Attachment_IV_-_Price_Schedule.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- FY25 Drydock Repairs NOAA Ship Bell M. Shimada
- Solicitation number
- 1305M224Q0181
About this file
This document appears to be an attachment containing a price schedule for the Fiscal Year 2025 Drydock Repairs to the National Oceanic and Atmospheric Administration (NOAA) Ship Bell M. Shimada. The price schedule lists 31 base items, including temporary services, drydocking, tank inspections, propulsion line shaft inspections, steering gear maintenance, and various other ship maintenance and repair tasks. The document also includes 10 additional items for "Growth Work" which will be awarded via contract modification as needed. Pricing is provided in a firm-fixed-price format, with unit prices and estimated quantities. The related federal contract opportunity has a solicitation number of 1305M224Q0181 and is a Firm Fixed Price contract for the FY25 Drydock Repairs to the NOAA Ship Bell M. Shimada.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price schedule
| Attachment IV NOAA Ship Bell M. Shimada Drydock | ||||||
| PRICE SCHEDULE | ||||||
| BASE ITEMS | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 1000 | 3.1 | Temporary Services | 1 | JB | ||
| 1000 | 3.2 | Drydocking | 1 | JB | ||
| 1000 | 3.3 | Tank Inspections | 1 | JB | ||
| 1000 | 3.4 | Propulsion Line Shaft Inspections - Withdrawal | 1 | JB | ||
| 1000 | 3.5 | Steering Gear Rudder Maintenance | 1 | JB | ||
| 1000 | 3.6 | Pressure Vessel Inspections | 1 | JB | ||
| 1000 | 3.7 | Sea Valve Overhaul | 1 | JB | ||
| 1000 | 3.8 | Fire System Inspections | 1 | JB | ||
| 1000 | 3.9 | Underwater Body Preservation | 1 | JB | ||
| 1000 | 3.10 | Hull Protection Anodes | 1 | JB | ||
| 1000 | 3.11 | Davit Maintenance | 1 | JB | ||
| 1000 | 3.12 | Life Raft Annual Inspections | 1 | JB | ||
| 1000 | 3.13 | Small Boat Maintenance | 1 | JB | ||
| 1000 | 3.14 | Cargo Gear Five Year Maintenance | 1 | JB | ||
| 1000 | 3.15 | Steel/Hull Inspection Repairs | 1 | JB | ||
| 1000 | 3.16 | Gauge Calibration | 1 | JB | ||
| 1000 | 3.17 | Anchor Windlass and Capstans Inspections | 1 | JB | ||
| 1000 | 3.18 | Portlight and Joiner Repair | 1 | JB | ||
| 1000 | 3.19 | Pipe Repairs | 1 | JB | ||
| 1000 | 3.20 | Freeboard Coating | 1 | JB | ||
| 1000 | 3.21 | Preservation General | 1 | JB | ||
| 1000 | 3.22 | Pump Maintenance | 1 | JB | ||
| 1000 | 3.23 | Electric Motor and Generator Inspections | 1 | JB | ||
| 1000 | 3.24 | MSD System Maintenance | 1 | JB | ||
| 1000 | 3.25 | SSDG Intake / Uptake | 1 | JB | ||
| 1000 | 3.26 | HVAC Duct Cleaning | 1 | JB | ||
| 1000 | 3.27 | HVAC Air Handler Cleaning | 1 | JB | ||
| 1000 | 3.28 | Deck Equipment | 1 | JB | ||
| 1000 | 3.29 | Wet Lab | 1 | JB | ||
| 1000 | 3.30 | Sea Trial | 1 | JB | ||
| 1000 | 3.31 | Stability Test / Inclining Experiment | 1 | JB | ||
| 2000 | 4.1 | Emergency Power and UPS Update | 1 | JB | ||
| 2000 | 4.2 | Polar Code Implementation | 1 | JB | ||
| 2000 | 4.3 | Electrical Cableways | 1 | JB | ||
| 2000 | 4.4 | Radio Repeater System | 1 | JB | ||
| 2000 | 4.5 | Lighting System Update | 1 | JB | ||
| 2000 | 4.6 | SWBD Breaker Replacement | 1 | JB | ||
| 2000 | 4.7 | Bridge System Updates | 1 | JB | ||
| 2000 | 4.8 | Ship's Emergency Diesel Generator Top End Overhaul | 1 | JB | ||
| 2000 | 4.9 | Overboard Update | 1 | JB | ||
| 2000 | 4.10 | Bowthruster Overhaul | 1 | JB | ||
| Total Base Items | ||||||
| ADDITIONAL ITEMS - GROWTH | ||||||
| ADDITIONAL ITEM REQUESTS (AIRs) These items relate to Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Additional Item Requests (AIRs) are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 3000 | 5.1 | AIRS/Growth (estimated) |
**Provide breakdown, as follows:
AIRs/Growth Labor Rate
| Unit Price: $________; Quantity: 3,700; Unit of Issue: Hour; Extended Price: $____________ | HRS | EST 3,700 | |
| 3000 | 5.1 | AIRs/Growth Material Markup/Handling Fee |
Unit Price: $______; Quantity: 1; Unit of Issue: Percent ________%;
Extended Price: [$300,000.00 X percentage quoted]: $______________ Anticipated Award Type: Firm-fixed-price
| Product/Service Code: 1910 | % | EST $300,000.00 | |||||
| Lay days (See CAR CLAUSE 1352.271-86) | Day | EST 1 | |||||
| Total Growth | |||||||
| OPTION ITEMS | |||||||
| Note: These items may be exercised in accordance with FAR Clause 52.217-7 “OPTION FOR INCREASED QUANTITY-SEPARATELY PRICED LINE ITEMS”. | |||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE | |
| 6000 | 6.1 | Post-Industrial Period Berthing | |||||
| Period of Performance (POP): 14 days after the repair POP | Day | EST 14 | |||||
| Total Option Items |
| BASE | $0.00 |
| BASE + OPTIONS | |
| BASE + OPTIONS +GROWTH |
FF0000Attachment IV RFQ 1305M222QNMAN0074 NOAA Ship Bell M. Shimada Drydock
File details come from the government source that posted it. Updated .