Amendment 0004.pdf

PDF 277 KB Posted

Attached to
FY 23 NOAA Ship Reuben Lasker Drydock Repairs
Solicitation number
1305M222QNMAN0102
Issued by

About this file

This document provides an amendment to the solicitation for the FY 23 NOAA Ship Reuben Lasker Drydock Repairs. Key details include:

  • The amendment addresses 17 questions from potential offerors regarding work items and technical specifications. It clarifies requirements around surface preparation percentages, equipment quantities, and the scope of work for areas like the freeboard, deckhouse and underwater body.

  • The amendment also provides additional technical manuals and drawings to aid in developing responses. It updates some work item paragraphs based on the questions.

  • The drydock repairs solicitation is for the National Oceanic and Atmospheric Administration and involves various preservation, maintenance and replacement work on systems and equipment aboard the NOAA ship Reuben Lasker during its upcoming drydock period. The amendment aims to ensure offerors have the necessary information and clarification on requirements prior to submitting responses.

View the file

Other files

File Type Posted
RFQ 1305M222QNMAN0102-0004.pdf PDF
Attachment I Work Item Specification FY 23 Dry Dock Repairs NOAA Ship Reuben Lasker Revision 0002.pdf PDF
Amendment 0006.pdf PDF
Attachment II - Price Schedule-0001.xlsx XLSX spreadsheet
Amendment 0005.pdf PDF
CCTV Conceptual Drawing.pdf PDF
Additional References 2.zip ZIP file
Attachment I Work Item Specification FY 23 Dry Dock Repairs NOAA Ship Reuben Lasker Revision 0001.pdf PDF
Additional References 1.zip ZIP file
RFQ 1305M222QNMAN0102-0003.pdf PDF
Amendment 0003.pdf PDF
RFQ 1305M222QNMAN0102-0002.pdf PDF
Amendment 0002.pdf PDF
RFQ 1305M222QNMAN0102-0001.pdf PDF
Amendment 0001.pdf PDF
Drawings 2.zip ZIP file
Attachment V - AIR Process.pdf PDF
Attachment VI - Subcontracting Plan Outline.pdf PDF
Attachment IV- Past Performance Questionnaire.pdf PDF
Tech Pub 2.zip ZIP file
Tech Pub 3.zip ZIP file
Attachment II - Price Schedule.xlsx XLSX spreadsheet
Drawings 1.zip ZIP file
Attachment III - Past Performance Information Form.pdf PDF
Attachment I Work Item Specification FY 23 Dry Dock Repairs NOAA Ship Reuben Lasker.pdf PDF
Tech Pub 4.zip ZIP file
Tech Pub 1.zip ZIP file
RFQ 1305M222QNMAN0102.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Ashley Perry

SEE ATTACHMENT PAGE

6. ISSUED BY

NOAA/EAD

200 GRANBY STREET, SUITE 405

NORFOLK, VA 23510

SEE BLOCK 6

9A. AMENDMENT OF SOLICITATION NUMBER

1305M222QNMAN0102

1 7

08/30/2022

9B. DATED (SEE ITEM 11)

08/8/2022

1305M222QNMAN0102 Page 2 of 7

The purpose of Amendment 0004 is to provide questions and answers:

1. Question 1 Work Item 10109 – Ground Tackle Inspection & Preservation – paragraph 4.4 The specification directs the yard to power tool clean the chain lockers but is silent in regards to any required coatings. What is the intent regarding coatings for the chain lockers?

Answer 1: Apply paint coatings in accordance with the vessel’s paint schedule: Drawing FSV6-631-01 Rev B – Paint Schedule. Review Work Item 10109 paragraph 4.4.

FSV6-631-01 Rev B – Paint Schedule has been provided with amendment.

2. Question 2: Work Item 10112 – Freeboard Preservation – paragraph 4.2.2 The specification directs the yard to power tool clean the freeboard area where coatings have failed. For bidding purposes, what percentage of the freeboard area will require power tool cleaning?

Answer 2: For bidding purposes assume 25%. Review paragraph 4.2.2 of the Work Item 101112.

3. Question 3: Work Item 10114 – Inspect Tank Vents – paragraph 4.2. The specification directs the yard to service tank vents in place. What is the quantity of tank vents to be serviced?

Answer 3: The tank vent valves shall be removed for inspection and maintenance required in this work spec. The quantity of tank vent valves to be serviced are one vent valve per each fuel, ballast, sewage, and potable water tank onboard.

4. Question 4: Work Item 10114 – Inspect Tank Vents – paragraph 4.3.1.

The specification directs the yard to powder coat the tank vents in place. Will NOAA accept a SP-11 prep and coat alternative?

Answer 4: The tank vent valves shall be removed for inspection and maintenance required in this work spec.

Review Work Item 10114 paragraph 4.2 of the specification which has been updated to remove the wording “in place”.

5. Question 5: Work Item 10121 – Utilities and Services, Daily Rates Mooring/ Drydock – paragraph 1.2. The specifications purpose is to establish daily rates for utilities and services.

Attachment II lists 10121 as “1 JB and Additional Temp Services at 1 day at Additional Schedule Rates. Is it the intent at 10121 to provide lump sum price for utilities and service for the period of performance?

Answer 5: The intent of this item is to develop/determine two different daily rates for utilities and services. Requirements while in dry dock are less and as such the daily rate should be less during this period. When in the water alongside the requirement are greater

1305M222QNMAN0102 Page 3 of 7 and should have a higher daily rate. Based on the schedule these rates for drydock/dockside.

shall be computed for the scheduled time period and combined for the overall price for the item.

6. Question 6: Work Item 20205 - Replace CCTV System paragraph - 4.1.4. The specification Directs the yard to install new MCTs in locations as required. For bidding purposes what is the quantity of MCTs that are required?

Answer 6: For bidding purposes assume NO new MCTs are required. Adding a new MCT would be subject to a change order if necessary.

Review Work Item 20205 paragraph 4.1.4 which has been updated.

7. Question 7: Work Item 20205 - Replace CCTV System paragraph - 4.3.1.

The specification states that the parts list is not inclusive. For purposes of bidding what bid allowance should the yard include for additional required parts but not specified?

Answer 7: When placing the order for the new equipment listed in 4.3.1, consult with the manufacturer to ensure the parts are available to meet the POP and suggest alternates if these parts no longer available. The additional parts that may be required are all consumables required to complete the system install. (this may include connectors, cable banding, etc…)

8. Question 8: Work Item 20207 – Replace TV System Antennas paragraph 4.2. The Specification directs the yard to remove the TV Antenna from the stack. What is the location of the TV antenna on the stack?

Answer 8: The TV antenna is currently on the top of the exhaust stack on the aft, outboard side.

9. Question 9: The following work items in the table below were not provided with references will they be provided before quotes are due? Please provide the Tech Manuals and Drawings.

Work Item and Title Tech Manual/ Drawing 20210 Replace Laundry Drain Piping with SEACOR PVC FSV6-644-01 Sanitary &

Laundry Spaces Arrangement 20211 Replace Wet Lab Sink Drain Piping with SEACOR

PVC

FSV6-667-01 Laboratory Layout

20211 Replace Wet Lab Sink Drain Piping with SEACOR

PVC

FSV6-667-02 Laboratory Arrangement Details

50501 Service Trawl Blocks 00592-0-RT Trawl Block 30T 50501 Service Trawl Blocks 00581-0-RT- Trawl Block Hinge 50507 Clean Heat Exchangers and Modify Piping RL-591-01-00043-010

Hydraulic Power Unit 50507 Clean Heat Exchangers and Modify Piping RL-591-01-00001-010 Section 3

Trawl System Single Source

1305M222QNMAN0102 Page 4 of 7

50511 Main Machinery (MWR) Fan Servicing RL-512-01-00001HVAC, FSV6- 512-01 HVAC Diagram

10111 - Inspect / Service Thrust Line Shaft & Propulsion Motor Carrier Bearings

FRV40-226-005-010 Rev B Line Shaft and Thrust Bearing Manual

20208 – Pump Servicing RL-521-01-00001 Centrifugal Fire Pump

20208 – Pump Servicing RL 524-01-00052 Aux.

Seawater Cooling Pump

20208 – Pump Servicing RL 529-01-00001 Bilge-Ballast- Fire Pump

20208 – Pump Servicing RL 256-01-0001 Main seawater Cooling pump

50507 – Clean & Test Heat Exchangers & Modify Piping RL-591-01-00001-010 Section 3 Trawl System Single Source

50509 – Replace Leaking and Corroded Duct in Drying Stores

FSV6 – 512 -01 Rev (F) – HVAC Diagram Supply & Exhaust

Answer 9: Requested tech manuals and drawings have been provided with amendment.

10. Question 10 (a): Work Item 10112 – Freeboard Preservation - Concerning the overall scope detailed in 1.1, are we correct in our understanding that inner bulwarks are to be omitted from this scope of work? If not, are in interior bulwarks only to include inner bulwarks areas and bulwark top areas that are painted white?

Answer 10 (a): Per Section 1 of item 10112 – “Objective – To paint the freeboard from the boot-top to include the bulwarks (both sides & top) the trawl ramp, door pockets and port side of the stack.” Both sides of the bulwarks are required to be painted per the specification

Question 10 (b): Concerning line 4.2.2, approximately what percentage of the specified freeboard areas are to receive SP-11 mechanical prep?

Answer 10 (b): Assume 25%, Review paragraph 4.3.3 of the Work Item.

Question 10 (c): Are we correct in our understanding 4.3.1 requests that “areas of bare metal” are to be spot Coated per the desired percentage of 4.2.2 (above), not a full coat (100% of freeboard areas) as indicated in reference FDV6-631-01 Rev B, schedule E-1?

Answer 10 (c): Per the specification the areas that are taken to white metal are to have their coatings built up with zinc, epoxy and top coat prior to applying the full top coat to the freeboard.

Question 10 (d): Are we correct in our understanding that 4.3.3 requests two spot coats to

1305M222QNMAN0102 Page 5 of 7 the aforementioned spot coat areas (first addressed in 4.3.1)?

Answer 10 (d): Question answered on 10(c).

Question 10 (e): Are we correct in our understanding that the outboard side of the stack is to be included as part of the freeboard, but the interior, forward and aft sides of the stack are to be considered as part of item 50505, Deckhouse and Stack Coating Maintenance?

Answer 11 (e): Yes

Question 10 (f): Are we correct in our understanding that the deckhouse and stack does not include handrails in this scope of work?

Answer 10 (f): NO , per item 50505 requirements: “4.1.4 The deckhouse for this item is defined as the entire exterior house from the 01 deck to the flying bridge including but not limited to, all bulkheads, overheads, railings, stations, ladders, booths, pockets, vents, vent covers, doors, stack, foundations, etc, in general all of the area/items that are currently painted white. From this point forward this area will be referred to as the deck house.

11. Question 11(a): Work Item 20201 – Preservation of Underwater Body. Concerning line 4.3.1, approximately what percentage of the underwater body areas are to be blasted to SP-6?

Answer 11 (a): Per the specification: “4.3 Surface Preparation - 4.3.1 Perform Commercial Blast Cleaning (SSPC-6) of the complete underwater body from 2ft above the the boot-top to the keel in accordance with reference 2.3. This includes rudders, shaft tubes, grates/access panels/rope guards, sea chest, centerboard, and centerboard trunk.”

Question 11 (b): Are we correct in our understanding that the centerboard trunk (indicated in line 4.3.1) is only to include areas accessible when the centerboard is fully lowered in drydock, hence, not requiring preservation of areas that require the centerboard to be removed for access?

Answer 11 (b): The centerboard can be raised to allow complete painting of the underwater portion of the trunk. The centerboard can be lowered to the intermediate position in the dry dock to allow painting on both port/stb side. The remaining port side of the centerboard can be painted in the trunk via the access doors on the 2nd deck.

Question 11 (c): Are we correct in our understanding that line 4.4.1 intends for AC spot coats to the same areas addressed in 4.3.1?

Answer 11 (c): The intent of 4.3.1 is to remove all of the AF paint on the complete underwater hull and prep the existing AC coating for application of new AC paint. 4.4.1 applies new AC paint to the complete underwater body prepped in 4.3.1.

12. Question 12(a): Work Item 20206 – Replace Interior Deck Coverings. Concerning line 4.3, are we correct in our understanding that the 2nd deck passageway is to include all

1305M222QNMAN0102 Page 6 of 7 passageways on this deck?

Answer 13 (a): Yes, with exception of the weight room area.

Question 12 (b): Is the width of the chest freezer unit in the hydrographics lab greater than the width of the access door to the hydrographics lab?

Answer 12 (b): No

13. Question 13: Work Item 50504 – Deck Coating Maintenance. Are there any particular Areas of focus where deterioration is concentrated (per deck level)?

Answer 13: No, The COR will mark the areas that need preparation.

14. Question 14 (a): Work Item 50505 Deckhouse and Stack Coatings Maintenance. Are There any particular areas of focus where deterioration is concentrated (per deck level)?

Answer 14 (a): No, The COR will mark the areas that need preparation.

Question 14 (b): Are we correct in our understanding that the deckhouse and stack does not include handrails in this scope of work?

Answer 14 (b): NO , per item 50505 requirements: “4.1.4 The deckhouse for this item is defined as the entire exterior house from the 01 deck to the flying bridge including but not limited to, all bulkheads, overheads, railings, stations, ladders, booths, pockets, vents, vent covers, doors, stack, foundations, etc, in general all of the area/items that are currently painted white. From this point forward this area will be referred to as the deck house.

Question 14 (c): Is the intent of line 4.1.6 to reference line 4.1.4?

Answer 15 (c): Yes

15. Question 15: Work Item 50506 – Deck machinery Preservation. Are we correct in our understanding that not all machinery will require 30% touch up, and these areas will be focused on weather exposed equipment (without vinyl covers)?

Answer 15: Assume an average of 30% for bidding purposes for all machinery. Some machinery will be under 30% and some will be over.

16. Question 16: Work Item 50512 – Miscellaneous Pipe Repairs. We are uncertain of how Many hours to apply to this item.

Under “Objective”, we are instructed to provide “150 hours of labor” and under paragraph 4.2, we are instructed to “provide 100 hours of pipe fitter labor”

Please clarify which amount is to be applied to the quote.

1305M222QNMAN0102 Page 7 of 7

Answer 16: 150 hrs. Review Work Item 50512 paragraph 4.2.

17. Question 17: Work Item 50513 – Miscellaneous Welding and Fabrication. We are uncertain of how many hours to apply to this item.

Under “Objective”, we are instructed to provide “150 hours of labor” and under paragraph 4.2, we are instructed to “provide 100 hours of pipe fitter labor”

Please clarify which amount is to be applied to the quote.

Answer 17: 150 hrs. Review Work Item 50513 paragraph 4.2.

18. Question 18: Work Item 50514 Miscellaneous Lagging Repairs. Can NOAA specify a dollar amount for materials?

Answer 18: $1,000.00

Amendment 0004
Quetstions & Answers Amendment 0004.pdf