This document contains an attachment with a pricing schedule for the NOAA Ship Bell M. Shimada Drydock Repairs solicitation number 1305M222QNMAN0074. The pricing schedule lists base items, additional item requests for potential growth work, and optional items. Base items include routine drydocking, underwater inspections, hull preservation, and utilities. Additional item requests relate to growth work and include labor and material markup rates. Optional items involve various deck, pipe, and welding repairs. Offerors are required to provide unit prices for the base items and additional item requests, as well as extended pricing for the base and optional items. The total potential value of the opportunity includes the base items, additional item requests exercised, and optional items awarded.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Prices
| Attachment IV NOAA Ship Bell M. Shimada Drydock | ||||||
| PRICE SCHEDULE | ||||||
| BASE ITEMS | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 10000 | 10101 | Routine Dry Docking | 1 | JB | ||
| 10000 | 10102 | Underwater Inspections | 1 | JB | ||
| 10000 | 10103 | ABS Inspections Assistance | 1 | JB | ||
| 10000 | 10104 | Hull Anode Replacement | 1 | JB | ||
| 10000 | 10105 | Propeller Clean & Polish | 1 | JB | ||
| 10000 | 10106 | Service Sea Valves | 1 | JB | ||
| 10000 | 10107 | Service/Inspect Cathelco Anti-Fouling and Impress Current System | 1 | JB | ||
| 10000 | 10108 | Ground Tackle Maintenance & Preservation | 1 | JB | ||
| 10000 | 10109 | Bow Thruster Inspections, Grooming & Servicing | 1 | JB | ||
| 10000 | 10110 | Inspect/Service Thrust, Line Shaft & Propulsion Motor Carrier Bearings | 1 | JB | ||
| 10000 | 10111 | Freeboard Preservation | 1 | JB | ||
| 10000 | 10112 | Tank Preservation | 1 | JB | ||
| 10000 | 10113 | Dock & Sea Trials | 1 | JB | ||
| 10000 | 10114 | Protective Coverings | 1 | JB | ||
| 10000 | 10115 | Weight Control | 1 | JB | ||
| 10000 | 10116 | Utilities and Services, Daily Rates Mooring/Drydock | 1 | JB | ||
| 20000 | 20201 | Preservation of Underwater Body | 1 | JB | ||
| 20000 | 20202 | Replace Navigational AD Speed Log | 1 | JB | ||
| 20000 | 20203 | Replace Furuno FE700 | 1 | JB | ||
| 20000 | 20204 | Renew Head Decking | 1 | JB | ||
| Total Base Items | $0.00 | |||||
| ADDITIONAL ITEMS - GROWTH | ||||||
| ADDITIONAL ITEM REQUESTS (AIRs) These items relate to Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Additional Item Requests (AIRs) are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 30000 | 30000 | AIRS/Growth (estimated) |
**Provide breakdown, as follows:
AIRs/Growth Labor Rate Unit Price: $________; Quantity: 3,350; Unit of Issue: Hour; Extended Price: $____________
| HRS | EST. 3,350 | |
| 30000 | 30000 | AIRs/Growth Material Markup/Handling Fee |
Unit Price: $; Quantity: 1; Unit of Issue: Percent ________%;
Extended Price: [$20,000.00 X percentage quoted]: $______________
| % | EST. 20,000.00 | |||||
| N/A | Additional Temp Services (See CAR CLAUSE 1352.271-89) | Day | EST 1 | |||
| 30000 | 30001 | Lay days (See CAR CLAUSE 1352.271-86) | Day | EST 1 | ||
| Total Growth | $0.00 | |||||
| OPTION ITEMS | ||||||
| Note: These items may be exercised in accordance with FAR Clause 52.217-7 “OPTION FOR INCREASED QUANTITY-SEPARATELY PRICED LINE ITEMS”. | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 50000 | 50501 | Deck Coating Maintenance | 1 | JB | ||
| 50000 | 50502 | Deckhouse & Stack Coating Maintenance | 1 | JB | ||
| 50000 | 50503 | Miscellaneous Pipe Repairs | 1 | JB | ||
| 50000 | 50504 | Miscellaneous Welding & Fabrication | 1 | JB | ||
| 50000 | 50505 | Miscellaneous Insulation & Lagging Repairs | 1 | JB | ||
| Total Option Items | $0.00 |
| BASE | $0.00 |
| BASE + OPTIONS | $0.00 |
| BASE + OPTIONS +GROWTH | $0.00 |
&KFF0000Attachment IV
RFQ 1305M222QNMAN0074
NOAA Ship Bell M. Shimada Drydock
Sheet1