Radar Installation and Tower Services SOW
1 Background
The Atlantic Ranges and Targets Radar Team at Patuxent River Naval Air Station is upgrading the Surface
Surveillance Radar systems which are critical for range clearance and monitoring of operations conducted in the busy waterways of the Chesapeake Bay, lower Patuxent, lower Potomac and St. Mary’s rivers. This provides persistent situational awareness to safely conduct Navy Test and Evaluation operations and provide public safety. The radars currently installed version of Furunos are no longer supported, have not been produced since 2007, have been declared unsupported by the manufacturer, and to date are surviving from new ‘old stock’ supplies with intermittent availability.
The existing capability is increasingly stressed from larger hazard patterns due to increased range and dynamic capabilities of test articles. There is a high risk inherent in maintaining unsupported equipment and the diminishing stock of parts available for repairs increases the possibility the radar cannot be repaired and in turn will likely result in cancellations or delays to test events with public safety risk (e.g.
weapon separation, gunfire, and UAS platforms with Independent FTS).
2 Scope
The contractor shall provide radar installation and tower services to support the Atlantic Test Range
Radar Branch. The contractor shall perform all tower climbs, legacy cable removal, new cable installation, cable disposal, radar installation (to include lifting, setting and attaching radar unit to tower) and crane subcontracting as required to complete installation of radars identified in this SOW.
CLIN 0001: Bishops Head Furuno Installation Services
Remove legacy cabling, install new cabling and replace the existing fielded Furuno radar unit atop
Bishops Head tower structure with newly procured Furuno radar unit.
CLIN 0002: West Basin Furuno Installation Services
Remove legacy cabling, install new cabling and replace the existing fielded Furuno radar unit atop West
Basin tower structure with newly procured Furuno radar unit.
CLIN 0003: Webster Field Furuno Installation Services
Remove legacy cabling, install new cabling and replace the existing fielded Furuno radar unit atop
Webster Field tower structure with newly procured Furuno radar unit.
CLIN 0004: Point No Point Furuno Installation Services
Remove legacy cabling, install new cabling and replace the existing fielded Furuno radar unit atop Point
No Point tower structure with newly procured Furuno radar unit.
CLIN 0005: Weekend/Holiday Services Surcharge
Work performed on a weekend or holiday due to flight/mission support conflicts, is subject to a surcharge for the installation. This fee is assessed for each weekend or holiday worked regardless of installation site location.
3 Period of Performance
The tasks identified herein shall be completed by June 25, 2021.