This document contains a price schedule attachment for the FY 23 NOAA Ship Reuben Lasker Drydock Repairs solicitation. The attachment includes base items, additional growth items, option items, and additional schedule rates for the drydock repairs and maintenance of the NOAA research vessel Reuben Lasker. Base items include routine drydocking, inspections, hull and equipment preservation and repairs. Growth items provide estimated labor rates and material markups for additional work. Option items list specific optional repairs that may be exercised. The solicitation is issued by the Department of Commerce National Oceanic and Atmospheric Administration for drydock repairs of the NOAA Ship Reuben Lasker to be performed in FY 2023. Pricing is requested for labor rates, material markups, and specific repair and maintenance items.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Attachment II
1305M222QNMAN0102
| Price Schedule | ||||||
| BASE ITEMS | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | QTY | UNIT | UNIT PRICE | EXTENDED PRICE |
| 10000 | 10101 | Routine Dry Docking | 1 | JB | ||
| 10000 | 10102 | Underwater Inspections | 1 | JB | ||
| 10000 | 10103 | ABS/USCG Inspections | 1 | JB | ||
| 10000 | 10104 | Rudder/ Shaft Removal & Inspection | 1 | JB | ||
| 10000 | 10105 | Hull Anode Replacement | 1 | JB | ||
| 10000 | 10106 | Propeller Clean & Polish | 1 | JB | ||
| 10000 | 10107 | Service Sea Valves | 1 | JB | ||
| 10000 | 10108 | Service/Inspect Cathelco Anti-Fouling and Impress Current System | 1 | JB | ||
| 10000 | 10109 | Ground Tackle Inspection & Preservation | 1 | JB | ||
| 10000 | 10110 | Bow Thruster Inspections, Grooming & Servicing | 1 | JB | ||
| 10000 | 10111 | Inspect/ Service Thrust, Line Shaft & Propulsion Motor Carrier Bearings | 1 | JB | ||
| 10000 | 10112 | Freeboard Preservation | 1 | JB | ||
| 10000 | 10113 | Inspect/ Service MSD Tank | 1 | JB | ||
| 10000 | 10114 | Inspect Tank Vents | 1 | JB | ||
| 10000 | 10115 | Main Switchboard and Control Center Inspections/ Maintenance | 1 | JB | ||
| 10000 | 10116 | Ventilation Duct Cleaning | 1 | JB | ||
| 10000 | 10117 | Flush/ Clean Salt Water Auxillary and Main Engine Cooling Piping | 1 | JB | ||
| 10000 | 10118 | Inspect Rescue Boat & Davit | 1 | JB | ||
| 10000 | 10119 | Weight Testing of Cranes, A Frames, & Davits | 1 | JB | ||
| 10000 | 10120 | Dock & Sea Trials | 1 | JB | ||
| 10000 | 10121 | Utilities and Services, Daily Rates Mooring/ Drydock | 1 | JB | ||
| 10000 | 10122 | Protective Coverings | 1 | JB | ||
| 10000 | 10123 | Weight Control | 1 | JB | ||
| 20000 | 20201 | Preservation of Underwater Body | 1 | JB | ||
| 20000 | 20202 | Install Furuno FE-800 Depth Sounder | 1 | JB | ||
| 20000 | 20203 | Upgrade Propulsion Motor Bearing Seals | 1 | JB | ||
| 20000 | 20204 | Upgrade Radar Turning Units | 1 | JB | ||
| 20000 | 20206 | Replace Interior Deck Coverings | 1 | JB | ||
| 20000 | 20207 | Replace TV System Antennas | 1 | JB | ||
| 20000 | 20208 | Pump Servicing | 1 | JB | ||
| 20000 | 20209 | Replace Chem Lab Countertops | 1 | JB | ||
| 20000 | 20211 | Replace Wet Lab Sink Piping with SEACOR PVC | 1 | JB | ||
| Total Base Items: | $0.00 |
| ADDITIONAL ITEMS - GROWTH | ||||||
| ADDITIONAL ITEM REQUIREMENTS (AIRs) These items relate to Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Additional Item Requests (AIRs) are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | QTY | UNIT | UNIT PRICE | EXTENDED PRICE |
| 30000 | 30000 | AIRS/Growth (estimated) |
AIRs/Growth Labor Rate
| Unit Price: $________; Quantity: 4,000 ; Unit of Issue: Hour; Extended Price: $____________ | EST | |
| 4,000 | HRS | |
| AIRs/Growth Material Markup/Handling Fee |
Unit Price: $20,000.00; Quantity: 1; Unit of Issue: Percent ________%;
| Extended Price: [ $20,000.00 X percentage quoted]: $______________ | 1 | % | EST. $20,000.00 |
| 40000 | 40000 | AIRS/Growth (estimated) |
AIRs/Growth Labor Rate
| Unit Price: $________; Quantity: 2,000 ; Unit of Issue: Hour; Extended Price: $____________ | EST | |
| 2,000 | HRS | |
| AIRs/Growth Material Markup/Handling Fee |
Unit Price: $10,000.00; Quantity: 1; Unit of Issue: Percent ________%;
| Extended Price: [ $10,000.00 X percentage quoted]: $______________ | 1 | % | EST. $10,000.00 | |
| Total Growth: | $0.00 |
| Option Items | ||||||
| Note:These items (7.1 - 7.16) may be exercised in accordance with FAR Clause 52.217-7 “OPTION FOR INCREASED QUANTITY-SEPARATELY PRICED LINE ITEMS”. | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | QTY | UNIT | UNIT PRICE | EXTENDED PRICE |
| 50000 | 50503 | Main Generator Room Bilge Cleaning | 1 | JB | ||
| 50000 | 50504 | Deck Coating Maintenance | 1 | JB | ||
| 50000 | 50507 | Clean Heat Exchangers | 1 | JB | ||
| 50000 | 50508 | Replace Gaylord Booster Heater | 1 | JB | ||
| 50000 | 50509 | Replace Dry Stores Ducting | 1 | JB | ||
| 50000 | 50510 | Replace Wire on Davits | 1 | JB | ||
| 50000 | 50511 | Main Machinery Room (MMR) Fan Servicing | 1 | JB | ||
| 50000 | 50512 | Miscellaneous Pipe Repairs | 1 | JB | ||
| 50000 | 50513 | Miscellaneoous Steel Welding and Fabrication | 1 | JB | ||
| 50000 | 50514 | Miscellaneous Lagging Repairs | 1 | JB | ||
| Total Options: | $0.00 | |||||
| BASE + GROWTH: | $0.00 | |||||
| BASE + GROWTH + OPTIONS: | $0.00 |
| ADDITIONAL SCHEDULE RATES | ||||||
| CLIN | SPEC WORK ITEM | Product Description | QTY | UNIT | UNIT PRICE | EXTENDED PRICE |
| N/A | N/A | Additional Temporary Services (See CAR 1352.271-89) | 1 | Day | $ | $ |
| 30000 | 30301 | Lay Day (See CAR 1352.271- 86) | 1 | Day | $ | $ |