Amendment_6_Q_and_A.pdf

PDF 352 KB Posted

Attached to
Hopi Sidewalk Improvements Federal contract opportunity
Solicitation number
13-161-SOL-00009
Issued by
Department of Health and Human Services Indian Health Service

About this file

Amendment - 6 - Q and A

View the file

Other files for this federal contract opportunity

Other files attached to Hopi Sidewalk Improvements, newest first.
File Type Posted
Amendment_7_generator.pdf PDF
Amendment_5_Q_and_A.pdf PDF
Amendment_4_extendJune5th.pdf PDF
Amendment_3_Sect.I_52.229-3_update.pdf PDF
Amendment__2_Q-A_and_Attach5A-5B.pdf PDF
Attach_5A_DemoExhibit.pdf PDF
Attach_5B_InstallExhibit.pdf PDF
Amendment_1_drawings-larger.pdf PDF
Attach_2A_1_DRAWINGS_larger.pdf PDF
SF25-96_performancebond.pdf PDF
Attach_3_Downspout_relocate_exhibit.pdf PDF
Attach_1_WageDeter_hopisidewlk.pdf PDF
Attach_2_DRAWINGS_hopisidewlk.pdf PDF
Attach_4_SoilsRprt_hopisidewlk.pdf PDF
Return_SF-1442_SectB_SectK.pdf PDF
SF24-98_BidBondForm.pdf PDF
Sol_13-161-SOL_00009_HopiSidewalk.pdf PDF
SF25A-98_PaymentBond.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

SIX (6) 5-29-2013

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

Indian Health Service – DES 1301 Young Street – Suite 1071

Dallas, TX 75202-55433

Same as block 6

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

13-161-SOL-00009 Hopi Sidewalk

9B. DATED (SEE ITEM 11)

4-25-2013

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

This amendment No. 6 provides answers to questions Note this amendment # 6 does not extend the closing date and time but Amendment # 4 did - please refer to Amendment 4 .

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 6 -13-102-SOL-00009 Hopi Sidewalk

1. Where new asphalt is required, what thickness of sub base and asphalt will be required

a. Asphalt and sub base thickness will be as listed in the table on page 16 of the Geotechnical Engineering

Report, Main Traffic Corridors and Bus Parking, Alternative B

2. Keynote 16 on page three of the drawings is proposed fuel area, what will this area require

a. Answered in previous Amendment No. 5 Q. No. 10.

3. Per MAG section 340, minimum 6” engineered approved base is required for sidewalks and curb and gutter. In reviewing the bid documents it is seen most areas of sidewalk calls for 4” of ABC. Will 4” of ABC be required at all sidewalks? What will be required for the curb and gutter?

a. 4” ABC will be required at all sidewalks. ABC for curb and gutter shall be a depth to match that of adjoining asphalt.

4. Phase 2 b ii 1, Dialysis Entrance, calls remove existing Bollards and replace with 6 lighted Bollards. Is there currently 277 volts at bollards? If not where will the power be need to be brought from?

a. Existing bollards are lighted. Tie into existing circuit. Detailed bollard wiring diagrams are not available.