This is an Amendment 0001 to Solicitation 1305M226Q0214, issued by the Eastern Area Division of NOAA (National Oceanic and Atmospheric Administration) on August 4, 2026. The amendment extends the submission deadline to Monday, August 10, 2026, at 11:00 AM EST and provides responses to ten questions received during the inquiry period. The solicitation is for quarterly HVAC maintenance services at the Hawaiian Islands Humpback Whale National Marine Sanctuary Kihei campus, with a performance period of September 1, 2026, through August 31, 2027. The contract is structured as a Firm-Fixed-Price (FFP) arrangement and is subject to Service Contract Act (SCA) Wage Determination 2015-5739, Revision 27 (dated May 13, 2026).

The Q&A clarifies that routine preventative maintenance items including filters, belts, and refrigerant charge are included in the fixed quarterly pricing, while non-maintenance repairs and major component replacements exceeding $2,500 must be separately quoted and approved before performance. The site maintains multiple HVAC systems (Mitsubishi VRF 8-ton unit, Marvair, Skymark, Fujitsu, and Carrier units) requiring comprehensive quarterly maintenance covering environmental sand mitigation, coil preservation using marine-grade chemicals, condensate and drainage management, electrical system calibration, and refrigerant diagnostics. On-site contractors have access from 8:00 AM to 9:30 AM Monday through Friday, with water and electrical utilities provided. No specific manufacturer certifications are required—only industry-standard HVAC credentials. There is no incumbent contractor. Offerors must submit complete packages electronically to the contract specialist in non-scanned format and acknowledge receipt of this amendment prior to the submission deadline.

View the file

Other files for this federal contract opportunity

Other files attached to HIHW Quarterly HVAC Maintenance, newest first.
File Type Posted
QA_1305M226Q0214_0001.pdf PDF
a__SOW_1305M226Q0214.pdf PDF
Sol_1305M226Q0214.pdf PDF
b__Contractor_Past_Performance_Reference_Sheet.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

MICHELLE WALTON

See continuation page

EAD-SAP

FED BLDG 200 GRANBY ST SUITE 815

NORFOLK VA 23510

EAD-SAP

1305M226Q0214

08/04/2026

07/23/2026

1 7

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

1305M226Q0214/0001

UNIQUE ENTITY ID ______________________

CAGE CODE ____________

OFFEROR MAY SUBMIT THE QUOTE ON THIS SF-1449

FORM OR THEIR OWN COMPANY FORM IN THE SAME

FORMAT PROVIDED ON THE SF1449.

Period of Performance: 09/01/2026 to

08/31/2027

SCA WD 2015-5739, Revision No. 27, dated

5/13/2026 is incorporated and can be found on

SAM.gov.

AMENDMENT 0001 OF SOLICITATION # 1305M226Q0214 IS ISSUED TO PROVIDE THE

FOLLOWING RESPONSES TO QUESTIONS RECEIVED BY THE INQUIRY DEADLINE. ADDITIONALLY,

THE SUBMISSION DEADLINE IS EXTENDED TO MONDAY, 8/10/2026 AT 11AM EST.

Q&A

1. Out-of-Scope Repairs and Equipment Replacements: Sections 2.0 and 3.0 of the Statement of Work indicate that quarterly maintenance includes "routine maintenance, necessary repairs, life cycle assessment of units, and replacement of defunct or end of life units", under a Firm-Fixed-Price (FFP) contract type. Under standard federal commercial contracting guidelines, could the Government please clarify if there is a pre-approved micro-purchase or simplified dollar threshold (e.g., $2,500) per repair/replacement event under which the Contractor is expected to absorb the cost of parts and labor, and above which repairs or equipment replacements (including major systems such as the 8-ton Mitsubishi VRF unit or Marvair systems) will be handled via separate, bilaterally negotiated contract modifications? If all repair labor, materials, and complete unit replacements must be covered strictly within the FFP quarterly maintenance CLIN pricing, this represents an unbounded pricing risk.

a. If additional supplies/equipment is needed for repairs (such as something needing replaced that was found during the general maintenance already accounted for), then yes- the contract would need to be modified to add the funds and update the SOW, similar to a CFR. However, as a FFP contract, vendors in general should include everything in the basic SOW as part of their pricing. Yes, in-scope additional costs equal to or less than $2500 may possibly be covered under purchase card.

2. Standardized Preventive Maintenance Checklist: SOW Section 1.0 and 2.0 require

"routine quarterly maintenance in line with manufacturer standards". To ensure all offerors evaluate and price this requirement on an identical basis, could the Government provide a standardized preventive maintenance checklist or specify the exact minimal maintenance tasks (e.g., coil cleaning frequency, duct inspections, electrical testing, refrigerant leak checks) expected during each quarterly visit?

a. To ensure system reliability, safety, and operational longevity in the coastal environment of the Hawaiian Islands Humpback Whale National Marine Sanctuary Kihei campus, a comprehensive quarterly preventive maintenance protocol must cover five core technical areas. First, it requires environmental and sand intrusion mitigation, which entails cleaning or replacing all return air filters to manage the high traffic of 20–150 daily visitors and airborne sand, alongside inspecting supply/exhaust configurations and external weather hoods. Second, marine-environment coil preservation must be performed by pressure washing all exterior condenser coils with marine-grade chemical cleaners to counteract salt crusting and prevent premature corrosion. Third, condensate and drainage management demand the routine flushing of primary condensate pans and drain lines to prevent tropical humidity blockages, alongside auditing secondary safety pans and float switches on suspended ducted split systems to prevent ceiling overflow damage. Fourth, electrical and control system calibrations must look for salt-air oxidation by inspecting and tightening terminal wiring, while logging compressor and fan motor amp draws to track overall performance. Finally, refrigerant cycle diagnostics require testing operational pressures against manufacturer superheat or subcooling specifications and deploying electronic leak detection arrays to minimize the risk of losing factory charges.

3. Consumable and Component Specifications: SOW Section 3.0 lists the target HVAC inventory, including Mitsubishi, Marvair, Skymark, Mr. Cool, Fujitsu, and Carrier systems.

Could the Government provide the exact filter sizes, MERV ratings, and belt specifications, as well as the expected quantities of these routine consumables required for each system?

a. The 8-ton Mitsubishi PUHY-P96 VRF outdoor condenser does not utilize air filters and features direct-drive condenser fans, meaning no belts are required. For the six connected indoor units, filter sizes and quantities depend entirely on their specific model numbers, though most Mitsubishi VRF indoor units use washable nylon mesh filters rather than disposable ones. Like the outdoor unit, these indoor systems use direct-drive motors and do not require belts.

The two Marvair VAI24ACC and two VAI36ACC vertical packaged wall-mount units typically use standard 2-inch disposable filters with a commercial standard MERV 8 rating. While exact dimensions depend on the installed return air grille, common factory sizes for this cabinet style are 16"x30"x2" or 20"x30"x2", requiring one filter per unit. These systems utilize direct-drive motors for both the indoor blower and condenser fan, so no belts are needed.

The 3-ton Skymark AC036 unit ships standard with 2-inch-thick disposable filters, with a MERV 8 rating recommended. Common filter dimensions for this specific chassis are 16"x25"x2" or 20"x25"x2", taking one to two filters per unit.

Depending on how the unit was originally configured at the factory, the blower may feature a direct-drive motor or an optional belt-driven system.

The two single-zone Fujitsu ductless split-systems do not use standard MERV-rated disposable filters; instead, they rely on washable, reusable nylon screen filters, requiring two per indoor unit. Small, disposable air-purifying inserts can sometimes be added depending on the specific indoor model number. Both the indoor and outdoor units for these systems are completely direct-drive and do not require any replacement belts.

The Carrier DX system consists of a 6-ton 38AUZA07 outdoor condenser that requires no air filters or belts, paired with a 40RUAA07 indoor air handler. The indoor unit takes standard 2-inch disposable MERV 8 filters, typically requiring four filters sized at either 16"x20"x2" or 16"x24"x2". This air handler uses a belt-driven forward-curved fan, with the exact V-belt size depending on whether the unit was equipped with a standard, medium, or high-static drive package.

4. Site Access Constraints and Public Closures: SOW Section 4.0 states that "the area around the building and where the contractor will be working should be closed off so the public cannot access the area" while keeping the offices and Visitor Center accessible. To minimize operational disruptions to the sanctuary staff and public, are there designated off-peak days of the week or specific pre-approved hours during which NOAA prefers these safety zone closures to be established?

a. The site is closed to the public but open to contractors from 0800-0930 M-F

5. Technical Certifications & Warranty Preservation: Does the Government require that the on-site technicians hold specific manufacturer-authorized certifications (such as a Mitsubishi VRF Certified Technician designation for the Classroom Building's 8-ton system) to perform maintenance and preserve existing warranties, or is a State of Hawaii specialty HVAC contractor's license and standard EPA Section 608 refrigeration certification sufficient?

a. The vendor is not required to hold specific manufacturer-authorized certifications, rather whatever industry standard requirements there are to perform general HVAC maintenance.

6. Government-Furnished Facilities and Utilities: Will the Government provide the contractor with access to on-site water and electrical utilities necessary to perform maintenance tasks, such as pressure washing condenser coils? Additionally, is there dedicated, secure storage space on-site for the Contractor to pre-stage routine consumables (such as spare filters and belts)?

a. Yes, to both questions. The site prefers contractors provide own servicing items and equipment space (such as in a vehicle), but staging space is available if arranged with site ahead of time.

7. Who is the incumbent? If there is an incumbent, could you please provide us with the

Purchase Order number and the total value?

a. There is not a current incumbent.

8. Are there any post-award submittals that we should be aware of? If so, could you please provide the relevant information?

a. A post-award meeting is recommended to discuss quarterly maintenance objectives with site personnel.

9. Please clarify whether the fixed-price quarterly HVAC maintenance requirement includes the cost of corrective repairs, replacement parts, refrigerant, major components, and complete replacement of defunct or end-of-life units. If repairs or equipment replacement are identified during maintenance, are these items to be separately quoted and authorized by the Government before performance?

a. Routine preventative maintenance items such as charge, filters, and belts are expected to be provided by the Contractor in fulfillment of the SOW. For non-maintenance repairs such as replacing major parts, excess refrigerant, and other services, invoice the site prior to the additional work to determine best mechanism for payment. Payment for labor and materials in addition to preventative maintenance will not be made until work is approved and subsequently performed.

10. Is there any specific way you would like your quote submitted outside of the instruction to offeror?

a. Your complete package should be submitted directly to the stated contract specialist via email. The quote should be in electronic (not scanned) format.

There aren't any special instructions outside of what's noted in the solicitation and attachments. Please review the solicitation in its entirety for instructions.

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .