1305M325Q0075 LIX SOW Rev 02.18.2025.docx

DOCX document 58 KB Posted

Attached to
Non-Personal Services to Replace HVAC Condenser Units at NWS Forecast Office, Slidell, LA
Solicitation number
1305M325Q0075
Issued by

About this file

This is a Statement of Work and RFQ for replacing HVAC condensing units at the National Weather Service (NWS) Weather Forecast Office in Slidell, LA. The work requires replacing two 30-ton Trane condensing units for operations areas, one 15-ton Trane unit for the technician area, and three Liebert DCDF205-A condensing units for the equipment room. The contractor must provide all labor, supervision, tools, equipment, and materials for removal and installation, including refrigerant recovery and proper disposal of old units.

The solicitation (1305M325Q0075) is a total small business set-aside under NAICS 333415 with a size standard of 1,250 employees. Quotes are due by 4:00 PM MST on February 20, 2025, submitted electronically to Marilyn.Herrera@noaa.gov. The period of performance is 120 days from award. Key requirements include a minimum 5-year warranty on parts and 1-year warranty on workmanship. The evaluation criteria prioritize technical approach and past performance over price. A site visit is highly recommended but not optional. All products must meet Buy American-Supplies requirements, and Service Contract Labor Standards wage rates apply for St. Tammany Parish, LA.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

NWS (LIX) WEATHER FORECAST OFFICE

62300 Airport rd Slidell, LA 70460-5243

Replace Condensing Units (CU) # 1, 2, 3 And Liebert CU 1,2,3

INTRODUCTION:

The National Weather Service (NWS) Weather Forecast Office (WFO) located in Slidell, La (LIX) air conditioning equipment is in urgent need of attention. This equipment is at the end of its useful life and requires replacement.

OBJECTIVE: This is a brand name or equivalent but the CUs must be the same capacity/tonnage

To replace the (2) Trane 30-ton condensing units (CU) for the Operations area, (1) Trane 15-ton CU for the Technician area, and (3) Liebert DCDF205-A condensing units for the Equipment room. All associated equipment for the three split systems shall be replaced. LIX WFO is an active operation. Air conditioning disruption must be minimized to allow for sustained operations.

SCOPE:

The contractor shall provide all labor, supervision, tools, equipment, transportation, material and incidentals necessary to remove and reinstall the Condensing Units and any associated equipment to ensure proper, efficient operation of the new condensing units. The contractor shall verify proper function of the HVAC Controls after installation is complete.

The contractor shall provide the National Weather Service with the following: Replacement of two (2) existing Trane model # RAUJC304BC030BD000009, 460V, 3 Ph. 410A Condensing Unit (ACU # 1) and (ACU # 2) with equivalent units, furnish a (1) replacement for the existing model J15YDC00A4ALM5, 460V, 3 Ph. 410A Air Condensing Unit (ACU #3) with equivalent unit, and furnish three (3) equivalent replacement Liebert CU model DCDF205-A, 460v, 3 Ph, units. This includes; but is not limited to, Condensing Units, driers, refrigerant, refrigerant recovery, all labor and associated work required to restore the systems to a fully operational system. All tonnage should be equivalent to current condensing units.

DELIVERY:

1. The Contactor shall provide a minimum five (5) year written warranty on parts and one (1) year written warranty on workmanship.

2. The Contractor shall provide a Work Performance Plan and Schedule to the NWS for review and approval, prior to the start of the project.

CONTRACTOR TASKS:

1. Contractor shall recover and store refrigerant as per EPA Standards. The recovered Freon shall be left on site and returned to the Government.

2. Disconnect, remove and dispose of old condensing units.

3. Connect the new compressors/condensers to the existing refrigerant piping including new refrigerant driers. Replace aluminum insulation jacket.

4. Connect the new compressors/condensing units to the existing electrical service.

5. Secure the new condensing units to the concrete foundation.

6. Provide all rigging to remove and replace compressor/condenser units without damaging existing landscape. Contractor shall be responsible for restoring work area to original condition.

7. Charge systems with refrigerant. Install site glass inside condensing units.

8. Start-up and verify operation of systems.

9. Contractor shall be responsible for all permits and permit fees required to complete the work as necessary.

10. Clean work area at completion of job and remove all trash and waste.

SECURITY:

1. Contractor shall comply with Federal security requirements.

2. Smoking and weapons are prohibited on Federal property.

3. Contractor shall maintain site security as instructed by the site Point of Contact.

4. All work performed on this Contract shall be performed by Legal Immigrants or Citizens of the USA. All Immigrants working on this project shall be required to provide documentation to prove their Legal Immigration Status in the USA.

OTHER REQUIREMENTS:

1. Interested parties are encouraged to make an appointment to visit the worksites prior to bidding.

2. Contractor shall coordinate all work with the designated Weather Forecast Office (Site) Points of Contact.

3. Work shall be performed in a manner that minimizes equipment downtime.

4. All utility outages shall be approved by the NWS and be scheduled with the NWS at least two weeks in advance.

PLACE OF PERFORMANCE:

NWS (LIX) Forecast Office
62300 Airport rd

Slidell, La 70460-5243

CONTACTS FOR ATLANTA WEATHER FORECAST OFFICE:

Primary/COR: TO BE PROVIDED AT TIME OF AWARD

Site: TO BE PROVIDED AT TIME OF AWARD

PERIOD OF PERFORMANCE:

1. The contract shall be completed within 120 days from date of award.

2. All required submittals shall be submitted to the Contracting Officer and/or COR within 14 calendar days from the date of award. The following data will be required.

- Cut sheets and Manufactures data for condenser units being used.
- Project Manager and Onsite Manager
- Contact information for both

STANDARD REQUIREMENTS

Code Compliance. The Contractor shall comply with all local, state, and Federal environmental, health, and safety regulations while conducting this work. In additional, the Contractor shall ensure that all work is in compliance with the applicable codes.

1. Disposal. The Contractor will be required to properly remove and dispose of all waste material.

2. Work shall be performed between 7:00am & 5:00pm Monday thru Friday unless otherwise approved by the COR. Contractor agrees to observe all Federal Holidays, plus any other day off work designated by Federal Statute, Executive Order, or Presidential Proclamation:

2025 Holiday Schedule

Date
Holiday
Wednesday, January 01
New Year’s Day
Monday, January 20
Birthday of Martin Luther King, Jr.
Monday, January 20 *
Inauguration Day
Monday, February 17 **
Washington’s Birthday
Monday, May 26
Memorial Day
Thursday, June 19
Juneteenth National Independence Day
Friday, July 04
Independence Day
Monday, September 01
Labor Day
Monday, October 13
Columbus Day
Tuesday, November 11
Veterans Day
Thursday, November 27
Thanksgiving Day
Thursday, December 25
Christmas Day

*This holiday is designated as "Inauguration Day" in section 6103(c) of title 5 of the United States Code, which is the law that specifies holidays for Federal employees. Federal employees in the Washington, DC, area are entitled to a holiday on the day a President is inaugurated on January 20th for each fourth year after 1965.

**This holiday is designated as "Washington's Birthday" in section 6103(a) of title 5 of the United States Code, which is the law that specifies holidays for Federal employees. Though other institutions such as state and local governments and private businesses may use other names, it is our policy to always refer to holidays by the names designated in the law.

3. Project sign in sheet shall be completed each day for employees on site.

4. Government Contact. The Contracting Officer’s Representative (COR) will serve as the Government’s point of contact for all submissions.

5. The Government does not warrant that any documents provided as attachments to be free from discrepancies, ambiguities, errors, omissions, or changing conditions. It is the responsibility of the Contractor to confirm existing conditions and resolve discrepancies between documents.

6. Key Personnel The contractor will provide the following Key Personnel positions prior to the start of the project. These positions can be occupied by the same person but must be able to fulfill both position roles. Before Key Personnel changes are made, the COR must be notified in writing prior to the change.

Project Manager – Must be able to represent the contractor in regards tocontract requirements and/issues.
Onsite Manager – Must be at the location of project whenever work is being performed by contractor or subcontractors. Communication with NWS personnel must be through this position.

7. Service Contract Labor Standards (SCLS) wage rates apply for St. Tammany Parish LA.

SAFETY AND EMERGENCY PLAN:

A.Contractor shall observe and institute all applicable OSHA safety requirements and procedures to prevent accidents and injuries to both Contractor and Government employees including 40 CFR 1926 Subpart M for fall protection requirements.
B.Contractor shall designate one person as Safety Coordinator for purposes of communication between the Contractor and the National Weather Service Primary Contact: TO BE PROVIDED AT TIME OF AWARD
C.Contractor shall provide a Safety Plan and Procedure to protect employees from being injured while on the job site. Submit plan to the COR for review and approval.
D.Contractor shall provide an Emergency Plan and Procedure to provide immediate care for an employee injured while on the job site. Submit plan to the COR for review and approval.

GOVERNMENT PROVIDED MATERIALS AND/OR SERVICES

A. EXCLUSIONS. Except as indicated elsewhere in this SOW, the Government will provide no data, materials, equipment and/or services to the Contractor. Any and all research required to fulfill the SOW described herein, shall be the responsibility of the Contractor. The Government retains the right to request the Contractor to acquire additional information on behalf of the Government.

B. The Government does not warrant that any documents provided as attachments to be free from discrepancies, ambiguities, errors, omissions, or changing conditions. It is the responsibility of the Contractor to confirm existing conditions and resolve discrepancies between documents.

END OF STATEMENT OF WORK

image1.jpeg

File details come from the government source that posted it. Updated .