This is Amendment 0001 to a federal solicitation (1305M326Q0365) issued by the National Oceanic and Atmospheric Administration (NOAA) at its Boulder, Colorado facility. The amendment, effective July 27, 2026, revises the Statement of Work for snow removal and ice mitigation services and extends the quote due date to Thursday, August 13, 2026, at 10:00 AM MDT.
The revised Statement of Work establishes the following service requirements: the contractor must self-monitor conditions at the performance site and self-dispatch when triggering conditions occur. Snow removal services are initiated when two inches of snow accumulate, with the contractor required to be on-site within two hours of reaching the two-inch threshold and every two inches of accumulation thereafter throughout weather events. For ice mitigation, the contractor must apply de-icing agents (either calcium chloride or magnesium chloride) on all paved surfaces whenever any ice accumulation is observed, including ice from melting and refreezing, regardless of snowfall. The pricing structure is firm-fixed monthly pricing that must include all qualifying snow and ice events, with unlimited two-inch pushes and ice-only responses. The amendment includes 15 vendor questions and government responses addressing operational protocols, notification methods, response times, deicing material specifications, invoicing documentation, after-hours access procedures, historical workload data, and snow disposal requirements. The government clarified that no historical data on previous mobilizations is available but noted that some months required zero mobilizations while others required multiple mobilizations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
KERRI COFFEY
See continuation page
WAD-SAP
325 BROADWAY, SOU6
BOULDER CO 80305
WAD-SAP-B
1305M326Q0365
07/27/2026
07/27/2026
1 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
1305M326Q0365/0001
AMENDMENT NUMBER 0001 (08/07/2026):
THE STATEMENT OF WORK HAS BEEN REVISED.
QUOTERS SHOULD BASE THEIR QUOTE ONLY ON
ATTACHMENT 1 STATEMENT OF WORK_REVISED_080726.
QUOTES RECEIVED THAT ARE NOT RESPONSIVE TO
ATTACHMENT 1 STATEMENT OF WORK_REVISED_080726
MAY BE EXCLUDED FROM EVALUATION WITHOUT
NOTIFICATION TO THE QUOTER.
QUOTE DUE DATE HAS BEEN CHANGED TO THURSDAY,
AUGUST 13, 2026, 10:00AM MDT.
VENDOR QUESTIONS
Questions 1-8 are similar so they are grouped together. The response following Question 8 addresses Questions 1-8.
QUESTION 1: Mobilization and Response
Timeframe. SOW Section 3 specifies that the
Contractor shall report for snow removal services when two (2) inches of snow have accumulated and when ice is observed. Could the Government please define the expected mobilization response window (e.g., within 2 hours of the accumulation trigger or official notification) for crews to arrive on-site?
QUESTION 2: Operational Dispatch Protocol.
Given that the facility operates 24 hours a day, seven days a week, could the Government clarify how services are formally initiated? Is the Contractor expected to independently monitor the site and self-report based on weather observations, or will the Government
Point of Contact or on-site facility personnel issue a formal dispatch notification/call-out?
QUESTION 3: Response time. The SOW specifies the service trigger as two inches of accumulated snow or observed icing conditions, with services performed on a per-event basis.
What is the expected or required response time from the trigger event to on-site contractor arrival?
QUESTION 4: Notification method. How will the contractor be notified when a service trigger event occurs? Specifically, will notification come by phone call, email, automated weather alert, or is it the contractor's own discretion
Continued...
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C) based on conditions?
QUESTION 5: Intermediate Clearing and Deicing.
During a continuing storm, does each additional two (2) inches of accumulation require complete re-clearing of all identified areas?
QUESTION 6: Mobilization, Notification, and
Response Expectations. Is the contractor expected to self-dispatch when qualifying snow or ice conditions occur, or will NOAA authorize or request each mobilization?
QUESTION 7: Please also clarify who determines when ice accumulation requires service and whether a specific arrival or response time applies.
QUESTION 8: Is full-site salting required after every intermediate push, or may deicing be applied based on observed conditions and accepted industry practice, with complete treatment during final cleanup?
RESPONSE: For both snow removal and ice mitigation, it is the Contractor’s responsibility to self-monitor conditions at the performance site and to self-dispatch. In order to know the snow or ice accumulation, the
Contractor may call the NOAA site (phone number to be provided after award) or utilize other sources as determined by the Contractor to obtain necessary information. The Contractor shall report for snow removal services when two
(2) inches of snow have accumulated and shall perform snow removal operations throughout the weather event every additional two (2) inches of accumulation.
The Contractor is to be on-site within two (2) hours after the snow accumulation has reached two (2) inches and every two (2) inches of accumulation thereafter throughout the weather event.
The Contractor must report to the site and apply de-icing agents (either calcium chloride or magnesium chloride) on all paved surfaces whenever any ice accumulation is observed on paved surfaces, including ice from melting and refreezing, regardless of snowfall.
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
QUESTION 9: Deicing Agent Material
Restrictions: The SOW states that salting shall be performed concurrently on paved areas and sidewalks. Are there any environmental restrictions or preferred specifications regarding the chemical composition of deicing agents?
RESPONSE: The Contractor is to use either calcium chloride or magnesium chloride. The
Statement of Work has been revised to clarify this requirement.
QUESTION 10: IPP Invoicing Documentation
Requirements. NOAA Clause 1330-52.232-71
(Electronic Submission of Payment Requests) indicates that required invoice attachments may be specified by the Contracting Officer. As this field is currently blank, could the
Government confirm whether any specific supporting documents—such as weather reports, service logs, dispatch notifications, or post-service photos—must accompany monthly invoice submissions in the Invoice Processing
Platform?
RESPONSE: NAM Clause 1330-52.232-71, third paragraph, does not list any documents that need to be included with payment requests.
QUESTION 11: Are there any post-award submittals that we should be aware of? If so, could you please provide the relevant information?
RESPONSE: Any required reporting is stated in the solicitation or Statement of Work.
QUESTION 12: After-hours access. The SOW requires 72-hour advance notice for after-hours access requests. For weather events that occur outside normal business hours, does a standing pre-authorization apply, or must the 72-hour
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C) notice still be satisfied? Given that snow events often develop overnight or on weekends, we want to confirm the protocol before committing to a response time in our technical approach.
RESPONSE: Neither the solicitation nor
Statement of Work has a statement or requirement about a 72-hour advance notice or after-hours access.
QUESTION 13: Site point of contact at award.
The SOW states the site point of contact will be provided at award. Can you confirm who the site POC will be?
RESPONSE: The Government Point of Contact will be provided in the award.
QUESTION 14: Firm-Fixed-Price Scope and
Historical Workload. Should each monthly firm-fixed price include all qualifying snow and ice events, including unlimited two-inch pushes and ice-only responses? If available, could NOAA also provide historical annual quantities for snow events, plowing mobilizations, intermediate pushes, and salt applications?
RESPONSE: Yes, the proposed firm-fixed pricing should include all possible events per month.
We do not have any historical data on previous plowing mobilizations; however, in the past, some months required zero mobilizations, while other months needed multiple mobilizations.
QUESTION 15: May accumulated snow remain in suitable on-site stacking areas, with off-site hauling excluded unless separately authorized?
RESPONSE: Accumulated snow may remain on site, with the understanding that the Contractor piled the snow out of the way, off of parking/driving/walking surfaces. The
Contractor should discuss any situations in
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C) which snow can not be piled off of parking/driving/walking surfaces.
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .