QA Rev 4.docx
DOCX document 14 KB Posted
- Attached to
- Alaska Region Hydrogen Conexes
- Solicitation number
- 1305M320RNWWV0008
About this file
This document contains questions and answers regarding a solicitation for hydrogen conexes in Alaska. The National Oceanic and Atmospheric Administration (NOAA) seeks a contractor to construct conexes ready for NOAA personnel to install hydrogen systems upon arrival at sites in Alaska. Conexes must be fully documented throughout construction if built outside Alaska, with regular updates submitted to NOAA. The contractor shall follow NOAA's color palette as defined on the NOAA Style Guide website. The related federal contract opportunity is solicitation number 1305M320RNWWV0008 for Alaska Region Hydrogen Conexes issued by the Department of Commerce NOAA.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 03 SF30.pdf | ||
| Alaska Site Locations.pdf | ||
| Revised Attachment 1 - Statement of Work 7.2.2020.docx | DOCX document | |
| Amendment 02 SF30.pdf | ||
| QA Rev 1.docx | DOCX document | |
| QA Rev 3.docx | DOCX document | |
| QA Rev 2.docx | DOCX document | |
| Amendment 01 SF30.pdf | ||
| Attachment 3 - Davis Bacon Act WD AK20200001.pdf | ||
| Attachment 1 - Statement of Work.docx | DOCX document | |
| 1305M320RNWWV0008.pdf | ||
| Attachment 2 - Past Performance Questionnaire8.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. The SOW 2.2.1 Task One – Construct the conexes in accordance with the design drawings. Is the intent to provide the conexes ready for NWS to install the hydrogen equipment or is the bid to include installing the hydrogen equipment? If the latter, what equipment is provided by NWS? Where is this equipment located? Must all construction be done in Alaska; ie: can the conexes be built in Wyoming and shipped complete to the sites?
NOAA Response: Conexes shall be ready for NWS personnel to install hydrogen systems upon arrival at the site location.
Conex construction must be fully documented by the contractor via photographs throughout the construction cycle (start to finish) if constructed outside of Alaska. Construction updates shall be regularly submitted by the contractor to NWS in accordance with the SOW requirements.
2. The SOW 2.2.2 Task Two – What is the NOAA color scheme/specifications?
NOAA Response: Contractor shall follow the NOAA Color Palette defined here:
https://www.cio.noaa.gov/noaa-style-guide/design-elements-left-nav.html