- FY 2020 DRYDOCK REPAIRS TO NOAA SHIP OREGON II
- Solicitation number
- 1305M219QNMAN0359
About this file
RFQ ATTACHMENT D.6
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0002.pdf | ||
| Electrical_One_Line_Diagram_OR-S62-0-10.pdf | ||
| OregonIIhoselist.xlsx | XLSX spreadsheet | |
| Amendment_0001.pdf | ||
| AMC-573-1C.pdf | ||
| MOC-573-2_Overhaul_Repair_of_Hyd_Cyls.pdf | ||
| ATTACHMENT_D.3_Past_Performance_Questionnaire.doc | DOC document | |
| ATTACHMENT_D.5_SUBCONTRACTING_PLAN_AS_WORD_DOC.doc | DOC document | |
| OREGON_II_FY20_Drydock_References-20190827T204057Z-001.zip | ZIP file | |
| RFQ_1305M219QNMAN0359.pdf | ||
| ATTACHMENT_D.2_Past_Performance_Information_Form.docx | DOCX document | |
| ATTACHMENT_D.4_U_S_DOL_POSTER.pdf | ||
| ATTACHMENT_D.1_02_FY_20_DD_Spec.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Prices
| PRICE SCHEDULE | ||||||
| BASE ITEMS | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 2 | General Requirements | 1 | JB | |||
| 3.1 | Temporary Services | 1 | JB | |||
| 3.2 | Dry Docking and Routine Dry Dock Work | 1 | JB | |||
| 3.3 | Hull Valve Inspection and Overhaul | 1 | JB | |||
| 3.4 | ABS Load Line Survey | 1 | JB | |||
| 3.5 | Ground Tackle Inspection | 1 | JB | |||
| 3.6 | Annual Life Raft Survey | 1 | JB | |||
| 3.7 | Annual Fire Inspection | 1 | JB | |||
| 3.8 | Miranda Davit Maintenance | 1 | JB | |||
| 3.9 | Underwater Hull Maintenance Coat | 1 | JB | |||
| 3.10 | Switchboard Cleaning (including breakers) | 1 | JB | |||
| 3.11 | Electrical Repairs | 1 | JB | |||
| 3.12 | Reduction Gear Inspection | 1 | JB | |||
| 3.13 | Piping Repairs | 1 | JB | |||
| 3.14 | Hydraulic Hose Renewals | 1 | JB | |||
| 3.15 | Miscellaneous Repairs | 1 | JB | |||
| 3.16 | Anchor Windlass Overhaul | 1 | JB | |||
| 3.17 | Window and Portlight Repairs | 1 | JB | |||
| 3.18 | Oily Water Separator Groom | 1 | JB | |||
| 3.19 | Laundry Room Completion | 1 | JB | |||
| 3.20 | Steel Replacement | 1 | JB | |||
| 3.21 | Freeboard Spot Blast and Paint | 1 | JB | |||
| 3.22 | Forward Crane Overhaul | 1 | JB | |||
| Total Base Items | $0.00 | |||||
| ADDITIONAL ITEMS - GROWTH | ||||||
| ADDITIONAL ITEM REQUESTS (AIRs) These items relate to Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Additional Item Requests (AIRs) are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 30000/40000 | 4.1 | AIRS/Growth (estimated) |
**Provide breakdown, as follows:
AIRs/Growth Labor Rate Unit Price: $________; Quantity: 2,200 ; Unit of Issue: Hour; Extended Price: $____________
| HRS | EST. 2,200 | |
| 30000/40000 | 4.1 | AIRs/Growth Material Markup/Handling Fee |
Unit Price: $120,000.00; Quantity: 1; Unit of Issue: Percent ________%;
Extended Price: [$120,000.00 X percentage quoted]: $______________
| % | EST. $120,000.00 | ||||
| N/A | Additional Temp Services (See CAR CLAUSE 1372.271-86) | Day | EST 1 | ||
| N/A | Laydays (See CAR CLAUSE 1372.271-89 | Day | EST 1 | ||
| Total Growth | $0.00 | ||||
| OPTION ITEMS |
CLIN SPEC
WORK
| ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT |
| PRICE | EXTENDED |
PRICE
| 5.1 | Engine Room Bilge Preservation | 1 | JB | |
| 5.2 | Bow Thruster Room Preservation | 1 | JB | |
| 5.3 | Split A/C Unit Renewal | 1 | JB | |
| 5.4 | MSD System Refurbish | 1 | JB | |
| 5.5 | Refurbish Wet Lab | 1 | JB | |
| 5.6 | Bilge Piping Hydrostatic Testing | 1 | JB | |
| 5.7 | Fuel Day Tank 95% Level Alarm Install | 1 | JB | |
| 5.8 | Escape Scuttle Renewal | 1 | JB | |
| 5.9 | NOTUS Hydrophone Installation | 1 | JB | |
| 5.10 | VSAT Platform Installation | 1 | JB | |
| Total Options | $0.00 |
| BASE | $0.00 |
| BASE + GROWTH | $0.00 |
| BASE+GROWTH+OPTIONS | $0.00 |