This is Amendment 0001 to RFQ 1305M327Q0010 for HVAC Unit Replacements, issued by the National Weather Service (WAD-NWS) in Seattle, Washington, with an effective date of October 28, 2026. The amendment removes FAR clause 52.219-27 (SDVOSB preference) and FAR clause 52.228-15 (performance bonds), clarifies that this is a 100% small business set-aside, provides an updated Statement of Work with revised Phoenix site Technical Point of Contact information, and addresses 31 contractor questions received during the solicitation period.

The solicitation requires replacement of HVAC units at three locations: Phoenix, Arizona; Flagstaff, Arizona; and Battle Mountain, Nevada. Contractors must price all three CLINs (Contract Line Item Numbers 0001, 0002, and 0003) as incomplete bids for individual CLINs will not be considered. On-site work must be completed within 90 calendar days after Notice to Proceed is issued, with the entire process not exceeding 240 days from contract award. A payment bond or irrevocable letter of credit for 100% of contract price is required within 10 days after award; performance bonds and bid bonds are not required. Quotes must remain valid for 90 days. The Government prefers R-410a refrigerant where available and will accept EPA-required low-GWP (A2L) refrigerant as an acceptable equal. No permits are required, certified test and balance reports are not required, electric heat is not required, and licensed subcontractors are acceptable in lieu of the prime contractor holding state licenses. The updated SOW identifies Michael Teer as the Phoenix site Technical Point of Contact.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

JENNA L. TAULMAN

See continuation page

WAD-NWS

7600 SAND POINT WAY NE BLDG 1

SEATTLE WA 98115

WAD-NWS

1305M327Q0010

10/28/2026

10/23/2026

1 9

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

1305M327Q0010/0001

The purpose of this amendment is to:

1. Remove the Clause, FAR 52.219-27, as this solicitation is 100% set aside for Small

Business vendors.

2. Remove the Clause, FAR 52.228-15, as this is not applicable to this RFQ.

3. Provide Updated SOW with updated Phoenix site Technical Point of Contact (TPOC) information.

4. Provide Government answers to questions received in response to this RFQ on the subsequent pages.

---End of Amendment 0001---

1305M327Q0010 RFQ Questions.xlsx

Solicitation Questions Project Title: HVAC Unit Replacements

RFQ/RFP Number: 1305M327Q0010

Q# Date Recv'd Question Response Date

Provided to Ctrs

1 10/24/26 The cover and SAM notice say total small-business set-aside, but the RFQ also includes 52.219-27 for SDVOSB concerns. Is this open to all qualifying small businesses, or restricted to eligible SDVOSBs?

This is open to all small businesses. The inclusion of clause FAR 52.219-27 is an error and will be removed in Amendment 0001. 10/28/26

2 10/24/26

SOW section 6 requires on-site completion within 90 calendar days after notice to proceed. The project-schedule evaluation says 90 days after receipt of equipment and materials. Which event starts the 90 days? We understand the overall limit is 240 days after award.

The 90 calendar days will start when the NTP is issued, after the contractor has confirmed all equipment and materials. 10/28/26

3 10/25/26

The cover and 52.228-13 allow a payment bond or irrevocable letter of credit for 100% of the price within 10 days after award. The RFQ also includes 52.228-15. Is that payment protection sufficient, or is a separate performance bond also required?

The inclusion of FAR 52.228-15 is an error and will be removed in Amendment 0001. FAR 52.228-13 applies as written in the solicitation. 10/28/26

4 10/25/26 The cover page and FAR 52.219-6 state a Total Small Business set-aside under NAICS 238220. Section 6 references NAICS 236220, and Section 4 lists 52.219-27 (SDVOSB). Please confirm the set-aside type and NAICS.

See Question 1 10/28/26

5 10/25/26 Please confirm whether only a payment bond or irrevocable letter of credit under 52.228-13 is required, or whether a performance bond is also required (SF 1442, Item 12a; 52.228-15).

Bids Bonds and Performance Bonds are not required. See Question 3. 10/28/26

6 10/25/26

Section 6, Factor 1 measures completion from receipt of equipment, while the SOW and CLINs measure it from the Notice to Proceed. Will the NTP be issued after equipment delivery? May on-site work at Flagstaff and Battle Mountain be scheduled around winter access within the 240 days?

The 90 calendar days will start when the NTP is issued, after the contractor has confirmed all equipment and materials. Yes, Installation may be scheduled around winter access.

10/28/26

7 10/25/26 May the units be replaced one at a time, with the second unit cooling the shelter, or is temporary cooling required during the changeover? One unit at a time is acceptable, as the units are redundant. 10/28/26

8 10/25/26 Could you share the existing units’ model and serial numbers, any required electric heat (kW), and the NEXRAD alarm interface points, including whether -48 VDC is available for controller backup?

Model # for Battle Mountain and Phoenix is W72AC-BOZZPxxxJ WMCBC-O8B. Flagstaff is older equivelant with R22 refrigerant, I do not have serial numbers. Heating is not required. There are no controllers currently, therefore controller backup would need to be field supplied.

10/28/26

9 10/25/26 Current-production units use EPA-required low-GWP (A2L) refrigerant.

Will these be acceptable as “equal” if they meet all salient characteristics and fit the existing openings without modification?

Yes 10/28/26

Project Title: HVAC Unit Replacements

RFQ/RFP Number: 1305M327Q0010

Q# Date Recv'd Question Response Date

Provided to Ctrs

10 10/25/26 Will the Government accept quotes for individual CLINs (one or two sites), or must quoters price all three CLINs (0001, 0002, and 0003)? No; quotes for individual CLINs will be considered incomplete. 10/28/26

11 10/25/26

The CLINs and SOW Section 6 say on-site work must be completed within 90 calendar days after the Notice to Proceed. Section 6, Factor 1, says completion within 90 calendar days of receipt of equipment and materials. SF 1442 Block 11 says 240 days after Notice to Proceed, while the CLINs say 240 days after award. Which governs, and about when will the Notice to Proceed be issued after award?

The 90 calendar days will start when the NTP is issued, after the contractor has confirmed all equipment and materials. Once the contractor receives the equipment/materials and confirms readiness, the Notice to Proceed (NTP) will be issued. On-site work must then be completed within 90 calendar days following the NTP. The entire process—including ordering equipment and materials, receipt, and all on-site work—may not exceed the 240-day cap from the date of contract award.

10/28/26

12 10/25/26

Section (x) and clause 52.228-13 require a payment bond or an irrevocable letter of credit. SF 1442 Block 12a and clause 52.228-15 call for performance and payment bonds. Which payment protection is required?

Bids Bonds and Performance Bonds are not required. See Question 3. 10/28/26

13 10/25/26

What type of connection does the existing NEXRAD alarm system accept (for example, dry contacts, normally open or normally closed), and where is the termination point? Can existing alarm wiring between the shelter and the alarm panel be reused?

Existing alarm wiring for alarms may be used . They are just 2 thermostat wires that terminate on thermostat block of Unit. 10/28/26

14 10/25/26 Do the replacement units need electric heat strips? If so, what kW rating? The controller specifications list heating stages, but the unit salient characteristics do not mention heat.

Heating stages are only charactheristics of the specified controller, heating is not required. 10/28/26

15 10/25/26 Can the Government provide the model numbers or nameplate data for the existing Bard units and controllers at each site?

Model # for Battle Mountain and Phoenix is W72AC-BOZZPxxxJ WMCBC-O8B Flagstaff is older equivelant with R22 refrigerant there is no controller currently at any of these locations

10/28/26

16 10/25/26 Is there an existing fire/smoke device at each shelter that must be connected to the new controller's fire/smoke shutdown circuit? As stated in SOW device is field supplied. 10/28/26

17 10/25/26 Are optional remote temperature sensors required, or is the controller's standard local sensor acceptable? No they are not required. 10/28/26

18 10/25/26 May the existing disconnects and power wiring be reused if they are in good condition, or must new disconnects be provided?

Wiring should be replaced to the junction box located on oppisite side of wall, roughly 6 feet of wire and the only disconnect point is electrical panel and the disconnect that is built into the bard.

10/28/26

Project Title: HVAC Unit Replacements

RFQ/RFP Number: 1305M327Q0010

Q# Date Recv'd Question Response Date

Provided to Ctrs

19 10/25/26 Provision 52.237-1 lists Michael Teer for Phoenix, while SOW Section 14 lists Daniel Aguayo. Which is correct?

Michael Teer is now the site TPOC. The attached SOW has been updated to reflect Michael Teer as the new TPOC for the Phoenix site.

See SOW "v2".

10/28/26

20 10/25/26 SF 1442 Block 13d shows 0 days, but Section 6 requires 90 days. Please confirm quotes must be valid for 90 days. Yes; quotes must be valid for 90 days. 10/28/26

21 10/25/26

Does the Government require the prime contractor to hold Arizona and/or Nevada contractor licenses for this work, or may properly licensed subcontractors perform the licensed trade work under the prime?

Sub contractor being licensed is acceptable 10/28/26

22 10/25/26 FAR 52.219-14 is not listed among the solicitation clauses. Does a limitation on subcontracting apply to this small business set-aside? If so, what percentage applies and how will compliance be measured?

FAR 52.219-14 does not apply to this acquisition because the value is less than the Simplified Acquisition Threshold. 10/28/26

23 10/25/26 Is a certified test, adjust, and balance (TAB) report required? If so, please identify the applicable standard, certifying body, and sites. No 10/28/26

24 10/25/26

Are the new units or controllers required to be tied into a facility fire alarm or fire life safety system at any site? If so, please identify the existing equipment at each site and who is responsible for supplying and testing the interface. If not, may the factory fire/smoke jumper remain in place?

The site does not currently have a fire alarm /fire safety system. The SOW states that the contractor must supply or be included by manufacture a fire detection device that shuts the units down when fire/smoke is detected. Its functioality is to be tested by the installer.

10/28/26

25 10/25/26

Does the Government require local or state building, electrical, or mechanical permits for this work at each site? If so, are they the contractor’s responsibility and cost? If the Government performs its own inspections in lieu of permits, please describe that process.

Permits are not required and the TPOC will sign off on project once completed 10/28/26

26 10/25/26

For vendors unable to attend the 11/2/2026 site visits, will the Government provide photographs or drawings of existing site conditions, including the existing units, wall openings, electrical disconnects, and any fire/smoke devices?

Site visits are highly encouraged but if pictures are requested, please list exactly what pictures are requested and we will make every effort to get those photos. If received, the photos will be distributed via formal amendment to this RFQ.

10/28/26

27 10/27/26 Equipment specs state "A/C" but then mention heating in the controller spec-- Are the units A/C with strip heat or heat pump models? See question 14 10/28/26

28 10/27/26 If strip heat is required, what size? Not required 10/28/26

29 10/27/26 Is there a prefered refrigerant? Both R-410 and R-454 models are available If available 410a is prefered. 10/28/26

Project Title: HVAC Unit Replacements

RFQ/RFP Number: 1305M327Q0010

Q# Date Recv'd Question Response Date

Provided to Ctrs

30 10/27/26 Can the Government provide a picture of the installed units data plate or provide the model # of the existing units?

See Appendix A; if this does not answer the question, please submit another question before the deadline. 10/28/26

31 10/27/26 Also all the scheduled site visits are on the same day and time, is there a way we can modify dates so we can see more than one?

It will not be necessary to go to each site. Flagstaff and Battle mountain are identical and Phoenix is shown in Appendix A simple wall mount application.

10/28/26

1305M327Q0010 Appendix A

a. Bard Plate Data

b. Snow Shelter - Bards (Flagstaff, AZ and Battle Mountain, NV are the same)

c. Phoenix, AZ - See Question 31

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .