ATTACHMENT 1.10 Building 3 Addition REV1 1305M324R0067 0001.pdf
PDF 3 MB Posted
- Solicitation number
- 1305M324R0067
About this file
This document is an attachment to a federal contract solicitation for the Building 3 Addition Project at the National Oceanic and Atmospheric Administration (NOAA) Great Lakes Environmental Research Laboratory (GLERL) facility in Muskegon, Michigan.
The solicitation seeks a single Firm-Fixed-Price contract for all work related to the building addition, including planning, labor, materials, equipment, permits, and transportation. Key details include a site visit on July 12, 2024, proposal due date of August 5, 2024, and anticipated award in August or September 2024. The attached documents provide architectural, structural, and other technical drawings and specifications for the addition. The contractor will be required to comply with applicable construction standards and codes, as well as environmental and labor requirements.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A AXIAL CONNECTION FORCE (KIPS)
ARCH. ARCHITECTURAL
B.O BOTTOM OF
B.O.F BOTTOM OF FOOTING
B.O.L BOTTOM OF LINTEL
B.O.S BOTTOM OF STEEL BEAMS
B.P BEARING PLATE
BRG. BEARING
CFS COLD FORMED STEEL
C.J. CONTROL JOINT
CLR. CLEAR
COL. COLUMN
C# COLUMN NUMBER
CONC. CONCRETE
CONT. CONTINUOUS
D.E DECK EDGE
D.B DECK BEARING
DWG. DRAWING
EA EACH
E.F EXHAUST FAN
ELEV. ELEVATION
EQ. EQUAL
E.W EACH WAY
F.D FLOOR DRAIN
FDN. FOUNDATION
F.F FINISHED FLOOR
FRM. FRAMING
FTG. FOOTING
F.V FIELD VERIFY
GA. GAUGE
GALV. GALVANIZED
HORIZ. HORIZONTAL
J.B JOIST BEARING
LGMF LIGHT GAUGE METAL FRAMING
M MOMENT CONNECTION FORCE (KIP-FT)
MAX. MAXIMUM
MECH. MECHANICAL
MEZZ. MEZZANINE
MIN. MINIMUM
O.C ON CENTER
O.H OVERHEAD
OPP. OPPOSITE HAND
P.A.F POWDER ACTUATED FASTENER
PEMB PRE-ENGINEERED METAL BUILDING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PW PRECAST WALL
R.D ROOF DRAIN
REINF. REINFORCEMENT/REINFORCING
REQ. REQUIRED
R.O ROUGH OPENING
RTU ROOF TOP UNIT
SCHED. SCHEDULE
SEMC. SEISMIC
S.F STEP FOOTING
SHT. SHEET
SIM. SIMILAR
SJI STEEL JOIST INSTITUTE
S.O.G SLAB-ON-GRADE
STD. STANDARD
T&B TOP AND BOTTOM
T.O TOP OF
T.O.C TOP OF COLUMN
T.O.F TOP OF FOOTING
T.O.G TOP OF OPEN WEB JOIST GIRDER
T.O.J TOP OF JOIST
T.O.P TOP OF PIER
T.O.S TOP OF STEEL
T.O.W TOP OF WALL
TYP. TYPICAL
U.N.O UNLESS NOTED OTHERWISE
V SHEAR CONNECTION FORCE (KIPS)
VERT. VERTICAL
W.P WORK POINT
W.W.M WELDED WIRE MESH
ABBREVIATIONS
S001 STRUCTURAL & GENERAL NOTES
S101 FOUNDATION PLAN
S301 FOUNDATION DETAILS
SHEET INDEX
S E A
L
S
O
IL
S A
N D
S T
R U
C T
U R
E S
IN
C
T H
IS
D
R A
W
IN
G M
A Y
B E U
T
IL
IZ
E D
O N
L Y
F O
R T
H E P
U R
P O
S E O
F C
O N
S T
R U
C T
IN
G
O R
I N
S T
A L L
IN
G T
H E W
O R
K S
H O
W N
T H
E R
E O
N A
T T
H E S
IT
E O
F T
H E W
O R
K
S P
E C
IF
IE
D A
N Y
O T
H E R
U S
E O
F T
H
IS
D R
A W
IN
G
IN
C L U
D
IN
G W
IT
H
O U
T L
IM
IT
A T
IO
N
A N
Y R
E P
R O
D U
C T
IO
N
O R
A L T
E R
A T
IO
N
O F T
H
IS
D R
A W
IN
G
W
IT
H
O U
T
T H
E P
R
IO
R W
R
IT
T E N
A P
P R
O V
A L O
F S
O
IL
S A
N D
S T
R U
C T
U R
E S
IN
C
IS
P R
O H
IB
IT
E D
R E V
IS
IO
N C
O M
M E N
T D
A T
E
.1
.2
B
ID
S
P
E R
M
IT
S A
D A
T E
N A
M E
D R
B
Y
E N
G B
Y
A P
R B
Y
P R
K
.1
.2
.1
.2
K
S F
J O
B N
O
GE
NE
RA
L N
OT
ES
S
CH
ED
UL
ES
N O
A A
G R
EA
T
L A
K
ES
E N
V
IR
O N
M
EN
T A
L R
ES
EA
R C
H L
A B
B E A
C H
S T
R E E T
M U
S K
E G
O N
M
I
.0
SHEET NO.
S-001
GENERAL NOTES
1. ALL APPLICABLE LOCAL, STATE AND FEDERAL RULES, REGULATIONS, ORDINANCES AND
CODES SHALL APPLY THROUGHOUT THE PROJECT.
2. THE STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH 2015 MICHIGAN BUILDING
CODE.
3. THE FOLLOWING LOADS HAVE BEEN USED FOR DESIGN PURPOSES:
A. BUILDING DESIGN CATEGORY II
B. SNOW LOADS
GROUND SNOW LOAD (Pg) 60 psf
SNOW EXPOSURE FACTOR (Ce) 0.9
SNOW LOAD IMPORTANCE FACTOR (ls) 1.0
THERMAL FACTOR (Ct) 1.1
FLAT ROOF SNOW LOAD (Ps) 42 psf
C. WIND LOADS
BASIC WIND SPEED (V) 115 mph
WIND IMPORTANCE FACTOR (Iw) 1.0
WIND EXPOSURE CATEGORY D
INTERNAL PRESSURE COEFFICIENT (GCpi) ±0.18
D. SEISMIC LOAD
SEISMIC IMPORTANCE FACTOR (Ie) 1.0
MAPPED SPECTRAL RESPONSE COEFFICIENTS:
SHORT PERIOD (Ss) 0.071g
1 SECOND PERIOD (S1) 0.044g
SPECTRAL RESPONSE COEFFICIENTS:
SHORT PERIOD (Sds) 0.075g
1 SECOND PERIOD (Sd1) 0.071g
RESPONSE MODIFICATION COEFFICIENT (R) 6.5
SEISMIC RESPONSE COEFFICIENT (Cs) 0.012
SITE CLASS D
SEISMIC DESIGN CATEGORY B
BASIC SEISMIC-FORCE RESISTING SYSTEM:
LIGHT FRAME COLD-FORMED STEEL WALLS WITH PANELS
ANALYSIS PROCEDURE:
EQUIVALENT LATERAL FORCE ANALYSIS
E. LIVE LOAD
ROOF 20 psf
FLOOR SLAB ON GRADE 100 psf
F. DEAD LOAD
ROOF - SUPERIMPOSED
ROOFING, INSULATION, CEILINGS 12 psf
HVAC ALLOWANCE 4 psf
FLOOR - SUPERIMPOSED 12 psf
4. VERIFY ALL APPLICABLE DIMENSIONS AND ELEVATIONS WITH ARCHITECTURAL DRAWINGS
PRIOR TO CONSTRUCTION.
5. VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION. IF EXISTING CONDITIONS DIFFER
FROM WHAT IS SHOWN, SOILS & STRUCTURES SHALL BE NOTIFIED IMMEDIATELY SO THE
DESIGN AMY BE PROPERLY MODIFIED.
6. DO NOT SCALE DRAWINGS.
7. CONTRACTOR TO COORDINATE WITH ARCHITECTURAL, MECHANICAL AND ELECTRICAL
DRAWINGS FOR ALL OPENINGS AND PENETRATIONS. NO OPENINGS SHALL PENETRATE
STRUCTURAL ELEMENTS WITHOUT THE ENGINEER OF RECORD'S APPROVAL.
8. ALL SPECIAL INSPECTIONS AND STRUCTURAL TESTS SHALL BE PERFORMED IN
ACCORDANCE WITH CHAPTER 17 OF THE 2015 MICHIGAN BUILDING CODE.
9. IF THERE ARE ANY CONFLICTS BETWEEN THE SPECIFICATIONS AND DESIGN DRAWINGS
PLEASE NOTIFY THE ARCHITECT.
10. THE CONTRACTOR IS RESPONSIBLE FOR ADEQUATELY SHORING, UNDERPINNING, SHEET
PILING, ETC AGAINST EXISTING STRUCTURES AS REQUIRED SO THEY ARE NOT DAMAGED
DURING CONSTRUCTION.
1 . ALL INDICATED STRUCTURAL ELEVATIONS ARE BASED ON THE GROUND FLOOR FINISHED
TOP SURFACE ELEVATION OF 100'-0".
CONTRACTOR PROPOSED ALTERNATES TO THE CONTRACT DRAWINGS AND
SPECIFICATIONS WILL BE CONSIDERED IF THEY RESULT IN SUBSTANTIAL SAVINGS TO THE
OWNER WITHOUT ADVERSELY IMPACTING THE INTEGRITY AND FUNCTION OF THE
STRUCTURE. ANY REQUEST FOR SUBSTITUTION SHALL BE ACCOMPANIED BY WRITTEN
DOCUMENTATION OF THE SAVINGS INCLUDING ALL BACKUP DATA AND SEALED
ENGINEERING CALCULATIONS NECESSARY TO EVALUATE THE MERITS OF THE PROPOSED
ALTERNATE. ADDITIONAL ENGINEERING AND ARCHITECTURAL REVIEW COSTS MAY IMPACT
THE VIABILITY OF ANY PROPOSED ALTERNATE.
REPRODUCTIONS OF CONTRACT STRUCTURAL DRAWINGS SHALL NOT BE USED FOR SHOP
DRAWINGS. ELECTRONIC FILES ARE NOT AVAILABLE FOR USE BY SUBCONTRACTORS.
SOILS AND STRUCTURES SHALL BE PROVIDED (2) COPIES OF ALL STRUCTURAL SHOP
DRAWINGS FOR REVIEW PRIOR TO CONSTRUCTION FOR CONFORMANCE TO THE DESIGN
CONCEPT ONLY . WE WILL RETURN (1) COPY WITH OUR RED-MARKED COMMENTS IN A
MINIMUM OF (5) BUSINESS DAYS TIME FROM RECEIVING OUR COPIES. NO WORK SHALL BE
PERFORMED WITHOUT REVIEWED SHOP DRAWINGS.
FRAMING CONDITIONS NOT SPECIFICALLY DETAILED OR INDICATED SHALL BE FRAMED
SIMILAR TO DETAILS SHOWN FOR THE RESPECTIVE MATERIAL OR CONDITION.
STRUCTURAL NOTES
CONCRETE
1. ALL CONCRETE HAS BEEN DESIGNED AND SHALL BE BUILT IN ACCORDANCE WITH THE
LATEST EDITION OF ACI 318
2. ALL CONCRETE TO HAVE A 28-DAY COMPRESSIVE STRENGTH OF 4000 PSI.
3. THE USE OF CHLORIDE ACCELERATORS IN ANY CONCRETE MIX DESIGN IS NOT PERMITTED.
4. CONCRETE EXPOSED TO FREEZE THAW CYCLES OR DEICING CHEMICALS SHALL BE AIR
ENTRAINED WITH AIR CONTENT PER ACI TABLE 19.3.3.1 EXPOSURE CLASS F3 AND SHALL
HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 4500 PSI.
5. ALL COLD WEATHER CONCRETE SHALL BE CONSTRUCTED AND PLACED PER ACI 306R.
6. ALL REINFORCING STEEL BARS TO BE ASTM A615 GRADE 60 DEFORMED AND ALL
DEFORMED WELDED WIRE FABRIC TO BE ASTM A185. ALL REINFORCING TO BE PLACED IN
ACCORDANCE WITH THE LATEST EDITION OF ACI 318 AND CRSI SPECIFICATIONS.
7. CONCRETE COVER FOR REINFORCING (UNLESS NOTED OTHERWISE):
A. CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH = 3"
B. EXPOSED TO EARTH OR WEATHER:
#6 THRU #18 BARS = 2"
#5 BARS AND 5/8" WIRE AND SMALLER = 1-1/2"
C. NOT EXPOSED TO EARTH OR WEATHER:
1. SLABS, WALLS AND JOISTS
#14 AND #18 BARS = 1-1/2"
#11 AND SMALLER BARS = 3/4"
2. BEAMS, GIRDERS AND COLUMNS:
PRINCIPAL REINFORCEMENT, TIES, STIRRUPS AND SPIRALS = 1-1/2"
8. MINIMUM CLEAR SPACE BETWEEN PARALLEL BARS IN A LAYER INCLUDING SPLICE BARS,
SHALL NOT BE LESS THAN:
A. FOR COLUMNS & PEDESTALS:
1. THE DIAMETER OF THE BAR TIMES 1.5
2. 1-1/2"
3. 1.33 TIMES THE MAXIMUM AGGREGATE SIZE.
B. FOR ALL OTHER BARS:
1. THE DIAMETER OF THE BAR
2. 1"
3. 1.33 TIMES THE MAXIMUM AGGREGATE SIZE.
9. ALL FILL REQUIRED SHALL BE COMPACTED AND TESTED TO A MINIMUM OF 95% OF ITS
MAXIMUM DENSITY AS DETERMINED BY ASTM D1557.
10. ALL NEW CONCRETE SHALL BE CURED IMMEDIATELY AFTER FINISHING OF REMOVING
FORMWORK. CURING SHALL BE EITHER A MOIST CURE METHOD OF THE USE OF A CURING
COMPOUND.
11. PROVIDE CORNER BARS THAT MATCH CONTINUOUS REINFORCEMENT SIZE AND QUANTITY
AT ALL INTERSECTIONS AND CORNERS OF FOOTINGS AND WALLS.
12. FOOTINGS SHALL BE PLACED ON SOLID BEARING REGARDLESS OF THE ELEVATION SHOWN
ON THE DRAWINGS. IF THE SOIL CONDITIONS ARE QUESTIONABLE, REFER TO SOILS AND
STRUCTURES FOR DIRECTION.
13. AN ALLOWABLE SOIL BEARING PRESSURE OF 2,500 POUNDS PER SQUARE FOOT WAS USED
FOR DESIGN PURPOSES.
14. ALL EXPOSED EXTERNAL CORNERS OF FOUNDATIONS TO BE CHAMFERED 3/4" BY 45
DEGREES UNLESS NOTED OTHERWISE.
15. FOUNDATION WALLS SHALL NOT BE BACKFILLED UNTIL CONCRETE HAS REACHED ITS
28-DAY COMPRESSIVE STRENGTH, AND THE WALLS MUST BE ADEQUATELY BRACED W/
TEMPORARY BRACING AND/OR FLOOR SLAB IS INSTALLED.
16. INSTALL RIGID INSULATION ON ALL PERIMETER FOUNDATION WALLS, REFER AND
COORDINATE WITH ARCHITECTURAL DRAWINGS.
17. THE WELDING OF REINFORCING STEEL BARS IS NOT PERMITTED, INCLUDING BUT NOT
LIMITED TO TACK WELDS, BUTT WELDS, GROOVE WELDS, ETC.
18. CONTRACTOR SHALL SUBMIT MIX DESIGNS FOR APPROVAL TO SOILS & STRUCTURES FOR
ALL CAST-IN-PLACE CONCRETE INCLUDING FOUNDATIONS, WALLS, AND FLOOR SLABS.
EXCLUDES PAVING OR OTHER EXTERIOR CONCRETE BY OTHERS.
CONCRETE
REINFORCING STEEL
LAP SPLICES
SIZE TOP BARS OTHER BARS
#3 24" 21"
#4 33" 27"
#5 42" 33"
#6 51" 39"
#7 72" 54"
#8 81" 63"
#9 93" 72"
#10 102" 81"
#11 114" 87"
SOIL SPECIAL INSPECTION
VERIFICATION AND INSPECTION TASK CONTINUOUS DURING TASK LISTED PERIODICALLY DURING TASK LISTED
VERIFY MATERIALS BELOW FOOTINGS ARE ADEQUATE TO
ACHIEVE THE DESIGN BEARING CAPACITY.
----- X
VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH
AND HAVE REACHED PROPER MATERIAL.
----- X
PERFORM CLASSIFICATION AND TESTING OF CONTROLLED
FILL MATERIALS.
----- X
VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT
THICKNESS DURING PLACEMENT AND COMPACTION OF
CONTROLLED FILL.
X -----
PRIOR TO PLACEMENT OF CONTROLLED FILL, OBSERVE
SUBGRADE AND VERIFY THAT SITE HAS BEEN PREPARED
PROPERLY.
----- X
CONCRETE SPECIAL INSPECTION
VERIFICATION AND INSPECTION CONTINUOUS PERIODIC REFERENCED STANDARD IBC REFERENCE
INSPECT REINFORCEMENT, INCLUDING PRESTRESSING
TENDONS, AND VERIFY PLACEMENT.
----- X ACI 318: 20, 25.2, 25.3, 26.6.1-26.6.3 1908.4
REINFORCING BAR WELDING:
A. VERIFY WELDABILITY OF REINFORCING BARS OTHER THAN
ASTM A706;
B. INSPECT SINGLE-PASS FILLET WELDS, MAXIMUM 5
16"; AND
C. INSPECT ALL OTHER WELDS.
X
X
X
AWS D1.4
ACI 318: 26.6.4
3 INSPECT ANCHORS CAST IN CONCRETE. ----- X ACI 318: 17.8.2 -----
INSPECT ANCHORS POST-INSTALLED IN HARDENED CONCRETE
MEMBERS.
A. ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR
UPWARDLY INCLINED ORIENTATIONS TO RESIST SUSTAINED
TENSION LOADS.
B.MECHANICAL AND ADHESIVE ANCHORS NOT DEFINED IN 4.A.
X
X
ACI 318: 17.8.2.4
ACI 318: 17.8.2
5 VERIFY USE OF REQUIRED DESIGN MIX. ----- X ACI 318: CH. 19, 26.4.3, 26.4.4
1904.1, 1904.2, 1908.2, 1908.3
PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS FOR
STRENGTH TESTS, PERFORM SLUMP AND AIR CONTENT TESTS,
AND DETERMINE THE TEMPERATURE OF THE CONCRETE.
X -----
ASTM C 172
ASTM C 31
ACI 318: 26.4, 26.12
1908.10
INSPECT CONCRETE AND SHOTCRETE PLACEMENT FOR
PROPER APPLICATION TECHNIQUES.
X ----- ACI 318: 26.5 1908.6, 1908.7, 1908.8
VERIFY MAINTENANCE OF SPECIFIED CURING TEMPERATURE
AND TECHNIQUES.
----- X ACI 318: 26.5.3-26.5.5 1908.9
9 INSPECT ERECTION OF PRECAST CONCRETE MEMBERS. ----- X ACI 318: 26.8 -----
INSPECT FORMWORK FOR SHAPE, LOCATION AND DIMENSIONS
OF THE CONCRETE MEMBER BEING FORMED.
----- X ACI 318: 26.11.1.2(b) -----
12.
13.
14.
15.
TYP.
50'-4"
1 2 3 4
N O R
TH
SCALE: 1/4" = 1'-0"
FOUNDATION PLAN
AREA NOT IN SCOPE
EXISTING 1-STORY PRE-ENGINEERED
METAL BUILDING
5'-0"
'-0
'-1
11"
S301
S301
W
T
.O .F
'-0
W
T
.O .F
'-0
S301
11"
NEW 6" CONC. SLAB-ON-GRADE, REINFORCED
WITH 6X6 W2.9XW2.9 WWF PLACED 2" FROM
TOP OF SLAB. PROVIDE 10 MIL VAPOR BARRIER
OVER 12" MIN. OF COMPACTED MDOT CLASS II
GRANULAR FILL OR MDOT 6AA AGGREGATED FILL
COMPACTED PER CONCRETE NOTE #9.
W18
B.O.F. = MATCH EXIST.
W18 T.O.F. = 97'-0"
PROVIDE CONTROL JOINTS AT A
MAX SPACING OF 14'-0" O.C. EA.
WAY PER DETAIL 5/S301, TYP.
SHEET NO.
S-101
J O
B N
O
D A
T E
N A
M E
D R
B
Y
E N
G B
Y
A P
R B
Y
S
O
IL
S A
N D
S T
R U
C T
U R
E S
IN
C
T H
IS
D
R A
W
IN
G M
A Y
B E U
T
IL
IZ
E D
O N
L Y
F O
R T
H E P
U R
P O
S E O
F C
O N
S T
R U
C T
IN
G
O R
I N
S T
A L L
IN
G T
H E W
O R
K S
H O
W N
T H
E R
E O
N A
T T
H E S
IT
E O
F T
H E W
O R
K
S P
E C
IF
IE
D A
N Y
O T
H E R
U S
E O
F T
H
IS
D R
A W
IN
G
IN
C L U
D
IN
G W
IT
H
O U
T L
IM
IT
A T
IO
N
A N
Y R
E P
R O
D U
C T
IO
N
O R
A L T
E R
A T
IO
N
O F T
H
IS
D R
A W
IN
G
W
IT
H
O U
T
T H
E P
R
IO
R W
R
IT
T E N
A P
P R
O V
A L O
F S
O
IL
S A
N D
S T
R U
C T
U R
E S
IN
C
IS
P R
O H
IB
IT
E D
R E V
IS
IO
N C
O M
M E N
T D
A T
E S
E A
L
LEGEND
MARK
W18
FOOTING SCHEDULE
DIMENSIONS
LENGTH
CONT.
WIDTH
1'-6"
THICKNESS
12"
REINFORCING
(2) #5 BARS CONT.
TOP OF WALL 8" BELOW FINISHED FLOOR
J O
B N
O
FO
UN
DA
TI
ON
P
LA
N
- N
EW
W
OR
K
N O
A A
G R
EA
T
L A
K
ES
E N
V
IR
O N
M
EN
T A
L R
ES
EA
R C
H L
A B
B E A
C H
S T
R E E T
M U
S K
E G
O N
M
I
.0
S
O
IL
S A
N D
S T
R U
C T
U R
E S
IN
C
T H
IS
D
R A
W
IN
G M
A Y
B E U
T
IL
IZ
E D
O N
L Y
F O
R T
H E P
U R
P O
S E O
F C
O N
S T
R U
C T
IN
G
O R
I N
S T
A L L
IN
G T
H E W
O R
K S
H O
W N
T H
E R
E O
N A
T T
H E S
IT
E O
F T
H E W
O R
K
S P
E C
IF
IE
D A
N Y
O T
H E R
U S
E O
F T
H
IS
D R
A W
IN
G
IN
C L U
D
IN
G W
IT
H
O U
T L
IM
IT
A T
IO
N
A N
Y R
E P
R O
D U
C T
IO
N
O R
A L T
E R
A T
IO
N
O F T
H
IS
D R
A W
IN
G
W
IT
H
O U
T
T H
E P
R
IO
R W
R
IT
T E N
A P
P R
O V
A L O
F S
O
IL
S A
N D
S T
R U
C T
U R
E S
IN
C
IS
P R
O H
IB
IT
E D
R E V
IS
IO
N C
O M
M E N
T D
A T
E
.1
.2
B
ID
S
P
E R
M
IT
S A
D A
T E
N A
M E
D R
B
Y
E N
G B
Y
A P
R B
Y
P R
K
K S
F
D A
T E
N A
M E
D R
B
Y
E N
G B
Y
A P
R B
Y
P R
K
.1
.2
.1
.2
K
S F
D A
T E
N A
M E
D R
B
Y
E N
G B
Y
A P
R B
Y
P R
K
.1
.2
.1
.2
K
S F
DETAIL
1/S301
F.F. = FINISHED FLOOR = 100'-0"
T.O.W. = TOP OF WALL = 100'-0" U.N.O.
T.O.F. = TOP OF FOOTING = 97'-0" U.N.O.
B.O. FTG.
MATCH EXIST.
8"
T.O.W 99'-4"
FIN. FLOOR
100'-0"
SCALE: 3/4" = 1'-0"S101
2 FOUNDATION WALL @ EXIST.
(2) #5 BARS CONT.
TOP & BOTTOM
#5 DOWELS FULL HEIGHT
@ 48" O.C. W/6" HOOK
RIGID INSULATION,
SEE ARCH.
CONCRETE FLOOR
SLAB, SEE PLAN
EPOXY #5 BARS 8" INTO EXIST.
FTG. @ 12" O.C. USING HILTI
HIT-HY 200 ADHESIVE
2" EXPANSION
MATERIAL
C L R8
M
IN
EXSISTING BUILDING
FND. WALL & FTG.
18"
24"
4" DOWEL
@ 12" O.C.
18"
24"
SLOPE
FIN. FLOOR
100'-0" 24"
18"
B.O. FTG.
96'-0"
T.O. WALL
99'-4"
T.O.F.
SEE PLAN
SCALE: 3/4" = 1'-0"S101
3 EXTERIOR FROST FREE SLAB
C L
R (2) #5 BARS CONT.
TOP & BOTTOM
2" EXPANSION
MATERIAL.
8" CONCRETE
WALL
4" DOWEL
@ 12" O.C.
4" DOWEL
@ 12" O.C.
CONC. FLOOR
SLAB, SEE PLAN
RIGID INSULATION,
SEE ARCH.
5" VERTICAL DOWEL
@ 48" O.C. W/6" HOOK,
ALT. HOOK DIRECTION
CONT. WALL FTG.
(SEE FTG. SCHEDULE
FOR SIZE & REINF.)
(2) #5 BARS CONT.
TOP & BOTTOM
11" EXT.
FND. WALL
T.O. WALL
99'-4"
SCALE: 3/4" = 1'-0"
TYPICAL TRENCH DETAIL4
S101
100'-0"
FIN. FLOOR
CONC. FLOOR
SLAB, SEE PLAN
M
IN
8" MIN 8" MIN
TRENCH DRAIN,
BY OTHERS
C L R
(3) #4 CONT.
#4 @ 18" O.C.
8" SAW CUT MIN. 14 SLAB DEPTH
SAWCUT WITHIN 8 HOURS OF POURING
TYP. CONTROL JOINT
NOTE: CONTROL JOINTS TO BE
SPACED AT MAX, 14'-0" O.C.
4"Ø X 2'-0" SMOOTH DOWELS @
12" O.C. CENTERED IN SLAB.
EXTEND 12" INTO SLAB
SCALE: 3/4" = 1'-0"
SLAB DETAILS5
S101
TYP. CONSTRUCTION JOINT
C L R
C
L R
10 MIL VAPOR
BARRIER
10 MIL VAPOR
BARRIER
MIN. 12" COMPACTED
AGGREGATE OR GRANULAR FILL
MIN. 12" COMPACTED
AGGREGATE OR GRANULAR FILL
EDGE EACH SIDE W/ 18" RADIUS
CONC. FLOOR
SLAB, SEE PLAN
CONC. FLOOR
SLAB, SEE PLAN
GRADE
T.O.F
SEE PLAN
FIN. FLOOR
100'-0"
SCALE: 3/4" = 1'-0"S101
1 TYP. FOUNDATION WALL
11"
METAL STUD WALL, METAL PANEL
& ANCHORAGE BY OTHERS
2" EXPANSION
MATERIAL
CONCRETE FLOOR
SLAB, SEE PLAN
#5 DOWELS FULL HEIGHT
@ 48" O.C. W/6" HOOK
ALT. HOOK DIRECTION
(2) #5 BARS CONT.
TOP & BOTTOM
RIGID INSULATION,
SEE ARCH.
WALL FOOTING, SEE
SCHEDULE FOR SIZE &
REINFORCEMENT
SHEET NO.
S-401
J O
B N
O
D A
T E
N A
M E
D R
B
Y
E N
G B
Y
A P
R B
Y
S
O
IL
S A
N D
S T
R U
C T
U R
E S
IN
C
T H
IS
D
R A
W
IN
G M
A Y
B E U
T
IL
IZ
E D
O N
L Y
F O
R T
H E P
U R
P O
S E O
F C
O N
S T
R U
C T
IN
G
O R
I N
S T
A L L
IN
G T
H E W
O R
K S
H O
W N
T H
E R
E O
N A
T T
H E S
IT
E O
F T
H E W
O R
K
S P
E C
IF
IE
D A
N Y
O T
H E R
U S
E O
F T
H
IS
D R
A W
IN
G
IN
C L U
D
IN
G W
IT
H
O U
T L
IM
IT
A T
IO
N
A N
Y R
E P
R O
D U
C T
IO
N
O R
A L T
E R
A T
IO
N
O F T
H
IS
D R
A W
IN
G
W
IT
H
O U
T
T H
E P
R
IO
R W
R
IT
T E N
A P
P R
O V
A L O
F S
O
IL
S A
N D
S T
R U
C T
U R
E S
IN
C
IS
P R
O H
IB
IT
E D
R E V
IS
IO
N C
O M
M E N
T D
A T
E S
E A
L
J O
B N
O
ST
RU
CT
RU
AL
D
ET
AI
LS
N O
A A
G R
EA
T
L A
K
ES
E N
V
IR
O N
M
EN
T A
L R
ES
EA
R C
H L
A B
B E A
C H
S T
R E E T
M U
S K
E G
O N
M
I
.0
S
O
IL
S A
N D
S T
R U
C T
U R
E S
IN
C
T H
IS
D
R A
W
IN
G M
A Y
B E U
T
IL
IZ
E D
O N
L Y
F O
R T
H E P
U R
P O
S E O
F C
O N
S T
R U
C T
IN
G
O R
I N
S T
A L L
IN
G T
H E W
O R
K S
H O
W N
T H
E R
E O
N A
T T
H E S
IT
E O
F T
H E W
O R
K
S P
E C
IF
IE
D A
N Y
O T
H E R
U S
E O
F T
H
IS
D R
A W
IN
G
IN
C L U
D
IN
G W
IT
H
O U
T L
IM
IT
A T
IO
N
A N
Y R
E P
R O
D U
C T
IO
N
O R
A L T
E R
A T
IO
N
O F T
H
IS
D R
A W
IN
G
W
IT
H
O U
T
T H
E P
R
IO
R W
R
IT
T E N
A P
P R
O V
A L O
F S
O
IL
S A
N D
S T
R U
C T
U R
E S
IN
C
IS
P R
O H
IB
IT
E D
R E V
IS
IO
N C
O M
M E N
T D
A T
E
.1
.2
B
ID
S
P
E R
M
IT
S A
D A
T E
N A
M E
D R
B
Y
E N
G B
Y
A P
R B
Y
P R
K
K S
F
D A
T E
N A
M E
D R
B
Y
E N
G B
Y
A P
R B
Y
P R
K
.1
.2
.1
.2
K
S F
D A
T E
N A
M E
D R
B
Y
E N
G B
Y
A P
R B
Y
P R
K
.1
.2
.1
.2
K
S F
| BLDG3ADD_A-101 Work (1) |
| BLDG3ADD_A-102 Work (1) |
| BLDG3ADD_A-103 Work (1) |
| BLDG3ADD_A-104 Work (1) |
| BLDG3ADD_A-201 Work (1) |
| BLDG3ADD_A-202 Work (1) |
| BLDG3ADD_A-401 Work (1) |
| BLDG3ADD_A-601 Work (1) |
| BLDG3ADD_E-001 Work (1) |
| BLDG3ADD_E-002 Work (1) |
| BLDG3ADD_E-101 Work (1) |
| BLDG3ADD_E-102 Work (1) |
| BLDG3ADD_G-001 Work (1) |
| BLDG3ADD_M-001 Work (1) |
| BLDG3ADD_M-002 Work (1) |
| BLDG3ADD_M-101 Work (1) |
| BLDG3ADD_M-401 Work (1) |
| BLDG3ADD_M-402 Work (1) |
| BLDG3ADD_M-601 Work (1) |
| BLDG3ADD_S-001 |
| Sheets and Views |
| S001 |
| BLDG3ADD_S-101 |
| BLDG3ADD_S-401 |
File details come from the government source that posted it. Updated .