This federal solicitation seeks proposals for an Indefinite Delivery Indefinite Quantity contract to provide Architectural Services for Master Planning and Associated Studies. The National Institute of Standards and Technology will award up to three contracts worth a total of $15 million over five years, with a minimum guarantee of $10,000. This is a 100% set-aside for small businesses. Proposals are due February 15, 2024.
The solicitation outlines six evaluation factors including specialized experience, team qualifications, experience with historic properties and sustainability, past performance, capacity, and firm location. Offerors must describe experience with campus master planning, research facility design, and related projects since 2017. Key personnel requirements and resumes are also specified. If selected as highly qualified, offerors will participate in oral presentations and discussions to be evaluated for contract award. Cost will be negotiated only with awardees.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Institute of Standards and Technology RFQ 1333ND24QNB190033ARCHITECTURAL SERVICES FOR MASTER PLANNING AND ASSOCIATED STUDIES IDIQ Virtual Site Visit: January 18, 2024 Questions Due Date: February 13, 2024 Proposals Due Date: March 13, 2024
Questions and Answers
RFQ ARCHITECTURAL SERVICES FOR MASTER PLANNING AND ASSOCIATED STUDIES IDIQ
Status Date: 02/21/2024
No. Offeror Question NIST Response Amendmen t
1. We are very excited to see the announcement and have a quick question. We are curious as to the methodology around not accepting JV bids. We haven’t seen that much and were curious if this is a NIST preference or is this going to be something for us to pay attention to across the DOD
Refer to Amendment 1
2 I am writing to inquire about this opportunity with your agency, specifically on steps needed to submit our application, or to bid on this opportunity. Could you please advise on how to submit our application for this listing below?
Our firm X is a for profit, woman-owned small business, organized as S-corporation. We specialize in accounting services, such as audits, forensic services, and regulatory ethics, controllership. Certain areas we focus are accounting best practices, internal controls, and cash flow management. Our listing on SAM.gov can be found by GACE code X Unique Entity ID X.
Thank you for your interest in this procurement. If your firm has a NAICS code that matches 541310 - Architectural Services, your firm is encouraged to review the evaluation factors and then submit a proposal.
The proposal requirements are defined within the sam.gov listing.
https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bcc47f80a6f940eabb4daf85e939c492/download?&token=
Virtual Site Visit: January 18, 2024
3 In reference to the Design-Build Institute of America (DBIA) Associate statement on page 8 of the Statement of Work, would licensed, certified, and/or registered personnel satisfy this or be equivalent to cover this requirement? If not, is this required for all key personnel and disciplines?
Section C Statement of Work states in part the following:
“ 2.1 Contractor Key Personnel”
The Contractor shall employ the services of personnel submitted with SF 330, Section E and agreed upon during negotiations to perform the services required under this contract. All key personnel on the Contract shall be distinguished and licensed in their field (For non-architects and non-engineers, key personnel shall be credentialed in their field). Key personnel for this Contract shall be, at a minimum:”
“ No substitution will be made without the advance written approval of the Contracting Officer. Before approval, the Contractor must submit, in writing, the proposed replacement's experience and qualifications record.”
“For program of requirements individual task orders, the key personnel shall be required to have a minimum of Design - Build Institute of America (DBIA) Associate level certification.”
This question involves specifically (future) task orders related to ‘program of requirements’. As noted in the SOW, task order procurements related to (future) program of requirements will identify which key personnel are required to have DBIA certifications.
Task order offerors (future) will submit the key
Virtual Site Visit: January 18, 2024 personnel they are planning on offering to meet the key personnel requirements for that program of requirements.
In order to respond to this RFP, it is NOT a requirement that offeror’s personnel have DBIA associate level certification or higher at this time.
Additionally see response #29.
4 Please confirm we are to adjust the margins on the Standard SF 330 to comply with the one (1) inch margins on all forms.
Offerors are not expected to modify SF 330 formatting
5 My name is Adam and I am with the Hotel not far from NIST Gaithersburg offices. I noticed that your department has an upcoming project planned to start in July. I wanted to see if your team may be in need of overnight guest rooms during the span of your project. We are conveniently located in the heart of Gaithersburg, we have plenty of parking and full restaurant onsite. I have attached some information about our hotel and would love to speak with you further.
Thank you for interest in our procurement related to Architectural Services for Master Planning and Associated Studies.
NIST will not be using this contract action to award restaurant/lodging services to a hotelier. The NAICS code for awardees will be 541310 - Architectural Services
6 Since we were on the list to attend will we be receiving the list of all attendees?
Yes
Virtual Site Visit: January 18, 2024
7 This may have been asked: Will NIST allow a SB-to-SB Joint Venture to submit as Prime?
We understand why Mentor Protégé JV’s involving large businesses aren’t ideal.
Please reference response #1
8 1. Please confirm which of the following guidelines are to be followed - Page 2 of the RFP states “minimum of 50% of the required work with in-house staff.” But page 6 FACTOR #5.b. states “Offeror shall demonstrate its ability to comply with FAR 52.219-14, which requires at least 50 percent of the cost of contract performance incurred for personnel be expended by Offeror’s employees and/or their proposed subcontractors who are small business.”
Refer to Amendment 1
9 At the virtual site visit last week, the government affirmed the intent to post the list of site visit attendees, as was indicated in the solicitation. Can you please advise as to the expected timing for posting the attendee list?
Yes – it is posted with these RFIs and Responses
10 We have the following questions regarding the Architectural Services for Master Planning IDIQ and Associated Services opportunity:
• Regarding Section M Factor 1, #3-iv, does the government intend that each project
Section M is how offeror’s proposals are to be evaluated by NIST. Section L//File named “RFQ 1333ND24QNB190033 MasterPlanningAE IDIQ” is the technical factors that offerors have to address:
Virtual Site Visit: January 18, 2024 address a minimum of two factors (2.a, 2.b, 2.c, and 2.d)?
• Regarding Section M Factor 1, #3-iii, if the project only involves buildings is acreage required, or is acreage only required for master planning projects?
Section L/ File named “RFQ 1333ND24QNB190033 MasterPlanningAE IDIQ” Factor #1 in part states:
“a. The Offeror shall describe its experience (including that of its proposed subcontractors) in performing a minimum of two of the following types of projects comparable in size and complexity to the Statement of Work, section 1.3:
1. Master planning of a campus and/or military base equal to or greater than fifty (50) acres. 50 acres must be for one single location versus adding acreage from multiple sites to achieve 50 acres.
2. Concept Studies
3. Feasibility studies for an existing building,
4. Programming, planning, and/or design for research facilities.”
Section L/ File named “RFQ 1333ND24QNB190033 MasterPlanningAE IDIQ” factor 1 states that offerors shall address at a minimum of 2 of the subfactors (a.1, a.2, a.3, or a.4)
Section M factor 1 evaluation describes how the offeror’s proposal is evaluated if the offeror provides more than 2 examples.
In relation to the question regarding Section L factor 1.a.1 in part it states:
“1. Master planning of a campus and/or military base equal to or greater than fifty (50) acres. 50 acres must
Virtual Site Visit: January 18, 2024 be for one single location versus adding acreage from multiple sites to achieve 50 acres.”
Offerors who elect to provide an example for 1.a.1 shall demonstrate that the master planning activity was on a campus and/or military base equal to or greater than fifty (50) acres.
11 Factor #4: How will NIST evaluate past performance for completed and accepted projects in which the federal government did not provide
CPARS?
Refer to Amendment 1
12 Factor #4: Will PPQ be accepted? If so, will it be counted less than or the same as a CPARS?
See response #11
13 Factor #4: Does NIST recommend contractors to only include projects with CPARS and/or PPQ in Factors 1 and 3?
See response #12
14 It has been noted that Key Personnel must have a DBIA Associate Level certification for POR Task Orders. We respectfully request you to consider exceptions where a Team can demonstrate successful completion of DB PORs in the recent past for NIST or other Federal Agencies.
See response #3
15 Please clarify #17 of the 1.3 Scope of Work Tasks
– is this task requiring development of a GIS map for one or more of the NIST campuses?
SOW in part states:
https://sam.gov/api/prod/opps/v3/opportunities/resources/files/caf2a339657244f7907a3542e9ae4bba/download?&token=
Virtual Site Visit: January 18, 2024
“The Contractor shall provide all management, supervision, labor, supplies, equipment and facilities to develop and deliver contractor services in accordance with the following requirements.”
“17. Campus Mapping and modeling including 3- Dimensional (3D), Global Position”
These potential services involve all aspects of GIS activities.
16 Please confirm that Section G Contract Administration Data, page 2, under Request for Proposal, #6 is inadvertently listed and there are no items against it.
Section G page 2 (Request for Proposal) item #6 has no content.
17 Please confirm that we are allowed to use our own SF330 Format as long as the information is the same as what is on the original government issued SF330 forms (rev 7/2021). If so, please confirm this means that the 1” margin is not required as stated in the original solicitation.
Please reference response #4.
Offerors are free to use their own SF 330 format provided it contains the same information in SF330 forms (rev 7/2021).
18 Factor 1 projects - is it required for all projects to be submitted by the PRIME offeror? Can one of the projects be provided by a subconsultant?
MasterPlanningAE IDIQ” factor #1 in part states:
“…Specialized experience and technical competence of the Offeror and its proposed subcontractors performing facilities planning services completed since the start of calendar year 2017…” https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2189ecfb9aa843c299d49176dd7ddf74/download?&token=
Virtual Site Visit: January 18, 2024
As noted in the RFP, offeror’s and subcontractors’ experience maybe submitted for evaluation.
19 For Factor 1- Can a “project” be an IDIQ with several task orders described on the 3 pages allowed? Or does one “project” have to be one task order?
An IDIQ contract is not a project/example. Individual Task Orders under an IDIQ contract are projects/examples.
20 Factor 2 says “at a minimum, key personnel required are…”. There was mention at the site visit that personnel submitted outside of the list provided will not be evaluated. Please confirm if this is the case, or will the committee evaluate all personnel provided, even those not listed as required roles?
MasterPlanningAE IDIQ” factor 2 has three requirements (a., b., and c.)
Provide on SF 330 Sections C, D, E, G as described below.
a. Professional qualifications of the Offeror and its proposed subcontractors and key personnel. Any experience earlier than the start of calendar year 2017 will not be considered. Provide on SF 330 Sections C and D respectively:
1. Proposed Team
2. Organizational Chart of Proposed Team
For subfactor “a” offerors, have wide latitude to describe their proposed team that places them in the most positive light. SF 330 sections C, D, and E have no page limitations. If an offeror desires to describe those not identified as key personnel so as to place a spotlight on their proposed team, there is no prohibition. There is also no requirement to do so.
Virtual Site Visit: January 18, 2024
b. and c. in part states (revised per Amendment 1):
“b. The Offeror shall describe its professional qualifications and those of its proposed team (proposed subcontractors and key personnel). Offeror to identify the roles of its key personnel by providing on SF 330 Section E resumes for its proposed key personnel that include credentials, education, licenses, registrations, relevant experience, and the role to perform NIST's requirements. Provide resumes in SF 330:
1. Resumes of key personnel proposed for this contract. The Offeror shall include, key personnel as required under 2.1 CONTRACTOR KEY PERSONNEL of Section C Statement of Work
c. The Offeror shall provide key personnel participation in example projects on SF 330 Section G.”
For subfactor “b”, only those key personnel found in Section C Statement of Work paragraph 2.1 “Key Personnel” will be evaluated.
Amendment removed “at a minimum” from the original
RFQ
21 Will an existing JV between two small businesses who worked on Federal government project be acceptable?
Please reference response #1.
Virtual Site Visit: January 18, 2024
22 Will firms that are awarded a contract be precluded from performing design work later?
Yes
23 Section C Statement of Work – 2.1 Contractor Key Personnel:
Please confirm whether a DBIA certification is required of ALL key personnel? Only for a specific number of key personnel? Or specific role?
Please reference response #3.
24 Section M Evaluation Factors for Award – Evaluation Factor #4 Recent Past Performance:
Please confirm CPARS and/or PPQs are not required to be provided for each Section F project provided for Factor #1. Please confirm that it is the intent of NIST to review the Offeror’s CPARS evaluations through the CPARS site only.
Please reference responses #11 and #12
25 Section M Evaluation Factors for Award – Evaluation Factor #1 Specialized Experience and Technical Competence:
Are any of the required criteria (2.a, 2.b, 2.c, 2.d) weighted more than the others? For example, is criteria 2.a weighted more favorably than 2.d?
Section M Factor #1 in part states:
“Offerors that provide responsive examples that address criteria 2.a, 2.b, 2.c, and 2.d will be reviewed more favorably. The more criteria are responsively addressed, the more favorably Offeror is reviewed.”
https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3c8d387fcbe84fd29b457a124d291bd1/download?&token=
Virtual Site Visit: January 18, 2024
There is no weighting on Section L/ File named “RFQ 1333ND24QNB190033 MasterPlanningAE IDIQ” factor 1 (2.a, 2.b., 2.c., or 2.d.) They are equally weighted.
26 Section M Evaluation Factors for Award – Evaluation Factor #5 Capacity of the Offeror and Proposed Subcontractors:
Is the intent of this evaluation factor to include information on the individual firm’s capacity as a whole or the individual key personnel’s capacity?
MasterPlanningAE IDIQ” factor #5 in part states:
“Submit on SF 330 Sections A, B, I; SF 330 Part II – GENERAL QUALIFICATIONS and on the 20-page limitation proposal.
a. Offeror shall describe their, as well as their subcontractors’, current and planned workload. The Offeror shall describe its and its subcontractors’ current and planned one (1) year workload from www.sam.gov RFP Date versus available team resources.”
Section M factor #5 in part states:
“The Government will evaluate Factor 5 to determine the offeror’s capacity and their subcontractor’s capacity for current work and planned work (1 year starting from www.sam.gov RFP Date).”
It is assumed in the potential offeror’s question that “individual key personnel” are employees of the offeror or a subcontractor with multiple employees.
For this factor offerors are to address this factor for the offeror and subcontractor firms not individual key personnel.
Virtual Site Visit: January 18, 2024
27 Section M Evaluation Factors for Award – Evaluation Factor #2 Experience and Team Professional Qualifications:
Please confirm if only (1) resume should be provided for each key personnel role? If so, we would like to request NIST re-evaluate this requirement as we feel it would be beneficial to provide multiple resumes for each role to show our team’s breadth of services for the Gaithersburg campus and the Boulder campus individually. (i.e., The civil engineer we use for Gaithersburg, MD may not provide services in Boulder, CO thus requiring a 2nd resume needed to cover Boulder, CO).
MasterPlanningAE IDIQ” factor #2 (b.) does not limit the number of SF330 resumes for Section C “Statement of Work” paragraph 2.1 (Contractor Key Personnel”
28 Section M Evaluation Factors for Award – Evaluation Factor #2 Experience and Team Professional Qualifications:
Please confirm if NIST is requiring specific licenses or certifications for each of the key personnel roles. If so, please provide what they are.
NIST is a customer to the architect and engineer, A&E.
Dependent on the location of the work and the scope under the individual Task order, pertinent State Laws that apply to Registered Architects, Professional Engineers and Land Surveyors apply to the Contractor, A&E.
Please also reference response #3.
29 Please clarify the certifications/credentials desired for the following roles: Senior Urban/Campus Planner, Senior Traffic Engineer, Senior Security Specialist, Senior Cost Estimator, Senior Cultural Resource Specialist, Senior Environmental/NEPA specialist.
For factor #2, section M in part states:
“…The Government will review professional qualification for Offeror and its proposed subcontractors and key personnel. If the experience is earlier than calendar year 2017 for personnel that experience will not be considered…”
Virtual Site Visit: January 18, 2024
See response #28 in addition to the response to this question.
As there are a wide spectrum of certifications/credentials available to professionals, NIST will evaluate all key personnel resumes including credentials/certifications (if any) as part of the evaluation process.
30 Please clarify which individuals require DBIA certification.
See response #3
31 Factor 3: Please clarify if SF330 Section “F” projects utilized for Factor 1 will be evaluated for Factor 3. If not, how should the projects applying to each section be identified to the government.
It is anticipated that some offerors may not desire to use examples in factor #1 to address factor #3.
Offerors have latitude to submit additional projects for factor #3.
Section M factor 3 in part states:
“If the Offeror submitted five past examples for factor #1, Government will review
a) 20 page limit proposal for factor #3 examples that are up to one (1) page each.
b) And/or SF 330 Section H.”
32 Factor 3: Please clarify that the Section “F” projects are still limited to only 5 projects, the additional proposal is limited to 20 pages and Section H is limited to 3 pages.
The identified 20 pages (not part of the SF 330) are pages that offerors are free to use how offerors deem they want to use.
Virtual Site Visit: January 18, 2024
Section F is limited to three (3) pages PER project.
There is a limit of five (5) projects/examples.
Section H is limited to three (3) pages.
33 Factor 3: Please clarify if we can have additional Section “F” projects outside of the 5 considered for Factor 1.
See responses #31 and #32.
If an offeror has used all the pages allotted for factor 1 via SF 330 Section F (five projects), the remaining option for the offeror to respond to factor #3 via the 20 pages not part of the SF 330 offer.
34 Factor 3: Please clarify if a Section “F” project can count toward Factor 3 only and not Factor 1.
See responses #31, 32, and #33.
35 Factor 1: Please clarify if a Section “F” project can count toward Factor 1 only and not Factor 3.
See responses #31, 32, and #33.
36 Factor 3: Will a Section “F” projects be reviewed more highly than a narrative with no projects.
MasterPlanningAE IDIQ” factor 3 in part states:
“ (a) The Offeror shall also describe its experience working with its proposed subcontractors and key personnel. Any experience earlier than the start of calendar year 2017 will not be considered. A minimum of one of the following types of projects comparable in size and complexity to the Statement of Work, section 1.3:”
Virtual Site Visit: January 18, 2024
If an offeror does not provide at least one example for
MasterPlanningAE IDIQ” factor 3, it will the Offeror maybe deemed nonresponsive.
The information within the proposal for factor #3 will be evaluated equally regardless how it is formatted contingent it meets the overall RFP requirements.
37 Audited Rates: Please confirm that the government will accept other rates currently approved by federal agencies on other IDIQs as acceptance of another agencies “audit”. Please confirm the documentation expected for confirmation of the rates.
Confirmed.
RFP in part states (revised per Amendment 1)
The Offeror’s and its subcontractors’ proposed overhead rates shall be supported by Federal government agency’s audit if the Offeror or any subcontractors have been audited within the last two
(2) years and if such rates are not currently under dispute; should Federal government agency’s audits be unavailable, the Government may accept the audited overhead rate reports from an independent CPA firm, being sure that the CPA has removed unallowable costs as defined in FAR Part 31 and otherwise complied with cost principles contained in FAR Part 31. Audits conducted in accordance with Generally Accepted Accounting Principles (GAAP) will not be accepted. If an audited overhead report cannot be provided, the following shall be submitted by the Offerors:
a) Audited Financial statements for the most recent
Virtual Site Visit: January 18, 2024 three (3) years and Certificate of Cost and Pricing Data in accordance with FAR 15.406-2 for Contractor. If financial statements are not audited, submit explanation of why they are not audited.
b) Audited Financial statements for the most recent three (3) years and Certificate of Cost and Pricing Data in accordance with FAR 15.406-2 for each of the subcontractors proposed. If financial statements are not audited, submit explanation of why they are not audited.
Amendment 1 removed “State” from the original RFQ
38 Please confirm if audited rates are required for all roles or only the Prime Contractor.
The response to question #37 applies to subcontractors also.
39 Please confirm if narrative statement outlining the offerors polices for accumulating overhead costs is for all prime contractor and sub-contractors or only for prime contractors.
See responses #37 and #38. Fee schedule requirements apply to offeror and subcontractors.
40 Multiple times in the Scope and RFQ a 20 page limit for proposal is noted. Is this intended to be a 20 page limit for each factor or for the overall combination of all factors.
SF 330 with the exclusion of SF 330 sections F and H have zero page limitation.
SF 330 section H is limited to three (3) pages.
SF 330 section F is limited to five examples/projects at three pages each.
Virtual Site Visit: January 18, 2024
An offeror may use 20 pages outside of the SF 330 for any information they want to present.
41 Does the section H 3 page limit count against the 20 page limit for the proposal?
No – see response #40
42 To present a measure of diversity for master planning of campuses and/or military bases that include comparable private/commercial R&D campuses, will NIST allow for the acreage requirement to be 40-50 acres and greater versus the current requirement of 50 acres or greater?
The solicitation requirement is not being modified for this factor. See response #10 additionally.
43 In light of COVID and its impact on the building/real estate industry, will NIST consider adjusting the 2017 project age requirement to 2015 to present?
The solicitation requirement is not being modified for this factor.
44 Can Factor 1: Projects be from the subconsultants on the team?
Please reference response #18.
45 Master planning on a campus and/or military base equal to or greater than fifty (50) acres. 50 acres must be for one single location versus adding
No, there is no preference given to military base(s)
Virtual Site Visit: January 18, 2024 acreage from multiple sites to achieve 50 acres. If the master plan is not a military base, will it be rated lower?
46 Will a master plan for a park, greater than 50 acres, with some buildings be acceptable?
Please refer to response #10 in addition to this response.
Section L factor 1 in part states:
“ 1. Master planning of a campus and/or military base equal to or greater than fifty (50) acres. 50 acres must be for one single location versus adding acreage from multiple sites to achieve 50 acres.”
NIST expects a campus to be one that consists of buildings in close proximity to each other with centralized support, amenities and other internal functions. Traditionally this would apply to governmental agencies, corporations (for profit or non-profit), hospitals, etc. Persons work or learn in the buildings or live on the campus.
47 We are interested in submitting qualifications for consideration. Can you tell me if Joint Ventures between Small Businesses will be acceptable?
See response #1
48 The virtual site visit is still pending, and did not occur on 1/18/2024, correct?
The Site Visit occurred on 1/18/2024.
Virtual Site Visit: January 18, 2024
49 I am writing regarding a recently released solicitation for Architectural Services for Master Planning & Associated Studies IDIQ, Solicitation #1333ND24QNB190033. We are interested in submitting qualifications for consideration. Can you tell me if Joint Ventures between Small Businesses will be acceptable?
Refer to Amendment 1.
50 I Wanted to confirm that the rfq deadline date was now extended to the 22nd? From the 15th.
Refer to Amendment 1 which extended the due date and time to March 13, 2024 1pm EST.
51 I am writing about ARCHITECTURAL SERVICES
FOR MASTER PLANNING AND ASSOCIATED
STUDIES IDIQ. Is there a time frame for when the final Q&A will be released?
Amendment 1 extended the RFI submission due date to February 13, 2024 5pm EST. NIST plans to respond on or before February 23, 2024. Those RFIs which were submitted on or after 01/25/2024 start at question #49.
52 I am writing to inquire about this opportunity with your agency, specifically on steps needed to submit our application, or to bid on this opportunity. Could you please advise on how to submit our application for this listing below?
Our firm X is a for profit, woman-owned small business, organized as S-corporation. We specialize in accounting services, such as audits, forensic services, and regulatory ethics, controllership. Certain areas we focus are accounting best practices, internal controls, and cash flow management. Our listing on SAM.gov can be found by GACE code x Unique Entity ID x.
Please refer to response to question 2.
Virtual Site Visit: January 18, 2024
53 I wanted to follow up and see if the RFI’s have been posted?
I do not see them available on the SAM.gov website.
Responses to the first round of RFIs were posted on February 8, 2024 on sam.gov listing. See response #51 for additional details.
54 The SBA architectural firm that I work for recently became aware of the current “Architectural Services for Master Planning IDIQ and Associated Services” (Notice ID 1333ND24QNB190033) contract on sam.gov. I’m aware that we have missed both the virtual site visit as well as the RFI due dates; however, I did have a question regarding eligibility to submit for the solicitation. If our team was not present at the Virtual Site Visit on 18 January 2024, are we still allowed to submit our qualifications for the contract? Additionally, will the answers and/or clarifications for RFI’s submitted prior to 25 January be posted to sam.gov or will those be distributed to the site visit attendees only?
See response #51.
The virtual site visit was NOT mandatory to participate in order to submit an offer for this RFP. All potential offerors who meet the requirements for this RFP are encouraged to consider submitting an offer.
All RFIs are posted on www.sam.gov so all interested parties are able to review the questions and answers.
55 We have noticed the deadline has been extended to Feb 22nd. Please let us know when the RFI responses will be posted to sam.gov.
Per amendment #1 the new RFI date is March 13, 2024 @ 1 PM (EST)
Please refer to responses to questions 51 and 53 http://www.sam.gov/
Virtual Site Visit: January 18, 2024
56 After reviewing the amendment posted yesterday, we have an additional question:
1. On page 7 FACTOR #4. RECENT PAST PERFORMANCE 1. Submit Past Performance Questionnaire (PPQ) forms attached to this RFQ for Factors 1 and 3.
Offerors shall have PPQ forms submitted directly to cheryl.allen@nist.gov and guzel.gufranova@nist.gov. But 1.c states NIST will review performance evaluations in the CPARS database. Our question is – do we need to submit PPQs if all our projects if they already have CPARS ratings? Also if we already have a current PPQ for any other non-federal projects can we submit that with our proposal or do we need to ask the client to complete another one and send it directly to NIST?
See response #58 for additional responses.
Factor 4 c in total states the following:
“NIST shall additionally use performance evaluations data from the Contractor Performance Assessment Rating System (CPARS), in accordance with FAR
42.1501 and may consider credible documentation included in the SF 330. If other data is obtained through other than CPARS and/or the submitted SF330, either favorable or unfavorable, during the entire selection process and prior to award it may be considered.”
The offeror when presenting the question overlooked the word “additionally” with respect to CPARs.
Offerors are to comply with Factor 4a. and Factor 4b.
When NIST is evaluating responses to factor 4, NIST will review CPARs to see performance data for the offeror in CPARS for all contract activities listed in CPARs.
PPQs are to be submitted (emailed) by the offeror’s customer not by the offeror. Additionally refer to response to question 58.
57 Factor #3: “If any example projects submitted for FACTOR #1 coincide with any example projects for FACTOR #3, submit those projects separately to address FACTOR #3.” Please confirm that this statement means if a project is used to demonstrate
Amendment #1 on page 8 of 17 states in part the following for Factor #3 “…. If any example projects submitted for FACTOR #1 coincide with any example projects for FACTOR #3, submit those projects separately to address FACTOR #3….”
mailto:cheryl.allen@nist.gov mailto:guzel.gufranova@nist.gov
Virtual Site Visit: January 18, 2024 experience with one or more of the scope areas in Factor #1 and one or more of the scope areas in Factor #3, we should be providing that project description twice in the proposal.
It is assumed by this question, that the potential offeror has examples for Factor #1 that also may be used for Factor 3. Offerors have the following options to comply with this requirement. When responding to factor #1 within their proposal clearly identify within factor #1 response that you are also addressing factor #3.
Ensure when providing information for factor #1 that concurrently factor #3 information is provided to address factor #3 items and quantity of examples.
This method offers the ability to conserve pages (SF 330 Sections “H” and ”F”, and additional 20 pages) for other purposes.
Offerors may also follow the means identified in responses #31 and #32. In addition, refer to Amendment 2.
58 Factor #4. Recent Past Performance requires PPQ forms as part of submission. Please allow firms to submit completed CPARS evaluations in lieu of PPQs, where available. Projects performed for the federal government often receive CPARS, which represents a contemporaneous evaluation of contractor performance. Conversely, a PPQ is often completed years after the project is completed by evaluators that may have diminished memories of contractor performance that occurred, both good and bad.
Factor #4. Recent Past Performance requires PPQ forms as part of submission. For projects
Refer to Amendment 2.
Virtual Site Visit: January 18, 2024 performed for NIST, please allow firms to submit CPARS evaluations completed by NIST in lieu of PPQs
59 Where shall the signed amendment form be located in the submission?
Submit as separate documents. Signed amendment forms will not count against page limitation.
60 We are presuming any amendment forms issued are not part of the 20 page limitation. Please confirm.
Correct – amendment forms are not part of any page limitation
61 Since SF330 forms are set up to be in a specific order, i.e.—Part I- A, B, C, D and so on—is it permissible that our 20 pages can possibly be included in between the SF330 sections, or shall they all go at the end of the SF330 forms?
Offerors have the flexibility to prepare their offers/proposals as they deem appropriate.
SF 330 limitations are identified in response #40.
The 20 page limitation for non-SF 330 sections can be presented in any order the offeror desires that presents their proposal in the best manner determined by the offeror.
62 The factors are not in the same order as the SF330 format. Please confirm that the submission shall be submitted in the SF330 order and not the order of the factors.
RFP does not dictate the “order” that offerors are to present their proposal. Offerors have the flexibility to present their proposal in a logical manner that they deem presents their proposal in the best possible light.
63 Please clarify the Factor 3 projects are to be on a non-SF330 template if we have already used our
(5) projects for Factor 1. If this is the case, do we
Please see responses #31, #32, and #58.
Virtual Site Visit: January 18, 2024 place the Factor 3 projects at the end of Section H?
Will CPARS be accepted for project examples submitted for Factor 1 and 3 in lieu of PPQs?
See response to Question #58
64 Please confirm CPARS/PPQs will not count against any page limitations for this submission.
PPQs will NOT count toward any page limitation identified in RFP.
65 Per RFI response to Question #27, please confirm multiple resumes can be provided for each key personnel role.
To expand on response #27. For any specific key personnel, the offeror is free to provide more than 1 (one) person’s resume for that key personnel role.
Key personnel are identified in Section C “Statement of Work” paragraph 2.1 (Contractor Key Personnel”
| RFQ ARCHITECTURAL SERVICES FOR MASTER PLANNING AND ASSOCIATED STUDIES IDIQ |
| a) Audited Financial statements for the most recent three (3) years and Certificate of Cost and Pricing Data in accordance with FAR 15.406-2 for Contractor. If financial statements are not audited, submit explanation of why they are not audited. |
| b) Audited Financial statements for the most recent three (3) years and Certificate of Cost and Pricing Data in accordance with FAR 15.406-2 for each of the subcontractors proposed. If financial statements are not audited, submit explanation of why they are not audited. |