Sol_1333MF26Q0102_Amd_0004.pdf

PDF 196 KB Posted

Attached to
NOAA Galveston, TX Campus Arc Flash Serv & Cert Federal contract opportunity
Solicitation number
1333MF26Q0102
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

This is Amendment 0004 to Solicitation No. 1333MF26Q0102, issued by the NMFS Field Delegates on September 11, 2026, with an effective date of September 11, 2026. The amendment provides corrections and clarifications to previously answered questions regarding an Arc Flash Hazard Analysis project at the Galveston Campus.

The solicitation requires the contractor to conduct a comprehensive Arc Flash Hazard Analysis covering 189 electrical devices (not the initially stated 89 panels), including transformers, switchgear, distribution switches, and automatic transfer switches (ATS). The contractor must certify that the analysis is completed in accordance with applicable engineering standards, field verification is performed, arc flash labels are installed, calculations are based on verified field conditions, and reports are reviewed and approved by a licensed Professional Engineer where required by state law. The facility operates at voltages of 110V, 208V, 5kV, and 15kV, with three incoming services at 400 amps from utility provider NRG. The campus contains four on-site generators (two Generac and two Cummins). The contractor is responsible for opening all energized electrical equipment during site surveys and must comply with applicable city and state regulatory requirements. Field verification will be conducted jointly between the contractor and government personnel. Campus personnel will provide full-time escorts during site investigations. No electrical single-line diagrams, one-line diagrams, panel schedules, or current electrical drawings are available for distribution prior to contract award, though prints and files will be made available to the awarded contractor for on-site use. A previous Arc Flash Study was conducted in 2023. No extension to the response deadline was granted.

View the file

Other files for this federal contract opportunity

Other files attached to NOAA Galveston, TX Campus Arc Flash Serv & Cert, newest first.
File Type Posted
Combined_Synopsis_Solicitation_Amd_0004_Q_A_Corrections__1333MF26Q0102_(26-513)_0004.pdf PDF
Sol_1333MF26Q0102_Amd_0003.pdf PDF
Combined_Synopsis_Solicitation_Amd_0003_Q_A__1333MF26Q0102_(26-513)_0003.pdf PDF
Sol_1333MF26Q0102_Amd_0002.pdf PDF
Sol_1333MF26Q0102_Amd_0001.pdf PDF
Sol_1333MF26Q0102.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

RAYNIER CAMERINO

See continuation page

NMFS Field Delegates

601 EAST 12TH STREET SUITE 1746

KANSAS CITY MO 64106

NMFS-FD

1333MF26Q0102

09/11/2026

08/29/2026

1 5

1333MF26Q0102 0004

Continued...

Continuation page from block 14.

The purpose of this amendment is to provide corrections to response to questions previously answered for Solicitation No. 1333MF26Q0102

A separate attachment is provided under the file name "Combined Synopsis Solicitation Amd_0004 Q&A_ 1333MF26Q0102 (26-513)" to provide images that are not visible on the SF30 document.

Combined Synopsis Solicitation No. 1333MF26Q0102 Response to Questions:

Question 1: Regarding the subject solicitation, can you please clarify what "certification" entails for this project?

Answer 1: Per the Statement of Work, certification requires the contractor to certify that the Arc Flash Hazard Analysis is completed in accordance with applicable engineering standards, field verification has been performed, arc flash labels are installed, calculations are based on verified field conditions, and reports are reviewed and approved by a licensed Professional Engineer (PE) where required by state law.

Question 2: Are current electrical drawings, one-line diagrams, panel schedules, or other available electrical-system documentation for the Galveston Campus available for review prior to quotation submission? If so, could these documents please be provided?

Answer 2: No, these are currently not available for distribution.

Question 3: Can you please tell me if there is a previous arc flash analysis or if this is a new study? If there is a previous study, can you please share the previous study along with single-line drawings?

Answer 3: This is a new requirement.

Question 4: We understand that there are 89 panels:

• What about transformers: There are four (4) but were not included as they were not surveyed last event.

• Switchgear: There are multiple switches on the campus where power enters but were not included as they were not surveyed last event.

• Distribution switches - two

• ATS - There are multiple switches on the campus where power enters but were not included as they were not surveyed last event, contractor will make their proposal based on their observation and information provided.

Total number should have been reported as 189.

Question 5: Are electrical single-lines available?

Answer 5: Need specifics of what is requested/required.

Question 6: Generation on site?

Answer 6: There are four total generators on campus, two Generac and two Cummins.

7. Existing Power System Models:

Will the Government provide existing SKM or other power system models for each facility? If available, will the editable/native model files be provided to the awarded consultant?

Prints and files will be made available to awarded contractor for use on site.

8. Previous Study Reports and Drawings:

Are previous Arc Flash Studies, Protective Device Coordination Studies, Short-Circuit Studies, and electronic single-line diagrams available for review?

Sent directly to COR to large to attached here

9. Access to Energized Equipment:

Will qualified Government personnel/electricians be responsible for opening all energized electrical equipment, including switchgear, switchboards, panelboards, MCCs, ATSs, transformers, and other equipment, during the site survey? Or is the consultant expected to provide qualified electricians to perform this work?

The campus personnel will open (unlock) the panels and buildings where the work will be performed, however, the opening all energized electrical equipment, including switchgear, switchboards, panelboards, MCCs, ATSs, transformers, and other equipment will be done by interested qualified parties.

10. Electrical Equipment Inventory:

Will the Government provide an existing electrical equipment inventory for each facility, including switchgear, switchboards, panelboards, MCCs, ATSs, transformers, disconnects, generators, and other major electrical equipment?

Listed in study sent to COR.

11. Electrical Inspection / Field Verification:

For the required electrical system inspection and field verification, please clarify the expected level of inspection. Is the consultant expected to perform only a visual inspection and collect nameplate data, or is a detailed internal inspection required?

The appropriate industry standard that will keep us in compliance and allow for the panels to be certified.

12. Can the government provide one-line drawings of the site?

No,these are currently not available for distribution.

13. How many services feed the buildings? 3

14. What size are the incoming services (voltage and amps)? 400 amp

15. Who is the utility serving the buildings? NRG

16. What voltages (208V, 480V, 5kV, 15kV) are at the facility?

110, 208 through the facilities, while we have 5 and 15kV running up to and through

17. The RFP notes 89 panels but does not note any other equipment to be labeled. Does the facility have any other equipment anticipated to be labelled such as MCCs, disconnects, SWBDs, Switchgear, etc? There are a total of 189 devises, I made a typo and edited out the 1 from 189

------------------------------------------------ 9/3/2026-----------------------------------

18. Is there a current SLD for the facility for the electrical distribution systems?

One is available on campus but not authorized to release, Prints and files will be made available to awarded contractor for use on site.

19. Are there One-line diagrams for new construction if not represented on Facility onelines Available? One is available on campus but not authorized to release, Prints and files will be made available to awarded contractor for use on site.

20. Is there a prior electrical study completed within the last 6 years that can be provided?

Last study was the ARC Flash Study conducted in 2023

21. Is there a complete software model for the facility? There is not a digital model available, only hard copy

22. Is there an up-to-date electrical site plan for the facilities? Yes

23. Will the center be coordinating and providing the current required utility information to execute the analysis? Available on campus but not authorized to release, Prints and files will be made available to awarded contractor for use on site.

24. The SOW does not require an emergency power analysis, is this correct? Yes

25. The SOW does not require a facility grounding assessment, is this correct? Yes

26. Is there any electrical equipment located in places that would need to be surveyed oA hours or weekends? No

27. Will a full-time escort be provided to unlock doors and show around the team during the Site Investigation? Yes

28. Are any hot work permits, safety plans, or documentation required prior to being onsite and conduct the investigation on energized equipment?

It is the contractors requirement to be incompliance with applicable regulatory requirement set by the city and state regulators.

29. The SOW calls out “89 electrical panels which need to be certified as safe from Arc Flash.”

As Arc Flash labels are to be installed on any equipment they maybe worked on while energized, does this number include the other electrical equipment that may require an Arc Flash Label? There are a total of 189 devises, I made a typo and edited out the 1 from 189 Detailed listing of previous ARC Flash Certification was provided to COR (in separate document).

30. Who is to conduct the Required Field Verification for the final report? Is the Contractor walking it back down or is the station backchecking it? It will be a joint verification.

31. Will there be reviews performed by the center and if so how many, when and duration?

It is unclear what is being asked.

32. Will there be electricians provided to open the electrical equipment, or will the contractor need to provide their own? It is the contractors responsibility to open all panels.

33. Is there any access requirements to being onsite? Each visit will require all personnel to sign-in in the appropriate building and be escorted to job site.

34. To allow time to factor in the responses to these RFIs and considering the upcoming holiday, would you please consider extending the due date? All RFI’s have been answered, request no extensions.

35. We understand from Amendment 0001 that this is a new study and that electrical drawings, one-line diagrams, panel schedules, and campus maps are not currently available for distribution. Could you please confirm whether any other system information is available electronically, such as a partial equipment inventory, utility data, protective-device information, or equipment photographs? If no additional information is available, we will prepare our quotation using only the information currently posted on the solicitation portal and contained in the published solicitation documents and amendments.

Campus map attached taken from Google Maps our Campus areas are in the blue rectangles, the red roofs are the 4700 Avenue U address and the white roof building are 4900 Fort Crockett.

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)

File details come from the government source that posted it. Updated .