Amendment 5 - Answers to some questions
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_7_generator.pdf | ||
| Amendment_6_Q_and_A.pdf | ||
| Amendment_4_extendJune5th.pdf | ||
| Amendment_3_Sect.I_52.229-3_update.pdf | ||
| Attach_5B_InstallExhibit.pdf | ||
| Amendment__2_Q-A_and_Attach5A-5B.pdf | ||
| Attach_5A_DemoExhibit.pdf | ||
| Amendment_1_drawings-larger.pdf | ||
| Attach_2A_1_DRAWINGS_larger.pdf | ||
| Attach_1_WageDeter_hopisidewlk.pdf | ||
| Attach_2_DRAWINGS_hopisidewlk.pdf | ||
| SF25-96_performancebond.pdf | ||
| Attach_3_Downspout_relocate_exhibit.pdf | ||
| SF25A-98_PaymentBond.pdf | ||
| Attach_4_SoilsRprt_hopisidewlk.pdf | ||
| Return_SF-1442_SectB_SectK.pdf | ||
| SF24-98_BidBondForm.pdf | ||
| Sol_13-161-SOL_00009_HopiSidewalk.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 5
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
Five (5) 5-23-2013
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
Indian Health Service – DES 1301 Young Street – Suite 1071
Dallas, TX 75202-55433
Same as block 6
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
13-161-SOL-00009 Hopi Sidewalk
9B. DATED (SEE ITEM 11)
4-25-2013
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
This amendment No. 5 provides answers to questions and includes supplemental annotated drawing. Note this amendment # 5 does not extend the closing date and time but Amendment # 4 did - please refer to Amendment 4 .
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment #5 1 13-161-SOL-00009 Hopi Sidewalk
Response to questions
Hopi Site Improvements (Sidewalk Replacement)
General questions/comments –
Q 1 Do we have to provide new civil drawings?
a. No. Legible markups of construction drawings will be accepted. Swing ties or sub-foot latitude and longitude location of re-located utilities installed storm drain manholes, invert elevation of installed storm drains will be required markups.
Q 2 Will there need to be a Tribal Inspector present while we dig?
a. No. Facility personnel or IHS project manager will be on site.
Q 3 What is the timeline to start all 3 stages?
a. Upon receiving Notice to Proceed, contractor, IHS project manager, and facility manager will work to establish a focused time line. Contractor should pl an to schedule simultaneous work (as an example, employee entrance sidewalk demolition and construction coincident with installation of storm drain system).
Q 4 How much time will be allowed for testing and results?
a. Contractor should plan to deliver soil samples to laboratory one week prior to density testing requirement in order to have results available at time of field testing
Q 5 Where it states “provide pedestrian and vehicular traffic control”, will cones blocking off area suffice?
a. Where vehicle traffic must be controlled, refer to the MUTCD. Pedestrian traffic may be controlled using cones.
b. Contractor should also provide highly visible signage to be located at clinic exits alerting patients and employees that exits are temporarily inaccessible.
Generator questions/comments – No new drawings will be issued and all measurements for bid quantities are the responsibility of the bidder. I have provided some estimation below.
Q 6 Could you supply me with elevation for the platform and stairs? I need col umn base elevation, top of steel for bar grate and stair rise and run.
a. Actual measurements are the responsibility of the contractor. These measurements are estimations only and do not relieve the contractor from the responsibility of measuring for bid or take off quantities.
b. The generator is mounted on a concrete slab.
i. Column Base elevation – Using top of slab as a reference point (0), natural ground is approximately -12 inches to -14 inches
ii. Top of steel bar grate – Per sheet 9 of 9, top of grate to match top of generator base below oil drains, field verify height. Top of slab to bottom of generator base, below oil drains is approximately +14 inches to +16 inches
iii. Stair rise and run – Per sheet 9 of 9, max rise is 7 inches. Run will depend on elevation of ground at first step.
Amendment #5 2 13-161-SOL-00009 Hopi Sidewalk
Sidewalk questions/comments – No AutoCad or surveyed drawings are available for sidewalk estimation. Quantities used for bid and construction take off should be gathered by interested bidders via a site visit. The attached exhibit provides approximate lengths for sidewalk sections.
Q 7 In reference to Attachment 5a and 5b in Amendment 2, can we please receive more information in regards to dimensions of the sidewalks?
a. Responsibility for accurate bid and take off measurements lies with the contractor.
Sidewalk measurements are rough approximations. Accurate bid and material quantities can only come from field verification and measurement.
b. See attached exhibit for rough estimates of partial sidewalk dimensions. These exhibits represent the drawings for the sidewalk construction portion of this project.
Q 8 A partial floor plan I required of the Health Care Facility and “Emergency Garage” with room/entry identification in order to properly estimate placement of sidewalks and coordinate phasing. (i.e. Dialysis Entrance, Employee Entrance, Elect. Service panel location).
Will this be provided as an amendment before bid is due?
a. See attached sidewalk exhibit for location of Dialysis Entrance and Employee
Entrance.
Storm drainage, emergency equipment pad, paved driveway questions/comments –
Paved driving path will be constructed per the geotechnical report, designed for truck access (80-kN EAL of 73,000 utilizing AC and ABC
Q 9 Will there be a plan sheet indicating the location for the equipment pad?
a. The equipment pad, also referred to in the statement of work as the trailer pad, is located as indicated by note 17 on sheet 3 of 9.
Q 10 Is the proposed fuel area raised, and is it made of concrete?
a. The fuel area referred to on sheet 3 of 9, note 16 is not raised and it will be paved per the geotechnical report, designed for truck access, utilizing asphalt concrete
(per note 8, same sheet) and aggregate base course.
Q 11 The “Equipment Pad” detail no.”8”, page 9 of 9 indicates a 12” thick slab poured against the CMU building wall and footing; and refers to civil drawings for size and location of equipment pad. There are no indications of this pad on the civil drawings and no note of a size for an “Equipment Pad”. There is also no mention of a 12” thick slab in “Part 1-The
Schedule-Section C”. Please confirm a size and location of the equipment pad if required.
a. The equipment pad is to be constructed as designed per sheet 9 of 9 (i.e. 12” thickness). The pad will be located as indicated by note 17 on sheet 3 of 9. Trailer pad shall be 21’ x 30’ as stated in the schedule of work.
Amendment #5 3 13-161-SOL-00009 Hopi Sidewalk
Q 12 Does the statement in the miscellaneous section of the contract stating “Contractor will be responsible for all takeoff quantities for bidding purposes. All quantities on plan set are estimates only and are not to be used for bidding purposes” appl y to the footage and elevations on the plan as well?
a. Ultimately, the contractor is responsible for quantities. The lengths and elevations provided were designed utilizing survey equipment and methods, however per keynotes in plan sets (e.g. 9, 10, 11, and 13 on sheet 4 of 9), contractor is responsible to verify elevations and quantities
Amendment #5 4 13-161-SOL-00009 Hopi Sidewalk
Amendment #5 5 13-161-SOL-00009 Hopi Sidewalk