This is a statement of work for drydock repairs to the NOAA Ship Reuben Lasker. The repairs include routine drydocking, underwater body inspections and repairs, assistance with ABS and USCG inspections, removal and inspection of the rudder and tail shaft, hull anode replacement, inspection and preservation of ground tackle, bow thruster inspections and servicing, inspection and maintenance of thrust bearings and line shaft bearings, freeboard preservation, inspection and servicing of the MSD tank, inspection of tank vents, switchboard and control center inspections and maintenance, HVAC system cleaning, and various other inspections, maintenance, and repair items. The work is to be completed by an authorized contractor and overseen by NOAA and ABS/USCG representatives.

View the file

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOAA Ship REUBEN LASKER FY23 DRYDOCK REPAIRS

WORK ITEM SPECIFICATION

FY23 DRY DOCK REPAIRS

NOAA Ship REUBEN

LASKER REVISION-0002

Vessel Particulars

Year Built: 2013 Builder: Marinette Marine, Corp.

Marinette, Wisconsin

ABS ID: 13225985

IMO Number: 9664988 Construction: Welded Steel Hull/ Aluminum superstructure Propulsion: Diesel-Electric

Single Propeller/fixed pitch/1603 HP Bow Thruster: Elliot 40T3S/940 HP Length Overall: 208.6 Feet Beam: 49.2 Feet Draft: 19.4 ft Full load Centerboard retracted Draft: 29.7 ft Full load Centerboard extended Frame spacing: 600 mm (23.62”) Displacement: 1,840 metric Tons Light Ship

2,479 metric Tons Full Load

Item # Title Page

NOAA Ship REUBEN LASKER FY23 DRYDOCK REPAIRS

TABLE OF CONTENTS

Appendix A

Detailed Work Item Specification

Basic – Class 10000 Items

10101 - Routine Dry Docking 6 10102 - Underwater Body Inspections & Repairs 14 10103 - ABS/USCG Inspections Assistance 17 10104 - Rudder/Shaft Removal & Inspection 22 10105 - Hull Anode Replacement 27 10106 - Propeller Clean & Polish 28 10107 - Service Sea Valves 29 10108 - Service/Inspect Cathelco Anti-Fouling and Impress Current System ………………… 33 10109 - Ground Tackle Inspection & Preservation 35 10110 - Bow Thruster Inspections & Servicing 37 10111 - Inspect/Service Thrust, Line Shaft & Propulsion Motor Carrier Bearings 40 10112 - Freeboard Preservation 42 10113 - Inspect/Service MSD Tank 44 10114 - Inspect Tank Vents 47 10115 - Switchboard and Control Center Inspections/Maintenance 49 10116 - HVAC System Cleaning 51 10117 - Flush/Clean Salt Water Auxiliary and Main Engine Cooling Piping 54 10118 - Inspect Rescue Boat & Davit 56 10119 - Weight Testing of Cranes, A Frames, & Davits 58 10120 - Dock & Sea Trials 61 10121 - Utilities and Services, Daily Rates Mooring/Drydock 65 10122 - Protective Coverings 68 10123 - Weight Control 69

Basic - Class 20000 Items

20201 - Preservation of Underwater Body 70 20202 - Furuno FE800 IMO Sounder Upgrade 72 20203 - Upgrade Propulsion Motor Bearing Seals 75 20204 - Upgrade Radar Turning Units 77 20205 – Removed 79 20206 - Replace Interior Deck Coverings 86 20207 - Replace TV System Antennas 88 20208 - Pump Servicing 90 20209 - Replace Chem Lab Countertops 93 20210 - Removed 95 20212 - Replace Wet Lab Sink Drain Piping with SECAOR PVC 97

Optional – Class 30000 Items

30301 - Additional Government Requirements 99 30302 - Provide Drydock Lay Days 101

Optional – Class 40000 Items

40401 - Additional Government Requirements 102

Item # Title Page

Optional – Class 50000 Items

50501 - Removed 104 50502 - Removed 106 50503 - Main Generator Room Bilge Cleaning 110 50504 - Deck Coating Maintenance 111 50505 - Removed 113 50506 - Removed 115 50507 - Clean Heat Exchangers and Modify Piping 117 50508 - Replace Galley Booster Heater 119 50509 - Replace Dry Stores Ducting 121 50510 - Replace Wire on Davits 123 50511 - Main Machinery Room (MMR) Fan Servicing 125 50512 - Miscellaneous Pipe Repairs 127 50513 - Miscellaneous Steel Welding and Fabrication 128 50514 - Miscellaneous Lagging Repairs 129

Appendix B

Specific Contract Work Definitions and Requirements

Appendix C

NOAA Standard Specifications

S0100 Implementation and Conduct of Checkpoints S2906 Arc Welding on Waterborne Vessels S4800-2 Piping Systems, General Requirements S6900 General Requirements for Electrical/Electronic Items S1205 Zinc Protectors S1905-1 Inspection & Routing Maintenance of Impressed Current Cathodic Protection Systems S8200 Weight Testing of Cranes and Davits

S2603 Inspection, Repair and Preservation of Ground Tackle S4824-1 Refurbishment of Regulating/Reducing Valves S4824-2 Repair & Test of Swing Check Valves S4824-3 Shop Repair & Testing of Gate Valves S4824-4 Shop Repair & Testing of Globe Valves AMC-240-1 Propulsion Shafts and Propellers AMC-505-1B Valve Overhaul & Test

Appendix D

Technical Publications

RL- 226 - 006-01: Stern Tube Bearing/ Shaft Sea RL- 202-01-01-050B Rev B CMCS RL-225-099-01, Marine Shaft Braking System RL- 202-0001-080 CMCS RL-320-0001 - Distribution Panelboards RL-500-00-01 Rev A Shipboard Valves RL-562-01: Rudder RL-568-01-01: Bow Thruster RL-593-01-01 Marine Sanitation System RL-572-01-01 Rev B Stores Crane RL-591-01-02- Rev A, Aft Deck Crane RL-583-01-02- Rev B Rescue Boat Davit RL-583-01-04- Rev A, Work Boat Davit RL-591-01-00016-010 Rev A Gantry RL-562 High Performance Flap Rudder RL-591-01-01 Rev A Side Sampling Station A-Frame RL-633-01-Cathelco Anti-Fouling System RL-633-01- Impress Current Protection System

Appendix E

Industry Standards and Public Documents

No Industry Standards or Public Documents are provided with the solicitation. Referenced Industry Standards and Public Documents are:

IEEE Standard 45-1983; Recommended Practice for Electric Installations on Shipboard Code of Federal Regulations Title 46, Subchapter J; Electrical Engineering Steel Structures Painting Council, (SSPC), Surface Preparation Specifications American Bureau of Shipping, Rules for Building and Classing Steel Vessels

Appendix F

Drawings

FSV6 - 997-01 Docking Plan FSV6 - 163-01 Sea Chest Diagram FSV6 - 243-01 Shaft Layout and Details FSV6 - 562-01 Rudder Arrangement FSV6 - 568-01 Bow Thruster Layout & Detail FSV6 - 602-01 Hull Markings FSV6 - 633-02 Cathodic Protection FSV6 - 601-01 General Arrangement FSV6 - 633-01 Impressed Current Cathodic Protection FSV6 - 601-02 Booklet of General Drawings

FSV6 - 524-01 Aux SW Cooling System FSV6 - 505-01 Gen Requirements for Piping FSV6 - 163-01 Rev B: Seachest Diagram FSV6 - 256-01 Main Seawater Cooling Sys FSV6 - 461-03 Transducer Arrangement FSV6 - 523-01 Scientific Seawater System FSV6 - 523-02 Egg Sampling System FSV6 - 524-01 Aux Seawater Cooling Sys FSV6 - 528-01 Grey and Black Water System FSV6 - 529-01 Bilge and Ballast System FSV6 - 581-01 Anchor Storage/Handling Layout & Details FSV6 - 528-01 Grey and Black Water Sys FSV6 - 583-01 Boat Launching and Stowage A & D FSV6 - 170-01 Mast Details/Arrangements FSV6 - 631-01 Paint Schedule FSV6 - 200-01 Machinery Arrangement FSV6 - 265-04: MSW and ASW Discharge Waster Piece Installation

Appendix G

Government Furnished Material

COST

Item #10108: Cathoidco Anodes as follows:

2 each - Anodes Ref : UZX27 (copper) $1,000 2 each - Anodes Ref : UZX29 (cast iron) $1,000 8 each - Anodes Ref : SUV27 (copper) $4,000 8 each - Anodes Ref : SUV29 (cast iron) $4,000

Item #100113:

One (1) each – Set of Medium for MSDS tank $2,000

Item #20204 One (1) each - Furuno S-Band Turning unit and antenna - SN36AF/ANT12 $12,000 One (1) each - Furuno X-Band Turning unit and antenna – XN12AF/4 $4,000

APPENDIX A

Detailed Statement of Work

Basic – Class 10000 Items

Item No. 10101 Title: Routine Drydocking

1 SCOPE

1.1 Background: The ship is an ABS classed vessel. The contractor must notify ABS of the schedule for all events and inspections that they want to observe.

1.2 Objective: To drydock the ship in a drydock or a marine railway and to provide for it in this abnormal condition in a way that allows other work items to be accomplished. To return the vessel to the water.

2 REFERENCE DOCUMENTS

2.1 Appendix B Specific Contract Work Definitions and Requirements

95953104.95953152 Ship’s Drawing FSV6-997-01; Docking Plan

95953104.95953153 NOAA Std Form S0700, Docking Report

95953104.95953154 NOAA Standard Specification S0700-3; Drydock Standards For NOAA Ship

Availabilities

95953104.95953155 American Bureau of Shipping, Rules for Building and Classing Steel Vessels

95953104.95953156 NOAA Standard Specification 0100; Conduct of Checkpoints

95953104.95953157 Drydocking Worksheet (Attached)

95953105 GOVERNMENT FURNISHED MATERIAL (GFM)

3.1 None

4 REQUIREMENTS

4.1 The contractor shall furnish all plant, labor, and materials required to dock and undock the ship in a safe and satisfactory manner and perform the work and associated services, including inspections and reports, outlined herein and/or required in other specification items. The dry dock must be certified in accordance with reference 2.3, S0700-3. Before drydocking and undocking, the contractor's dockmaster shall hold a drydocking/undocking conference to advise the ship's personnel what will be expected of them.

4.1.1 As documentation of the drydock’s certification status submit the Drydocking Worksheet attached to reference 2.3 with the solicitation. If the contractor may put the ship into more than one drydock, submit Drydocking Worksheet for all drydocks the contractor may use.

4.2 Within the first 5 days after arrival at the contractor’s facility, the ship shall be lifted in a suitable drydock or marine railway, in accordance with reference 2.2. Blocks and shoring shall be placed clear of obstruction so as to support the ship without strain or distortion. The ship shall be hauled without list.

The ship shall be docked in docking position 2 as shown on reference 2.2.

***** CHECKPOINT *****

4.2.1 Immediately before drydocking, inspect blocking system with the COR. Present the COR with a list of blocks left out. Demonstrate the marking of the Stern Reference Point and the centering devices.

Prove the distance from the Stern Reference Point to the first keel block. Demonstrate the position and height of blocks randomly selected by the COR. Demonstrate that all blocks in the list of blocks to be left out are, indeed, not present.

4.3 After the ship is hauled, service lines shall be provided and hooked up. Staging shall be erected, as required, to accomplish the underbody work and inspection. Suitable gangways shall be furnished and maintained to provide access to the ship at all times.

4.3.1 Some discharges, such as cooling water and ballast pump overboard, discharge directly over the side. If it is not acceptable for this discharge to go into the drydock basin, provide a means to capture them and dispose of them in an appropriate manner.

4.4 Water wash - Within 3 hours after drydocking, the entire underwater body including the centerboard and trunk, sea chest intakes and intake piping to the strainer baskets, and boot-top are to be water washed with fresh water to remove dire, slime and marine growth. Sonic projectors (transducers) shall be cleaned of all marine growth with plastic scrapers and scrubbing pads. Upon cleaning they shall be rinsed with low pressure water and protected from the full hose blast. The water wash shall meet the following minimum requirements:

The most heavily slimed areas shall be washed within the first hour.

Hose pressure shall be 100 PSI minimum Hose size shall be 1-1/2" minimum

Use of a high pressure wash is not required but is acceptable to the Government.

4.5 After docking, the contractor and Contracting Officer's Representative (COR) shall jointly inspect the hull. Particular attention shall be given to docking damage. The contractor shall submit a report within 24 hours detailing damage found and recommending required repairs. No remedial work, except that specified in other items of this contract, shall commence until authorized in writing by the Contacting Officer.

4.6 The ship will remain out of the water until all work required under the contract, which requires drydocking, has been completed. All required painting of the interior shell plating surfaces that would be below the waterline after undocking must be completed while in drydock. Upon completion of the underwater work and approval by the COR, the ship will be undocked. During the entire docking and undocking procedure and while the ship is out of the water, special care shall be taken to protect the ship from damage or fire.

4.7 In undocking the ship, the dock shall be flooded or the railway lowered, as the case may be, until as many underwater openings as possible are covered without lifting the ship off the blocks. An adequate watch shall be posted to check for leaks. If no leaks are found, and upon permission of the COR, the undocking may continue. Reference sighting marks for longitudinal and transverse positioning shall be provided so that the ship may be re-landed if necessary.

4.8 After the ship is undocked, the contractor must submit a docking report in accordance with reference

2.3. The contractor is advised that, although the report is not required until after undocking, the information necessary to complete the report must be gathered while the ship is in drydock.

5 QUALITY ASSURANCE

5.1 Submit a written report of the results of the all testing and inspections required by this item. The report must contain the date, time, results, and names of the witnesses.

6 NOTES

6.1 All hull openings shall be secured outside of normal working hours.

6.2 While the ship is in drydock, all hull openings shall be secured outside of normal working hours.

6.3 Drydock Worksheet

Item No. 10102 Title: Underwater Body Inspections & Repairs

1.1 Background This item contains some inspections required by Item #10103 ABS/USCG Surveys; however, the work in this item either goes beyond the ABS required inspections or specifies which of ABS/USCG allowed options is required by the Government.

1.2 Objective To inspect various structures and equipment that are accessible only when the ship is in drydock.

2.2 NOAA Standard Specification S0100; Implementation and Conduct of Check Points

2.3 American Bureau of Shipping, Rules for Building and Classing Steel Vessels

2.4 Drawing FSV6 -163-01: Sea Chest Diagram

2.5 Drawing FSV6 -243-01: Shaft Layout and Details

2.6 Drawing FSV6- 562-01: Rudder Arrangement

2.7 Drawing FSV6 - 568-01: Bow Thruster Layout & Detail

2.8 Technical Manual FSV6-562-01 Rudder

2.9 Technical Manual RL-226-006-010 Stern Tube Bearing and Shaft Seal

2.10 Technical Manual RL-568-01-00001-010 Bow Thruster

3 GOVERNMENT FURNISHED MATERIAL (GFM)

4.1 General Requirements

4.1.1 The contractor shall perform all work in accordance with the requirements of the documents cited in paragraph 2 above.

4.1.2 Whenever an inspection is called for the contractor must submit a written report to the COR detailing findings and /or recommended repairs.

4.1.3 The vessel is ABS Classed and USCG inspected. ABS/USCG may attend some of the inspections required in this specification. The contractor is responsible for advising ABS/USCG when the inspections will occur.

4.1.4 All inspections of the stern tube bearing, seal, shaft, and rudder shall be accomplished under the guidance of a technical representative familiar with all system components. A possible source for a technical representative with extensive experience on NOAA FSV’s and these components is:

SP Systems 29 E Marine View Drive Everett, Wa 98201 206-392-0021

4.2 Sea Chest Inspections

4.2.1 Remove all sea chest gratings. Inspect interior of sea chest for damage. Inspect all zincs and antifouling system anodes for wastage. Provide a report to the COR of the inspections and any repairs if needed.

4.2.2 Upon completion of all underwater work, reinstall sea chest gratings with new 316 CRESS hardware.

4.3 Rope Guard & Line Cutter Inspections

4.3.1 Remove the rope guard. Remove any debris/line found. Upon completion of all underwater work, reinstall with new 316 CRESS hardware.

4.3.2 Inspect the line cutter for signs of damage and/or corrosion. DO NOT remove the line cutter unless serious damage is discovered that requires replacement of the unit. Provide a report to the COR of the inspections and any repairs if needed.

4.4 Hull Inspections

4.4.1 Hull: Inspect the condition as to structural damage, corrosion, welds, rivets, fastenings, caulking or evidence of grounding, collision or extensive strain.

4.5 Bow Thruster Inspections

4.5.1 Remove the gratings from the bow thruster intakes to facilitate access to the bow thruster sea chest for inspections and painting. Upon completion of all underwater work, replace the gratings using new 316 CRESS fasteners with locking nuts.

4.5.2 Inspect bow thruster for signs of damage and/or corrosion. Complete the items listed in reference 2.10, check list 2 and checklist 3, to all components that are submerged. Provide a report to the COR of the inspections and any repairs if needed.

4.6 Centerboard Inspections

4.6.1 Inspect the Centerboard and trunk for signs of damage and corrosion. Open all centerboard access covers and clean/inspect the interior. Provide a report to the COR on the condition and any recommended repairs.

4.6.2 Inspect and clean all transducer faces using plastic scrapers and scrubbing pads. After cleaning/inspections, transducers shall be protected from sand blasting and painting.

****** CHECKPOINT ******

4.7 Rudder Inspections. Provide the services of an American Bureau of Shipping (ABS)/USCG representatives to witness the inspections required by this work item. Initial inspections should be done before rudder is removed. NOTE - The rudder shall be removed, disassembled & inspected in item 10104.

4.7.1 Under the guidance of the rudder tech rep, verify the mechanical integrity of the rudder stock taper joint, rudder flap and associated linkage. Inspect rudder sections to the extent possible without removing rudder welded access plates. Remove bolted covers or obstructions, measure Neck Bearing, Rudder Hinge, Link System slide bolt to slide bushing clearance.

4.7.2 In addition to feeler gage measurements of bearing/shaft/pin clearances taken above, perform a test of the rudder and the rudder flap clearances by jacking the rudder forward, aft, port and starboard to determine amount of travel at a convenient location to attach dial indicator measuring travel of the rudder with respect to the hull. Measure and record travel and dial indicator location(s) on a condition report.

4.7.3 Drain the rudder in the presence of the COR and the ABS/USCG representative. If water is present, conduct an air test of the rudder to a pressure of 3 PSIG. The test shall show absolutely no pressure drop in 10 minutes. If the test shows a pressure drop, conduct a soap test to isolate all leaks and submit a report to the COR detailing the leaks and recommended repairs.

*****CHECK POINT*****

4.8 Propeller shaft, stern tube bearing, and shaft seal inspections. NOTE – The tail shaft shall be removed and inspected on item 10104.

4.8.1 Provide the services of an ABS/USCG representative to witness the inspections required by this work item.

4.8.2 Under the guidance of the shaft bearing/rear seal tech rep, perform the following:

4.8.2.1 In accordance with reference 2.9, measure and record stern tube bearing wear down readings, specifically the shaft-to Thordon stern tube bearing clearance. Submit a report detailing the bearing clearances to the COR and ABS/USCG Inspector.

4.8.2.2 Inspect the rear shaft seal. If inspection indicates replacement, replace the seal.

4.9 Locate and inspect fuel Tank drain plugs for signs of leakage.

4.10 Remove void drain plugs listed below and inspect for water intrusion. Record results on a condition report. Fill and drain or float coat voids and rudder with rust preventive compound complying with MIL-C- 16173, Grade 5, or Eureka Fluid Film Liquid A or equal. Reinstall void drain plugs using ABS approved thread anti-seize sealant on all plugs:

Skeg drain plug frame 87-88 starboard

Aft stern tube structure Port & starboard bilge keels Rudder and rudder blade/flap

5.1 Submit a written report of the results of the tests and inspections required by this item. The report must contain the date, time, results, and names of the witnesses.

6.1 Work in this item must be accomplished while the ship is in drydock.

Item No. 10103 Title: ABS/USCG Inspections Assistance

1 SCOPE:

1.1 Background -The NOAA Ship REUBEN LASKER is an ABS Classed vessel and USCG inspected. The ABS ID is 13225985. Each inspection in this item is considered a CHECKPOINT and the COR must be notified in accordance with reference 2.1.

1.2 Objective -To coordinate the services of and assistance to the American Bureau of Shipping (ABS) and

USCG representatives to conduct of the following surveys:

Annual Automation Survey 5 Annual Hull Survey 5 Annual Machinery Survey 5 Drydocking Survey Special Periodical Survey - Automation Special Periodical Survey - Hull 1 Special Periodical Survey – Machinery Tailshaft Survey - Tail Shaft Renewal Load Line Survey 1 Renewal Safety Construction Survey 1

2 REFERENCE DOCUMENTS:

2.1 NOAA Standard Specification S0100; Implementation and Conduct of Checkpoints

2.2 American Bureau of Shipping, Rules for Building and Classing Steel Vessels

2.3 Appendix B Specific Contract Work Definitions and Requirements

2.4 NOAA Standard Specification S533-1, Potable Water Tank Disinfection

2.5 Specification Item 20208 – Pump Servicing

2.6 Drawing FSV6-551-01 Compressed Air System Diagram

3 GOVERNMENT FURNISHED MATERIAL (GFM):

3.1 None.

4 REQUIREMENTS:

4.1 The contractor shall perform all work in accordance with the requirements of the documents cited in

4.1.2 Coordinate the services of an American Bureau of Shipping (ABS) representative to conduct the surveys listed in 1.2 and the USCG to complete required inspections for the vessels 5 tear COI . The majority of USCG inspections requirements are identical to those required by ABS. The Contractor shall conduct a joint meeting with the COR, ABS and USCG to discuss inspections and requirements for attendance by the ABS and/or USCG within 3 working days of the ship’s arrival at the contractor’s facility.

Each item requiring inspection shall be reviewed to ensure there will be adequate coverage and that all necessary documentation has been provided to ABS/USCG.

4.2.1 The ABS/USCG representative shall witness the inspections required as specified by the individual work items. All inspections shall be accomplished with COR, or other designated government representative present.

4.2.2 The majority of USCG inspection requirements are identical to those required by ABS. The USCG may attend each inspection point or defer this to ABS. The contractor shall instruct ABS to coordinate all inspection items and checkpoints with the USCG to ensure that COI requirements met.

4.2.3 The Contractor shall provide the COR a schedule of ABS/USCG inspections and shall update the schedule as required to show those inspections which have been completed and those which are outstanding with an anticipated completion date.

4.2.4 The Government will compensate ABS for survey costs under a separate purchase order.

Neither Government nor Contractor shall be compensated by the other for delay of a scheduled survey if delay is caused by ABS for which neither Contractor nor Government is at fault.

4.3 Provide all assistance to the ABS Surveyor/USCG Inspector as required to conduct the surveys listed in 1.2.

4.3.1 Various items in this Statement of Work may overlap with the requirements of this item. In general, when there is overlap it is because the item specifies which of the optional ABS/USCG Survey methods will be used or because the Government requires more than the minimum ABS/USCG required inspection. The fact that an item may or may not be called out separately in this Statement of Work does not relieve the contractor from the responsibility to provide the ABS Surveys listed above.

4.3.2 Items identified by the ABS Surveyor/USCG Inspector that require correction before certificates can be issued shall be reported to the government in a CFR and repairs shall be accomplished under a change order.

4.4 Tail shaft and rudder will be removed and shall also be inspected in place per item 10102. Propellers blades shall be inspected attached to the hub per item 10107.

4.5 Tank Inspections and Cleaning

4.5.1 Open, clean and ventilate the tanks, voids, lockers and coffer dams as shown on table 6.5. Expect the ship to arrive at the contractor’s facility with not more than 40% of its fuel capacity on board. Transfer fuel as required to accomplish the inspections. Fuel transfers will be performed by the ship’s crew. Provide the services of a Marine Chemist to certify the tanks gas free, safe for entry, safe for hot work.

4.5.2 Cleaning requirements. - The Contractor shall remove tank cover(s) and clean tank interior surfaces free of all foreign materials, such as sediment or sludge, taking care not to damage the coating system (if applicable). Remove cleaning media and residues continuously during the washing process. Remove any residual wash media; and wipe up residual moisture with clean lint-free cloths. Disinfecting tank and internal components (specifically tank 4-34-0) as needed to make tank safe for entry and inspection.

4.5.3 Any remaining fluids in a tank to be tested which would prevent it from being certified gas free, safe for men and hot work shall be removed and disposed of by the Contractor in compliance with all applicable Federal, state, and local laws, ordinances and regulations.

4.5.4 The Contractor shall visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, TLI condition, suction/discharge piping condition, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a report to the COR for each tank that is inspected.

4.5.5 ABS/USCG inspection will involve “hydros” of tanks. The contractor is responsible for developing a plan with ABS to accomplish these tests and for submitting the plan to the COR as part of the ABS inspection plan.

4.5.6 Potable Water Tank refilling/testing - Fill each tank until water runs out the vents. Only potable water, suitable for human consumption, shall be used. Disinfect both potable water tanks in accordance with reference 2.4.

4.5.7 When closing tanks and voids upon completion of all test and inspections, install new gaskets, chase threads, clean threaded sockets and replace damaged fasteners.

4.5.8 The COR will be notified before final closures of all tanks or voids to perform a final inspection.

***** CHECK POINT *****

4.6 Pump Inspections - The pumps listed on Table 6.8 will be removed from the ship and overhauled per repair item 20208. During the rebuild process schedule the ABS Surveyor/USCG Inspector to complete required inspections.

4.7 Pressure Vessel Inspections - Inspect and test the ship pressure vessels for five-year service per ABS requirements. Provide and install new pressure relief valves, per reference 2.6. Submit a CFR documenting the findings of the inspections.

4.8 Hull/Deck Gauging – This will be the initial hull/deck NDT gauging for the ship. Hull gauging shall be performed at locations and quantity as dictated by ABS Surveyor/USCG inspector. Gauging reports shall include the locations of hull and deck measurement points imposed on vessel drawings.

4.9 Painting – Clean all damaged paint to sound paint or bare metal. Clean all exposed metal free of foreign matter and corrosion. Spot prime all damaged paint or exposed metal. Coat all new and damaged areas with 2 coats of finish paint to match the surrounding area. Epoxy paint must be used over galvanized metal.

5 QUALITY ASSURANCE:

5.1 Submit a written report(s) of the results of the testing required by this item. The report(s) must contain the date, time, results, and names of the witnesses.

6 NOTES:

6.1 Some inspections in this item must be done while the ship is in dry dock. Some require the ship to be in the water. The contractor is responsible for scheduling the inspections around the dry docking.

6.2 All inspections in this item are in support of the ABS/USCG classification process and must be carried out to the satisfaction of the ABS surveyor/USCG Inspector. Required repairs identified will be the subject of a Change Request.

6.3 The crew will assist in making documentation and equipage available for inspection. The crew must be told what is required and given reasonable time meet those requirements.

Pump Location Manufacturer Model Serial No.

Bilge/Ballast/Fire MMR (Fr 54) Aurora 341A (2-1/2 X 3 X

9), 3500 RPM

1009198-2

Balast AMR Aurora 341A (2-1/2 X 3 X

9), 3500 RPM

1009198-1

Fire BT Room (Fr 18) Aurora 341A (2-1/2 X 3 X

9), 3500 RPM

1009207

Main SW (Inboard) MMR (Fr 53) Aurora 361A (6 X 6 X 11), 1750 RPM

1008163-2

Main SW (Outboard) MMR (Fr 53) Aurora 361A (6 X 6 X 11), 1750 RPM

1008163-1

Aux SW (Inboard) MMR (Fr 53) Aurora 361A (4 X 5 X 9B), 1750 RPM

1008170-2

Aux SW (Outboard) MMR (Fr 53) Aurora 361A (4 X 5 X 9B), 1750 RPM

1008170-1

6.4 Pump Table

6.6 Tank/Void Table

Tank # Ballast Tank List Capacity (Liters) Location

4‐1‐0 Forepeak Ballast (C) 43,678 Fr. 1‐7 CL

4‐13‐2 Ballast Deep Tank #1A (P) 21,456 Fr. 13‐19 Port

4‐13‐1 Ballast Deep Tank #1A (S) 21,456 Fr. 13‐19 Stbd

4‐29‐2 Ballast Double Bottom #3 (P) 36,012 Fr. 29‐39 Port

4‐29‐1 Ballast Double Bottom #3 (S) 36,012 Fr. 29‐39 Stbd

Tank # Fuel Tank List Capacity (Liters) Location

4‐7‐2 4‐7‐2 Fuel Oil Deep Tank #1F (P) 31,233 Fr. 7‐13 Port

4‐7‐1 4‐7‐1 Fuel Oil Deep Tank #1F (S) 31,233 Fr. 7‐13 Stbd

4‐19‐2 4‐19‐2 Fuel Oil Deep Tank #2 (P) 58,727 Fr. 19‐29 Port

4‐19‐1 4‐19‐1 Fuel Oil Deep Tank #2 (S) 58,727 Fr. 19‐29 Stbd

4‐29‐0 4‐29‐0 Fuel Oil Double Bottom #3 (C) 34,878 Fr. 29‐24 Center

4‐30‐2 4‐30‐2 Fuel Oil Double Bottom #4 (P) 43,088 Fr. 39‐49 Port

4‐39‐1 4‐39‐1 Fuel Oil Double Bottom #4 (S) 43,088 Fr. 39‐49 Stbd

4‐30‐0 4‐39‐0 Fuel Oil Double Bottom #4 (C) 66,483 Fr. 39‐49 Center

3‐72‐3 3‐72‐2 Fuel Oil Deep Tank #5 (P) 43,112 Fr. 72‐82 Port

3‐72‐1 3‐72‐1 Fuel Oil Deep Tank #5 (S) 43,112 Fr. 72‐82 Stbd

3‐39‐2 3‐39‐2 Fuel Oil Day Tank (P) 16,496 Fr. 39‐49 Port

3‐39‐1 3‐39‐1 Fuel Oil Day Tank (S) 16,496 Fr. 39‐49 Stbd

4‐7‐2 4‐7‐2 Fuel Oil Deep Tank #1F (P) 31,233 Fr. 7‐13 Port

4‐7‐1 4‐7‐1 Fuel Oil Deep Tank #1F (S) 31,233 Fr. 7‐13 Stbd

Tank # Fresh Water Capacity (Liters) Location

3‐19‐2 Fresh Water (P) 17,508 Fr. 19‐27 Port

3‐19‐1 Fresh Water (S) 17,508 Fr. 19‐27 Stbd

Tank # Misc Tanks Capacity (Liters) Location

4‐34‐0 Waste Water (C) 36,163 Fr. 34‐39 Center

4‐47‐2 Oily Water (P) 5,352 Fr. 47‐49 Port

4‐47‐1 Oil Waste (S) 4,973 Fr. 47‐49 Stbd

3‐47‐1 Lube Oil (P) 3,525 Fr. 47‐49 Port

02‐22‐0 Roll Stabilization Tank (C) 72,441 Fr. 22‐29 Center

Void # Compartment Name Location

4‐49‐01 Void Fr 49 Center, Interbottom

6.7 Tank /Void Schematic

Item No 10104 Title: Rudder & Tail Shaft Removal and Inspections

1. SCOPE

1.1. Provide labor, material, and equipment to remove, inspect, repair and reinstall the rudder, propulsion shaft and shaft seal assembly.

2. REFERENCE DOCUMENTS

2.1. Tech Manual RL-562 High Performance Flap Rudder, Becker FKSR”

2.2. Drawing FSV6L-562 FM02, “Rudder Arrangement”

2.3. Drawing FSV6-243 FM01, “Shafting Layout & Details”

2.4. NOAA Standard Specification AMC-240-1, “Propulsion Shaft and Propellers”

2.5. Standard: MIL-STD-2199: Glass reinforced plastic coverings for propeller shafts

2.6. Tech Manual FRV40-225-006-010, “Stern Tube Bearing and Shaft Seal

2.7. SKF Instruction File SKF C 3184 KM, “CARB Bearing Dismounting”

2.8. Tech Manual FRV40-225-011-010, “Cathodic Protection System

2.9. Tech Manual FRV40-225-099-010, “Marine Shaft Braking System

2.10. SKF Instruction Number 81489, “The SKF OKV Coupling Mounting & Dismounting Instruction”

2.11. SKF Drawing 25616 Rev 9, “Ovako Couplings AB

2.12. Specification Item 20201 – Preservation of Underwater Body

3. GOVERNMENT FURNISHED MATERIALS (GFM)

3.1. None

4. REQUIREMENTS

4.1. General Requirements

4.1.1. The contractor shall perform all work in accordance with the requirements of the documents cited in

4.1.2. Whenever an inspection is called for, and unusual conditions are found, the contractor must submit a written report to the COR detailing recommended repairs.

4.1.3. The vessel is ABS Classed and USCG inspected. ABS/USCG may attend some of the inspections required in this specification. The contractor is responsible for advising ABS/USCG when the inspections will occur.

4.1.4. All inspections of the stern tube bearing, seal, shaft, and rudder shall be accomplished under the guidance of a technical representative experienced with all system components. A possible source for a technical representative with extensive experience on NOAA FSV’s with these components is:

Everett, WA 98201

4.2 Propulsion Shaft Alignment Analysis

4.2.1 Prior to the ship proceeding into the dry dock, provide an industry specific alignment expert with PE credentials to attend vessel to measure and report on main propulsion shaft bearing loads via strain gauge method. Strain gauges to remain installed on the shaft to allow for periodic measurement in the future. Record the bearing loads in the following table:

Bearing Vertical Horizontal Thrust Bearing Line Shaft Bearing Stern Tube Bearing

4.3 Rudder Removal

4.3.1 Prior to removing the rudder operate the rudder from hard over to hard over and record the total travel

(in degrees) to each side. Time the rudder from hard over on one side to hard over on the other side and record the results. Time the rudder in each direction. Provide the COR with a report of all readings.

4.3.2 Attach temporary pad eyes to the hull. Remove the Becker high performance flap rudder in accordance with References 2.1 and 2.2. Record widening pressures and axial pressures on a condition report and provide the condition report to the COR.

4.3.3 Disassemble the joint link system and inspect the slide bar and bushing and the link pin and bushing for wear in accordance with Reference 2.1.

4.3.4 Disassemble the rudder hinge pins and inspect the hinge pins, bushing, wear rings and thrust rings for wear in accordance with Reference 2.1.

4.3.5 Remove the lower cover (PC 18) on Reference 2.1.

4.3.6 Support the rudder stock and disassemble the sealing assembly shown of Detail Z of Reference 2.1.

Inspect the lip seal ring and O-rings for damage or wear.

4.3.7 Take bearing clearance measurements in accordance with reference 2.1 and fill in the Bearing

Clearances table in Reference 2.1. Provide a copy of the Bearing Clearances table to the COR.

4.3.8 Clean, preserve and lubricate all mechanical parts and areas that will be inaccessible after assembly in accordance with Reference (a) assembly drawing notes and lubricant table.

4.4 Tail Shaft Removal

4.4.1 Install temporary pad eyes on the hull to allow for the propeller and tail shaft to be removed as an assembly. See Reference 2.3 for the dimensions and weights of the tail shaft and propeller assembly. Nylon straps with addition padding shall be used to suspend the shaft during removals. The COR shall inspect all rigging and approve prior to removal.

4.4.2 Remove the tail shaft and propeller assembly, as one unit, from the ship in accordance with

Reference (d) and as follows:

4.4.3 Remove the rope guard assembly and store until the tail shaft and propeller assembly are reinstalled.

4.4.4 Disconnect the water supply to the stern tube seal and bearing assembly to the extent that the tail shaft can be removed. Store all removed parts until the tail shaft and propeller assembly are reinstalled.

4.4.5 Provide the services of a Kobelco OEM certified/authorized service rep to assist with the disassembly and reassembly of the shaft mechanical seal. Disassemble the Kobelco shaft seal assembly in accordance with Reference (e). Disassemble the entire assembly to allow for replacement of mounting gasket, inflatable seal, seal ring and O-rings. Store all removed parts until the tail shaft and propeller assembly are reinstalled.

Note position of body fit bolts, PC 4 of Reference 2.5 for reinstallation in original position.

4.4.6 Disassemble the shaft slip ring assembly as needed to allow for shaft removal. See Reference 2.7.

Store all removed parts until the tail shaft and propeller assembly are reinstalled.

4.4.7 Disassemble the shaft brake assembly in accordance with Reference 2.8 to the extent needed to allow for shaft removal. Store all removed parts until the tail shaft and propeller assembly are reinstalled.

4.4.8 Disassemble the hydraulic coupling (PC 11 of Reference 2.3) in accordance with References 2.9 and

2.10. Catch and properly dispose of all oil. Store and protect all parts until the tail shaft and propeller assembly are reinstalled. Prior to disassembly, record the existing “Pull Up” dimension, shown at 27mm in Reference 2.10. Provide a copy of the measurement to the COR.

Pull Up Dimension = ________ Recorded by: _______________________ Date: _________

Identify the position of the hydraulic coupling on the tail shaft so that this position can be restored at reassembly.

4.5 Tail Shaft Inspection

4.5.1 After the tail shaft and propeller assembly have been rigged out of the ship, move the tail shaft and propeller assembly to a temporary storage location. Support the shaft on supports spaced no more than eight feet apart on center. Provide the COR with a report of the shaft condition and of all readings.

4.5.1.1 Provide the services of the local ABS & USCG surveyor to inspect the tail shaft.

4.5.1.2 Perform all measurements, inspections and test on the tail shaft in accordance with

Reference 2.4. to include spark testing of the fiberglass wrap

4.5.1.3 Clean and polish the forward and aft sleeves (Reference 2.3 sheet 3, PC’s 2 & 3).

4.5.2 After all measurements, inspections and test have been performed on the tail shaft, reinstall the shaft.

4.6 Stern Tube Bearing Inspection

4.6.1 Clean all marine growth from the stern tube bearing water passages and sliding surfaces. Provide a report of the condition of the bearing to the COR.

***** CHECK POINT *****

4.6.2 Measure and record the inside diameter of the stern tube bearing at 12 locations vertical and 12 locations horizontal.

4.7 Stern Tube Maintenance

4.7.1 The stern tube shall be cleaned and preserved per the requirements of repair item 20201 –

Preservation of Underwater Body.

4.8 Shaft Seal Assembly

4.81 Under the direction of the Kobelco OEM certified service representative, align and install the shaft seal assembly in accordance with Reference 2.5. Provide a condition report to the COR with all alignment measurements.

4.8.2 Restore sealing water pipe and hose.

4.9 Shaft Brake Reassembly - Reassemble the brake discs and calipers in accordance with Reference 2.8.

4.10 Hydraulic Coupling Reassembly

4.10.1 Reassemble the hydraulic coupling in accordance with References 2.9 & 2.10. Renew the Sealing, PC 4 of Reference 2.10.

4.10.2 Restore the hydraulic coupling to its original position with pull up reading the same as recorded in paragraph 4.4.8. Record the hydraulic coupling pull up below and provide a copy to the COR.

Pull Up Dimension = ________ Recorded by: _______________________ Date: _________

4.10.3 Reinstall the shaft grounding assembly with new brushes in accordance with Reference 2.7.

4.11 Rudder Installation

4.11.1 Renew all gaskets, seals and O-rings disturbed by disassembly of the rudder.

4.11.2 Reinstall the rudder in accordance with Reference 2.1.

4.11.3 Contact the COR to witness rudder pull up on the rudder stock. Record pull up distance and widening and axial pressures on the table in Reference (a). Pull up pressures are provided on Reference

2.2 drawing R-1.41547: Nominal 4.7mm, Minimum 3.8mm, Maximum 5.6mm. Provide the COR with a copy of the pressures and distances.

4.11.4 Weld the two access covers back on the rudder and perform MT or PT on all of the completed welds. Repair all deficiencies, if any.

4.11.5 Remove all temporary pad eyes and preserve all disturbed steel areas in accordance with contract item 10105.

4.11.6 After the rudder has been installed operate the rudder from hard over to hard over and record the total travel (in degrees) to each side. Time the rudder from hard over on one side to hard over on the other side and record the results. Time the rudder in each direction. Provide the COR with a report of all readings.

4.12 Propulsion Shaft Alignment Analysis - After the ship is back in the water provide an industry specific alignment expert with PE credentials to attend vessel to measure and report on main propulsion shaft bearing loads via strain gauge method. The theoretical and allowable propulsion shaft bearing loads are shown in the following table:

Allowable Bearing Loads (lbs)

Bearing Max. Allowable Min. Allowable Prescribed (Straight Line)

Thrust Bearing 19,125 2,000 8,720 Line Shaft Stern Tube 87,480 N/A 27,680

5.1 Submit a written report(s) of the results of the testing required by this item. The report(s) must contain the date, time, results, and names of the witnesses.

6.1 One potential source for the bearing and propulsion shaft alignment is:

Diehl Engineering Company P.O. Box 1573 26076 Iowa Ave Kingston, WA 98346

(360) 297-8781

6.2 Illustrations

Rudder removal pad eyes Rudder protective cap over hydraulic nut

Shaft removal

Item No. 10105 Title: Hull Anode Replacement .

1.1 Objective: To replace all hull anodes.

2.1 Drawing FSV6-633-02 Rev B: Cathodic Protection

2.2 NOAA Standard Specification S1205, Zinc Protectors

2.3 Appendix B Specific Contract Work Definitions and Requirements

3.1 None.

4.1 The contractor shall perform all work in accordance with the requirements of the documents cited in

4.2 Remove existing anodes on the hull and as indicated from the areas shown on 2.1.

4.2.1 Anodes are bolted to studs. Chase all studs to remove corrosion and paint. Ensure threads are good and rethread or replace as required. Chip and grind surfaces flush if required in way of removals.

4.3 Install approximately forty (45) new anodes in accordance with 2.1 and 2.2.

4.3.1 Anode sizes and material are specified in 2.1.

4.3.2 Attach new anodes with new CRSS 316 locknut fasteners with washers and thread anti- seizing compound per reference 2.1.

4.4 Prepare and preserve all disturbed surfaces to match surrounding areas in accordance with the requirements of Work Item #104.

5.1 A representative sampling of each type of anode shall be weighed in the presence of the COR.

6.1 Grinding and welding required by this item shall be accomplished prior to hull painting required by item.

6.2 Anodes shall be installed after the completion of work item 20201. Exercise care to keep anodes free of paint.

Item No. 10106 Title: Propeller, Clean and Polish

1.1 Objective: To clean, inspect, and polish the ship's propeller.

2.3 American Bureau of Shipping, Rules for Building and Classing Steel Vessels

4.1 The contractor shall perform all work in accordance with the requirements of the documents cited in

4.2 Perform cleaning of the propeller including hubs, fillets, and blades with non-metallic, non-scratching scrub pads, or high pressure water. Remove all traces of fouling and calcareous deposits and provide a smooth surface. Cleaning is to be performed by or following the guidance of a propeller shop representative.

*****CHECK POINT******

4.3 Propeller polishing shall follow the cleaning process and will remove any remaining basal plates, all calcium deposits, and will produce a smooth finish, Rupert scale B or better. Check the track and pitch and make minor adjustments as required. Cleaning is to be performed by or following the guidance of a propeller shop representative.

4.4 After inspection by ABS and the COR, protect the propeller with padding to prevent damage from nicks and dings until just prior to undocking.

5 TEST AND INSPECTION:

5.1 As required above.

6.1 Provide the ABS Surveyor with prior notice and the opportunity to inspect any or all portions of ongoing work ordered by this item.

Item No. 10107 Title: Repair Sea Valves

1.1 Background: Sea Valves are subject to ABS/USCG inspection during all phases of the work. The contractor must advise ABS of the repair and testing schedule.

1.2 Objective: To remove from the ship, overhaul, test and reinstall all sea valves. To fabricate and install new waster pieces.

2.2 NOAA Standard Specifications S4824-1, 2, 3, & 4, & AMC-505-1B Overhaul of Sea Valves

2.3 NOAA Ship REUBEN LASKER Sea Valve List (attached)

2.4 Drawing FSV6-163-01 Rev B: Seachest Diagram

2.5 Drawing FSV6-256-01 Main Seawater Cooling System

2.6 Drawing FSV6-461-03 Transducer Arrangement

2.7 Drawing FSV6-523-01 Scientific Seawater System

2.8 Drawing FSV6-523-02 Egg Sampling System

2.9 Drawing FSV6-524-01 Auxiliary Seawater Cooling System

2.10 Drawing FSV6-528-01 Grey and Black Water System

2.11 Drawing FSV6-529-01 Bilge and Ballast System

2.12 American Bureau of Shipping, Rules for Building and Classing Steel Vessels

2.13 Tech Manual RL-500-00-V0001-010 Rev A Shipboard Valves

4.1.1 Body and seat hydro's must be witnessed by the COR and ABS surveyor.

4.1.2 Prior to removal, valves must be marked with a stamped metal tag identifying them. The piping from which the valve is removed must also be marked with a matching stamped metal tag. Valves are to be reinstalled in the same location as they were removed from.

4.1.3 Where valves are threaded and require replacement, replace them with a flanged valve. Modify the piping as required to accept the flanged valve.

4.2 Remove all valves listed in reference 2.3 from the ship to the shop.

4.3 Valves 3" and under are to be replaced with new valves that are equal to the valve removed in material, style and quality of construction. New valves shall be subject to pressure/leak testing. Threaded valves must be replaced with flanged valves. Modification of piping to accept the flanged valve, if required, will be done via a change order.

4.4 Open and inspect each valve. Remove stems and disks from the bonnet. Clean the interior of the valve body to bright metal removing any nicks and ridges. Inspect valve body and disk for signs of erosion or thin areas.

4.4.1 Gate and Globe Valves: Clean threads in valve yokes and on stems. Straighten valve stems to within 0.002" TIR. Skim cut and/or polish the stems in way of the packing to remove ridges and foreign matter. Include final dimensions of the stem area in the final report. Remove old packing material and install new packing of the same type and number of rings. Clean and dress packing gland threads. Lap or grind seats and disks as required to obtain a 360 degree line of contact using Prussian Blue.

Reassemble using new gasket material and replacing damaged fasteners.

4.4.2 Butterfly Valves: Inspect the stem seal area for distortion or damage. Hand dress the stem seal area to remove nicks and burrs. Replace the resilient seat and stem seals. Clean and free up operating and locking mechanisms. Reassemble.

4.4.3 Ball Valves: Disassemble clean and inspect for erosion and thin walls. Clean and polish the ball. Clean, polish and hand dress the stem in way of the seal. Reassemble replacing the stem seal and replacing the seat or seat ring as appropriate.

4.4.4 Clapper Valves: Disassemble clean and inspect for erosion and thin walls. Clean and resurface seats and disks. Clean and polish pins. Pins damaged beyond reuse shall be replaced with new monel pins.

4.4.5 Scupper Valves shall be opened, the bodies cleaned to bright metal and inspected for erosion and thin walls. Seats shall be resurfaced as required to make tight. Check tightness by using Prussian Blue and a contractor furnished steel bluing tool to simulate the ball.

4.4.6 Any valve beyond economical repair shall be immediately reported to the COR. The report should include a recommended replacement valve, lead time and cost. Threaded valves shall be replaced with flanged valves and the piping modified to accommodate the flanged valves. A change order will be issued to accomplish this work if needed.

********** CHECK POINT **********

4.5 Repair all valves per reference 2.2. After repair or purchaser, all sea valves must be hydrostatically tested per reference 2.2 at a minimum of 50 PSIG from both sides of the seat. This test must be done in a way to include testing of the body and packing. No leakage is allowed at gasket joints or at the seal/packing

4.6 After passing the final hydrostatic test, reinstall the valves using new gaskets and replacing damaged fasteners. Threads shall extend 3-5 threads beyond the nuts. Replace or repair any removed/damaged lagging on the valves and adjacent piping.

4.7 Replace any waster pieces as discovered. A change order will be issued to accomplish this work if needed.

4.8 Submit a report to the COR detailing the repairs done on each Sea Valve. If the valve was replaced, include the manufacturer, model or part number, and test data of the new valve.

4.9 Touch-up Painting - Clean all damaged paint to sound paint or bare metal. Clean all exposed metal free of foreign matter and corrosion. Spot prime all damaged paint or exposed metal. Coat all new or damaged areas with 2 coats of finish paint to match the surrounding area. Epoxy paint must be used over galvanized metal.

5.1 Submit a written report of the results of the testing required by paragraphs 4.5 and 4.7. The report must contain the date, time, results, and names of the witnesses.

6 Notes

6.1 This work must be done while the ship is in drydock

6.2 Reuben Lasker Valve List (subject to change)

# Main Engine Room Valve List ID No. Size Valve Type

1 Sea Chest Inlet, Stbd, FR 61 163‐VL‐01 10‐ inch Gate, bronze, flanged, RR

2 Sea Chest Vent, Stbd 506‐VL‐50 2‐ inch Gate, steel, welded

3 Sea Chest Air Blowdown, Stbd 551‐VL‐70 3/4‐inch Gate, steel, welded

4 Sea Chest Inlet, Port, FR61 163‐VL‐02 10‐ inch Gate, bronze, flanged, RR

5 Sea Chest Vent, Port 506‐VL‐49 2‐ inch Gate, steel, welded

6 Sea Chest Air Blowdown, Port 551‐VL‐69 3/4‐inch Gate, steel, welded

7 Sea Chest Warm‐ Up, Stbd, FR62‐63 163‐VL‐03 6‐ inch Gate, bronze, flanged, RR

8 Stbd Overboard, FR71 256‐VL‐23 6‐ inch Bronze, flanged, RR

9 Port Overboard, FR71 256‐VL‐24 6‐ inch Bronze, flanged, RR

9A Port Overboard FR71‐A 256‐VL‐24‐A 6‐inch Bronze, flanged butterfly

10 Port ASW Overboard 524‐VL‐23 5‐inch Gate bronze, flanged RR

A

Port ASW Overboard ‐ A 524‐VL‐23‐A 5‐inch Bronze, flanged butterfly

11 Brine Overboard 524‐VL‐33 2 ½ Inch Bronze gate, flanged,RR

A

Brine Overboard ‐ A 524‐VL‐33‐A 2 ½ Inch Bronze, flanged, butterfly

10 OWS Overboard, Port Side, FR49 593‐VL‐47 1‐ inch Flanged, gate

11 Stern Tube Supply 256‐VL‐8 1‐1/2 in Globe, bronze

12 Sea Water Strainer #1 Inlet, Port Side 256‐VL‐2 10‐ inch Butterfly, lug, bronze, monel trim

13 Sea Water Strainer #1 Outlet, Port Side 256‐VL‐6 10‐ inch Butterfly, lug, bronze, monel trim

14 Sea Water Strainer #2 Inlet, Port Side 256‐VL‐54 10‐ inch Butterfly, lug, bronze, monel trim

15 Sea Water Strainer #2 Outlet, Port Side 256‐VL‐56 10‐ inch Butterfly, lug, bronze, monel trim

16 Sea Water Strainer #1 Inlet, Stbd Side 256‐VL‐53 10‐ inch Butterfly, lug, bronze, monel trim

17 Sea Water Strainer #1 Outlet, Stbd Side 256‐VL‐27 10‐ inch Butterfly, lug,…