About this file
This is Amendment 0002 to Solicitation 1333ND26QNB190242, issued by the National Institute of Standards and Technology (NIST) on July 29, 2026, with an effective date of July 29, 2026. The amendment incorporates 22 Requests for Information (RFIs) with corresponding government responses addressing clarifications on contract performance, pricing structure, equipment specifications, and submission procedures.
The solicitation is for preventative maintenance and repair services for a Liebert EXS Uninterruptible Power Supply (UPS) system and associated battery equipment located at NIST's Building 24 in Boulder, Colorado. The contract structure includes a one-year base period (October 1, 2026 through September 30, 2027) with four one-year option periods extending through September 30, 2031. Services required consist of one annual preventative maintenance visit per year (estimated at no more than four hours) and non-recurring repair work as needed. The preventative maintenance contract includes all labor, materials, and equipment necessary to perform manufacturer-specified maintenance, excluding life-cycle replacements such as capacitor banks, fan replacements, and individual battery replacements. Battery coverage is limited to replacement of one complete string (80 batteries) per year, but only when testing demonstrates failure. Repair work is priced on a time-and-materials basis with quoted normal and after-hours labor rates; all repair CLINs are awarded at $500 not-to-exceed with labor hours proposed separately. The government clarified that site visit attendance is not mandatory, that subcontractors with required qualifications are acceptable, and that all proposals must be submitted electronically to shawn.borisow@nist.gov. The offer deadline remains August 8, 2026, at 3:00 PM Mountain Time.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Battery Maintenance Report.pdf | ||
| UPS 2078465 Annual Maintenance.pdf | ||
| 1333ND26QNB190242 AMD0001 Inc RFIs.pdf | ||
| Attachments.zip | ZIP file | |
| 1333ND26QNB190242 UPS PM and Repair B24 NIST Boulder CO.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Attachment Page
PAGE 2 OF 9 1333ND26QNB1902420002
The purpose of this amendment (0002) is to incorporate RFIs with government responses:
A. Incorporate the following RFIs with government responses:
[KTR RFI 03] “Is attendance at the July 28 site visit mandatory for quotation responsiveness, technical acceptability, or award eligibility?”
[GOV RESPONSE 03] While a site visit is not mandatory to quote it is highly recommended.
[KTR RFI 04] “The base period is shown as beginning August 1, 2026, before the August 8 quotation deadline. Please confirm the corrected anticipated performance start date and mobilization period.”
[GOV RESPONSE 04] The performance dates are adjusted as seen in amendment.
[KTR RFI 05] “Factor 3 identifies the offeror as the prime contractor and requires at least one recent and relevant past-performance questionnaire. [REMOVED KTR NAME] currently has zero completed federal prime contracts. Will a new prime receive neutral treatment, or will the absence of a prime-contract reference make the quotation unacceptable?”
[GOV RESPONSE 05] Please ensure to submit in accordance with solicitation documents and statement of work.
[KTR RFI 06] “May clearly attributed past performance of a proposed factory-authorized UPS maintenance subcontractor be evaluated, or is Factor 3 limited strictly to contracts performed by the prime offeror?”
[GOV RESPONSE 06] Please ensure to submit in accordance with solicitation documents and statement of work.
[KTR RFI 07] “The requirement calls for factory-trained and authorized Liebert technicians with proprietary tools and software. May those technicians and the manufacturer authorization be furnished by a named qualified small-business subcontractor while [REMOVEDKTR NAME] remains the responsible prime contractor, or must [REMOVED KTR NAME] itself hold Liebert authorization?”
[GOV RESPONSE 07] A sub-contractor that has the qualifications specified in the SOW is acceptable.
[KTR RFI 08] “Are the current equipment-condition reports, prior preventive-maintenance reports, alarm history, repair history, battery test results, and known deficiencies available to quoters?”
[GOV RESPONSE 08] The last report can be made available. See attachments: Battery Maintenance Report.pdf, and UPS 2078465 Annual Maintenance.pdf
[KTR RFI 09] “Clarification of pricing structure – PM full service vs. Labor rates The solicitation pricing section requests preventative maintenance (PM) service and separate labor rates for normal working hours and overtime.
However, Section III (Specific Requirements) of the Statement of Work, under Tasks, Item 3 states:
‘Parts: include parts coverage, to include filters. Per standard practice, parts not Included are capacitors or fan replacements.’
Can NIST please confirm:
• The UPS and battery preventative maintenance services contract should be quoted as full service, including parts and labor, but excluding life cycle replacements such as full capacitor bank and fan replacements and individual batteries and full battery strings.
• The requested labor rates are intended for items not covered by the full-service parts and labor UPS preventative maintenance contract such as life cycle replacement that fall outside full service PM coverage?”
[GOV RESPONSE 09] The solicitation pricing structure is identified as recurring and non-recurring work requirements. CLINs X001 is for recurring work, which is preventative maintenance in accordance with statement of work. CLINs X002 is non-recurring work or identified as repair work. As this work is unknown at the time of solicitation and is not
PAGE 3 OF 9 1333ND26QNB1902420002
performed in a recurring method there is a requirement to supply quotes containing labor hours, and material. This is for the purpose of preparing work orders in the future, gaining approval, and performing repairs. All amounts attached to non-recurring line items are not invoiceable until there is an approved work order during performance of contract. Please refer to the CLIN description in the bid schedule, which assist in knowing the difference per performance year.
[KTR RFI 10] “Clarification of section III in SOW – Full Service Battery Coverage Section III (Specific Requirements) of the Statement of Work, under Tasks, Item 4, states the following requirement:
‘Batteries: include parts, labor, disposal, and batteries as required. Up to one (1) string of batteries per year, not accumulated over contract term.’
The requested level of annual battery coverage is Non- Standard, clarification is requested.
Can NIST please confirm:
• That this requirement is accurate as written, and that the contractor is expected to include parts, labor, disposal, and replacement of individual failed batteries and up to One (1) full string per year as part of the Battery preventative maintenance service contract?
• If this requirement is accurate, could NIST please provide and confirm the manufacturer date and the install date of the batteries?
• If each of the above are not correct, please confirm that the battery preventative maintenance is for preventative maintenance services and all repairs or replacement of individual or full battery strings will be quoted, as needed, firm fixed price inclusive of parts, labor, warranty and shipping.”
[GOV RESPONSE 10] This replacement would be covered under the repair CLIN. It is not meant as an added cost to the annual maintenance portion of the contract. Replacement would only be undertaken if failure/deficiency warranted a string replacement.
[KTR RFI 11] “Maintenance Bypass (MBP) availability To safely perform an annual UPS PM, the UPS must be de-energized.
Can NIST please confirm:
• If Building 24’s Liebert EXS UPS system is equipped with a Maintenance Bypass Panel
(MBP)”
[GOV RESPONSE 12] No external MBP is installed. This has not been an issue in the past.
[KTR RFI 13] “We are performing independent research on the Combined Synopsis/Solicitation (1333ND26QNB190242). We would like to know if this is a brand-new contract OR if there is (was) an incumbent performing these services. If not brand new, could you please provide the current / previous contract number and what the total contract value was?”
[GOV RESPONSE 12] Previous contract was 1333ND23CNB190019
[KTR RFI 13] “Does ‘one battery string’ mean all 80 batteries in the listed cabinet?”
[GOV RESPONSE 13] Yes.
[KTR RFI 14] “What is the battery manufacturer, model, amp-hour rating, installation date and current condition?”
[GOV RESPONSE 14] Please refer to Amendment 0001.
[KTR RFI 15] “Is replacement of one complete string required every year, or only when testing demonstrates failure?”
[GOV RESPONSE 15] When testing demonstrates failure.
[KTR RFI 16] “Must the PM price carry the full potential battery-replacement cost each year?”
[GOV RESPONSE 16] No.
[KTR RFI 17] “Are capacitors and fans to be quoted through the $500 repair CLIN, or separately through a modification?”
PAGE 4 OF 9 1333ND26QNB1902420002
[GOV REPSONSE 17] Through the repair CLIN.
[KTR RFI 18] “What does “verify approval for Battery Life program” specifically require?”
[GOV RESPONSE 18] It is NIST’s understanding that the manufacturer has a battery life program specification and to follow those guidelines.
[KTR RFI 19] “Will NIST provide a load bank, or must the contractor provide one?”
[GOV RESPONSE 19] No load bank required.
[KTR RFI 20] “What is the expected PM outage duration and preferred weekend work window?”
[GOV RESPONSE 20] Work can be completed during the workweek. Expected duration is no more than 4 hours.
[KTR RFI 21] “Proposal Submission Method: The solicitation instructs offerors to submit signed and dated offers to the office specified in the solicitation; however, the required method of proposal submission is not clear. Could you please confirm the required method for submitting proposals?”
[GOV RESPONSE 21] All submissions shall be submitted electronically to shawn.borisow@nist.gov.
[KTR RFI 22] “Site Visit: Could you also please confirm whether attendance at the scheduled site visit was mandatory for offerors intending to submit a proposal?”
[GOV RESPONSE 22] Please refer to RFI 03.
B. Change periods of performance (PoP) and revise CAR Clause 1352.270-70 for all PoPs starting in October and ending in September. Please review the below for details.
C. Add Attachments:
• Battery Maintenance Report.pdf, and
• UPS 2078465 Annual Maintenance.pdf
D. The Offer Due Date, Block 8 of the Standard Form (SF) 1449, remains unchanged due to this amendment on August 08, 2026, no later than 3:00 PM MT.
E. No other changes occur as a result of this amendment.
SCHEDULE Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Base Year (BY) PM
0001 Base Year (BY), Perform one (1) annual preventative maintenance. Contractor is required to provide all labor, materials, and equipment to perform preventative maintenance on NIST's electrical equipment in accordance with the attached statement of work.
Period of Performance: 10/01/2026 to 09/30/2027
1.00 EA
Base Year (BY) Repair
0002 Base Year (BY), Perform authorized repairs and replacements identified during the performance of annual preventative maintenance. Contractor is responsible for provision of all labor, material, tools, and equipment (rental or otherwise) to perform authorized repair and/or replacement services. All work is required to be approved by contracting officer prior to performance or invoicing may occur. The following labor rates are applicable to all work performed under this item:
Normal Laber per hour: $__________
After-Hours Labor per hour: $__________
THIS IS A NTE LINE ITEM AND SHALL BE AWARDED
AT $500.00. ONLY PROPOSE LABOR HOURS ON
THIS CLIN
Period of Performance: 10/01/2026 to 09/30/2027
Option Year 1 (OY1) PM
OPT
1001 Option Year 1 (OY1), Perform one (1) annual preventative maintenance. Contractor is required to provide all labor, materials, and equipment to perform preventative maintenance on NIST's electrical equipment in accordance with the attached statement of work.
Period of Performance: 10/01/2027 to 09/30/2028
Option Year 1 (OY1) Repair
1002 Option Year 1 (OY1), Perform authorized repairs and replacements identified during the performance of annual preventative maintenance. Contractor is responsible for provision of all labor, material, tools, and equipment (rental or otherwise) to perform authorized repair and/or replacement services. All work is required to be approved by contracting officer prior to performance or invoicing may occur. The following labor rates are applicable to all work performed under this item:
Normal Laber per hour: $__________
After-Hours Labor per hour: $__________
THIS IS A NTE LINE ITEM AND SHALL BE AWARDED
AT $500.00. ONLY PROPOSE LABOR HOURS ON
THIS CLIN
Period of Performance: 10/01/2027 to 09/30/2028
PAGE 5 OF 9 1333ND26QNB1902420002
Option Year 2 (OY2) PM
2001 Option Year 2 (OY2), Perform one (1) annual preventative maintenance. Contractor is required to provide all labor, materials, and equipment to perform preventative maintenance on NIST's electrical equipment in accordance with the attached statement of work.
Period of Performance: 10/01/2028 to 09/30/2029
Option Year 2 (OY2) Repair
2002 Option Year 2 (OY2), Perform authorized repairs and replacements identified during the performance of annual preventative maintenance. Contractor is responsible for provision of all labor, material, tools, and equipment (rental or otherwise) to perform authorized repair and/or replacement services. All work is required to be approved by contracting officer prior to performance or invoicing may occur. The following labor rates are applicable to all work performed under this item:
Normal Laber per hour: $__________
After-Hours Labor per hour: $__________
THIS IS A NTE LINE ITEM AND SHALL BE AWARDED
AT $500.00. ONLY PROPOSE LABOR HOURS ON
THIS CLIN
Period of Performance: 10/01/2028 to 09/30/2029
Option Year 3 (OY3) PM
3001 Option Year 3 (OY3), Perform one (1) annual preventative maintenance. Contractor is required to provide all labor, materials, and equipment to perform preventative maintenance on NIST's electrical equipment in accordance with the attached statement of work.
Period of Performance: 10/01/2029 to 09/30/2030
Option Year 3 (OY3) Repair
3002 Option Year 3 (OY3), Perform authorized repairs and replacements identified during the performance of annual preventative maintenance. Contractor is responsible for provision of all labor, material, tools, and equipment (rental or otherwise) to perform authorized repair and/or replacement services. All work is required to be approved by contracting officer prior to performance or invoicing may occur. The following labor rates are applicable to all work performed under this item:
Normal Laber per hour: $__________
After-Hours Labor per hour: $__________
THIS IS A NTE LINE ITEM AND SHALL BE AWARDED
AT $500.00. ONLY PROPOSE LABOR HOURS ON
THIS CLIN
PAGE 6 OF 9 1333ND26QNB1902420002
Period of Performance: 10/01/2029 to 09/30/2030
Option Year 4 (OY4) PM
4001 Option Year 4 (OY4), Perform one (1) annual preventative maintenance. Contractor is required to provide all labor, materials, and equipment to perform preventative maintenance on NIST's electrical equipment in accordance with the attached statement of work.
Period of Performance: 10/01/2030 to 09/30/2031
Option Year 4 (OY4) Repair
4002 Option Year 4 (OY4), Perform authorized repairs and replacements identified during the performance of annual preventative maintenance. Contractor is responsible for provision of all labor, material, tools, and equipment (rental or otherwise) to perform authorized repair and/or replacement services. All work is required to be approved by contracting officer prior to performance or invoicing may occur. The following labor rates are applicable to all work performed under this item:
Normal Laber per hour: $__________
After-Hours Labor per hour: $__________
THIS IS A NTE LINE ITEM AND SHALL BE AWARDED
AT $500.00. ONLY PROPOSE LABOR HOURS ON
THIS CLIN
Period of Performance: 10/01/2030 to 09/30/2031
PAGE 7 OF 9 1333ND26QNB1902420002
Table of Contents
1352.270-70 PERIOD OF PERFORMANCE (APR 2010)
PAGE 8 OF 9 1333ND26QNB1902420002
CLAUSES
1352.270-70 PERIOD OF PERFORMANCE (APR 2010)
(a) The base period of performance of this contract is from October 1, 2026 through September 30, 2027 . If an option is exercised, the period of performance shall be extended through the end of that option period.
(b) The option periods that may be exercised are as follows:
Period Start Date End Date Option I October 1, 2027 September 30, 2028 Option II October 1, 2028 September 30, 2029 Option III October 1, 2029 September 30, 2030 Option IV October 1, 2030 September 30, 2031
(c) The notice requirements for unilateral exercise of option periods are set out in FAR 52.217-9.
(End of clause)
PAGE 9 OF 9 1333ND26QNB1902420002
1.2
C:\PERFORM\FORMS\S30.FRP
Forms Management
C:PERFORMFORMSS30.FRP
Acrobat PDFWriter 2.01 for Windows D:19971010095222 D:19990614133004 Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQUISITION NUMBER
5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6)
CODE
STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.
is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY
CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer) Previous edition unusable
| Descript: |
| Descript1: See Attachment Page. |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT: |
| IDCode: |
| pdfpage1: 1 |
| Pages: 9 |
| DocNo: 1333ND26QNB1902420002 |
| EffDate: JUL 29, 2026 |
| ReqNo: NB194000-26-01262 |
| ProjNo: |
| IssuedByCode: 000014 |
| IssuedBy: NATIONAL INST OF STDS AND TECHNOLOGY |
325 BROADWAY
BOULDER CO 80305-3328
| AdminByCode: |
| AdminBy: See Block 6 |
| ContractorCode: |
| FacCode: |
| SolNo: 1333ND26QNB190242 |
| SolDate: MAY 28, 2026 |
| AwdNo: |
| AwdDate: |
| NoCopies: |
| Amended: Yes |
| OffrExt: Off |
| OffrNoEx: No |
| ApprData: See Schedule |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).: |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| SignName: |
| SignTitl: |
| ContDate: |
| ContrOfficerInfo: |
| CODate: |
| Contractor Info: |
| ContractorPOC: |
| Contractor: |
| ModAmount: |
| 15B. CONTRACTOR/OFFEROR: |
| signature: |
| AwdChg: Off |
| SolChg: Yes |
| Header: |
| Footer1: |
File details come from the government source that posted it. Updated .