132010SG2022_IFB PLANS.pdf
PDF 2 MB Posted
- Attached to
- 751/22240. GAG; Platte River - Lower Weir Repair
- Solicitation number
- RFQ - 171 - 230000000661
- Issued by
- Benzie County, Holt CDP, Michigan
About this file
This document is an Invitation for Bid (IFB) for the Platte River - Lower Weir Repair project, issued by the Michigan Department of Technology, Management, and Budget (DTMB) for the state of Michigan. The project involves improvements to the Platte River Weir located in Lake Township, Benzie County, Michigan. The work includes installing sheet piling, removing and reinstalling existing riprap, and other site restoration activities. Bids are due by 2:00 PM on May 22, 2023. A pre-bid conference is scheduled for May 5, 2023. The project is expected to be completed by July 5, 2023.
The IFB provides detailed construction plans, soil erosion and sedimentation control requirements, and other technical specifications. Pricing is to be submitted on a unit cost basis. There are no set-asides identified. The project is funded by the state of Michigan. Contractors must be prequalified with the Michigan DTMB to be eligible to bid on this contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Platte Weir Repairs_DCSpec Rev032022 V13_2.pdf | ||
| DTMB-0415 Advertisement (Rev 10-22)_2.pdf | ||
| 751-22240.GAG_Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLAN INDEX
FILE NO. DESCRIPTION NO.
JD-1922-01 TITLE 01
JD-1922-02 NOTES 02
JD-1922-03 SESC NOTES AND DETAILS 03
JD-1922-04 EXISTING CONDITION PLAN 04
JD-1922-05 PLAN AND PROFILE 05
JD-1922-06 DETAILS 06
N
SECTION 28, T.27N.-R.15W.,
LAKE TOWNSHIP,
BENZIE, MICHIGAN
PROJECT
LOCATION
B O
E K
E
LO
O
M-22
LONG LAKE
PLATTE RIVER WEIR
IMPROVEMENTS
MICHIGAN DTMB
LOCATION MAP
NOT TO SCALE
N
AREA MAP
NOT TO SCALE
BENZIE
COUNTY
LIC E NSE D
P R O F E
ENGI
N E
ER
STATE OF MICHIGAN
S S I O N A L
SHAWN
P.
MIDDLETON
ENGINEER
No.
42722
BY MARK REVISIONS DATE
C
DE. BY:
DR. BY:
STDS.
SCALE
DATE
CH. BY:
APP. BY:
SHEET
FILE NO.
OF
PROJECT NO.
2023C
MICHIGAN DTMB
320 SOUTH WALNUT STREET
LANSING, MI 48909
FEBRUARY, 2023
132010SG2022
Manistee, MI 49660 302 River Street
MANISTEE OFFICE
www.SpicerGroup.com Tel. 231-794-5620
SMB ISSUED FOR BIDDING 5/22/23
THE WORK REPRESENTED BY THIS DRAWING WAS DESIGNED BY THE ENGINEER FOR
THIS SPECIFIC APPLICATION AND SPECIFIC LOCATION DESCRIBED HEREON IN
ACCORDANCE WITH THE CONDITIONS PREVALENT AT THE TIME THE DESIGN WAS
DONE. THE ENGINEER DOES NOT GUARANTEE AND WILL NOT BE LIABLE FOR ANY
OTHER LOCATION, CONDITION, DESIGN OR PURPOSE.
QRP
QRP
SMB
SPM
- 01
AS SHOWN JD-1922-01 01
C
TITLE
LAKE MICHIGAN
LOON
LAKE
PLATTE
LAKE
SLEEPING
BEAR DUNES
NATL POND
M-22HOWELL RD
BIRCH POINT DR
P
LA
TT
E
R D
LAKE
PLATTE IS
LE
V
IE
W D
R
PETERSON RD
LASSO RD
DEADSTREAM RD
MICHIGAN ROAD
PLATTE RIVER
WONDERLAND
ROAD
AR
BO
RV
IE
W
DR
IV
E
M -2
PETERSON
ROAD
ARAL L
ODGE
LASSO RD
R
IVER
M-22
RUSH LAKE TRAIL
C O
O
PER
R O
AD
- EXISTING ELECTRIC
- EXISTING CURB & GUTTER
- PROPOSED UTILITY
- PROPOSED CURB & GUTTER
- EXISTING WATER MAIN
- EXISTING SANITARY SEWER OR FORCEMAIN
- EXISTING STORM SEWER
- EXISTING TELEPHONE CABLE
- EXISTING GAS MAIN
- EXISTING ROAD CENTERLINE
LINE TYPE LEGEND
BC = BACK OF CURB
BM = BENCH MARK
C/C = CENTER TO CENTER
CB = CATCH BASIN
CL = CENTERLINE
CJ = CONSTRUCTION JOINT
CMP = CORRUGATED METAL PIPE
CSP = CORRUGATED STEEL PIPE
CONC = CONCRETE
DI = DUCTILE IRON PIPE
EF = EACH FACE
ELEC = ELECTRIC
EL OR ELEV = ELEVATION
EOM = EDGE OF METAL
EOP = EDGE OF PAVEMENT
EQ/SP = EQUALLY SPACED
ESMT = EASEMENT
EW = EACH WAY
EX OR EXIST = EXISTING
FF = FINISH FLOOR
FL = FLOW LINE
FS = FINISH SURFACE
FG = FINISH GROUND
GALV = GALVANIZED
G = GUTTER
HDG = HOT DIP GALVANIZED
HDPE = HIGH DENSITY POLYETHYLENE
HP = HIGH POINT
HMA = HOT MIX ASPHALT
HYD = HYDRANT
INV = INVERT
LP = LOW POINT
OC = ON CENTER
OH = OVERHEAD
MH = MANHOLE
MIN = MINIMUM
MON = MONUMENT
NFL = NOT FIELD LOCATED
NTS = NOT TO SCALE
PROP = PROPOSED
PVC = POLYVINYL CHLORIDE
RCP = REINFORCED CONCRETE PIPE
ROW = RIGHT OF WAY
SAN = SANITARY
SB = SOIL BORING
SS = STAINLESS STEEL
STA = STATION
STM = STORM
SWR = SEWER
T/B = TOP AND BOTTOM
TC = TOP OF CURB
TOB = TOP OF BANK
TOS = TOE OF SLOPE
TELE = TELEPHONE
TRW = TOP OF RETAINING WALL
TW = TOP OF WALK
UNO = UNLESS NOTED OTHERWISE
WM = WATER MAIN
WS = WATER SURFACE ELEVATION
ABBREVIATIONS
CONTACTS
MICHIGAN DNR - FISHERIES DIVISION
ATT: AARON SWITZER
EMAIL: switzera1@michigan.gov
PHONE: (231) 383-2565
MICHIGAN DTMB
ATT: GERALD GREGORSKI
PROJECT DIRECTOR
PHONE: (231) 557-9043
SPICER GROUP
ATT: SHANE BRENNAN
PROJECT MANAGER
EMAIL: shane.brennan@spicergroup.com
PHONE: (517) 243-9695
AT&T
ATT: JEFFREY SHUSTER
205 E HARRIS ST
CADILLAC, MI 49601
PHONE: (231) 779-8451
CONSUMER ENERGY
ATT: BLAKE WILSON
EMAIL: blake.wilson@cmsenegy.com
PHONE: (231) 499-9792
OWNER
PROJECT DIRECTOR
ENGINEER
TELEPHONE
ELECTRIC
- MAIL BOX
- GUY ANCHOR AND POLE
- LIGHT POLE
- POWER AND TELEPHONE POLE
- TELEPHONE POLE
- POWER POLE
- TELEPHONE PEDESTAL
- WATER VALVE
- GAS VALVE
- FIRE HYDRANT
- CURB CATCH BASIN
- CATCH BASIN
- MANHOLE
- FENCE LINE
- OVERHEAD UTILITY
- RAILROAD TRACKS
- STATION LINE
- LIMITS OF RIGHT OF WAY
- EASEMENT
- SILT FENCE
- TREE LINE
- EXISTING CONTOURS
- PROPOSED CONTOURS
- REVERSE PAN CURB & GUTTER
PROPOSED SYMBOLS
- BARRIER FREE PARKING
- CATCHBASIN
- WATER VALVE
- FIRE HYDRANT
- MANHOLE
- LIGHT POLES
- SPOT ELEVATION LABELS600.00
LABEL
G = GUTTER
TW = WALK
TC = TOP OF CURB
FS = FINISH SURFACE
- DRAINAGE FLOW
- BARRIER FREE PARKING
- BREAK IN LINE
- TREE
- BUSH
- PINE
- WETLANDS
- STUMP
- SET 1/2" IRON ROD
- FOUND SURVEY CORNER
- SOIL BORING
- AIR CONDITIONING UNIT
- SATELLITE DISH
- ANTENNA
- RAILROAD SIGNAL
- SPRINKLER
- TRANSFORMER
AC
- ELECTRICAL PEDESTAL
T
E
- WATER METER
- MONITORING WELL
- 1/4 SECTION CORNER
- BENCH MARK
- TELEPHONE MANHOLE
- ELECTRIC MANHOLE
- HAND HOLE
- EXISTING SIGN-1 POST
- EXISTING SIGN-2 POST
SYMBOL LEGEND
EXISTING SYMBOLS
x x x
1+00
M.W.
SB#
- EXISTING DRAINS (OTHER)
G G
T T
W W
E E
GENERAL NOTES
NO WORK SHALL BE PERFORMED BEFORE 7:00 AM OR AFTER 7:00 PM MONDAY THROUGH SATURDAY. NO WORK SHALL HAPPEN ON
SUNDAYS OR HOLIDAYS, UNLESS AUTHORIZED BY THE OWNER.
CONTRACTOR SHALL NOTIFY ENGINEER 48 HOURS PRIOR TO START OF CONSTRUCTION, CONSTRUCTION STAKING AND INSPECTION.
CONTRACTOR SHALL MAINTAIN ACCESS FOR MAIL DELIVERY AND GARBAGE PICKUP AT ALL PARCELS. IF THESE SERVICES CANNOT BE PERFORMED, CONTRACTOR IS RESPONSIBLE FOR TAKING THE NECESSARY MEASURES TO CARRY THEM OUT.
COORDINATE DRIVE CLOSURES AND MAIL BOX RELOCATION WITH LANDOWNERS A MINIMUM OF ONE DAY IN ADVANCE.
CONTRACTOR TO PROVIDE DUST CONTROL AND SWEEP ROADS DAILY.
ALL EXCAVATED MATERIAL NOT TO BE REUSED OR DISPOSED OF ON SITE SHALL BE REMOVED FROM SITE. THE CONTRACTOR IS RESPONSIBLE FOR DISPOSING OF MATERIALS ACCORDING TO LOCAL AND STATE REQUIREMENTS.
UNDERGROUND UTILITIES/MISS DIG
FOR PROTECTION OF UNDERGROUND UTILITIES AND IN CONFORMANCE WITH PUBLIC ACT 174, 2013, THE CONTRACTOR SHALL DIAL 1-800-482-7171 OR 811 A MINIMUM OF THREE FULL WORKING DAYS, EXCLUDING SATURDAYS, SUNDAYS, AND HOLIDAYS, PRIOR TO BEGINNING EACH EXCAVATION IN AREAS WHERE PUBLIC UTILITIES HAVE NOT BEEN PREVIOUSLY LOCATED. MEMBERS WILL THUS BE ROUTINELY NOTIFIED. THIS DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF NOTIFYING UTILITY OWNERS WHO
MAY NOT BE A PART OF THE "MISS DIG" ALERT SYSTEM.
THE EXISTING UTILITIES ON THESE DRAWINGS HAVE BEEN SHOWN ACCORDING TO THE BEST AVAILABLE INFORMATION.
CONTRACTOR SHALL FIELD LOCATE ALL UTILITIES PRIOR TO BEGINNING CONSTRUCTION AND SHALL NOTIFY THE ENGINEER AS TO
WHERE POSSIBLE CONFLICT EXISTS.
ALL CONSTRUCTION UNDER EXISTING UTILITIES, INCLUDING HOUSE SERVICES, SHALL BE COMPLETELY BACKFILLED WITH SAND, IN
12" LAYERS, AND COMPACTED TO NOT LESS THAN 95% OF THE MAXIMUM UNIT WEIGHT.
ANY UTILITIES ENCOUNTERED DURING CONSTRUCTION SHALL BE SUPPORTED, PER THE SPECIFICATIONS OF THE INDIVIDUAL UTILITY
COMPANY CLAIMING OWNERSHIP OF THE UTILITY.
SOIL EROSION AND SEDIMENTATION CONTROL MEASURES
APPROPRIATE SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO EARTH-DISTURBING ACTIVITIES. PLACE TURF ESTABLISHMENT ITEMS AS SOON AS POSSIBLE ON POTENTIAL ERODABLE SLOPES AS DIRECTED BY OWNER.
CRITICAL DITCH GRADES SHALL BE PROTECTED WITH EITHER SOD, SEED/MULCH, OR SEED/MULCH BLANKET AS DIRECTED BY
OWNER.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT SOIL EROSION AND SEDIMENTATION CONTROL MEASURES ARE IN PLACE AND MAINTAINED UNTIL THE CONTRACT HAS BEEN COMPLETED AND ACCEPTED. MEASURES SHALL ONLY BE PAID FOR ONCE.
ALL CATCHBASINS AND SEDIMENTATION TRAPS/BASINS SHALL BE CLEANED OUT UPON COMPLETION OF THE PROJECT.
CONTRACTOR SHALL CONFORM TO SOIL EROSION AND SEDIMENTATION CONTROL ACT, PART 91 OF ACT 451 OF 1994.
PROPERTY OWNERS
PROPERTY OWNERS' NAMES, WHERE SHOWN, ARE FOR INFORMATION ONLY, AND THEIR ACCURACY IS NOT GUARANTEED.
ADJUSTING MONUMENT BOXES
ALL GOVERNMENT CORNERS ON THIS PROJECT SHALL BE PRESERVED, WHETHER SHOWN OR NOT. IT MAY BE NECESSARY TO
PLACE OR ADJUST MONUMENT BOXES, AS REQUIRED.
TRAFFIC
THE CONTRACTOR SHALL MAINTAIN LOCAL TRAFFIC AT ALL TIMES. SIGNAGE MUST BE IN ACCORDANCE WITH THE MICHIGAN MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES AND SHALL BE COORDINATED WITH THE ENGINEER AND GOVERNING ROAD AGENCY.
PERMITS MAY BE REQUIRED.
PERMITS
PRIOR TO COMMENCING CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED BY THE
APPROPRIATE AGENCIES.
CONSTRUCTION PROCEDURES SHALL CONFORM TO THE REQUIREMENTS OF THE APPROPRIATE AGENCIES.
GENERAL NOTES CONT.
RESTORE ALL LAWN AREAS WITH 4" OF TOPSOIL, SEED, AND MULCH.
CONTRACTOR TO RESTORE INCIDENTAL DAMAGES ON THE PROJECT AS DIRECTED BY OWNER AND ENGINEER.
REMOVE EXISTING FENCES, LANDSCAPING, AND OTHER STRUCTURES AS NEEDED FOR CONSTRUCTION. REINSTALLATION OF FENCES MUST BE COORDINATED WITH THE LAND OWNER. COST TO BE INCLUDED IN RELATED ITEMS OF WORK.
ROADS, DRIVEWAYS AND SIDEWALKS
ALL DRIVING SURFACES ARE TO BE RESTORED TO IN KIND DEPTH AND MATERIAL, UNLESS OTHERWISE SPECIFIED ON THE PLANS. COST TO BE INCLUDED IN THE BID PRICE FOR WORK PERTAINING TO EACH CROSSING.
BROKEN CONCRETE AND DEBRIS SHALL BE CONSIDERED WASTE AND SHALL BE DISPOSED OF BY THE CONTRACTOR OFF
SITE. COST SHALL BE INCLUDED IN THE OTHER PAY ITEMS OF THE PROJECT.
CONTRACTOR SHALL COORDINATE LOCATION OF ANY ACCESS ROADS WITH THE LANDOWNER AND THE ENGINEER. ANY
ACCESS ROAD SHALL BE REPAIRED TO THE LANDOWNER'S AND OWNER'S APPROVAL.
UTILITIES
ANY UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
DEMOLISH EXISTING STRUCTURE(S) AND DISPOSE OF IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REQUIREMENTS. COST TO BE INCLUDED WITH THE ITEM BEING INSTALLED AS DIRECTED BY OWNER/ENGINEER.
SOIL EROSION SEDIMENT CONTROL
ALL RIPRAP MATERIAL SHALL BE APPROVED BY THE ENGINEER UNLESS OTHERWISE DIRECTED. SUBMIT SAMPLES TO ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION. OWNER AND ENGINEER RESERVES THE RIGHT TO REJECT ANY
AND ALL RIPRAP.
BY MARK REVISIONS DATE
C
DE. BY:
DR. BY:
STDS.
SCALE
DATE
CH. BY:
APP. BY:
SHEET
FILE NO.
OF
PROJECT NO.
2023C
MICHIGAN DTMB
320 SOUTH WALNUT STREET
LANSING, MI 48909
FEBRUARY, 2023
132010SG2022
Manistee, MI 49660 302 River Street
MANISTEE OFFICE
www.SpicerGroup.com Tel. 231-794-5620
SMB ISSUED FOR BIDDING 5/22/23
THE WORK REPRESENTED BY THIS DRAWING WAS DESIGNED BY THE ENGINEER FOR
THIS SPECIFIC APPLICATION AND SPECIFIC LOCATION DESCRIBED HEREON IN
ACCORDANCE WITH THE CONDITIONS PREVALENT AT THE TIME THE DESIGN WAS
DONE. THE ENGINEER DOES NOT GUARANTEE AND WILL NOT BE LIABLE FOR ANY
OTHER LOCATION, CONDITION, DESIGN OR PURPOSE.
QRP
QRP
SMB
SPM
- 02
N/A JD-1922-02 02
C
NOTES
88B
115B
115F
HgtadA
114B
W
58B
100A
115D
BY MARK REVISIONS DATE
C
DE. BY:
DR. BY:
STDS.
SCALE
DATE
CH. BY:
APP. BY:
SHEET
FILE NO.
OF
PROJECT NO.
2023C
MICHIGAN DTMB
320 SOUTH WALNUT STREET
LANSING, MI 48909
FEBRUARY, 2023
132010SG2022
Manistee, MI 49660 302 River Street
MANISTEE OFFICE
www.SpicerGroup.com Tel. 231-794-5620
SMB ISSUED FOR BIDDING 5/22/23
THE WORK REPRESENTED BY THIS DRAWING WAS DESIGNED BY THE ENGINEER FOR
THIS SPECIFIC APPLICATION AND SPECIFIC LOCATION DESCRIBED HEREON IN
ACCORDANCE WITH THE CONDITIONS PREVALENT AT THE TIME THE DESIGN WAS
DONE. THE ENGINEER DOES NOT GUARANTEE AND WILL NOT BE LIABLE FOR ANY
OTHER LOCATION, CONDITION, DESIGN OR PURPOSE.
SOIL EROSION AND
SEDIMENTATION CONTROL NOTES
1. INSTALL AND MAINTAIN ALL TEMPORARY SOIL EROSION AND SEDIMENTATION CONTROL MEASURES IN
ACCORDANCE WITH THE APPROVED PLAN PRIOR TO COMMENCEMENT OF CONSTRUCTION OR MASS
GRADING. ALL SESC MEASURES MUST BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE
BELL CREEK DRAIN SESC PLAN AND PROJECT SPECIFICATIONS.
2. SOIL EROSION CONTROL MEASURES MUST BE INSPECTED BY A STATE CERTIFIED INSPECTOR
AFFILIATED WITH THE COUNTY DRAIN COMMISSIONER'S OFFICE PRIOR TO COMMENCEMENT OF
CONSTRUCTION OR MASS GRADING.
3. DAILY INSPECTION AND MAINTENANCE MUST BE MADE TO ENSURE ALL EROSION CONTROL MEASURES ARE FUNCTIONING PROPERLY AND INTACT. NECESSARY REPAIRS MUST BE PERFORMED WITHIN 24
HOURS.
4. ADDITIONAL SOIL EROSION CONTROL MEASURES MUST BE PROVIDED THROUGHOUT CONSTRUCTION
ACTIVITY AS NEEDED AND DETERMINED BY THE APA/ENGINEER. THE SOIL EROSION AND
SEDIMENTATION CONTROL PLAN IS TO BE AMENDED TO INCLUDE ADDITIONAL EROSION CONTROL
MEASURES IMPLEMENTED ON-SITE.
5. SEDIMENT FROM WORK ON THIS SITE IS TO BE CONTAINED ON THE SITE AND IS NOT TO BE ALLOWED TO COLLECT ON ANY OFF-SITE AREAS OR IN WATERWAYS. WATERWAYS INCLUDE BOTH NATURAL AND
MANMADE OPEN DITCHES, STREAMS, STORM DRAINS, LAKES, PONDS, AND WETLANDS.
6. ALL VISUAL TRACKING INCLUDING MUD, DIRT, AND DEBRIS TRACKED ONTO EXISTING ROADWAYS MUST BE IMMEDIATELY REMOVED NO LESS THAN ON A DAILY BASIS BY SCRAPING AND SWEEPING
AND/OR AS DIRECTED BY THE ENGINEER.
7. DUST CONTROL MUST BE EXERCISED AT ALL TIMES DURING THE PROJECT AND AS DIRECTED BY THE
ENGINEER OR APA. APPLY DUST SUPPRESSANT TO SURFACES USING A PRESSURE TYPE WATER
DISTRIBUTOR TRUCK EQUIPPED WITH A SPRAY SYSTEM.
8. ALL PERMANENT SOIL EROSION CONTROL MEASURES MUST BE IN PLACE WITHIN 24 HOURS OF FINAL GRADING (GRADE LISTED ON PLANS), THIS INCLUDES ALL VEGETATIVE STABILIZATION. VEGETATIVE STABILIZATION WILL BE ONGOING. TOPSOIL, FERTILIZER, SEED, POLYMER, SILT STOP (OR EQUAL), MULCH AND OR RIPRAP MUST BE IN PLACE BEFORE PROCEEDING TO THE NEXT WORK AREA. ALL TEMPORARY MEASURES SUCH AS SILT FENCE AND INLET PROTECTION BAGS ARE TO BE REMOVED ONCE PERMANENT SESC MEASURES ARE IN PLACE AND VEGETATION IS ESTABLISHED. REMOVAL OF TEMPORARY MEASURES, FOLLOWING ACCEPTANCE OF THE PROJECT IS THE RESPONSIBILITY OF THE
CONTRACTOR.
9. PRIOR TO WINTER CONSTRUCTION, ALL EXPOSED SOILS MUST BE STABILIZED WITH A COMBINATION OF SILT STOP 705 POLYMER BLEND, NORTH AMERICAN GREEN EROSION CONTROL BLANKETS, MULCH, OR OTHER APPROVED METHOD IF VEGETATION COULD NOT BE ESTABLISHED DURING THE GROWING
SEASON AS DETERMINED BY THE APA OR ENGINEER.
10. WORK AREAS MUST BE STABILIZED WITH TOPSOIL, SEED, FERTILIZER, AND MULCH WITHIN 24 HOURS FOLLOWING CONSTRUCTION. VEGETATIVE STABILIZATION IS ONGOING THROUGHOUT THE PROJECT.
11. ALL SOIL EROSION CONTROL MEASURES MUST BE INSPECTED DAILY, THE STORM WATER OPERATOR IS TO MAKE A WEEKLY INSPECTION OR INSPECT AFTER EACH RAIN EVENT THAT RESULTED IN A
DISCHARGE TO ENSURE PROPER MAINTENANCE OF THE SOIL EROSION CONTROL MEASURES. ANY
DEFICIENCIES OR REPAIRS TO SOIL EROSION CONTROL MEASURES MUST BE CORRECTED
IMMEDIATELY. INLET PROTECTION MEASURES, DANDY BAG II (OR EQUAL), FLEX STORM (OR EQUAL), MUST BE INSTALLED IN CATCHBASINS BEFORE ANY STORMWATER RUNOFF IS ALLOWED TO ENTER
THE TOP OF THE STRUCTURES. THE SILT AND SEDIMENT MUST BE REMOVED FROM INLET
PROTECTION MEASURES AS NEEDED TO ENSURE PROPER FUNCTION OF THE BAGS.
12. THE NEED FOR TEMPORARY MEASURES SUCH AS SILT FENCE AND DANDY BAG II (OR EQUAL), FLEX STORM (OR EQUAL) FOR EXISTING OR NEW CATCHBASINS MUST BE ASSESSED ON A DAILY BASIS.
PIPES ARE TO BE CAPPED AT THE END OF EACH WORKDAY. AT NO TIME SHOULD SEDIMENT COLLECT
IN A CATCHBASIN OR AN OFF-SITE AREA. TEMPORARY MEASURES MUST BE REMOVED ONCE
PERMANENT MEASURES ARE IN PLACE AND VEGETATION IS ESTABLISHED.
13. IF DEWATERING IS NECESSARY, CONTRACTOR SHALL SUBMIT A DEWATERING PLAN TO THE APA FOR
APPROVAL.
14. THE NOTICE OF COVERAGE (IF REQUIRED), SOIL EROSION AND SEDIMENTATION CONTROL PLAN, AND
STORMWATER OPERATOR LOGS MUST BE LOCATED ON SITE AT ALL TIMES.
15. ALL RESTORATION TO OCCUR WITHIN 24 HOURS OF FINAL GRADING.
MAINTENANCE PROGRAM FOR SESC MEASURES
GENERAL MAINTENANCE
· TEMPORARY SESC MEASURES MUST BE INSTALLED, MAINTAINED, AND REMOVED BY THE
CONTRACTOR.
· TEMPORARY MEASURES MUST BE MAINTAINED AND IN PLACE UNTIL AREAS ARE PERMANENTLY
STABILIZED.
· PERMANENT MEASURES MUST BE INSTALLED AND MAINTAINED BY THE CONTRACTOR UNTIL FINAL
COMPLETION.
· DAILY MAINTENANCE IS THE CONTRACTOR'S RESPONSIBILITY.
· TEMPORARY SESC MEASURES MUST BE REMOVED AT THE END OF THE PROJECT ONCE PERMANENT
MEASURES ARE ESTABLISHED.
· TEMPORARY SESC MEASURES MUST BE INSTALLED PRIOR TO OR AT THE TIME OF EARTH
DISTURBANCE.
· INSPECT WEEKLY AND AFTER EACH RAIN EVENT UNTIL VEGETATION HAS BEEN ESTABLISHED.
· IF NECESSARY, REPAIR AND RE-SEED OR REPLANT ERODED AREAS IMMEDIATELY.
SEEDING AND MULCHING
· SEEDING PRACTICES INCLUDE TOPSOIL (AS DIRECTED BY ENGINEER), SEED, POLYMER, AND MULCH OR
MULCH MATTING (AS DIRECTED BY ENGINEER OR WHERE SHOWN ON PLANS).
· WHERE NECESSARY, APPROPRIATE MULCH MUST BE APPLIED BASED ON SLOPE AND GROWING
CONDITIONS AS APPROVED BY THE PROJECT ENGINEER.
· ALL SLOPES AND HIGHLY EROSIVE AREAS MUST BE SEEDED, POLYMER APPLIED AND MULCHED AS
NEEDED WHEN CONSTRUCTION ACTIVITY IS NOT TAKING PLACE.
· SEED AND MULCH IS TO BE INSPECTED DAILY FOLLOWING EACH RAIN EVENT TO DETERMINE IF
CONCENTRATED FLOWS ARE PRESENT.
· IN THE EVENT THAT SEED AND MULCH ARE REMOVED BY EROSIVE RUNOFF, REPAIRS ARE TO BE
MADE IMMEDIATELY.
· ALL AREAS DURING CONSTRUCTION MUST BE PERMANENTLY STABILIZED WITHIN 72 HOURS OF FINAL
GRADE (GRADE LISTED ON PLAN).
SILT FENCE
· SILT FENCE IS TO BE TRENCHED IN NO LESS THAN 6 INCHES BELOW THE GROUND SURFACE.
· INSPECT SILT FENCE DAILY AND IMMEDIATELY FOLLOWING EACH RAINFALL.
· REPAIR WHEN SILT FENCE IS SAGGING OR HAS BEEN REMOVED/TORN DOWN.
· WHEN SILT COLLECTS TO HALF THE HEIGHT OF THE FENCE ALL SILT IS TO BE REMOVED AND FENCE
REPAIRED.
· REMOVE SILT FENCE WHEN PERMANENT SESC MEASURES ARE IN PLACE AND VEGETATION IS
ESTABLISHED.
COMPLIANCE WITH PART 91 OF PA 451
· RESPOND IMMEDIATELY TO STORMWATER OPERATOR AND/OR SOIL EROSION AND SEDIMENTATION
CONTROL INSPECTOR CONCERNS. MAKE CORRECTIVE MEASURES AS REQUIRED IMMEDIATELY AS
DETAILED BY THE APPROVED APA MANUAL(S).
GENERAL TIMING & SEQUENCE
ALL PROPOSED EXCAVATION ACTIVITIES FOR THIS PROJECT MUST ADHERE TO THE
FOLLOWING SEQUENCE.
1. CONTRACTOR IS RESPONSIBLE FOR INSTALLING AND MAINTAINING SOIL EROSION
AND SEDIMENT CONTROL MEASURES THROUGHOUT THE ENTIRE PROJECT.
2. CONTRACTOR IS TO PERFORM PROPOSED EXCAVATION ACTIVITIES REQUIRED TO
OBTAIN PROPOSED GRADES AND SIDE SLOPES AS DESIGNATED ON PLANS.
ROUTINE MAINTENANCE ACTIVITIES
A
BEST MANAGEMENT PRACTICEKEY
B
C
D
E
Debris Removal
Sediment Removal
Stormwater Basin Maintenance
Drain Crossing Maintenance
Enclosed Drain Maintenance
SESC PLAN
NO
> 100 FEET
NO
NO
NO
When bare soil is exposed, temporarily or permanently, to erosive forces from wind and or water on flat areas, mild slopes, grassed waterways and spillways, diversion ditches and dikes, borrow and stockpile areas, and spoil piles.
As a temporary measure used to capture sediment from sheet flow. May also divert small volumes of sheet flow to protected outlets.
DETAILED DRAWINGS AND SPECIFICATIONS ARE
LOCATED IN THE MICHIGAN ASSOCIATION OF COUNTY
DRAIN COMMISSIONERS SOIL EROSION AND
SEDIMENTATION CONTROL AUTHORIZED PUBLIC
AGENCY PROCEDURES MANUAL
SYMBOLOGY FOR INSERTION INTO CONSTRUCTION
DRAWINGS:
= PERMANENT MEASURE
= TEMPORARY MEASURE
P
T
On flat areas, slopes, grassed waterways and spillways, diversion ditches and dikes, borrow and stockpile areas, and spoil piles when areas are subject to raindrop impact, and erosive forces from wind or water.
SSURGO SOILS IN PROJECT LOCATION
MUSYM COMPOSITION NAME DRAINAGE
HYDROLOGIC
GROUP HYDRIC
58B Covert sand, 0 to 6 percent slopes Moderatley Well Drained A NO
60 Dair Muck Very Poorly Drained B/D YES 88B Udipsamments, nearly level and undulating Excessively Drained A NO 100A Dair-Pipestone complex, 0 to 2 percent slopes Very Poorly Drained B/D YES 114B Nordhouse sand, 0 to 6 percent slopes Excessively Drained A NO 115B Nordhouse sand, 0 to 6 percent slopes Excessively Drained A NO
115D Nordhouse sand, 6 to 18 percent slopes Excessively Drained A NO 115F Nordhouse sand, 18 to 70 percent slopes Excessively Drained A NO 119 Madaus muck Very Poorly Drained C/D YES
122 Dair-Adrian mucks Very Poorly Drained B/D YES HgtadA Houghton-Adrian mucks, lake moderated snowy, 0 to 1 percent slopes Very Poorly Drained B/D YES
W Water
DISTURBANCE/MEASURE
START COMPL.
5/1 5/10
6/7
INSTALL TEMPORARY CONTROL
MEASURES
WEIR IMPROVEMENT
INSTALL AND ESTABLISH PERMANENT
SESC MEASURES
5/10
6/7 6/21
6/21 7/5
TOTAL DISTURBED AREA: 0.5 ACRES
REMOVE TEMPORARY CONTROL
MEASURES
APRIL
DEC JANNOV
AutoCAD SHX Text
QRP
AutoCAD SHX Text
QRP
AutoCAD SHX Text
SMB
AutoCAD SHX Text
SPM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N/A
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
GENERAL SESC NOTES AND DETAILS
AutoCAD SHX Text
WHERE USED
AutoCAD SHX Text
KEY
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
SESC MEASURE
AutoCAD SHX Text
AutoCAD SHX Text Seeding
AutoCAD SHX Text
AutoCAD SHX Text Perimeter Sediment Control Measures (Silt Fence, Straw Wattles, etc.)
AutoCAD SHX Text
AutoCAD SHX Text Mulch
CONTROL POINT #
585.19
7.9
7.5
7.5
7.8
7.9
7.4
7.3
6.8
7.2
8.9
8.7
4.6
4.8
4.5
4.9
5.1
5.3
5.6
5.5
5.6
5.4
5.5
5.4
5.1
5.5
5.3
5.1
5.5
ELECT METER
10" TREE
4" TREE
5" TREE
10" PINE
8" TREE
4" PINE4" PINE
5" PINE
CLEANOUT
585.38
5.9
6.1
6.6
5.9
5.8
6.1
6.1
5.9
6.2
6.2
6.1
6.3
6.2
5.9
6.0
6.0
5.9
6.0
6.2
6.3
6.0
6.2
6.4
6.5
6.5
6.7
6.5
6.4
5.9
5.9
5.6
5.7
5.8
5.7
5.5
5.5
5.7
5.5
5.4
5.3
5.5
5.1
5.3
5.8
6.2
6.1
6.1
6.2
5.9
5.4
5.7
5.4
4.6
5.9
5.9
6.1
6.8
6.9
6.7
6.7
6.9
6.8
6.8
6.6
6.8
6.6
6.8
6.5
6.5
6.3
6.0
6.1
7.657
7.157 6.857 7.3
7.657
8.557 8.6
9.0
4.4
4.3
5.9
6.4
8.0 589.1
9.0
7.1
5.758 6.0
5.258
3.0
TOP SEDIMENT
578.95
HARD BOTTOM
578.45
TOP SEDIMENT
578.61
HARD BOTTOM
578.26
TOP SEDIMENT
577.68
HARD BOTTOM
577.48
TOP SEDIMENT
578.33
HARD BOTTOM
577.70
TOP SEDIMENT
579.28
HARD BOTTOM
578.13
TOP SEDIMENT
579.85
HARD BOTTOM
579.44
TOP SEDIMENT
579.90
HARD BOTTOM
579.34TOP SEDIMENT
579.57
HARD BOTTOM
579.25
TOP SEDIMENT
580.33
HARD BOTTOM
579.92
2.5
2.4
TOP SEDIMENT
580.50
HARD BOTTOM
579.79
TOP SEDIMENT
580.05
HARD BOTTOM
579.80
TOP SEDIMENT
579.48
HARD BOTTOM
578.45
TOP SEDIMENT
579.01
HARD BOTTOM
578.67
TOP SEDIMENT
578.85
HARD BOTTOM
578.73
TOP SEDIMENT
579.13
HARD BOTTOM
578.75
HARD BOTTOM
579.60
5.3
5.358
3.7
TOP SEDIMENT
580.14
HARD BOTTOM
579.91
TOP SEDIMENT
578.61
HARD BOTTOM
577.70
TOP SEDIMENT
578.36
HARD BOTTOM
577.84
TOP SEDIMENT
578.74
HARD BOTTOM
578.12
TOP SEDIMENT
579.66
HARD BOTTOM
578.10
TOP SEDIMENT
580.00
HARD BOTTOM
578.48
TOP SEDIMENT
580.93
HARD BOTTOM
580.59
2.5
3.2
3.7
3.5
3.2
3.1
3.2
3.358
1.9 0 58
2.0
3.6
3.4
5.2
5.1
4.2
4.1
3.3
3.0
1.7
1.9
4.9
4.6
5.3
4.9
5.2
4.8
5.0
4.9
4.0
3.8
TOP SEDIMENT
577.82
HARD BOTTOM
577.64
TOP SEDIMENT
577.76
HARD BOTTOM
577.52
TOP SEDIMENT
577.56
HARD BOTTOM
577.36
2.5
TOP SEDIMENT
580.21
HARD BOTTOM
579.84
TOP SEDIMENT
580.23
HARD BOTTOM
579.96
TOP SEDIMENT
580.01
HARD BOTTOM
579.56
TOP SEDIMENT
578.32
HARD BOTTOM
578.10
TOP SEDIMENT
577.52
HARD BOTTOM
577.26
TOP SEDIMENT
577.56
HARD BOTTOM
577.51
3.7
5.3
5.3
580.45
TOP SEDIMENT
579.50
TOP SEDIMENT
579.24
579.21
TOP SEDIMENT
579.63
HARD BOTTOM
579.34
TOP SEDIMENT
580.32
HARD BOTTOM
580.05
HARD BOTTOM
580.38
TOP SEDIMENT
580.38
HARD BOTTOM
580.23
TOP SEDIMENT
579.81
HARD BOTTOM
577.00
TOP SEDIMENT
580.27
HARD BOTTOM
577.92
TOP SEDIMENT
580.10
3.2
3.1
3.0
3.3
3.1
3.0
3.3
2.1
3.0
4.3
4.6
4.2
3.3
2.7
4.0
4.2
4.4
3.5
5.2
6.0
6.2
5.1
5.6
6.1
5.8
5.4
5.3
5.5
6.2
6.2
5.6
5.4
6.3
6.9
6.7
6.7
6.8
6.5
6.5
6.6
6.7
6.7
6.6
6.5
6.758
6.5
6.4
6.4
6.4 58
6.5
6.5
6.5
6.1
6.1
6.1
6.3
6.3
6.1
5.7
5.9
5.7
5.6
5.2
5.7 58
6.115" CMP
INV=584.84 15" CMP
INV=584.86
3.0
2.4
2.2
4.0
3.7
3.8
4.058
3.8
3.6
X
X
X
X
X
X
X
X
X
X X
X X
X
X X
X
X X
X
X
X
X
X
CHAIN LINK FENCE
CHAIN LINK FENCE
STAIRS
WALLS
WALL
RAILING
WALLS
WALL
RAILING
GRAVEL
HARD BOTTOM
579.35
HARD BOTTOM
579.32
WALL
WALL
R A
M P
PARKING BLOCKS
PARKING BLOCKS
PARKING BLOCKS
PARKING BLOCKS
PARKING BLOCKS
PARKING BLOCKS
GRAVEL
GRAVEL
GRAVEL G
RA
VE
L
GRAVEL
CHAIN LINK FENCE
CHAIN LINK
FENCE
CHAIN LINK
FENCE
TOP SEDIMENT
579.90
TOP SEDIMENT
579.18
HARD BOTTOM
578.87
CONC.
WOOD WALK
BOARD FENCE
BOARD FENCE
CONC.
CONC.
CONC.
CONC.
GRAVEL
GRAVEL
WALL
12.1'
.1
8.2'
.7
BUILDING
BLG
BM #200
MISC WOOD BOX
MISC WOOD BOX
BIT. PATH
TOP OF BANK
TOP OF BANK
TOP OF BANK
TOP OF BANK
TOP OF BANK
TOP OF BANK
TOP OF BANK
TOP OF BANK
TOP OF BANK
TOE OF SLOPE
TOE OF SLOPE
TOE OF SLOPE
TOE OF SLOPE
TOE OF SLOPE TOP SEDIMENT
579.37
TOP SEDIMENT
577.88
TOP SEDIMENT
580.33
HARD BOTTOM
580.12
TOP SEDIMENT
577.37
HARD BOTTOM
577.26
HARD BOTTOM
577.68
3 58
58557
586 58
BOAT LAUNCH RAMP
SCALE: 1" = 20'
LEGEND
- STUMP
- TREE LINE
- OVERHEAD POWER LINES
- FENCE LINE
- CATCHBASIN
- MANHOLE
- LIGHT POLE
- MAIL BOX
- GAS VALVE
- POWER POLE
- WATER VALVE
- FIRE HYDRANT
- CONCRETE CURB
- TRANSFORMER
- SPRINKLER
- BITUMINOUS SURFACE
- CONCRETE SURFACE
- TELEPHONE POLE
- POWER AND TELEPHONE POLE
- RAILROAD SIGNAL
- BARRIER FREE PARKING
- CURB CATCHBASIN
XX
- SIGN
W W
T T
G G
CTV
E E
ACC
- BURIED ELECTRIC LINES
- WATERMAINS
- TELEPHONE LINES
- STORM SEWER LINES
- SANITARY SEWER LINES
- GASMAINS
- BURIED CABLE LINES
- CABLE TV PEDESTAL
- ELECTRICAL PEDESTAL - SATELLITE DISH
- AIR CONDITIONING UNIT
- SOIL BORING
- TELEPHONE PEDESTAL
- GUY ANCHOR AND POLE
- SET P.K. NAIL
- SET 1/2" IRON ROD
- FOUND SURVEY CORNER
- PINE
- TREE
- BUSH
BENCHMARKS
BM #200 - Set mag nail in concrete light pole base, North side.
NAVD88 EL. 585.32'
- SET WOOD LATH
SECTION 28, T.27 N. - R.15 W.
LAKE TOWNSHIP
BENZIE COUNTY, MICHIGAN
Contour Interval = 1 foot
0 4020105
N
N.F.L. - NOT FIELD LOCATED
(M) - MEASURED DIMENSION
(R) - RECORDED DIMENSION
- BENCHMARK
- CONTROL POINT
R
W - RIGHT OF WAY MARKER
BY MARK REVISIONS DATE
C
DE. BY:
DR. BY:
STDS.
SCALE
DATE
CH. BY:
APP. BY:
SHEET
FILE NO.
OF
PROJECT NO.
2023C
MICHIGAN DTMB
320 SOUTH WALNUT STREET
LANSING, MI 48909
FEBRUARY, 2023
132010SG2022
Manistee, MI 49660 302 River Street
MANISTEE OFFICE
www.SpicerGroup.com Tel. 231-794-5620
SMB ISSUED FOR BIDDING 5/22/23
THE WORK REPRESENTED BY THIS DRAWING WAS DESIGNED BY THE ENGINEER FOR
THIS SPECIFIC APPLICATION AND SPECIFIC LOCATION DESCRIBED HEREON IN
ACCORDANCE WITH THE CONDITIONS PREVALENT AT THE TIME THE DESIGN WAS
DONE. THE ENGINEER DOES NOT GUARANTEE AND WILL NOT BE LIABLE FOR ANY
OTHER LOCATION, CONDITION, DESIGN OR PURPOSE.
QRP
QRP
SMB
SPM
- 04
######## JD-1922-04 04
C
EXISTING CONDITION PLAN
T
AutoCAD SHX Text
AutoCAD SHX Text
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
8 57
581582
N
PEA STONE
SPECIAL LEGENDNOTES
1. ASSUMED THE WEIR IS BUILT ON PILES PER DNR
FISHERIES. NO RECORD DRAWINGS AVAILABLE.
2. PILE CAP ASSUMED TO BE 2' THICK.
EXISTING WEIR STRUCTURE
EXISTING WALKWAY
EXISTING RAILING
PROPOSED SHEET
PILING DRIVEN FLUSH
WITH TOP OF PILE CAP
PEA STONE BACKFILL
TOP OF WALKWAY
DOWN STREAM RIVER BOTTOM
UP STREAM RIVER BOTTOM
T
TOP OF
PILE CAP
ASSUMED BOTTOM OF PILE CAP
A A
B B
SECTION A-A SECTION B-B
BY MARK REVISIONS DATE
C
DE. BY:
DR. BY:
STDS.
SCALE
DATE
CH. BY:
APP. BY:
SHEET
FILE NO.
OF
PROJECT NO.
2023C
MICHIGAN DTMB
320 SOUTH WALNUT STREET
LANSING, MI 48909
FEBRUARY, 2023
132010SG2022
Manistee, MI 49660 302 River Street
MANISTEE OFFICE
www.SpicerGroup.com Tel. 231-794-5620
SMB ISSUED FOR BIDDING 5/22/23
THE WORK REPRESENTED BY THIS DRAWING WAS DESIGNED BY THE ENGINEER FOR
THIS SPECIFIC APPLICATION AND SPECIFIC LOCATION DESCRIBED HEREON IN
ACCORDANCE WITH THE CONDITIONS PREVALENT AT THE TIME THE DESIGN WAS
DONE. THE ENGINEER DOES NOT GUARANTEE AND WILL NOT BE LIABLE FOR ANY
OTHER LOCATION, CONDITION, DESIGN OR PURPOSE.
QRP
QRP
SMB
SPM
- 05
AS SHOWN JD-1922-05 05
C
PLAN AND PROFILE
SCALE: 1" = 10'
0 20105
NATURAL FIELD STONE
NATURAL FIELD
STONE RIPRAP
PROPOSED SHEET
PILE WALL
PROPOSED
FIELDSTONE
RIPRAP
REMOVE, SALVAGE AND REINSTALL
EXISTING CHAINLINK FENCE AS
NEEDED FOR CONSTRUCTION.
ENCLOSE AREA WITH PROTECTIVE
FENCING DURING CONSTRUCTION.
BM #200
EXISTING WEIR
WALKWAY LEG (TYP)
EXISTING WEIR
GATE STRUCTURE
EXISTING CONCRETE
RETAINING WALL
R
IVER
FLO
W
R
IVER
FLO
W
REMOVE AND REINSTALL
EXISTING RIPRAP AS NECESSARY
TO INSTALL SHEET PILE.
MAXIMUM 6" BETWEEN SHEETING
AND EXISTING PILE CAP. MAINTAIN
AS CLOSE PROXIMITY AS POSSIBLE.
EXISTING PILE CAP
44"
9"
22"22"
PZ-22 SHEET PILING DETAIL
NOT TO SCALE
SHEET PILING INSTALLATION DETAIL
NOT TO SCALE
BY MARK REVISIONS DATE
C
DE. BY:
DR. BY:
STDS.
SCALE
DATE
CH. BY:
APP. BY:
SHEET
FILE NO.
OF
PROJECT NO.
2023C
MICHIGAN DTMB
320 SOUTH WALNUT STREET
LANSING, MI 48909
FEBRUARY, 2023
132010SG2022
Manistee, MI 49660 302 River Street
MANISTEE OFFICE
www.SpicerGroup.com Tel. 231-794-5620
SMB ISSUED FOR BIDDING 5/22/23
THE WORK REPRESENTED BY THIS DRAWING WAS DESIGNED BY THE ENGINEER FOR
THIS SPECIFIC APPLICATION AND SPECIFIC LOCATION DESCRIBED HEREON IN
ACCORDANCE WITH THE CONDITIONS PREVALENT AT THE TIME THE DESIGN WAS
DONE. THE ENGINEER DOES NOT GUARANTEE AND WILL NOT BE LIABLE FOR ANY
OTHER LOCATION, CONDITION, DESIGN OR PURPOSE.
QRP
QRP
SMB
SPM
- 06
AS SHOWN JD-1922-06 06
C
DETAILS
FILL ANULAR SPACE
WITH PEA STONE TO
THE TOP OF PILE CAP
6"
File details come from the government source that posted it. Updated .