.5 52.209-13Violation of Arms Control Treaties or Agr
K.6 52.209-2Prohibition on Contracting With Inverted D
K.7 52.209-5Certification Regarding Responsibility Mat
K.8 52.223-1Biobased Product Certification
K.9 52.240-90Security Prohibitions and Exclusions Repr
K.10 52.240-91Security Prohibitions and Exclusions
SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L.1 52.222-5 Construction Wage Rate Requirements Secondary Site of the Work (May 2014)
L.2 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY 2014)
L.3 52.252-5AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
L.4 52.252-6AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
L.5 1352.233-71 GAO AND COURT OF FEDERAL CLAIMS PROTESTS (APR 2010)
L.6 52.204-7System for Award ManagementRegistration
L.7 52.212-1Instructions to OfferorsCommercial Product
L.8 52.216-1Type of Contract
L.9 52.233-2Service of Protest
L.10 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
L.11 1352.233-70 AGENCY PROTESTS (APR 2010)
L.12 Instructions to Offerors
L.13 1352.270-71 PRE-BID / PRE-PROPOSAL CONFERENCE AND SITE VISIT (APR 2010)
SECTION M EVALUATION FACTORS FOR AWARD
M.1 52.212-2EvaluationCommercial Products and Commerci
M.2 Basis for Award
PAGE 8 OF 196 1333ND26RNB190025
SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 Statement of Work
PAGE 9 OF 196 1333ND26RNB190025
STATEMENT OF WORK
Construction Services for Building 2A Demolition Project
I. BACKGROUND INFORMATION
The Department of Commerce (DOC), National Institute of Standards and Technology (NIST) campus is located in Boulder, Colorado and is a research & development facility. DOC also consists of National Oceanic Atmospheric Administration (NOAA) and National Telecommunications and Information Administration (NTIA) agencies on the NIST campus. The Office of Facilities and Property Management (OFPM) at NIST is responsible for maintaining and renovating spaces which consist of laboratories, office space and facilities maintenance areas, except the David Skaggs Research Center.
II. PURPOSE
The objective of this acquisition is to disconnect Building 2A (B2A) from all utility services supplied to the building, complete demolition/ removal of B2A and remaining contents, return subgrade to elevation of adjacent soils, installation of new concrete sidewalk, new asphalt flatwork at vehicular surfaces, new parking striping on asphalt surfaces and new parking lot luminaires for this section of the parking lot.
III. PLACE OF PERFORMANCE
Work will be performed at the US Department of Commerce (DOC) Boulder Laboratories campus at 325 Broadway, Boulder, CO in and around B2A.
IV. SPECIFIC REQUIREMENTS
1. The Contractor shall coordinate with the Government Contracting Officer’s Representative (COR) all activities required throughout the duration of this task order.
The Contractor shall communicate with the COR and the Contracting Officer (CO) on all matters pertaining to the task order.
2. Contractor will provide and install temporary chain link fencing and safety barriers, as required to secure the site.
Task 1 – Demolish Building 2A (Base Scope – CLIN 0001)
1. The contractor will demolish Building 2A including the superstructure, roof, mechanical and electrical equipment, foundation/footers, building utility feeds, associated site improvements within the building footprint and the pavement around Building 2A.
Dispose of the demolition debris to an off-site facility.
2. Demolish all utilities, abandon piping, and conduits within the demolition footprint. Utility demolition includes removing utilities to:
a. Domestic water – demolish back to the supply from inside of Building 2
b. Sanitary sewer – demolish back to the clean out. Modify as needed to seal and cap ¼” below grade
c. Gas – demolish back to the where gas line tees off from the Building 2 service.
Cut and cap.
d. Compressed Air – demolish back to service in Building 2 service.
PAGE 10 OF 196 1333ND26RNB190025
e. Fire Extinguisher’s – turned over to NIST.
f. Electrical – B2A is fed from existing electrical distribution board “PDP, which is located in B2’s mechanical room (B2-0105). Remove conductors in their entirety along with any associated disconnect switches at B2A and in B2-0105. Revise distribution board directory and label circuit break breaker as “SPARE”. Existing underground conduit shall remain and be used for the raceway to serve the new parking lot luminaires. Disconnecting the B2A conductors in “PDP” shall occur during one of the planned site outages in May and September.
g. Fire Alarm – B2A fire alarm devices are fed from the existing fire alarm control panel in B2. The fire alarm cabling entry point and power supply are located in Janitor’s Closet (B2A-115). The power supply shall be handed over to NIST.
Remove all devices in B2A and fire alarm cabling in their entirety back to B2’s fire alarm control panel. If the B2A fire alarm cabling is in a dedicated conduit within B2, the conduit shall be removed as well. Existing underground conduit(s) shall be removed but coordinated with NIST to the extent of their demolition. Provide as-built site plan noting location of abandoned conduit(s). Contractor will also be responsible for updating and removing B2A from NIST’s fire alarm programming.
h. Telecomm – B2A is fed from the existing IT equipment in B2. The existing networking fiber for B2A originates in IT room B2-1062 and passes through IT room B2-1103. The telephone and fiber cabling point is located in Janitor’s Closet (B2A-115). Remove the fiber and telephone cables in their entirety back to B2. Existing underground conduit(s) shall be removed as well but coordinated with NIST to the extent of their demolition. Provide as-built site plan noting location of abandoned conduit(s). NIST-OISM will be responsible for removing networking equipment prior to the building’s demolition.
i. Security – B2A security control panel, located near the west exit, is connected to the existing network IT equipment in B2-0105. All existing security cabling within B2A and back to B2 shall be removed. NIST ESO will remove the keypads, control panel, and all door’s core cylinders prior to the building’s demolition.
Existing security camera shall be removed and returned to NIST. Existing underground conduit that serves the keypad at the gas storage enclosure shall be removed in its entirety.
j. Building Controls - B2A is fed from the existing B2, remove all controls within building and communication trunk back to B2 JCI controls engine.
Task 2 – Restore Building 2A site (Base Scope – CLIN 0002)
1. Backfill the foundation using approved CDOT Class 1 backfill compacted in 6-inch lifts to 95% maximum dry density on standard proctor test
2. Prior to asphalt operations, fine grade the subgrade to match the surrounding pavement.
Proof roll subgrade with minimum 20 Ton truck to verify that the subgrade is stable. The proof roll must be witnessed by a NIST representative.
PAGE 11 OF 196 1333ND26RNB190025
3. Install 6” minimum CDOT Class 2 aggregate base compacted to 95% maximum dry density on standard proctor test.
4. Place asphalt, curb and gutter per NIST site standards. Asphalt replacement should extend 12” beyond the new aggregate base. Seal asphalt joints with hot applied single component joint sailing compound.
5. Where sidewalk previously provided access to building 2a connect sidewalk to the path
North of building 2a.
6. Install (2) parking lot luminaires, poles, and concrete bases.
a. New luminaire head shall match site standard fixture and be equipped with an integral photocell.
b. New pole shall match existing type/style, color, and height.
c. New circuit for the parking lot luminaires shall originate from B2 utilizing the underground conduit that served B2A’s electrical service. The conduit goes back to B2 mechanical room (B2-0105). Intercept the conduit in the mechanical room and install a new junction box. Conduit shall then be installed from new junction box to existing panelboard “PNL-0105-08”/”Welder Panel”. Provide new 20A1P circuit breaker in this panelboard to serve the new parking lot luminaires. New circuit breaker shall match existing panelboard manufacturer and AIC rating.
d. Typically, this circuit would be (2#12+#12G)3/4” C. Contractor to perform voltage drop calculations and provide the proper size circuit and conduit.
e. Contractor shall trench and backfill for the new circuit in existing landscaped areas. Repair landscaping to match pre-construction conditions.
f. Rework landscape irrigation as necessary.
g. Provide pole base detail signed by a licensed Colorado Structural Professional
Engineer.
h. Provide photometrics for NIST review/approval.
i. Refer to NIST site standard specifications for additional information and requirements.
7. Install new exterior security camera on the east side of B2 to monitor the new parking spaces. Coordinate exact location with NIST prior to rough-in. New conduit and cabling shall be routed back to existing security networking equipment located in B2-0105. New camera, conduit, cabling, and testing shall meet NIST Site Standards.
8. Stripe new parking lot spaces.
Safety on the NIST Campus NIST is committed to maintaining a work environment that safeguards the public and the environment, as well as personnel and property.
PAGE 12 OF 196 1333ND26RNB190025
If the award requires construction, demolition, excavation, renovation, or other work for which the contractor directs and oversees contractor personnel (including subcontractors) at NIST-owned and operated sites, the contractor shall:
Provide a detailed, site-specific Safety Plan to the contracting officer within 7 days after award that describes how the contractor will maintain a safe work environment and comply with applicable Occupational Safety and Health Administration (OSHA) standards, as well as with applicable state and local laws, standards, and codes.
The Safety Plan shall specify how the company’s policies and practices will comply with each of the applicable standards, laws, and codes.
The contracting officer will provide written comments regarding the plan to the contractor within seven (7) days of receipt and will require the contractor to submit a revised safety plan within seven (7) days after that to the contracting officer for their review. This cycle may be repeated, if necessary, until the contracting officer determines the safety plan to be acceptable.
Reference:
See NIST’s Contractor Safety Program for required elements of Contractor Safety Plans.
Safety-Related Equipment The Contractor shall:
Provide all safety-related equipment required to perform the work under this award, including personal protective equipment (PPE) and other equipment that is required or appropriate to protect contractor personnel and other personnel on the NIST campus.
Contractor-provided personal protective equipment shall include, at a minimum, hard hats, safety shoes, safety glasses (prescription or standard), respiratory protection (powered air purifying respirator or full-face mask respirator), high visibility clothing and gloves that meet applicable OSHA standards for PPE.
Training The Contractor shall:
Provide safety-related training required by applicable OSHA, state and local regulations or standards to affected contractor personnel (including subcontractor personnel) that perform work under this award. Such training may include, for example, training for proper use of PPE, respirator use, fall protection, crane operation, forklift operation;
electrical safety, or other safety-related topics.
Maintain records of safety training provided to contractor personnel (including subcontractor personnel) that perform work on this award. The contractor shall make
PAGE 13 OF 196 1333ND26RNB190025
those records available to the contracting officer, contracting officer’s representative for the award, or other authorized personnel within 7 days of receipt of their written request, and annually thereafter or upon request.
Require contractor personnel (including subcontractors) to attend required NIST-specific health or safety training that is required by the award.
Health Hazard Assessments and Medical Evaluations The Contractor shall:
Provide required health hazard exposure assessments, medical evaluations and screenings, and exposure monitoring required by applicable OSHA requirements.
Ensure PII information is protected.
Homeland Security Presidential Directive (HSPD)-12 The Contractor (and/or any subcontractor) and its employees who require physical access to NIST facilities or logical access to NIST IT networks or systems must comply with Homeland Security Presidential Directive (HSPD)-12, Policy for a Common Identification Standard for Federal Employees and Contractors; OMB M-05-24; OMB M- 19-17; FIPS 201, Personal Identity Verification (PIV) of Federal Employees and Contractors; NIST HSPD-12 policy; and Executive Order 13467, Part 1 §1.2.
5. Roster
The Contractor (and/or any subcontractor) must submit a roster by name, position, e-mail address, phone number and responsibility, of all staff working under this acquisition where the Contractor will develop, have the ability to access, or host and/or maintain a government information system(s).
The roster must be submitted to the COR and/or CO within 14 days of the effective date of this contract. Any revisions to the roster as a result of staffing changes must be submitted within 14 days of the change. The COR will notify the Contractor of the appropriate level of investigation required for each staff member. If the employee is filling a new position, the Contractor must provide a position description, and the Government will determine the appropriate suitability level.
Position Sensitivity Designations Requirement All Contractor (and/or any subcontractor) employees must obtain a background investigation commensurate with their position sensitivity designation that complies with Parts 1400 and 731 of Title 5, Code of Federal Regulations (CFR).
V. GENERAL REQUIREMENTS
Include all requirements that are not specific tasks but are applicable to the overall contract and the work that will be performed. For example, IT Security, Government Property, Public Affairs Clearance, OMB clearance, printing, data rights, etc.
PAGE 14 OF 196 1333ND26RNB190025
REQUIREMENTS FOR CONTRACTOR PERSONNEL
Identify all qualifications that the Contractor and/or their personnel working on this contract must possess.
Safety: The Contractor employee must be responsible for knowing and complying with all installation safety prevention regulations. Such regulations include, but are not limited to, general safety, fire prevention, and waste disposal.
Security: NIST is a restricted campus. An identification badge is required for access for entry into buildings and is shown to the armed Security Police when entering the campus.
Identification Badges: Contractor employees must comply with NIST identification and access requirements. Each Contractor employee must wear a visible identification badge provided by the NIST Security Office.
VI. DELIVERABLES
1. Quality Control Plans and Site-Specific Safety Plans shall be submitted no later than 30 days after award.
2. Notice to Proceed will not be issued until the contractor’s Site-Specific Safety Plan has been accepted.
3. If not included in the proposal, a schedule of values shall be submitted no later than 30 days after award.
Standards of Acceptance: The NIST POC or COR shall review all the above deliverables and respond with an acceptance or an email with request for revision to the Contractor Point of Contact (POC) within 15 business days of receipt of a deliverable.
• The Contractor shall provide a submittal log and submittals in formats approved by the
COR.
• Contractor is not to include any contact information in the specifications or drawings.
• The Contractor shall provide all architectural and engineering associated with the project, including stamped construction drawings and specifications.
• Detailed as-builts in PDF format shall be provided.
• The Contractor shall review, and field verify all existing facility documentation provided by NIST.
VII. PAYMENT SCHEDULE
The Contractor will be paid, in accordance with the payments clause in the contract and as otherwise noted in this document, upon receipt of a proper invoice. Refer to FAR Clause 52.232-5 Payments under Fixed-Price Construction Contracts.
VIII. SITE MOBILIZATION
1. NIST shall provide the Contractor with the area for construction and staging activities shown in the attached staging drawing. Additional storage areas on the NIST campus may be available to the Contractor if approved by NIST. Refer to NIST Boulder General Contractor Requirements. Fire department access into and through the B81 parking lot, including access to the B81 FDC must be maintained during the project. Provide the described site plan, with FD access drives highlighted, for review by FPAD.
PAGE 15 OF 196 1333ND26RNB190025
IX. SUBMITTALS
Contractor shall provide the following submittals to the COR for approval. NIST shall have up to 14 calendar days to review and return the submittal to the contractor.
Submittals as required in the contract documents from the following divisions:
Division 00 - Procurement and Contracting Requirements
Project CPM Schedule Testing agency certifications Construction daily reports Project as-builts in .pdf format.
Division 01 - General Requirements Refer to Attachment 01 for General Requirements Submittals
Division 02 - Existing Conditions Pre-construction photographs showing the existing conditions of the area around the site Submit proposed protection measures, including drawings, that indicates the measures proposed for protecting individuals and property. Indicate proposed locations and construction of barriers
Division 03 – Concrete Concrete demolition procedures Product data Mill certs
Division 04 - Masonry (NOT USED) Division 05 - Metals (NOT USED) Division 06 - Wood, Plastics, Composites (NOT USED) Division 07 - Thermal and Moisture Protection (NOT USED) Division 08 - Openings (NOT USED) Division 09 - Finishes (NOT USED) Division 10 - Specialties (NOT USED) Division 11 - Equipment (NOT USED) Division 12 - Furnishings (NOT USED) Division 13 - Special Construction (NOT USED) Division 14 - Conveying Equipment (NOT USED) Division 21 - Fire Suppression (NOT USED) Division 22 - Plumbing ( NOT USED) Division 23 - Heating, Ventilating, and Air Conditioning (HVAC) (NOT USED) Division 25 - Integrated Automation (NOT USED) Division 26 - Electrical Division 27 – Communications (NOT USED) Division 28 - Electronic Safety and Security Division 31 - Earthwork
Pre-excavation conference meeting minutes. Meeting at project site to include, at minimum, general contractor, excavation contractor, COR and NIST OFPM safety representative. The excavation permit will be issued after the meeting. Refer to Attachment 01 General Requirements for excavation permit requirements.
Material test reports for all imported fills including:
• Classification according to ASTM D2487 for each on-site or borrow soil material proposed for fill and backfill.
• Laboratory compaction curve according to ASTM D698 for each on-site or borrow soil proposed for backfill.
PAGE 16 OF 196 1333ND26RNB190025
Water sample data, if dewatering is required Division 32 - Exterior Improvements
Certificate of grass seed compliant with NIST standard seed mix requirements
Certification of each seed mixture for turfgrass sod compliant with NIST standard seed mix requirements
Product certificates Asphalt mix and material certifications
Division 33 – Utilities Test reports: Submit all field quality control test reports
• Contractor shall provide submittals through a NIST approved, secure electronic site accessible by NIST.
X. SECURITY REQUIREMENTS
1. No Government-furnished tools, equipment, or devices shall be removed from the NIST site.
2. The contractor (including subcontractors) shall be responsible for properly protecting all information used, gathered, or developed as a result of work under this contract.
3. The data shall not be used for any other purpose other than that specified in the contract. Any information made available to the contractor by the Government shall be used only for the purpose of carrying out the requirements of this contract.
4. If the contractor (including subcontractors) anticipates using external information system services provided by third-party entities, the contractor shall ensure that external information system meets the security standards as described in NIST Special Publication 800-53 and shall be maintained throughout the duration of the contract.
5. At the completion of the contract, all Government data shall be returned to NIST, or if return is not feasible, destroy and do not retain any copies of Government data such as backup copies created at the contractor (including subcontractors) site (and certify in writing to NIST that such return or destruction has been completed).
XI. Product and Execution Requirements
Refer to NIST site standards attachment.
Quality Assurance
1. Comply with all applicable requirements from federal, local, and state regulations and ordinances concerning shoring, bracing, or sloping of excavations and safety of workers.
2. All inspections and testing, including special inspections, required to complete the scope of work will be performed by an independent testing and inspection agency employed by the contractor and approved by the contracting officer as having the competence necessary to perform the work.
PAGE 17 OF 196 1333ND26RNB190025
Attachments: (All attachments contained within Attachments.zip, and 260604 B2A Additional Supporting Documents.zip) If you do not have the attachment files please contact the points of contact on documents.
Attachments.zip
• 01 General Contractor Requirements Boulder.pdf (inline in solicitation and in zip file)
• 02 Safety Plan Checklist.xlxs
• 03 NIST Laboratories Physical Access Control Standards.pdf
• 04 Building 2A Map.pdf
• 05 PPQ Performance.pdf
260604 B2A Additional Supporting Documents.zip
• OFPM Site Standards o 1- OFPM Lab and Office Material Standards 8-30-2024.pdf o 2- Appendix A Boulder 8-30-2024.pdf o 7- Appendix C Abbr 8-30-2024.pdf o 8- Appendix D Perf Tables 8-30-2024.pdf o 9- Appendix E OFPM Mech Site Standards 8-30-2024.pdf o 10- APP E1 Boulder Plumbing Fixtures 6-21-2024.pdf
• 000103-COVER PG & TOC (REV 1).pdf
• 2024-02-02 NIST - B2 As-Builts - Civil 100%.pdf
• 2024-02-02 NIST - B2 As-Builts - MEP 100%.pdf
• 013233-Photographic Documentation.pdf
• 015000-Temporary Facilities and Controls.pdf
• 011000.01.pdf
• 011000.pdf
• 011300.pdf
• 013100.pdf
• 013200.pdf
• 013300.pdf
• 013400.pdf
• 014000.pdf
• 014200.pdf
• 015100.pdf
• 017300.pdf
• 017400.pdf
• 017700.pdf
• 024119.pdf
• 024116-Structure Demolition.pdf
• 311000-Site Clearing.pdf
• 312000-Earth Moving.pdf
• B2 2E2419 One-Line.pdf
• B2A Demo Elec Specs.pdf
PAGE 18 OF 196 1333ND26RNB190025
• B2A Existing Utility Plan and Testholes.pdf
• NIST Elec Site Standards.pdf
• RAB Exterior Fixture.pdf
C.2 04 Building 2A Map
PAGE 19 OF 196 1333ND26RNB190025
PAGE 20 OF 196 1333ND26RNB190025
SECTION E
INSPECTION AND ACCEPTANCE
E.1 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
(Reference 52.246-12)
E.2 52.246-13 INSPECTION--DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS (AUG 1996) (Reference 52.246-13)
E.3 1352.246-70 PLACE OF ACCEPTANCE (APR 2010)
(a) The Contracting Officer or the duly authorized representative will accept supplies and services to be provided under this contract.
(b) The place of acceptance will be:
NIST
325 Broadway Boulder, CO 80305
(End of clause)
PAGE 21 OF 196 1333ND26RNB190025
SECTION F
DELIVERIES OR PERFORMANCE
F.1 52.242-14 SUSPENSION OF WORK (APR 1984)
(Reference 52.242-14)
PAGE 22 OF 196 1333ND26RNB190025
F.2 52.236-15Schedules for Construction Contracts.
PAGE 23 OF 196 1333ND26RNB190025
52.236-15 Schedules for Construction Contracts (DEVIATION January 2026)
(a)
(1) Within five days after the work commences on the contract or another period of time determined by the Contracting Officer, the Contractor shall prepare and submit to the Contracting Officer for approval a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the work (including acquiring materials, plant, and equipment).
(2) The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period.
(3) If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.
(b) The Contractor shall continually update the actual progress in the schedule and shall submit it to the Contracting Officer by the means prescribed in the contract for transmittals or as directed by the Contracting Officer.
(c)
(1) If the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to recover lost time and execute in accordance with the approved schedule, without additional cost to the Government.
(2) Such steps may include increasing the number of shifts, overtime operations, days of work, and/or the amount of construction plant.
(3) The Contractor shall submit, for approval, supplementary schedule(s) that demonstrate how the lost time will be recovered.
(d) If the Contractor does not recover the lost time, the Contracting Officer may determine that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor's right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.
PAGE 24 OF 196 1333ND26RNB190025
SECTION G
CONTRACT ADMINISTRATION DATA
G.1 1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010) (Reference 1352.201-70)
G.2 1352.201-72 CONTRACTING OFFICER`S REPRESENTATIVE (COR) (APR 2010)
(a) TO BE DETERMINED AT AWARD is hereby designated as the Contracting Officer`s Representative (COR). The COR may be changed at any time by the Government without prior notice to the contractor by a unilateral modification to the contract. The COR is located at:
TO BE DETERMINED AT AWARD
TO BE DETERMINED AT AWARD
TO BE DETERMINED AT AWARD
Phone Number: TO BE DETERMINED AT AWARD Email: TO BE DETERMINED AT AWARD
(b) The responsibilities and limitations of the COR are as follows:
(1) The COR is responsible for the technical aspects of the contract and serves as technical liaison with the contractor. The COR is also responsible for the final inspection and acceptance of all deliverables and such other responsibilities as may be specified in the contract.
(2) The COR is not authorized to make any commitments or otherwise obligate the Government or authorize any changes which affect the contract price, terms or conditions. Any contractor request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the express written prior authorization of the Contracting Officer. The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the contractor.
PAGE 25 OF 196 1333ND26RNB190025
SECTION H
SPECIAL CONTRACT REQUIREMENTS
H.1 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)
(Reference 1352.209-73)
H.2 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)
(Reference 1352.209-74)
H.3 1352.228-70 INSURANCE COVERAGE (APR 2010)
(a) Workers Compensation and Employer?s Liability. The contractor is required to comply with applicable federal and state workers'' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer?s liability section of the insurance policy, except when contract operations are so commingled with a contractor?s commercial operations that it would not be practical to require this coverage. Employer?s liability coverage of at least $100,000 shall be required, except in states with exclusive or monopolistic funds that do not permit workers'' compensation to be written by private carriers.
(b) General liability.
(1) The contractor shall have bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
(2) When special circumstances apply in accordance with FAR 28.307-2(b), Property Damage Liability Insurance shall be required in the amount of $N/A .
(c) Automobile liability. The contractor shall have automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract.
Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.
(d) Aircraft public and passenger liability. When aircraft are used in connection with performing the contract, the contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability, and $200,000 per occurrence for property damage. Coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
(e) Vessel liability. When contract performance involves use of vessels, the Contractor shall provide, vessel collision liability and protection and indemnity liability insurance as determined by the Government.
PAGE 26 OF 196 1333ND26RNB190025
SECTION I
CONTRACT CLAUSES
I.1 52.203-3 GRATUITIES (APR 1984)
(Reference 52.203-3)
I.2 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
(Reference 52.203-5)
I.3 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)
(Reference 52.203-6)
I.4 52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)
(Reference 52.203-7)
I.5 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014) (Reference 52.203-8)
I.6 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014) (Reference 52.203-10)
I.7 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (JUN 2020) (Reference 52.203-12)
I.8 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS
(JAN 2017)
(Reference 52.203-19)
I.9 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
(Reference 52.204-9)
I.10 52.222-3 CONVICT LABOR (JUN 2003)
(Reference 52.222-3)
I.11 52.222-7 WITHHOLDING OF FUNDS (MAY 2014)
(Reference 52.222-7)
I.12 52.222-8 PAYROLLS AND BASIC RECORDS (JUL 2021)
(Reference 52.222-8)
I.13 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)
(Reference 52.222-10)
I.14 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014)
(Reference 52.222-12)
I.15 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)
(Reference 52.222-14)
I.16 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2104)
(Reference 52.222-15)
I.17 52.222-30 CONSTRUCTION WAGE RATE REQUIREMENTS--PRICE ADJUSTMENT (NONE OR SEPARATELY SPECIFIED
METHOD) (AUG 2018)
(Reference 52.222-30)
I.18 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010) (Reference 52.222-40)
I.19 52.222-55 MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER EXECUTIVE ORDER 14026. (JAN 2022) (Reference 52.222-55)
PAGE 27 OF 196 1333ND26RNB190025
I.20 52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2022)
(Reference 52.222-62)
I.21 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2024)
(Reference 52.223-5)
I.22 52.226-7 DRUG-FREE WORKPLACE (MAY 2024)
(Reference 52.226-7)
I.23 52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (MAY 2024) (Reference 52.226-8)
I.24 52.227-1 AUTHORIZATION AND CONSENT (JUN 2020)
(Reference 52.227-1)
I.25 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
(Reference 52.228-5)
I.26 52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (JUN 2020)
(Reference 52.228-15)
I.27 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
(Reference 52.229-3)
I.28 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)
(Reference 52.232-5)
I.29 52.232-17 INTEREST (MAY 2014)
(Reference 52.232-17)
I.30 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
(Reference 52.232-23)
I.31 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)
(Reference 52.232-27)
I.32 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT (OCT 2018) (Reference 52.232-33)
I.33 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUNE 2013)
(Reference 52.232-39)
I.34 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (MAR 2023) (Reference 52.232-40)
I.35 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
(Reference 52.233-4)
I.36 52.242-13 BANKRUPTCY (JUL 1995)
(Reference 52.242-13)
I.37 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)
(Reference 52.246-21)
I.38 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 2012) (Reference 52.249-2)
I.39 52.249-3 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (DISMANTLING, DEMOLITION, OR REMOVAL OF
IMPROVEMENTS) (APR 2012)
(Reference 52.249-3)
PAGE 28 OF 196 1333ND26RNB190025
I.40 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)
(Reference 52.249-10)
PAGE 29 OF 196 1333ND26RNB190025
I.41 52.204-10Reporting Executive Compensation and Firs
PAGE 30 OF 196 1333ND26RNB190025
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
DEVIATION (JAN 2026)
(a) Definitions. As used in this clause:
Executive means officers, managing partners, or any other employees in management positions.
First-tier subcontract means a subcontract awarded directly by the Contractor to acquire supplies or services (including construction) for performing a prime contract. It does not include the Contractor’s supplier agreements with vendors, such as long-term arrangements for materials or supplies that benefit multiple contracts and/or the costs of which are normally applied to a contractor’s general and administrative expenses or indirect costs.
Month of award means the month in which the Contracting Officer signs a contract or the month in which the Contractor signs a first-tier subcontract.
Total compensation means the cash and noncash dollar value earned by the executive during the Contractor's preceding fiscal year and includes the information described at 17 CFR 229.402(c)(2).
(b) Requirement. Section 2(d)(2) of the Federal Funding Accountability and Transparency Act of 2006 (Pub. L. 109-282), as amended by section 6202 of the Government Funding Transparency Act of 2008 (Pub. L. 110-252), requires the Contractor to report information on subcontract awards. The law requires all reported information be made public;
therefore, the Contractor is responsible for notifying its subcontractors that the required information will be made public. Nothing in this clause requires disclosing classified information.
(c) Reporting. Unless otherwise directed by the Contracting Officer, or as provided in paragraph (f) of this clause, the Contractor shall report the following in the System for Award Management at as follows:
(1) Executive compensation of the prime contractor. The Contractor shall report the names and total compensation of each of the five most highly compensated executives for its preceding completed fiscal year, if—
(i) In the Contractor's preceding fiscal year, the Contractor received—
(A)80 percent or more of its annual gross revenues from Federal contracts (and subcontracts); loans, grants (and subgrants); cooperative agreements; and other forms of Federal financial assistance; and
(B)$25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts); loans, grants (and subgrants); cooperative agreements; and other forms of Federal financial assistance; and
PAGE 31 OF 196 1333ND26RNB190025
(ii) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986. (To determine if the public has access to the compensation information, see the U.S. Security and Exchange Commission total compensation filings at .).
(2) First-tier subcontract information. The Contractor shall report the following information by the end of the month following the month of award of each first-tier subcontract award:
(i) Unique entity identifier for the subcontractor receiving the award and for the subcontractor’s ultimate parent company, if the subcontractor has a parent company.
(ii) Name of the subcontractor.
(ii…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .