1333BJ21R00151001 - PTS SOW Attachment 11 Quality Assurance Surveillance Plan (QASP).pdf
PDF 474 KB Posted
- Attached to
- Patent Technical Services
- Solicitation number
- 1333BJ21R00151001
About this file
This document outlines a Quality Assurance Surveillance Plan (QASP) for the Patent Technical Services contract. The QASP defines the methods and procedures that the USPTO's Office of Patent Application Processing will use to monitor contractor performance and ensure required quality standards are met. Key deliverables include file maintenance, copying, mail processing, fee collection, formality reviews, and PCT support. Surveillance techniques involve random sampling, periodic inspections, and customer feedback. Performance is measured based on accuracy and timeliness metrics defined for each deliverable in an attachment. Roles of the Contracting Officer, Contracting Officer's Representative, and contractor personnel are also described. The QASP establishes how performance issues will be documented, resolved, and reported to ensure contract compliance.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FORM # USPTO-OP-014.v1.0 (06/2015) 1
Patent Technical Services (PTS)
Attachment 11
Quality Assurance Surveillance Plan
(QASP)
FORM # USPTO-OP-014.v1.0 (06/2015) 2
REVISION HISTORY
REVISION
NUMBER DATE REVISION DESCRIPTION
DOCUMENT CONVENTIONS
This document is a template for a Quality Assurance Surveillance Plan (QASP). This guide, along with the Performance Work Statement (PWS), should be used when creating a QASP for USPTO performance based contracts. This template must be supplemented with program-specific information to produce a QASP that accurately describes the surveillance methods, specific roles and responsibilities, and performance requirements for the USPTO.
FORM # USPTO-OP-014.v1.0 (06/2015) 3
1. INTRODUCTION
This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirement listed in the statement of work for Patent Techinical Srvices (PTS) contract. This plan sets forth the procedures and guidelines that Office of Patent Application Processing (OPAP) will be using to ensure the required quality performance standards or services levels are achieved by the Contractor.
2. PURPOSE
The QASP is used to inspect and monitor performance of work being performed by the Contractor. The QASP provides a means for evaluating whether the Contractor is meeting the performance standard/quality levels identified in the Statement of Work (SOW) and the Contractor’s Quality
Control Plan (QCP), and to ensure that the government pays only for the level of services received.
The QASP defines roles and responsibilities of all government staff in OPAP organization, identifies the performance objectives, and defines the methodologies used to monitor and evaluate the Contractor’s performance.
3. SCOPE
The QASP is a tool for use in Government administration of the contract and remains subject to revisions at any time by the USPTO throughout the contract performance period. USPTO will retain the right to change the surveillance methods, metrics, and Quality Assurance (QA) procedures described in the QASP, or to increase or decrease the degree of surveillance efforts at any time necessary to assure contract compliance. The contractor, and not the Government, is responsible for management and Quality Control (QC) actions to meet the terms of the contract.
4. SUMMARY OF WORK TO BE PERFORMED
The Office of Patent Application Processing (OPAP) government staff will be performing daily quality performance surveillance under the following
Tasks.
File Maintenance
(Reference Refiling, Artifacts Retrieved & Re-filed)
0002 Copying
0002AA Other
0002AB Office Action Images
0002AC PCT
FORM # USPTO-OP-014.v1.0 (06/2015) 4
Document Receipt &
Mailing
0003AA Incoming Mail
0003AB Outgoing Mail
0004 Print Working Folders
Incoming Mail Processing
(Open/Sort)
0005AA US Received
0005AB PCT Received
0005AC Faxes Received
Customer Service
Window
0006AA Processing Clerk 2 Day
0006AB
Processing Clerk 2 Night
(2 people)
0007 Fee Collection
0007AA New Applications
0007AB US Applications
0007AC PCT Applications
Fee Collection Other
Applications
0008AA US
0008AB PCT
0008AC Refunds
0009 Formality Review
0009AA Utility
0009AB Design
0009AC
Direct Hague Industrial
Design
0009AD
In-Direct Industrial
Design
0009AE Provisional
FORM # USPTO-OP-014.v1.0 (06/2015) 5
Formality Review
(Follow-on Papers)
0010AA Abandonments Processing
0010AB Missing Parts Responses
0010AC Change of Address
0010AD
Corrected Filing Receipt
Request
0010AE
Revocation/ Power of
Attorney Request
0010AF PDX Request
0010AG
SB69 /ADS Permission to
Access EPO Search
Results
0011 PCT National Stage
0011AA
PCT National Stage Bib
Data
0011AB
PCT National Stage
Mailing
0012 PCT International
0012AA
PCT International Bib
Data
0012AB PCT Printing & Mailing
Patent Application
Processing
0013AA
Secretary 3
(Commissioner's Office, 1 person)
0013AB
Secretary 2 (PCT Legal 2 people)
0013AC
Processing Clerk 2 (Patent
Academy, 2 people)
0013AD
Receptionist (Petitions 1 person)
FORM # USPTO-OP-014.v1.0 (06/2015) 6
0013AE
Processing Clerk 2
(Petitions, 3 people)
0013AF
Processing Clerk 2 (ODM, 3 people)
0013AG
Lead Processing Clerk
(ODM, 1 person)
Courier Support(Vehicle, Maintenance, Driver)
Project Management Staff
(Onsite)
5. ROLES AND RESPONSIBILITIES
5.1 Contracting Officer (CO)
The Contracting Officer (CO) is responsible for monitoring contract compliance, contract administration, cost control, and for resolving any difference between the observation documented by the Contracting Officer Representative (COR) and the Contractor. The CO will designate two full-time COR as the government authority for contract performance management. The number of additional representative serving as Task Order
Manager (TOM) or technical subject matter experts depends on the complexity of the services measured, as well as the Contractor’s performance.
5.2 Contracting Officer’s Representative (COR)
The Contracting Officer Representative (COR) is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. The COR is responsible for technical administration to ensure proper government surveillance of the Contractor’s performance. The COR is part of the Patents Management Team.
In implementing the QASP, the COR responsibilities include managing Quality Assurance (QA) activities to ensure compliance and completeness by:
• Overseeing the quality aspects of day to day operation of the PTScontract
• Serving as the technical liaison with the Contractor Quality staff
• Responsible for the final inspection and acceptance of all reports
• Other such other responsibilities as may be specified in the contract.
FORM # USPTO-OP-014.v1.0 (06/2015) 7
5.3 Contractor Personnel
Project Manager
• Oversee the performance and quality of work being performed.
• Respond to discrepancy on bi-weekly and monthly reports presented by the OPAP government staff.
• Meet with the USPTO COR on a monthly basis to review contract performance
Operations Manager
• Maintain and daily Operations of the PTS contract
• Respond to discrepancy reports or any actions needed from Director, OPAP
• Meet with the USPTO COR on a monthly basis to review contract performance
6. METHOLOGIES TO MONITOR PERFORMANCE
6.1 Surveillance Techniques
The OPAP government staff will perform quality surveillance using many of the various methods applicable which is included in the QASP as
Attachment A. OPAP government staff will use Random and Periodic surveillance methods and techniques which are appropriate for PTS contract and is incorporated into the SOW to monitor contract performance. Government will also rely on customer feedback from internal and external customers for quality assurance surveillance. The Contractor shall correct any problems or deficiencies upon notification from the Government based on specified sections of the SOW as addressed in Attachment 5 (Performance Metrics).
Random Surveillance
Evaluates random surveillance of contractor work as needed. The random sampling may be compiled into an excel spreadsheet of application numbers to determine its completeness and compliance with the patent filing requirement. This method is done to determine whether the contractor’s performance of a particular task for a given period of time meets the performance requirement based on randomly selected samples of the task. This method is the most appropriate for frequently recurring tasks
Periodic Surveillance
OPAP government staff typically performs the periodic inspections as needed and report any discrepancies as stated in SOW. It may be appropriate for tasks that occur infrequently and where 100% inspection is neither required nor practical. . The Government will also rely on customer feedback
FORM # USPTO-OP-014.v1.0 (06/2015) 8 from internal and external customers for quality assurance. The Contractor shall correct any problems or deficiencies upon notification from the Government based on specified sections of the SOW as addressed in Attachment 5 (Performance Metrics).
Acceptable Quality Levels
The acceptable quality levels (AQL) included in Attachment A, Performance Requirement Summary Table, for Contractor performance are instructed to allow the Contractor to manage how the work is being performed.
Customer Feedback
The Contractor is expected to establish and maintain professional communication between its employee and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the Contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problem, but the customer always has the option to communicate complaints to the COR as opposed to the Customer.
Customer complaints to be considered valid must be set forth clearly and in writing the detailed nature of the complaint to be forwarded to the COR.
The COR will accept the customer complaint and investigate using the Quality Assurance Monitoring Form identified in Attachment A or another format mutually agreed to with the CO.
Customer feedback may also be obtained from random customer complaints.
Walkthroughs
Walkthroughs method evaluates correctness, timeliness, reliability, and productivity. Structured walkthroughs are used for orientation, examining actual output of contractor work, identifying defects or errors, and improving products at any stage in the process. OPAP’s government staff and
COR will periodically perform walkthroughs in areas of work being performed by Contractors.
6.2 Resolving Performance Issues
OPAP government staff, COR and the Contractor may discover performance issues or deficiencies through the surveillance process. The COR will provide an email or a list of any unresolved deficiencies to the Contractor to afford them the opportunity to investigate the deficiencies to determine if in fact the errors are the contractors. If evidence is shown where the contractor’s quality program has already documented the deficiency and timely corrective action is resolving the errors and/or problem, the COR will follow up with the contractor’s Key Personnel to ensure the deficiencies are remedied in a timely manner, in accordance with the SOW.
FORM # USPTO-OP-014.v1.0 (06/2015) 9
6.2.1 Reviews and Resolution
The COR will continue to review performance surveillance of contractor performance on efficiency and effectiveness of any deficiencies being presented. The COR and the Contractor will meet monthly to discuss contractor performance. Should the need arise for an emergency meeting because of unexpected performance issues, these meetings can be called by either COR or OPAP Director.
The COR will notify the Contracting Officer, in writing, of unacceptable quality levels. The Contracting Officer will promptly provide written notification of discrepancies on a monthly basis, or immediately if the situation significantly affects the well-being of the contract. The Contractor will be given the opportunity to respond in writing to each discrepancy.
The Contractor shall provide a written response to the cause and the corrective action to prevent recurrence within 10 working days after receipt of
Contracting Officer’s notification. The Contractor should cite specific quality assurance program procedures or new procedures instituted to prevent recurrence.
6.3 Documenting Surveillance
OPAP government staff will provide documentation of performance surveillance by electronic reports, paper submission, customer feedback, and contract data requirements.
All documentation resulting from surveillance must be made part of the contract file. The COR must keep the on-going documentation files of performed surveillance in the COR contract file. Monitoring Reports are also kept by OPAP Program Office for documentation purposes.
7. QUALITY ASSURANCE DOCUMENTATION
7.1 The Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the
SOW and in this QUASP. Performance standards are assessed using the performance monitoring techniques identified Attachment A. The COR or
OPAP Management will provide feedback to the Contractor’s Key Personnel of any performance issues for remediation.
7.2 Monitoring Forms
The government’s QA surveillance will be accomplished periodically by the OPAP government personnel and be reported using the monitoring forms in Attachment B or other format mutually agreed to with the CO. The forms, when completed, will document the government’s assessment of the Contractor’s performance stated in the SOW to ensure that the required results are being achieved. These forms, in additional to other documented information are used by the COR to asses performance during the life of PTS contract and inform the CO of any performance issues.
7.2.1 The OPAP Managers will retain a copy of all completed QA surveillance forms.
7.3 Reporting
FORM # USPTO-OP-014.v1.0 (06/2015) 10
OPAP Management will retain results of The COR will provide monthly reports which summarize the results of the quality assurance surveillance of the Contractor’s performance. The monthly reports will include compilation of the Government Quality inspections results from the completed quality assurance monitoring forms (Attachment B) or other format if mutually agreed to with CO, will become part of the Quality Assurance documentation.
8. PERFORMANCE REQUIREMENTS SUMMARY
See Chart below (Attachment A: Performance Requirement Summary)
ATTACHMENT A: PERFORMANCE REQUIRMENT SUMMARY
CLIN Deliverable Accuracy Timeliness Turnaround Times Method of Surveillance
0001 File Maintenance 99% 99% 4-business hours within the receipt; Pickup artifact files from Tech Center (TC); refile artifact 4-hours of receipt from
TC.
Periodically inspect artifact files room located in
Remsen Concourse 0A41, Remsen 2C79 & Remsen
5C84 to ensure appropriately refiled or rely on internal and external customer feedback.
0002AA Other Copying 98% 98% Complete all copying and deliver of the folder to the designated location within 1 business day after pickup
Periodically inspect processed work and internal requests for copying in
Randolph Building, Room
1B11 or rely on internal and external customer feedback.
Due to automation, the majority of the Copying will be done for PCT appropriately refiled or rely on internal and external customer feedback.
FORM # USPTO-OP-014.v1.0 (06/2015) 11
0002AB Office Action
Copying
98% 98% Complete all copying and deliver of the folder to the designated location within 1 business day after pickup
Randomly inspect processed work and internal requests for copying in
Randolph Building, Room
1B11. Check contractor designated location files ready for mailing and scanning to ensure accuracy and timeliness appropriately refiled or rely on internal and external customer feedback. Due to automation, the majority of the Copying will be done for PCT.
0002AC Copying (PCT) 98% 98% Complete all copying and deliver of the folder to the designated location within 1 business day after pickup
Randomly inspect processed work in
Randolph Building, Room
1B11 of copied office action in PLRC. Check contractor designated location files ready for mailing and scanning to ensure accuracy and timeliness appropriately refiled or rely on internal and external customer feedback.
FORM # USPTO-OP-014.v1.0 (06/2015) 12
0003AA DRAM Incoming
99% 99% Complete all mail delivery with 2 business hours from receipt
Check DRAM mailroom area for incoming mail.
Check scheduled deliveries of incoming mail from Mail
Center to ensure mail delivery is completed within 2 hours appropriately refiled or rely
0003AB Outgoing Mail 99% 99% Notice of Allowance within (1) business day of retrieval from pickup location. Accelerated
Mail Notice within (1) business hour. All other mailing immediately following retrieval from printers; seal envelopes available for mailroom pickup no later than
(2) business days after retrieval of work.
Randomly inspect outgoing mail before sent to drop-off location for Mail Center pick-up or rely on internal
0004 Print Working
Folder
100% 98% 1 business day Randomly inspect Print
Working Folder area for accuracy and timeliness of
PWFs appropriately refiled or rely on internal and external customer feedback.
FORM # USPTO-OP-014.v1.0 (06/2015) 13
0005,0005AA,
0005AB,
00005AC
Incoming Mail
Processing (US, PCT, Faxes)
99% 99% Perform mail processing tasks several times each workday.
Central Fax - Keep log of all documents that do not print within (1) business day of receipt. Open and Sort -
Complete opening, sorting and accurate routing of all non-fee mail within (2) business days of receipt.
Randomly sample fee/non-fee mail to ensure they are opening, sorting, and accurate routing all non-fee mail within (2) business days. Randomly sample
Central faxes to ensure contractor is following proper instructions, apply correct fee and fee code to the correct application number within (1) business day appropriately refiled or rely on internal and external customer feedback.
0006 Customer Service
Window
99% 99% Perform mail processing tasks during Window hours of 8:30 am to 12 midnight. Open and
Sort - Complete opening, sorting and accurate routing of all non-fee mail within (2) workdays of receipt.
Perform surveillance of
Customer Window located in Randolph Building, IB11. Randomly sample fee/non-fee mail to ensure they are opening, sorting, and accurate routing all non-fee mail within (2) business days or rely on internal and external
FORM # USPTO-OP-014.v1.0 (06/2015) 14
0007, 0007AA,
0007AB
Fee Collection-
New Applications
(US Applications &
PCT Applications)
100%, for posting to correct application number;
98% for accuracy for other fee collection tasks.
98% Process all fees within 2 business days of receipt
Sample RAM transactions to ensure they are properly entering correct fees, fee codes with the correct applications within (2) accounting days of their receipt. Check mail for correct posting of fees.
Also check application numbers on RAM reports for correct RAM transactions or rely on internal and external customer feedback.
0008, 0008AA,
0008AB, 0008AC
Fee Collection –
Other Applications
(US Applications, PCT Applications, Refund Processing)
100%, for posting to correct application number;
98% for accuracy for other fee collection tasks.
98% Process all fees within 2 business days of receipt
Sample RAM transactions to ensure they are properly entering correct fees, fee codes with the correct applications within (2) business days of their receipt. Check mail for correct posting of fees.
Also check application numbers on RAM reports for correct RAM transactions appropriately refiled or rely on internal
FORM # USPTO-OP-014.v1.0 (06/2015) 15
0009, 0009AA,
0009AB,
0009AC,
0009AD,
0009AE,
Formality Review –
New Applications
(Utility, Design, Direct Hague
Industrial Design, Indirect Hague
Industrial Design, Provisional)
99% 99% Complete formality review within 10 business days of receipt
Sample contractor work after mailing and report error rate and errors found or rely on appropriately refiled or rely on internal and external customer feedback. From the results of the Government
Sampling, contractor has
(5) business days to contest errors on new application formality review processing
0010, 0010AA,
0010AB,
0010AC,
0010AD,
0010AE,
0010AF, 0010AG
Formality Review –
Follow-
Ons(Abandonment
Processing, Missing
Parts Responses, Change of Address, Corrected Filing
Receipt Request, PDX Request)
99% 99% Complete all processing with
10 business days of receipt
Sample contractor work after mailing and report error rate and errors found or rely on appropriately refiled or rely on internal and external customer feedback. From the results of the Government
Sampling, contractor has
(5) business days to contest errors on new application formality review processing.
FORM # USPTO-OP-014.v1.0 (06/2015) 16
0011, 0011AA,
0011AB
PCT National Stage
– (PCT National
Stage Bib Data, PCT National Stage
Mailing
98% 98% Complete PCT NST bib data entry and mailing within 2 business days of receipt
Sample contractor’s work after mailing to ensure bib data entry is correct and validate error rate. Check official notification mailing for correctness and to ensure timely drop-off at designated outgoing mail pick-up. The Government will also rely on internal and external customer feedback.
0012, 0012AA,
0012AB
PCT International –
(PCT International
Bib Data, Printing
& Mailing)
99% 99% Complete PCT International bib data entry and mailing within 2 business days of receipt
Sample contractor’s work after mailing to ensure bib data entry is correct and validate error rate. Check official notification mailing for correctness and to ensure timely drop-off at designated outgoing mail pick-up. The Government will also rely on internal
FORM # USPTO-OP-014.v1.0 (06/2015) 17
0013, 0013AA,
0013AB,0013AC,
0013AD,
0013AE,
0013AF,
General Clerical
Support
N/A N/A Perform various clerical duties as assigned by various Program
Offices.
Verify with the Program
Office Point of Contact
(POC) that staff hours were worked and clerical support received was satisfactory.
Perform random surveillance of contract staff that support CLIN
0013 and sub CLINs or rely
FORM # USPTO-OP-014.v1.0 (06/2015) 18
FORM # USPTO-OP-014.v1.0 (06/2015) 19
ATTACHMENT B:
File Room Inspection Form
Time Inspection Started: ___________ Time Inspection Completed: __________
Location: ___________________ DATE: __________________________
Inspector Name: __________________
Application Number:
Quality: Timeliness
File incorrectly placed on shelf Files not refiled within 4 hours
Multiple artifacts for same application number not located together
Other_____________________________________________________________________________
Multiple artifacts for same application number
Multiple artifacts for same application number
Multiple artifacts for same application number
FORM # USPTO-OP-014.v1.0 (06/2015) 20
Total Inspected_______________
Total Errors__________________
PLRC Inspection
DATE: __________________________ Inspector Name: __________________
Time Inspection Started: Time Inspection Completed:
Application Number: ______________________
Incorrect international application number Mail not processed within 2 business days
Incorrect mail date Corrections made within 4 hours of notification
Incorrect attachments
Incorrect pages noted for search Report
Incorrect copies made
Other_______________________________________
Quality: Timeliness
Incorrect international application number Mail not processed within 2 business days
Incorrect mail date Corrections made within 4 hours of notification
Incorrect attachments
Incorrect pages noted for search Report
Incorrect copies made
FORM # USPTO-OP-014.v1.0 (06/2015) 21
Total Inspected___________
Total Errors______________
DOCUMENT RECEIPT AND MAILING
OUTGOING MAIL INSPECTION FORM
Date:
Time Inspection Started:
Inspector:
Time Inspection Completed:
Quality of Mailing for Office Action Code
FORM # USPTO-OP-014.v1.0 (06/2015) 22
Indicate which Quality Code was incorrectly done on application:
A
Copies of the cited references(s) not mailed to applicant
B
Pages of office action not in numerical order
C Attachment(s) not included
D
Mailing address is not visible through the envelope's address window
Total Inspected
Total Errors
FORM # USPTO-OP-014.v1.0 (06/2015) 23
Print Working Folder
INSPECTION FORM
Date: Time Inspection Started: ___________
Inspector: Time Inspection Completed: __________
Quality of Print Working Folders Code
Indicate which Quality Code was incorrectly done on PWF request:
FORM # USPTO-OP-014.v1.0 (06/2015) 24
A Missing Request: (Specification, Abstract, claims and/or drawings)
B Missing serial number and bid data label on folder
Total Inspected
Total Errors
Central Fax Inspection Form
DATE: _______________________
Inspector Name: __________________
Application Number:____________________
Incorrect mail date Fees processed within 2 accounting days
Notify Gov. Rep. of New Applications Received Non fee documents routed within 2 workdays
Incorrect application Number applied to fees Corrections made within 4 hours of notification
Other_________________________________
Application Number:____________________
FORM # USPTO-OP-014.v1.0 (06/2015) 25
Total Errors______________
Fee Collection Inspection
DATE: __________________________ Inspector Name: __________________
Time Inspection Started: Time Inspection Completed:
Application Number: New Follow On (optional)
Incorrect application number Fees not entered in RAM within 2 accounting days
Incorrect mail date Corrections made within 4 hours of notification
Incorrect fee code
FORM # USPTO-OP-014.v1.0 (06/2015) 26
Incorrect authorization to charge
Incorrect fee code
Incorrect fee code
Total Errors______________
FORM # USPTO-OP-014.v1.0 (06/2015) 27
PCT 371 NATIONAL STAGE DATA ENTRY AND MAILING
DATE: _________________________
Inspector: _______________________
QUALITY OF MAILING (Check all of the following that are applicable)
_____ PCT 371 Bib Data entered correctly
_____ Mail complete official PCT 371 Notice
_____ Correct Filing Incorrect
_____ Mailing address is not visible through the envelope’s address window
_____ Mailing date is not the current (after 1 pm next day mail date)
_____ Envelopes are not properly sealed
TIMELINESS OF PCT 371 NATIONAL STAGE BIB DATA & MAILING (Check all of the following that are applicable)
_____ Process PCT 371 National Stage Bib Data entry and mailing within (5) days of contractor’s receipt
_____ Contractor fails to correct problem and deficiencies within (4) work hours of receiving notification.
Comments
FORM # USPTO-OP-014.v1.0 (06/2015) 28
PCT INTERNATIONAL BIB DATA ENTRY
DATE: _________________________
Inspector: _______________________
QUALITY OF MAILING (Check all of the following that are applicable)
_____ PCT International Bib Data entered correctly
_____ Mail correct PCT International Notice
_____ Correct Filing Incorrect
_____ Mailing address is not visible through the envelope’s address window
_____ Mailing date is not the current (after 1 pm next day mail date)
_____ Envelopes are not properly sealed
TIMELINESS OF PCT INTERNATIONAL BIB DATA (Check all of the following that are applicable)
FORM # USPTO-OP-014.v1.0 (06/2015) 29
_____ Process PCT International Data entry within (2) days of contractor’s receipt
_____ Contractor fails to correct problem and deficiencies within (4) work hours of receiving notification.
Comments
| 1. Introduction |
| 2. Purpose |
| 3. Scope |
| 4. Summary of Work to be Performed |
| 5. Roles and Responsibilities |
| 5.1 Contracting Officer (CO) |
| 5.2 Contracting Officer’s Representative (COR) |
| 5.3 Contractor Personnel |
| Project Manager |
| 6. Methologies to Monitor Performance |
| 6.1 Surveillance Techniques |
| 6.1.1 Random Surveillance |
| 6.1.2 Periodic Surveillance |
| 6.1.3 Acceptable Quality Levels |
| 6.1.4 Customer Feedback |
| 6.1.5 Walkthroughs |
| 6.2 Resolving Performance Issues |
| 6.3 Documenting Surveillance |
| 7. Quality Assurance Documentation |
| 7.1 The Performance Management Feedback Loop |
| 7.2 Monitoring Forms |
| 8. Performance Requirements Summary |
| ATTACHMENT B: |
| PCT 371 NATIONAL STAGE DATA ENTRY AND MAILING |
| INSPECTION FORM |
| PCT INTERNATIONAL BIB DATA ENTRY |
| INSPECTION FORM |