Landscaping_SOW_WFOJACKSON_7_22_2026_(Amendment_1)_0001.pdf
PDF 269 KB Posted
- Attached to
- LANDSCAPING AT NWS IN JACKSON, MS
- Solicitation number
- 1305M326Q0303
About this file
This is a Statement of Work (SOW) for landscaping and lawn care services at the National Weather Service Office in Jackson, Mississippi.
The Contractor shall provide comprehensive exterior landscaping and lawn care services for approximately 40,500 square feet, including labor, tools, equipment, supervision, materials, and transportation. Services encompass mowing and edging, grass and weed trimming, debris removal, chemical applications and weed control, pruning and mulching, and specialized care of the Upper Air Building secured area. The service schedule varies by season: mowing occurs once monthly in January–February, every two weeks in March and October–December, and weekly in April–September. Additional seasonal services include chemical weed control and plant/tree pruning in March and June, annual fertilizer application in May, and mulch/pine straw replacement during March. Fire ant control must be provided bi-weekly on an as-needed basis. Work may be performed any day of the week as coordinated with the Meteorologist in Charge (MIC). The site address is 234 Weather Service Drive, Jackson, MS 39232, with primary contact Bill Parker (bill.parker@noaa.gov) and administrative contact Lakeysha Johnson (lakeysha.johnson@noaa.gov).
Contractors must procure and maintain all necessary municipal, State, and Federal permits and licenses at their own expense. Personnel handling pesticides/herbicides must be state-certified and licensed, with proof of certification submitted with the offer. All products must be non-toxic, biodegradable, environmentally friendly, EPA-registered commercial products meeting standard requirements. Contractors must provide product lists and Safety Data Sheets for MIC approval prior to use. Monthly invoices submitted in arrears must include the Purchase Order number and be accompanied by signed service tickets from each visit. The Contractor shall observe Federal holidays and provide sufficient personnel for critical tasks during holidays under MIC guidance. Quality Assurance provisions allow the Government to require re-performance at no additional cost if services do not conform to contract requirements, or to reduce contract price if defects cannot be corrected. Security clearance requirements do not apply to this contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_1305M326Q0303_Amd_0002.pdf | ||
| Landscaping_SOW_WFOJACKSON_A0002_0002.docx | DOCX document | |
| Sol_1305M326Q0303_Amd_0001.pdf | ||
| Wage_Determination_2015-5153_Rev_30.pdf | ||
| Landscaping_SOW_WFOJACKSON_7_14_2026.pdf | ||
| Sol_1305M326Q0303.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)v2 (7.22.2026) Landscaping & Lawn Care Services
1.0 Objective & Scope
The Contractor shall provide all labor, tools, equipment, supervision, materials, and transportation necessary to perform comprehensive exterior landscaping and lawn care services (approximately
40,500 SQFT) for the National Weather Service (NWS) Office in Jackson, MS.
The Contractor shall maintain all grounds—including lawns, native grass areas, gravel, plant beds, parking lots, walks, driveways, and curbs—in a neat, professional, and well-manicured appearance.
Services must be performed without interfering with normal Government business operations.
2.0 Project Location & Points of Contact (POC)
● Site Address: National Weather Service Office, 234 Weather Service Drive, Jackson, MS 39232
● Primary POC: Meteorologist in Charge (MIC) or Acting MIC (A/MIC) bill.parker@noaa.gov
● Administrative POC: Administrative Assistant (ASA) lakeysha.johnson@noaa.gov
3.0 Performance Requirements & Schedule
3.1 Permitted Work Hours
Services may be performed at any time, any day of the week, as coordinated with the MIC.
3.2 Service Schedule
Mowing and specialized care will follow the frequency below, or will be performed on an as-needed basis as directed by the MIC:
Month Mowing Frequency Additional Seasonal Services
January & February Once per month
March Every two weeks Chemical Weed Control, Plant/Tree Pruning, Mulch/Pine Straw Replacement
April – September Once per week May: Annual Fertilizer Application
June: Chemical Weed Control, Plant/Tree
Pruning
October – December Every two weeks
4.0 Description of Services
All specific grounds care duties (items a–f) must be performed concurrently with the mowing schedule unless otherwise specified.
a. Mowing & Edging
● Cut grass across all lawn, semi-improved, and native grass areas. Grass clippings must be mulched or removed if visible after mowing.
● Edge all sidewalks, driveways, curbs, and concrete/asphalt borders. Edging includes removing any vegetation growing from cracks in pavements and curbs.
b. Grass & Weed Trimming
● Trim grass and weeds around trees, shrubs, buildings, fences, poles, fire hydrants, parking bumper blocks, boulders, and other fixed obstacles.
● The Contractor shall repair any damage caused to trees or shrubs during trimming operations.
c. Debris Removal & Grounds Policing
● Conduct general litter patrol to remove and properly dispose of all natural debris (e.g., tree limbs, dry brush, dead animals) and manmade litter offsite.
● Clear all sidewalks, parking lots, driveways, and concrete flat-work of lawn clippings, bark, dust, and dirt after each visit.
d. Chemical Applications & Weed Control
● Fertilizer: Apply an effective fertilizer to all lawns, shrubs, plants, and ground cover every May in strict accordance with manufacturer instructions.
● Weed Control: Keep lawns, native grass areas, beds, and gravel areas free of weeds at all times. Apply chemical weed control twice per year (March and June).
● Fire Ant Control: Provide fire ant control in lawns and flower beds bi-weekly. Treat as-need.
e. Pruning & Mulching
● Trimming & Pruning: Prune, clip, pinch back, and shape all plants, shrubs, and trees to maintain a neat appearance twice per year (March and June).
● Mulch: Replace mulch or pine straw in all flower beds annually during March timeframe (2-3 inches depth).
f. Upper Air (U/A) Building Secured Area
● Mow and weed-trim within 10 feet of the U/A Building, its leading sidewalk, associated asphalt pads, and inside the secured fenced area.
● Note: Contractor personnel must be escorted by NWS staff at all times while inside this secured area.
5.0 Regulatory, Safety, and Personnel Requirements
5.1 Licensing & Compliance
● The Contractor shall procure and maintain, at their own expense, all necessary municipal, State, and Federal permits and licenses.
● All operations must comply with Title 7, Chapter 6, Section 136 of the United States Code
(Insecticides and Environmental Pesticide Control).
● Personnel handling or applying pesticides/herbicides must be state-certified and licensed. Proof of certification for all applicable employees must be submitted with the offer package.
5.2 Product Safety & Safety Data Sheets (SDS)
● All products must be non-toxic, biodegradable, environmentally friendly, and derived from renewable (non-petroleum) sources. (Standard EPA-registered commercial products that meet 52.223-2.)
● The Contractor must provide a product list and standard Safety Data Sheets (SDS) to the MIC or ASA for approval prior to use, in accordance with the OSHA Hazard Communication Standard.
5.3 Personnel Supervision
● The Contractor’s supervisor shall oversee onsite operations, enforce strict discipline, and ensure compliance with all facility regulations.
● The Contractor shall promptly remove any employee whose work or conduct is deemed unsatisfactory by the MIC.
● The Contractor must immediately report any noted ground defects, plant diseases, or insect infestations to the MIC.
6.0 Quality Assurance & Inspection
If any services do not conform to contract requirements, the Government may require the Contractor to re-perform the services at no additional cost. If the defects cannot be corrected via re-performance, the contract price may be reduced to reflect the reduced value of the services, or the
Government may take action to ensure future compliance.
7.0 Invoicing & Documentation
● Invoices shall be billed monthly, in arrears, and must clearly display the relevant Purchase Order
(PO) number.
● The Contractor must complete a physical service ticket at the end of each visit, obtain a signature from the site manager or other designated official, and attach copies of all signed tickets to the monthly invoice.
8.0 Federal Holidays & Site Closures
The Contractor shall observe standard Federal holidays (including Juneteenth National
Independence Day). If a holiday falls on a Saturday, it is observed on the preceding Friday; if on a
Sunday, it is observed on the following Monday.
● The Contractor shall provide sufficient personnel to maintain critical tasks already in operation during holidays, guided by the MIC.
● In the event of emergency site closures (e.g., severe weather), the Contractor must contact the
MIC for guidance.
9.0 Security Clearances
The Certification & Accreditation (C&A) Requirements of Clause 73 do not apply to this contract; a
Security Accreditation Package is not required.
Appendix: Site Visit Information
● Contact Person: John Goforth, john.goforth@noaa.gov or Lakeysha Johnson, lakeysha.johnson@noaa.gov, 601-965-4639 EXT 221
● Available Windows: Monday through Friday, between 8:30 PM and 2:30 PM mailto:john.goforth@noaa.gov mailto:lakeysha.johnson@noaa.gov
File details come from the government source that posted it. Updated .